s 4 .

Project Iden t i fica t io n.

e -

No. SA3.CP35 1

i 1

l EBASCO SERVICES, INCORPORATED TU ELECTRIC COMANCHE PEAK STEAM ELECTRIC STATION UNITS 1, 2 AND COMMON AREA PROCEDURE FOR CONDUIT ISOMETRIC DESIGN VALIDATION PACKAGE CLOSE-0UT

REVISION : PREPARED .: REVIEWED  : ' APPROVED  : DATE :PAGE AFFECTED:
: BY  : BY  : BY  :  :  :
R0  : T.KUO  : C.Y.CHIOU : E.0DAR :10/16/87:  :
R1  : T. ;UO  : .Y. CHI U  : .00A  : I / 0 Of: S, 11-17, 21-24 :

i s

~;

8806220236 8806'6 PDR ADOCK 0 445 A PDR

r 4

Conduit Isome tric Design Validat).on Project Ident i f i ca t iotr Package Close-out NO. SAG.CP35 REV. 1 TABLE OF CONTENT PAGE 1.0 Introduction 1 2.0 Description of Project Close-out Work Activities 2 3.0 Reconciliation of Conduit Isometric Design Validation Package 2 3.1 Draving Changes 3 3.2 Design Criteria Changes 3 3.3 open Item List 4 3.4 Weld Related CMC'S 5 4.0 Resolution of Failure 5 5.0 Conduit ISO Design Validation Package Close-out 5 11 m*

.. . , . . , . . . . . . - - - . , - ... .- . -. -. - . . . - - . - , - - - - - e- - -

J

s ,

. 14 ...

p. .

. o. .

Conduit Isomptric Design Validation Project Identification.

  • Package Close-out NG. SAG.CP35 REV.1 TABLE O.J. CONTENT (CONT'D)  ;

PAGE -

FIGL*R ES .

1 Project Close-out Work Flow 6 t

) l tj-  !

/t [

b u

TABLES

1. List of Revised Drawings Contained in S-0910 Package 7 '
2. Checkl'ist for SAG.CPIO Design Criteria Changes 10 I
3. Checklist for SAG.CP25 Guideline Changes 11 ,
4. Checklist for SAG.CP29. Instruction Changes 18
5. Checklist for SAG.'CP2 Design Criteria Changes (Later) ,
6. Checklist for CP.SG.02 Design Criteria Changes (Later)  ;
7. Checklist for CP.SG 03 Instruction Changes (Later)

APPdNDIX A R.1  !

A. Generic Open Item Checklist Preparation 22 111

(

,. .-~~..---.5-,-~-,.--,--~~~~ ' - - "~c~~'

I

,v F

'41

  • e- e '

,, ,f

'e.  !

Conduit Isometric Design Validation project Identification  !

Package Close-out NO. SAG.CP35 '

REV.1 ,

l 1.v Introduction i

The purpose of.this project instruction-is to provide the guidelines for - the close-out of conduit isometric design validation package. This consists of the reconciliation of t conduit. isometric design validation package and package close-out.

If further changes are made to the drawings, the design criteria

~

or~new open items are identified..this procedure will be updated to reflect the changes. A project close-out work flow diagram is presented in Figure-1.-Section 2.0 contains the description of work flow activities. These instructions are to be followed in order and according to the work flow diagram to ensure that a '

conduit isometric design validation package is closed out completely and efficiently. '

. r

~

The reconciliation of conduit isometric design validation package, which consists of resolution of the package Open Item' List, weld related CMC's,. drawing change (by DCA's) and design criteria .

{

change, are discussed in Section 3.0. i An assessment of failures, if any, shall be performed as describec l in Section 4.0, to determine if the rigorous analysis (RSM  ;

Analysis) can resolve failures by reducing conservatism. If ,

failures can not be resolved by rigorous analysis, the ISO shall be identified for modification. ,

Modifications will be issued as DCA against as-built ISO with new ,

"IN" or Modified support drawings. Constructabilities review by [

walkdown engineer prior to performance of the analysis is ,

required. ,

Package close-out will be performed as described in Section 5.0, after the reconciliation of the design validation package is completed. Final approved package will bs transmitted to the i record center (TU Electric). l I

.1 .- t e

LConduit 1sometric Design Validation project Identification, Package Close-out No. SAG.CP35 REV.1 2.0 Desertotion of Project Close-out Work Activities .

(Figure 1.0 Project Close-out Work Flow)

1. - Reconciliation of Conduit ISO Design Validation package for drawing changes via DCA's, and design criteria changes, open.

items and the weld related CMC's.

2. Assess failure conditions to determine the action.

- Using rigorous analysis (RSM Analysis) in accordance with SAG.CP25, CP.SG.02 Appendix I to resolve failure conditions.

- Modifying and/or adding support (s) to eliminate the failure.

conditions.

3. For support modification and addition of new support. Field '

Walkdown group shall provide conceptual design and constructability study. -

4. Conduit Design Verification Group -(CDVG) will perform design validation based on the Field Walkdown group's recommended l

f design per SAG.CP25 SAG.CP29, CP.SG.02, and Cp.SG.03.-

5. CDVG will issue DCA's against as-built ISO and support drawings for s h e - m Ad: aN.a..
6. Craft installs the modification's. Any construction problem j shall be resolved by CDVG based on inputs from field Engineer.
7. Support completed by construction shall be QC inspected, any unsat condition shall be resolved thru NCR.

, 8. ISO package shall be reviewed by independent design verifier.

9. Upon completion of the ISO package, the final DV'ed ISO drawing shall be issued to DCC. For modifications, support ,

4 drawings shall be , issued as a result of this effort.

10. Transmit the final approved ISO package to record center. ,

l J'

3.0 Reconciliation of Cenduit Isometric Design Validation Packare This Section discusses the backfitting and revisiting the ISO Design Validation Package for drawing changes, design criteria changes, the open items and weld related CMC review.

2

. . . - . . . . ...._s._..... , .

., t

,'s .

.- .w ,

Conduit Isometric Design Validation Project Identificatica .

Package close-out NO.. SAG.CP35  ;

REV.1 j

_3 .1 Crsuing Changes '

i Engineer shall reconcile every ISO package for conformance to the l latest revision of affected drawings.  :

Table 1 lists the drawings contained in S-0910 package, which have be.n revised and may impact ISO design validation. Similar table L will be prepared for drawing changes in S2-0910 package. -

Table 1 shall be used as checklist to be filled in by Engineer.

If there is no impact for certain drawings changes, mark "NA" under the column head "Affected Pages in ISO Package". ,

3.2 Design Criteria Changes The conduit isometric design validation program for Uhit No. 1 and i 2X Conduits of Comanche Peak Steam, Electric Station is based on L E3ASCO design criteria SAG.CP10. SAG.CP17, SAG.CP21, SAG.CP25 and SAG.CP29. For Unit No. 2, the design criteria are SAG.CP2, SAG.CP12 SAG.CP22, CP.SG.02 and CP.SG.03. These design criteria have been revised and may impact the Conduit ISO design vslidation. '

Checklists shall be prepared to list the changes with revision, the page number having impact to the design validation. The checklist shall be filled in by Engineer and addressed on affected  !

ISO design validation package. If there is no impact for certain l items, mark "NA" under the column head "Affected Pages in ISO Fackage".  :

TABLE 2 shall be used as the checklist for design criteria changes I in SAG.CP10 "Design Criteria for Seismic Category I Electrical Conduit System" for Unit No. I and 2X Conduits. Similar checklist will'be prepared for SAG.CP2, "Design Criteria for Seismic Category I Electrical Conduit System" for Unit No. 2. L i

SAG. cpl? and SAG.CP12 are the design criteria for junction boxes for Seismic Category I Electrical conduit System for Unit No. 1  !

and Unit No. 2 respectively. All design changes have been  !

reflected in the revised drawings of S-0910 or S2-0910 package. t Therefore, presently no checklist is needed.

3 i

~.-. -

.s ;

4.

e p.

Conduit Isometric Design Validation Project Identification.

Package Close-out NO. SAG.CP35 REV.1 3.2 Design Criteria Changes (CONT'D) -

SAG.CP21 and SAG.CP22 are technical guidelines for Thermal Analysis of Seismic Cr.tessry I Electrical Conduit System for Unit No. I and Unit No. 2, respectively. The changes in these technical guidelines have been reflected in the position paper for thermal loads which is appended to design criteria SAG.CP10 and SAG.CF2. The recommendations contained in the position paper have-been incorporated in SAG.CP25. Therefore, presently no checklist is needed.

Table 3 shall be used as the checklist for changes in SAG.CP25, "Technical Guidelines for Seismic Category I Electrical Conduit Isometric Evaluation" for Unit No. I and 2X Conduits. Similar checklist will be prepared for CP.SG.02, "Technical Guidelines for Seismic Category I Electrical Conduit ISO Validation", for Unit No. 2.

TABLE 4 shall be used as the Check 1'ist for changes in SAG.Cp29, "General Instructions for Design Verification of Electrical Conduit and Box Supports" for Unit No. 1. Similar Checklist will be prepared for CP.SG.03, "Guidelines for preparation and checking of Calculation for Seismic Category I Electrical Conduit System".

3.3 Open Item List This Section contains the generic open items during design ,

validation of Conduit ISO. They are listed below:

1. Clamps exceed the allowables.
2. Threaded coupling preceding the bended overhang.
3. A-307 Bolt used in conduit clamp.

The "failed" clamps shall be re-evaluated based on the approach contained in Unit 1 Calculation Book NO. SPAN-1200.

4 The threaded coupling preceding the bended overhang will be generically fixed per SDAR CP.85.53, "Seismic Design of Conduit-Unsupported Conduit Bends". Therefore, this open item shall be considered as closed.

4

u 4

r Conduit Isometric Design Validation Project Identification, Package Close-out NO. SAG.CP35 REV.1 3.3 'Open Item List (CONT'D)

The replacement of A307 bolt used with clamp is still under evaluation.-

For generic open item checklist and preparation procedure see Appendix A. These includes the open item list mentioned above and R.1 newly identified items.

- 3.4 Weld Related CMC's

, Complete research from Permanent Plant Record Vault to identify the weld related Cd!'s are in progress, all conduit run having welds related CMC's will be identify thru this effort. These CMC's have been included in the ISO Redline Packages.-

Engineer shall reconcile every ISO design validation package for ueld si:e and configuration changes indicated on CMC's, as applicable.

4.0 Resolution of failure

\ny failure occurring during ISO package close-out, the ISO will be modified thru Field Walkdown Group's recommendation. Conduit DV Group will re-qualify the ISO and then issue the DCA against the As-Built ISO, with support drawings. The process is considered as complete until the support modifications have been ,

installed and support,is inspected and accepted b) 0 ". .

5.0 conduit Isometric Design Validation Package Final Close-o'ut The Conduit DV Group will issue the final ISO drawings and support drawing to DCC and transmit the ISO Design Validation Package to record center.

5

. . _ . . . - . . . . , _ . . _ . . _ - __ .,_ _ _ , ...y-........ . . .

Project I'dentification

^

  • - Conduit Isonetric Design Validation Pcckage C]ose-out NO. SAG.CP35

REY. 1 d'

" FIGURE 1.0 PROJECT CLOSE - OUT VORK FLOV d

  • RECONCILIATION OF CONDUIT 150 DESIGN val.IDATICN PACKAGE 8

- - DPAVING CHANGE.

$ - DESIGN CRITERIA CHANGE.

d - OPEN ITEM LIST.

2 - VELO REL ATED CM0' S.

5 NO YES F AILURE RIGOROUS FAILURE MODIIICATION

^$$ $" "

. ANALYSIS .

- YES r

FAILURE ISO PACKACE NO REVIEW AND  :

APPROVAL '

e---

ISSUE FINAL ISSUE DCA. TO FIELO GROUP DESIGN VALIDATED MODIFIED DEVELOP CONCEPTUAL ISO DwG. SUPPORT OVC*

MODIFIED DVG, & CONSTRUCTABILITY ,

IN SUPPCRT D'/c IN SUPPORT DWG (IF RE0'01 3 0 @u ,@ '

TRANSMIT CONOUIT DV TO RECORD CONSTRUCTION RE-ANALYSIS CENTER /

  • TU ELECTRIC NO INSP TION FAILURE

o s .-

r Conduit Isometric Design Validation Project Identification, Package'Close-out- NO. SAG.CP35

. REY.1 TABLE 1 (11T OE REVISED DRAWINGS CONTAINED 13 S-0910 PACKAGE .

DWG.-NO REV BRIEF DESCRIPTION OF AFFECTED PAGE NO.S OF ISO 2323-S-0910 S,H CP. CHANGES REMARKS PK(..

TC-1 01 Deletion of LA series No impact G-la 01 do do G-lb 01 do do l G-le 03 do & traceability do l G-id 02 do & traceability do ]

G-le 01 do & note 35 revised i G-1f 01 do No impact G-1g 01 do do G-2a 02 Note 6 revised do LA s'eries Deleted CA-la 01 Capacities to be revised CA-3a 01 Richmond inserts to be deleted CA'-3a-A 01 do CA-3a-B 01 do CA-3a-C 01 do CA-3b 01 do CA-3b-A 01 do CA-3b-B 01 do CA-3b-C 01 do .

CA-5a 01 Capacity Table removed CA-Sa-A 01 Revised Capacity Table CA-5c 01 Note to be added, tole-rance, etc.

CA-Sc-A 01 do CA-Sc-B 01 do CA-Sc-C 01 do CA-5d 01 Spans to adjacent to No be supp. deleted impact CA-5d-A 01 do do CA-5d-B 01 do do CA-12 01 Drafting error do CA-13-A 01 dimension deleted 7

.f.'~ .

o l

i. #~

Conduit Isomet,ric Design Validation Project Identifiestion Fackage Closh-out No. SAG.CP35 j

. REV.1 TABLE 1 LIST OF REVISED DRAWINGS CONTAINED M S-0910 PACKAGE DWG. NO REV BRIEF DESCRIPTION OF AFFECTED PAGE NO.S REMARKS 2323-S-0910 S,H CP. CHANGES OF ISO PKG.

CA-13-B 01 do CA-14a-B 01 Hiltibolt size revised CA-14e 01 Drafting error No impact CA-14c-A 01 do do CA-15 01- Revised section do CA-16a 01 do do CA-16a-A 01 do do CA-16a-B 01 do do CA-16a-C 01 do . do CA-16a-D 01 do do CA-16a-E 01 do do ,

CA-16a-F 01 do do ,

CA-16a-G 01 do do CA-16b 01 do do CA-166-A 01 do do CA-16b-B 01 do do CA-16b-C 01 do do  ;

CA-16b-D 01 do do CA-16b-E 01 do do CA-16b-F 01 do do

[

CA-16b-G 01 de do JA-2 01 JB sizes to be removed ' '

JA-7-A 01 Central spacer to be removed  ;

JA-10 01 Note added a section revised No impact JA-12 01 Dimension revised No impact JA-13b Notes added, section revised do

'JA-15a-thru r 01 Capacities revised LS-la 01 Span allowables revised LS-la-A 01 Note revised, fig. added No -

impact [

LS-lb 01 Traceability stamp  ;

revised do ,

8 f

. , , , . - - . . . .. - ~.. n ~ , e- . .. ~ .. . - .. e ~ ~ -w- ~ --

_, ,n. . ..

  • 6. .*

n s

Conduit Isometric Design Validation Project Identification.

Psckage Close-out NO. SAG.CP35 REV.1

. TABLE 1 (111 QE REVISED DRAWINGS CONTAINED LN S-0910 PACKAGE' DWG.- NO REV. BRIEF DESCRIPTION OF AFFECTED PAGE NO.S RE}! ARKS 2323-S-0910 SH CP. CHANGES OF ISO PKG.

LS-Ic 01 Note & Traceability revised do LS-le-A 01 Span allowables revised LS 01 Removed out of plane double bend

LS-2-A 01 do LS-2-B 01 do LS-2-C 01 do LS-2-D 01 do LS-3a 01 Span allowables revised LS-3a-A 01 Added restrictions LS-3a-B 01 do LS-3b- 01 Notes revised No impact LS-3d 01 Span allowables revised LS-5c 01 Added condulet veights LS-10-A 01 Notes revised, added JB welghts LS-11J 01 Notes to be revised LS-13c 01 Flex allowables revised LS-16a 01 Load formulas added .

CSD-Sa 01 Note 4 detail to be , No s revised impact

.CSD-14a 01 Section revised CSD-14a-A 01 Sections revised CSD-14e 01 do CSD-14c-A 01 Section revised No impact i

-4 i

9

n, - .

s. '

.4 3

)

Conduit Isometfic Design Validation Project Identification Package Close-out NO. SAG.CP35 REV.1

. ?f TABLE 2-se .

CHECKLIST FOR SAG.CP10 DESIGN CRITERIA CHANGES AFFECTED PAGES

' DESCRIPTION OF CHANGE REV. NO. PAGE No. IN ISO PACKAGE

1. The allouable flexural and R.2 5 Axial tensile stresses shall not exceed 0.9 Fy and the allowable shear stress shall not exceed 0.5 Fy.
2. The allowable axial compre- R.3 5

, ssive stress shall not ex-ceed 90 percent of either

. {'

1, the. ultimate buckling stress (defined by Euler Formula) or Yield Stress.

3. Allowable bond stress for R.4 3 conduit embedded in concrete.
4. i

, ' Richmond Insert Capacity, R.2 & 3 7

' using Safety factor of 3 for

, OBE & SSE case.

5.. Rigid conduit properties R.4 4 .

i Fy=25 KSI l E =29000 KSI .. s

6. Nelson stud shear capacity R.4 25 i reduction
7. Secondary wall displacement R.3 & 4 App. 9 t

e s

.1 J

10

.E ,

w

,* . r b

  • . p Conduit Isometric Design Validation Project Identification Package Close-out ,

NO. SAG.CP35 REV.1 TABLE 3 CHECKLIST FOR SAG.CP25 GUIDELINE CHANGFS ITEM REV SECTION BRIEF DESCRIPTION OF CHANGES AFFECTED PAGE N6.s

7 OF ISO PKG 1 1 4.14 Added attachment K for resolution of inaccessible attributes. g.1

, 2 1 5.0 Revised weights for Firewrap ' R.1 f (Thermoblanket).

R.1

! 3 1 5.0 & Added that the Firewrap (thermo-5.1 blanket) and thermolag may serve the R.1 function of separation barrier and/or radiation energy shield.

R.1 4 1 5.2 Added minitaum conduit system frequency

~

requirement. ,R.1 5 1 5.3 Added thermal load considerations R.1

- for conduit system validation.

6 1 5.4 Added methodology to consider the S1 effects of oversized bolt holes.

R.1 7 1 7.0 & "eleted chec}; of f requency require.nent.

7.1 R.1 l

8 1 ALL Deleted references and requirementr, R.1 j of LA-series of the drawing .

l 2323-S-0910. R.1 l

s e 9 1 7.la, "Bend less than 15'" revised to App.I "Bend less than or equal to 15*". . R.1 5.2 R.1 10 1 7.2 Revised that *.he minimum number of supports shall be as per dwg 2323-S-0910, for a conduit run with junction box. R.1

, 11 1 7.3 Added load factors for conduit loads I Lt or Lt when 1.5 peak "g" values or RSM analysis are not used.

11

E.

s Conduit Isometric Design Validation Project Identification package Close-out NO. SAG.Cp35 REV.1 TABLE 3 CHECKLIST FOR SAG.CP25 GUIDELINE CHANGES ITE>l'REV SECTION BRIEF DESCRIPTION OF CHANGES AFFECTED pAGE NO'.s

  • OF ISO pKG 12 1_ 8.1 Added the requirement that for double bend configurations, the R.1 calculated Lt & Lr loads shall not be considered less than contributary ,

weight of 1/2 span plus all fittings R.1 in the entire span.

i.

13 1 8.2 Added the definitions of appropriate ;R.1 "g" values to be used with calculated L. & Lr loads for clamp evaluation. R.1 14 1 8.2 Added that use of A-307 bolts is not permissible for clamp connections."

R.1 15 1 8.2 Added the clarification that the clamps of secondary ISO may not be R.1 evaluated with secondary ISO calculation package. These clamps shall be evaluated with the common support in the primary 'R.1 ISO calculation package.

16 1 S.2 Revised that the clamp allowables  :

using UNISTRUT bolts.are applicable lR.1 to clamps with UNISTRUT member; and clann allowables using NELSON studs are jg applicable to clamps with A325 and/or A449 i ,*

bolts.

17 1 8.3 Added methodology to verify conduit embedment in concrete wall or slab.

R.1 1

18 1 9.0 Added the requirement that in areas with 2 inch floor toppingi the embedment iR.1 length as measured / calculated from the top of the topping shall be I reduced by 2 inches for design validation. lR.1 19 1 9.0 Added the formula to calculate embedment *I length of the balt.

12

b ,

e o ,

a Conduit Isometric Design Validation Project Identification .

package close-out NO. SAG.CP35 REV.1 )

TABLE 3 CHECKLIST FOR SAG.CP25 GUIDELINE CHANGES I T E.'1 R E V SECTION BRIEF DESCRIPTION OF CHANGES AFFECTED PAGE NO'.s

  • -
  • OF ISO PKG 20 1 9.1 Added optional use of calculation TNE-CS-CA-00-313 (Attachment V) to lR.1 calculate weight of filler & shim plates, jR.1 21 1 9.1 Clarified that smaller capacity from R.1 the top and bottom elevation (instead of higher elevation) is to be used when 3

the support is located between two tR.1 elevation groups.

22 1 9.3 Revised that the modified and IN supports shall be analyzed in accordan~ce !R.1 with SAG.Cp29.

. 23 1 9.3: Clarified that member shear stress ;R.1 shall be calculatad by hand for all to-sion ( and not only for tersion R.1 induced by the offset between shear center and CG).  :

tR.1 24 1 9.3i Added the torque requirement for A325 ,R.1 bolts when they are used instead of  :

Nelson studs on ciamp connections, i' R.1

25 1 9.4 Deleted the requirement that secondary

[ ISG calculation shall contain calcu- , ,

L lation for clamp adequacy for common support.

R.1 ll ,

26 1 5.4 Added clarification regarding the I use of RSM analysis for all conduits R.1

[ supported by a problem common support.

R.1 27 1 9.5a Added rotational spring constants for generic base plates which are to be used  :

to calculate actual support frequency, ;R.1 h

instead of considering the generic sup- g,7

port base plate to be rigid.

13 1.

4 Conduit. Isometric Design Validation Project Identification ,

package Close-out NO. SAG.CP35 REV.1 TABLE 3 ,

CHECKLIST FOR SAG.CP25 GUIDELINE CHANGES

_ ITEM REV SECTION -BRIEF DESCRIPTION OF CHANGES AFFECTED PAGE NO.s

  • OF ISO PKG 28 1 9.7 Added the requirement that the conduit

. load Lo has to be verified by taking lR.1 into account the relative support stiffness distribution. Alst added the lR.1 method to accomplish this.

l R.1 29 1 10.0 Added the evaluation method for junction box and junction box supports. (Deleted R.1 section for resolution of IA items by adding attachment K.)

R.1 30 1 11.1 Added the requirement that REM analysis shall be performed to verify that actual R.1 "g" values at the support with K-factor violations are less than the design "g" lR.1

, values.

31- 1 11.2 Clarified the maximun resultant dis-placement (instead of maximum displacement) requirement at the tip of rigid overhang. ;E 1 32 1 11.4a Clarified design requirements when the ;g,1 conduit is attached to a pipe support.

33 1 11.4b Clarified design requirement for the R.1 junction box when a support on the ISO is attached to another disciplf.ne support.

, ,, ,, l g,1 34 1 11.4c Added the requirement that the support attached to a steel platform shall be R.1 removed if the response spectra for ,

the platform are not available. l*

35 1 11.4d Added conduit span frequency requirement R.1 (instead of required to be "rigid")

for ISO which is entirely attached to l R.1 SRF and for portion of ISO which is supported by SRF.

14

. . . . . ... .. . . . . . - . . . . . - . . . . - - . . . . . . . , . . .~ .-.

c=

o n -

s Conduit Isometric Design Validation Project Identification -

' Package Close-o,ut NO. SAG.CP35 REV.1 TABLE 3 CHECKLIST FOR SAG.CP25 GUIDELINE CHANGES ITEM REV SECTION BRIEF DESCRIPTION OF CHANGES AFFECTED PAGE NO.s T

  • OF ISO PKG 36 1 11.4d Added the option of using 1.5x-peak "g" values from 4% OBE and 7% SSE -lR.1 floor response spectra curves when entire. conduit run is supported by SRF.

lR.1 37- 1 11.4e Added the requirement that when the ,

conduit is supported by CTH or HVAC lR.1 support, representative segment shall be analyzed by RSM. Also added R.1 definition of representative segment.

~

38 1 12.1 Added interface requirement for HVAC R.1 Supports.

IR.1

. 39 1 12.1 'Added the requirement that FPLs shall be j prepared and provided to CTH or HVAC gro 2p for their approval. ,

jR.1 40 1 12.G Revised the procedure for evaluation of separation violations. Included use of lR.1 DCA instead of EESV forms.  !

41 1 App.I Revised to use enveloped digitized floor lI; 1 3.3 response spectra for all elevations .

(not necessarily the highest elevation) l R.1 when conduit is supported at different s e elevations. -

iR.1 42 1 App.I Added the requirement of using enveloped . R'1 3.3 response spectra when conduit system is j supported by Containment Building and

- internal structures of Reactor Building.

R.1 43 1 App.I Added requirement for minimum spacing R.1 5.2 for nodal points for STRUDL model, t

15

4 > -

s Conduit Isometric Design Validation Project Identification .

Pae:kage'Close-out NO. SAG.CP35 REV.1 TABLE 3 CHECKLIST FOR SAG.Cp25 GUIDELINE CHANGES I T E.'l R E V SECTION BRIEF DESCRIPTION OF CHANGES AFFECTED PAGE NOls F

  • OF ISO PKG 44 1 App.I Deleted Figure 1 giving worst lR.' 1 5.3b location of electrical fittings when their location is not known.

R.1 45 1 App.I Deleted the use of "Low Torsional 5.3c Spring" for removing computer analysis singularity.

lR.1 46 1 App.I Added value for modulus of elasticity, 5.5.e.1 E:29.0E6, and an instruction that this

~

skeleton value should be changed if R.1 different.

I

- 47- 1 App.I Added reference to S-0910 package !R.1 6.0 for acceptance criteria. ,

R.1 4? 1 App.I Clarified the derivation and use of 7.1.a actual "g" values for evaluation of '

R

! & 7.1.b support icads. Revised the method i .1 of calculation when comparison between actual "g" values and design "g" h.1 values fails.

i R.1 p 49 1 App.I Added clarification that actual "g" values b 7.1d shall be used when support capacity is s s unknown, such as for IN or modified lR.1 support. Also added explanation as to R.1 l when the actual "g" values shall be rotated.

3_

R.1

. 50 1 App.I Added table I.3 for K value for F 7.3h different configurations of conduit span.

R.1

- 51 1 App.I Defined when KL/r ratio may be taken 7.3h as 240.

16 I

. , . .-. . . . . . . . . . . . . . . . . . . . - - - - - . . . . - . . . . . - - . . - r- -.-.. i

. . ~

N.'4 A .

~

. p.

Conddit Isom,etric~ Design. Validation Project Identification .

i Package-Close-out- NO. SAG.CP35 REV.1 TABLE-3 CHECKLIST lFOR SAG.CP25 G_UIDELINE CHANGES ITE.t REV SECTION 'BRI2F DESCRIPTION OF CHANGES AFFECTcD PAGE SO.s

  • OF -ISO PKG

, 52. 1 App.I' Combined the formulas for OBE and SSE l R.1 7.4 load cases, . for validating support capacity. Clarified the definition of Go ga and generic support l R.1 capacities (Ct'and Er).

s

-A me I

17 v- r- - - , . e- , ..n--

a ,  ;> j u

r

.c. .

Conduit. Isometric Design'. Validation Project Identification Package Closd-out NO. SAG.CP35

  • REV.1 TABLE i CHECKLIST'FOR SAG.CP29 GUIDELINE CHANGES ITEM REV PAGE .DESCRT.PTION OF C'IANGES AFFECTED PAGES REMARKS
  • 8' IN. ISO PKG.

1 2 2 In-and modifiad suppcrts added to scope.

3 2 Evaluation of clamps for in supports added to scope of in cales.

2 -3 4 Added DV Procedure for modified supports.

3 2 5 Added DV Procedure for in supports.

4 2 5 Added Procedure for modification .

of supports.

5- -2 6 Procedure to model in & modified supports.

6 l' 7 Add torsional moment from shear center to center of conduit not accounted for by the use of rigid members 7 1 10 Added per requirements See item

  • 28 8 -2 10- Clarification on computer input reduction in allow bend stress for L-shaped members subject to
  • bending. See item
  1. 36,37 9 2 12 Added frequency requirements, fee itdm
  1. 32 10 2 13 Added procedure to obtain/ cal.

LL & LT loads for modified &

in supports.

11 1 15 Rota*e "G" Values 2 15 Use of enveloped design "G" See item values. ;24 12 3 15 Application of lowest G in L

strong direction of structure

& rotate other two G value.

18

. - . . . . _ . . . .. . . . . . . . . .._ _. ._. . _ . . . - .-.__w,...........,. ,_

L

,p - y.

w g.

u Conduit Isom,etric Design Validation Project Identification.

Package Close-out NO. SAG.CP35 TABLE 1 REV.1

t. CHECKLIST FOR SAG.CP29 GUIDELINE CHANGES ITEM'REV PAGE DESCRIPTION OF CHANGES AFFECTED PAGES REMARKS-4 7 IN ISO PKG.

14 2 16 Use of Equal co-efficients for See item JB nupport cesign. 25,26 15 2 18 Add input skeleton for modified

& in supports G values rotated See item

& not rotated cases. #32 16 2 19 Reduction of interaction ratio to account for possible undercut of See item members at weld locations. #31 l -17. 2 19 Requirements for punching shear See item at tubular connections added. -

  1. 33 3 19 Deleted conditions to be met when no local punching shear requirements need to be checked.

18 1 25 Added attachment H for effective thcoat thickness of partial penetra-l tion bevel groove welds.

19 2 26 Anchorage evaluation considerations for bolts in combination with welds. -

20 2 27 Added interface requirements.

21 2 28 a) Resolution of I.A. items.

b) T.S. thickness I.A. for generic &

modified /in supports. ,

22 1 30 Footprint loads revised. See item

  1. 34 2 30 Footpr' int loads revised & EESV See item added. #34 23 2 36 Added orientation of building global coordinate for modified /in supports.

24 2 27 Added enveloped design G values.

25 2 38 Added building & elevation groups for JB supports.

26 2 39 Equiv. co-offective & "G" value grouping for JB suppports added.

27 1 A-1 Maximum combined thick of shim & filler Pl. changed from 2" to 11/4".

19

...._... _ _ . . , . - - . . . _ . . _ . . - . ... . . . . . . . . . . . ~ . . . , . . . . . . . - _ . . . . . . . _ _ . , . . , - - . . - .

. m

p. * ,

u e

Conduit Isometric Design. Validation Project Identification-Package Close-out ,

NO. SAG.CP35 TABLE i CHECKLIST FOR SAG.CP29 GUIDELINE CHANGES ITEM REV PAGE DESCRIPTION OF CHANGES AFFECTED PAGES REMARKS

i. # IN ISO PKG.

- REV.1 28 1 C-1 Maximum KL/R for tension member increased to 300.

29 1 D-2 Use principal axes properties for

-angle sections except when member is restrained at both ends.

30 1 E Added table for shear center location of composite channels.

31 1 F Member strength loss due to"1/32" un-

~

dercut table of IR added.

32 1 K1 15* Added input skeleton for generic supports

- to show load combinations.

2 K2 18* Added skeleton for modified /in supports G values rotated.

2 K4 -

12* Add input skeleton for frequency run only.

2 K2 18* Revised skeleton K2 to add input fo: torsional moment from conduit.

3 K3 .

184 Same as K2.-

33 '2 L , s 19* Added allow normal force for stepped tubular section connection.

34 2 N-3 Footprint load transmittal form reference to ece: 5.11-74.

2 N-4 Added guidelines for EESV & FPL forms.

.2 N-5 EESV conditions to be documented.

2 N-6 EESV form.

35 2 P 10* Add tension spring constant for anchor bolts (teledyne report).

  • -INDICATES PAGE IN TEXT WHERE ATTACH IS REFERENCED.

20

. ._ _. _. . . . , . . . y. .. . . . . . . . . . . . . . . _ . . . . _ . . . . , . . . . . .

v r

  • y 6',_

n

=. p

-Conduit Isometric Design Validation Project Identification.

Package close-out NO. SAG.CP35 REV.1 TABLE 1 CHECKLIST FOR SAG.CP29 GUIDELINE CHANGES ITEM REV PAGE DESCRIPTION OF CHANGES AFFECTED PAGES REMARKS

  1. # IN ISO PKG. [

36 2 Q-2 Allow bending stress table for various Q-3 angle sizes.

11*

Q-4 Requirements for torsional buckling of 11* angle members.

37 3 Q-5 Allow load in angle bracing with gusset PL 11* connection.

38 4 22 Added Methodology for evaluating oversized bolt hole effects. R.1 n

. ~ ..o 1

.~

  • -INDICATES PAGE IN TEXT WHERE ATT.iCH IS REFERENCED.

21

...._ _ .. . . . . . . - - . . . , . . . . . . . . . . - . . . . . . . . . . . _ . . _ . . .. , . . . _ . . - . - - ~ . - - - . - .

f.o;., .

l s j Condu'it Isometric ~ Design Validation Project Identification.

. Package Close-out NO. SAG.CP35 Appendix A REV.1 ,

i J

APPENDIX .4 .

GENERIC OPEN ITEM CHECKLIST PREPARATION )

1.0 PURPOSE The purpose of this' appendix is to provide guidelines for preparing the Generic Open Item Checklist (Figure 1). The checklist provides a method for documenting selected generic open items during the course of R.1 Unit 1, Common and 2X Conduit ISO Design Validation.

2.0 SCOPE

, . Generic Open Item Checklist preparatio is applicable to all Unit 1, common and 2X conduit ISO packages which includes associated conduit.

supports.

i 3.0

'l

i OPEN ITEMS s,

The Generic open Item Checklist (Figure 1) will be used to document the selected generic open items listed below: ,

  • Overhang w/ threaded fitting; a threaded' fitting f,ollowjng i by an unsupported, free end conduit which includes a bead R.1 7 .

l

  • A-307 bolts used on clamps
  • Open items on clamps; clamps which exceed allowables i
  • P2558 clamps with 1/4" dia. studs or bolts
  • The presence of Richmond inserts
  • The presence of inaccessible attributes 22
  • ~ .. .__ m ,

r Conduit Isomei.ric Design Validation project Identification '

Package Clcs'-out e NO. SAG.Cp35 Appendix A -

REV.1

'4.0 GENERIC OpEN ITE>l CHECKLIST PREPARATION The originator shall complet the checklist as follows:

1-Enter the conduit ISO number or associated support number in ,

Block *1.

Enter the applicable building in Block #2 and the room number in Block 23.1 Review the ISO package for the open items listed in Blocks 44- R.1 through :9. Enter a check-mark ( V1 in the applicable column for those items which occur.

If an inaccessible attribute occurs for a Junction box, enter, a check-mark'(V) plus a "J3" in Block 49. Inaccessible items 4 resulting from installed Bisco Seals will not be- reflected as an open item in Block 9.

Enter any remarks in Block =10.

If an open item concerning a clamp (Block #5, #6 or *7) occurs on a common support, and the clamp is applicable to any conduit other than the primary, the secondary conduit

-ISO number will be specified in the remarks (Block #10) for j

that support.

i R.1 1

Enter initials and date (originator) in Blocks #11 and #12. i i

Each ISO package .shall be verified for open items by a  ! .

checker. The checker will indicate concurrence by initialing,

~ s ,

and dating in Blocks #13 and #14.  !

23

. . . . . - - > . . . . . . . . . . . . . . ., ... y.. . . . . ,......g. . , . . . . . . . . - - . . . , .

a w . . .

l

.. 1 s ,

. \

Conduit Isomet'ric Design Validation Project Identification Package Clos 6-out NO. SAG.CP35 .

1 Appendix A . REV.1 l l

ESASCO SERVICES INCORPORATED gy h Cart $"ItT - C8 I Cat 0 87 Catt e.g%t v3 f fic"'If d ,

    • 0.tcf J r*Cnrft i Raff3tE h gag 7 CEntTR tc CPUI ITIMS C1tECt11ST (CourDOIT ISO /SU7 Pot? TALIDAff 05) 2

=

~B G n ., ., 5 .; s S

i. Sj #3 3.g .

gg" R.1 \

isois m o u ,

g ,,

g 3 ;o o,s n- .g

=  !. -

munimts 85 :< s

. i B -

I Q @ GG G G @ G @  !

7 .

1,3 ~

i~

i

<4 R.1 l

  • % 40 i

i 24

.... n . . . .

.a . #

' /
  • FIGURE 7.3 NOfJ- ACCE SSIBLE ATTRIBUTE JUSTIFICATION FORM .

ATTRf 8UTE NUMBE d*

ATTRIBUTE DE SC 2iPTidN; FvM NUMSER: BUILDING:

ROOM:

No. SPECIFIC LOCATION NOT ACCESSIBLE QUE TO: (BE SPECIFIC)

I.

[

m c ECE 9.04-05 REV. O, EOCN-O f 0 ATE: 9/l/87 PAGE 7.3 - 1 0F l I

,qga g $ g 4 6 MM* N

, ' "i . . c ~ .

"ii EBASCO Interoffice Correspondence.

) DATE March'29, 1988 FILE REF.S AG . TUG 1.10225 -

.f GAf' '

l To Distribution OFFICE LOCATION Various h $b f FROM F Hettinger/H S u/J Kuo OFFICE LOCATION 81/2WTC

'. L ,

i*' susJECT. TU ELECTRIC COMANCHE PEAK SES UNIT #1 ADDENDUM #3 Td sad.CP29, REVISION 4

. REVISE NOTE'ON'PAGE D-2 Attached for your use is a marked-up page D-2 which will be . incorporated into. Revision 5 of SAG.CP29 at a later date. This addendum is to be used immediately in design validation.

^

Please acknowledge receipt of subject document by signing below and returning this cemo to F Hettinger at 81/2WTC no later than April 8, 1988.

JK/ep Attach.

Receipt Acknowledged *

^

. Print Name Signature Date (Last Name First) bistribution:

K T Wu I Wolff (CPSES Site) cc: E Odar J Ruggiero R Shetty

  • M McGrath C Y Chiou SAG. TUG 1.10225

, NYO Conduit Personnel (K T Wu)

  • CPSES Site Conduit Personnel (I Wolff) t

~

./ \ . .

M 2)

FREPARED BY: gg.p REVIEWED BY:

APPROVED BY: DATE: J[p. gg h 9

ATTACHMENT D _- ADDITIONAL NOTE.c ON MODELS AND DESIGN VEAIFICATION '

First stanp is for input where card input is copied. Second stanp is placed in front of run to reflect that the entire run results are correct and reasopable. (on page where

. "Strudl version" is shown) .

8. Deleted .l lR1 I
9. For all calculations:

E, (Modulus of elasticity for steel) - 29 x 10 ksi

. . -.. E (Modulus of elasticity for concrete) - 3460 kai . . . . ... ..

, G (Shearing Modulus of alasticity for steel) - E2 x 103 ksi k;- '
10. If any section with a used or unused bolt hole has an interaction equation coeffi.cient larger than 0.75, the section chall be manually verified by reducing the area and acnent of inertia to account for the bolt hole.
11. Whenever an as-built drawing shows that a conduit orientar. ion is not perpendicular to a support (skewed), the forces should be appropriately decomposed into components.- ,
12. Principal axes properties shall be used in the__ design -

l verification of all angle sections,[

i IR1 1

\ l

__.af' -. -

$$U O AhhlNh!,ly

'-*<t

, . d.-< ....r ...%,,.....,,,,,,,, , , , , , , , , , ,, . ,

. .j j .

j. EBASCO Interoffice Correspondence FILE NO : SAG. TUG 1. 9975 h

2 DATE: January 8, 1988 k '

E TO  : DISTRIBUTIO.N OFFICE LOCATION : VARIOUS Q Q &Sy&<[Ruo FROM: F. Hetting r / K. T. Wu / J. Kuo OFFICE LOCATION : 81/2 WTC 8

\'

SUBJECT:

TU ELECTRIC l COMANCHE PEAK SES UNIT #1

) ADDENDUM.#2 TO SAG.CP29, REVISION 4 j INTERPOLATION OF BOLT SPRING CONSTANTS FROM TELEDYNE i

1

.) The spring constants for bolts with embedment lengths other than i

those pro'vided in the Teledyne Report may be_obtained by linear inter-polation. However, extrapolation is not allowed. Attached for your f use is marked-up page 10 which will be incorporated into Revision 5 3 of. SAG.CP29 at a later date. This addendum is to be used immediately

) in design validation.

V k

l Please acknowledge receipt of subject document by signing below and g returning this memo to F. Hettinger at 81/2WTC no later than January 1 15, 1988.

Ig JK : be l

l 4

Receipt Acknowledged : ___________________________________________

g PRINT NAME (SIGNATURE) DATE (Last Name First) f i

1 l Distribution :

f K. T. Wu cc: E. Oder

[ I. Wolff- (CPSES SITE) J. .Padalino H. Patel (Dallas) R. Shetty M. McGrath C. Y. Chieu

.NYO Conduit Personnel ( K. T. Wu)

CPSES SITE Conduit Personnel (I. Wolff)

Dallas Conduit Personnel (H. Patel)

m -.

1:

PREPARED BY 6 [ Muo 'REVIEED . bit' (%. --- . v 1, APPROVED BY DATE: 1/8/88 t 1

.?

g-4 General Instruction for Design Project Identification 4 Verification of Electrical Cdaduit N6. SAG.CP29

& Box Supports Rev 4 ADDENDUM No.' 2 a

) 3 '. 5 ADDITIONAL NOTES l

} lR1

a. For KL/r requirements and K values to be used in slenderness ratio I j calculations see Attachment "C". l 4

f5

.j

b. For additional notes on models see Attach =ent "D".

);

]

.1 j c. Whenever open section members are used, hand calculations should

'.h be made to check warping stresses. Shear stresses due to torsion j are to be checked if not already verified by the STRUDL program.

2 b

j d. When using rotational stiffness coefficients with the frequency l j analysis, these spring constants should be included in the input I

.' under "joint releases" command (

Reference:

2D-STRUDL, Page 3-23).

] _

I f IR2 j e. For clarification in using Beta Angles, refer to Attachment "D". l I

f. The input data required to perform the anchorage spring rate and l 4 finite' element static analysis shall be filled on the standard I

'i

-l a

, input sheets prepared for this purpose. The stan brd input I j

1 sheet contains the base plate geometry,__

anchor length, locations i s _

? ofloadpointsandloads[Theboltspringconstantsshallbe llR3 N ained f yne Report, which is provided in Attachment P. ll

.l The spring constants for bolts with embedment lengths other than lI f kEs/lTED those provided by Teledyne shall be obtained by linear inter- 1I tion. Extrapolation is not allowed. , ll

g. In the design verification of L-shaped structural steel members l subject to bending and compression such as bracing angle connected l

.2 1 with a gusset plate, the required reduction in allowable bending i stress about the strong axis of various angle sizes for spans from l 1

j 24" to 144" are provided in a graph as well as tabular form in I I Attachment Q.

l

! j

j . 10

} 3753M

Wh ..

4

+

j . ,.

EBASCO Interoffice Correspondence

. -l 4

FILE NO : SAG. TUG 1. 9920 DATE: December 31, 1987 d TO  : DISTRIpUTION g' OFFICE LOCATION : VARIOUS FROM: F.

W &

Hettinger / K. T. Wu / J. Kuo OFFICE LOCATION : 81/2 WTC i.

i

SUBJECT:

TU ELECTRIC COMANCHE PEAK SES UNIT #1 j , ADDENDUM #1 TO SAG.CP29, REVISION 4 ADDITION OF REQUIREMENT TO CHECK BASE METAL SHEAR 1

! Base metal shear must be considered in the conduit support design

) validation effort. Attached for your use are marked-up pages 24

{ & 25 which will be incorporated into Revision 5 of SAG.CP29 at t

a lator date. This addendum is to be used immediately in design 2

validation.

l Please acknowledge receipt of subject document by signing below and returning this memo to F. Hettinger at 81/7WTC no later than January 8, 19P8.

JK : bc i' Receipt Acknowledged ___________________________________________

j PRINT NAME (SIGNATURE) DATE (Last Name First)

Distribution

I K. T. Wu cc: R. C. Iotti l I. Wolff (CPSES SITE) E. Odar I H. Patel (Dallas) J. Padalino R. Shetty i M. McGrath I C. Y. Chiou i

+

i NY3 Conduit Personnel ( K. T. Wu)

, CPSES SITE Conduit Personnel (I. Wolff)

Dallas Conduit Personnel (H. Patel)

) ,

n 1

a 9 gem

s t . .

[ PREPARED BYs w REVIEWED BY: E 7.m 1 -

[ -* APPROVED BY: MTE:

_ 12/31/07 3J e .

3 General Instruction for Design Project Identificalion

  • N Verification of Electrical Conduit No. SAG.CP29 *

].y. & Box Supports Rev 4 ADDENDUM No. 1 8.0 WELD DESIGN VERIFICATION i '

'1 q Allowable stresses for velds shall be as specified in the Unit il f Design Criteria (SAG. CP10).

Provision shall be made for an undersize of 1/32 inch for fillet velds 5 as per the Unit #1 Design Criteria (SAC. CP10).

1,

)

In order to standardize welding stress calculations, forms provided l

k for this purpose shall be used.

2

a. Minimum Weld Size -

J-Welds not meeting the AUS code minimum weld tire requirements, but f found through detailed analysis to have :, tress within the allowable b.

j stress, are acceptable from a design verification standpoint.

4 However, a minimum acceptable structural veld (as shovn on the

'.' As-Built drawing) shall not be less than 1/8 inch.

4.

- - - - ~ . -

j Both veld and base metal thickness must be appropriately considered '\

't in veld qualification per AISC cod'e requiiements except as noted

! above. ,

1 /

r j For fillet-welds, the allowable shear stress on the base metal shall I j not be exceeded. (See Section 1.5.3 of the AISC Manual of Steel 4

1 Construction 7th Edition and Supplements 1, 2, and 3). . Ihe base metal shear stress allowable shall be limited to .4Fy for' 0BE and l .5Fy for SSE. For full penetration welds, the allowable stresses f 4

shall be those for the base metal. /

1 C _ -

e

.b d

1 24

]

) .

s I **

General Instruction for Design Project Identification i Verification of Electrical Conduit No. SAG.CP29

& Box Supports Rev 4 ADDENDUM No. 1 f

8.0 WELD DESIGN VERIFICATION (Cont'd) ..

l f 1

b. Warping Stresses in Anchorage Welds 1

j In cases where members are subjected to varping effects (members

.i welded "all around" at embedded plates or anchored plates or other I) members), the anchorage veld verification shall include varping i

F20tA stresses in addition to other stresses. For such cases, varping l' P6t. 74 \

, vill cause two additional stresses in the veld. One of these vill

)

j i be in the same direction as, and must be added to, the shear stresses caused by direct shear and pure torsion loads. The other

' varping stress is in the same direction as, and must be added to, i i normal stresses caused by member axial and bending loads. These two

- total veld stresses must then be combined by SRSS.

I-

c. The stress on velds between conposite channels shell be calculated 5

j by the "Combs" program. Long hand calculatico s are n >t recommended.

i k For the eff ective throat thickness of prequalified partial i d.

3 lR1 I penetration bevel groove volds, see Attachmer t *H' .

,I

?

I

)

i k

1

.i .

1 I 25 1'

] 3753H

.; .. .