Category:INSPECTION REPORT
MONTHYEARIR 05000483/19990101999-10-14014 October 1999 Insp Rept 50-483/99-10 on 990913-16.No Violations Noted. Major Areas Inspected:Plant Support Re Biennial Exercise of Emergency Plan & Procedures IR 05000483/19990111999-09-22022 September 1999 Insp Rept 50-483/99-11 on 990812-20.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19990081999-09-13013 September 1999 Insp Rept 50-483/99-08 on 990725-0904.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19990071999-09-10010 September 1999 Insp Rept 50-483/99-07 on 990809-13.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluating Operators IR 05000483/19990061999-08-13013 August 1999 Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Noted & Being Treated as Ncv.Major Areas Inspected:Operations,Maint & Plant Support IR 05000483/19990051999-06-25025 June 1999 Insp Rept 50-483/99-05 on 990502-0612.Two Violations Noted & Being Treated as Noncited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19990031999-05-19019 May 1999 Insp Rept 50-483/99-03 on 990321-0501.Noncited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19990011999-04-0505 April 1999 Insp Rept 50-483/99-01 on 990207-0320.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19980181998-12-0404 December 1998 Insp Rept 50-483/98-18 on 980914-1002.Violations Noted. Major Areas Inspected:Review of Design & Licensing Basis for Essential Service Water Sys,Associated Electrical Support Sys & Review of Program Implement 10CFR50.59 IR 05000483/19980221998-11-25025 November 1998 Insp Rept 50-483/98-22 on 980927-1114.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000483/19980241998-11-25025 November 1998 Insp Rept 50-483/98-24 on 981026-30.Violation Noted.Major Areas Inspected:Licensee Implementation of NRC Approved Fire Protection Program IR 05000483/19980231998-10-28028 October 1998 Insp Rept 50-483/98-23 on 981013-15.No Violations Noted. Major Areas Inspected:Operational Status of License Emergency Preparedness Program Was Conducted IR 05000483/19980151998-10-26026 October 1998 Insp Rept 50-483/98-15 on 980706-10.No Violations Noted. Major Areas Inspected:Guidance of Temporary Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers IR 05000483/19980201998-10-15015 October 1998 Insp Rept 50-483/98-20 on 980817-0904.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000483/19980211998-10-0909 October 1998 Insp Rept 50-483/98-21 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980191998-09-29029 September 1998 Insp Rept 50-483/98-19 on 980914-18.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980121998-08-21021 August 1998 Insp Rept 50-483/98-12 on 980705-0815.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000483/19980171998-08-14014 August 1998 Insp Rept 50-483/98-17 on 980803-07.Violations Noted.Major Areas Inspected:Implementation of Solid Radioactive Waste Mgt & Radioactive Matls Transportation Program IR 05000483/19980161998-08-0606 August 1998 Insp Rept 50-483/98-16 on 980713-17.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980131998-07-29029 July 1998 Insp Rept 50-483/98-13 on 980714-17.Violation Noted.Major Areas Inspected:Engineering & Plant Support IR 05000483/19980141998-07-17017 July 1998 Insp Rept 50-483/98-14 on 980629-0702.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000483/19980111998-07-0808 July 1998 Insp Rept 50-483/98-11 on 980524-0704.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19980081998-06-0808 June 1998 Insp Rept 50-483/98-08 on 980412-0523.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980091998-05-19019 May 1998 Insp Rept 50-483/98-09 on 980428-30.No Violations Noted. Major Areas Inspected:Maint & Plant Support IR 05000483/19980071998-05-19019 May 1998 Insp Rept 50-483/98-07 on 980427-0501.Violations Noted.Major Areas Inspected:Radiation Protection Program Focussing on Refueling Outage Activities ML20247M2241998-05-19019 May 1998 Insp Rept 50-483/98-10 on 980428-30.No Violations Noted. Major Areas Inspected:Contingency Plan Developed in Response to Insp Findings in NRC Insp Rept 50-483/98-06 W/Special Emphasis on Training Process Used to Qualify People for Er IR 05000483/19980051998-05-0808 May 1998 Insp Rept 50-483/98-05 on 980413-0501.No Violations Noted. Major Areas Inspected:Maintenance,Engineering & Plant Support ML20217F4881998-04-22022 April 1998 Insp Rept 50-483/98-06 on 980324-26.Violations Noted.Major Areas Inspected:Plant Support IR 05000483/19980031998-04-17017 April 1998 Insp Rept 50-483/98-03 on 980301-0411.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980041998-04-17017 April 1998 Insp Rept 50-483/98-04 on 980406-10.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000483/19980021998-03-26026 March 1998 Insp Rept 50-483/98-02 on 980202-06.Violation Noted.Major Areas Inspected:Maint,Engineering Re Bldg Emergency Filter Sys Adsorber IR 05000483/19980011998-03-0909 March 1998 Insp Rept 50-483/98-01 on 980118-0228.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support IR 05000483/19970211998-01-27027 January 1998 Insp Rept 50-483/97-21 on 971207-980117.No Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980251998-01-12012 January 1998 Insp Rept 50-483/98-25 on 981115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support,Including Health Physics & Security IR 05000483/19970191997-12-18018 December 1997 Insp Rept 50-483/97-19 on 971117-1211.No Violations Noted. Major Areas Inspected:Engineering IR 05000483/19970201997-12-16016 December 1997 Insp Rept 50-483/97-20 on 971026-1206.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19970181997-11-12012 November 1997 Insp Rept 50-483/97-18 on 971027-31.No Violations Noted. Major Areas Inspected:Access Authorization,Alarm Stations, Communications,Access Control of Personnel,Packages & Vehicles,Assessment Aids & Security Plans IR 05000483/19970171997-11-12012 November 1997 Insp Rept 50-483/97-17 on 970914-1025.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970161997-10-0707 October 1997 Insp Rept 50-483/97-16 on 970915-19.No Violations Noted. Major Areas Inspected:External & Internal Exposure Controls, Dose Assessment & Records,Controls of Radioactive Matl & Contamination & Surveying & Monitoring IR 05000483/19970151997-09-22022 September 1997 Insp Rept 50-483/97-15 on 970802-0913.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970131997-09-0404 September 1997 Insp Rept 50-483/97-13 on 970811-15.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000483/19970141997-08-0606 August 1997 Insp Rept 50-483/97-14 on 970622-0802.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering ML20141E4791997-06-26026 June 1997 Insp Rept 50-483/97-05 on 970210-14 & 24-28.Violations Noted.Major Areas Inspected:Engineering IR 05000483/19970061997-06-20020 June 1997 Insp Rept 50-483/97-06 on 970519-23.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program IR 05000483/19970081997-05-20020 May 1997 Insp Rept 50-483/97-08 on 970317-0404.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970101997-05-19019 May 1997 Insp Rept 50-483/97-10 on 970330-0510.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000483/19970091997-05-0909 May 1997 Partially Withheld Insp Rept 50-483/97-09 on 970422-25.No Violations Noted.Major Areas Inspected:Licensee Implementation of Land Vehicle Control Measures Implemented IAW 10CFR73, Physical Protection of Plants & Matl IR 05000483/19970071997-04-0808 April 1997 Insp Rept 50-483/97-07 on 970216-0329.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970011997-03-26026 March 1997 Insp Rept 50-483/97-01 on 970224-28.No Violations Noted. Major Areas Inspected:Competency of Six SRO and Five RO Applicants for Issuance of Operating Licenses IR 05000483/19970041997-02-28028 February 1997 Insp Rept 50-483/97-04 on 970127-31.No Violations Noted. Major Areas Inspected:Routine Insp Reviewed Program to Maintain Occupational Exposures Alara,Training & Qualifications of Radiation Protection Organizations 1999-09-22
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000483/19990101999-10-14014 October 1999 Insp Rept 50-483/99-10 on 990913-16.No Violations Noted. Major Areas Inspected:Plant Support Re Biennial Exercise of Emergency Plan & Procedures IR 05000483/19990111999-09-22022 September 1999 Insp Rept 50-483/99-11 on 990812-20.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19990081999-09-13013 September 1999 Insp Rept 50-483/99-08 on 990725-0904.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19990071999-09-10010 September 1999 Insp Rept 50-483/99-07 on 990809-13.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluating Operators IR 05000483/19990061999-08-13013 August 1999 Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Noted & Being Treated as Ncv.Major Areas Inspected:Operations,Maint & Plant Support IR 05000483/19990051999-06-25025 June 1999 Insp Rept 50-483/99-05 on 990502-0612.Two Violations Noted & Being Treated as Noncited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19990031999-05-19019 May 1999 Insp Rept 50-483/99-03 on 990321-0501.Noncited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19990011999-04-0505 April 1999 Insp Rept 50-483/99-01 on 990207-0320.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19980181998-12-0404 December 1998 Insp Rept 50-483/98-18 on 980914-1002.Violations Noted. Major Areas Inspected:Review of Design & Licensing Basis for Essential Service Water Sys,Associated Electrical Support Sys & Review of Program Implement 10CFR50.59 IR 05000483/19980221998-11-25025 November 1998 Insp Rept 50-483/98-22 on 980927-1114.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000483/19980241998-11-25025 November 1998 Insp Rept 50-483/98-24 on 981026-30.Violation Noted.Major Areas Inspected:Licensee Implementation of NRC Approved Fire Protection Program IR 05000483/19980231998-10-28028 October 1998 Insp Rept 50-483/98-23 on 981013-15.No Violations Noted. Major Areas Inspected:Operational Status of License Emergency Preparedness Program Was Conducted IR 05000483/19980151998-10-26026 October 1998 Insp Rept 50-483/98-15 on 980706-10.No Violations Noted. Major Areas Inspected:Guidance of Temporary Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers IR 05000483/19980201998-10-15015 October 1998 Insp Rept 50-483/98-20 on 980817-0904.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000483/19980211998-10-0909 October 1998 Insp Rept 50-483/98-21 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980191998-09-29029 September 1998 Insp Rept 50-483/98-19 on 980914-18.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980121998-08-21021 August 1998 Insp Rept 50-483/98-12 on 980705-0815.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support IR 05000483/19980171998-08-14014 August 1998 Insp Rept 50-483/98-17 on 980803-07.Violations Noted.Major Areas Inspected:Implementation of Solid Radioactive Waste Mgt & Radioactive Matls Transportation Program IR 05000483/19980161998-08-0606 August 1998 Insp Rept 50-483/98-16 on 980713-17.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980131998-07-29029 July 1998 Insp Rept 50-483/98-13 on 980714-17.Violation Noted.Major Areas Inspected:Engineering & Plant Support IR 05000483/19980141998-07-17017 July 1998 Insp Rept 50-483/98-14 on 980629-0702.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000483/19980111998-07-0808 July 1998 Insp Rept 50-483/98-11 on 980524-0704.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19980081998-06-0808 June 1998 Insp Rept 50-483/98-08 on 980412-0523.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980091998-05-19019 May 1998 Insp Rept 50-483/98-09 on 980428-30.No Violations Noted. Major Areas Inspected:Maint & Plant Support IR 05000483/19980071998-05-19019 May 1998 Insp Rept 50-483/98-07 on 980427-0501.Violations Noted.Major Areas Inspected:Radiation Protection Program Focussing on Refueling Outage Activities ML20247M2241998-05-19019 May 1998 Insp Rept 50-483/98-10 on 980428-30.No Violations Noted. Major Areas Inspected:Contingency Plan Developed in Response to Insp Findings in NRC Insp Rept 50-483/98-06 W/Special Emphasis on Training Process Used to Qualify People for Er IR 05000483/19980051998-05-0808 May 1998 Insp Rept 50-483/98-05 on 980413-0501.No Violations Noted. Major Areas Inspected:Maintenance,Engineering & Plant Support ML20217F4881998-04-22022 April 1998 Insp Rept 50-483/98-06 on 980324-26.Violations Noted.Major Areas Inspected:Plant Support IR 05000483/19980031998-04-17017 April 1998 Insp Rept 50-483/98-03 on 980301-0411.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980041998-04-17017 April 1998 Insp Rept 50-483/98-04 on 980406-10.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000483/19980021998-03-26026 March 1998 Insp Rept 50-483/98-02 on 980202-06.Violation Noted.Major Areas Inspected:Maint,Engineering Re Bldg Emergency Filter Sys Adsorber IR 05000483/19980011998-03-0909 March 1998 Insp Rept 50-483/98-01 on 980118-0228.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support IR 05000483/19970211998-01-27027 January 1998 Insp Rept 50-483/97-21 on 971207-980117.No Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980251998-01-12012 January 1998 Insp Rept 50-483/98-25 on 981115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support,Including Health Physics & Security IR 05000483/19970191997-12-18018 December 1997 Insp Rept 50-483/97-19 on 971117-1211.No Violations Noted. Major Areas Inspected:Engineering IR 05000483/19970201997-12-16016 December 1997 Insp Rept 50-483/97-20 on 971026-1206.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19970181997-11-12012 November 1997 Insp Rept 50-483/97-18 on 971027-31.No Violations Noted. Major Areas Inspected:Access Authorization,Alarm Stations, Communications,Access Control of Personnel,Packages & Vehicles,Assessment Aids & Security Plans IR 05000483/19970171997-11-12012 November 1997 Insp Rept 50-483/97-17 on 970914-1025.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970161997-10-0707 October 1997 Insp Rept 50-483/97-16 on 970915-19.No Violations Noted. Major Areas Inspected:External & Internal Exposure Controls, Dose Assessment & Records,Controls of Radioactive Matl & Contamination & Surveying & Monitoring IR 05000483/19970151997-09-22022 September 1997 Insp Rept 50-483/97-15 on 970802-0913.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970131997-09-0404 September 1997 Insp Rept 50-483/97-13 on 970811-15.No Violations Noted. Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000483/19970141997-08-0606 August 1997 Insp Rept 50-483/97-14 on 970622-0802.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering ML20141E4791997-06-26026 June 1997 Insp Rept 50-483/97-05 on 970210-14 & 24-28.Violations Noted.Major Areas Inspected:Engineering IR 05000483/19970061997-06-20020 June 1997 Insp Rept 50-483/97-06 on 970519-23.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program IR 05000483/19970081997-05-20020 May 1997 Insp Rept 50-483/97-08 on 970317-0404.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970101997-05-19019 May 1997 Insp Rept 50-483/97-10 on 970330-0510.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000483/19970091997-05-0909 May 1997 Partially Withheld Insp Rept 50-483/97-09 on 970422-25.No Violations Noted.Major Areas Inspected:Licensee Implementation of Land Vehicle Control Measures Implemented IAW 10CFR73, Physical Protection of Plants & Matl IR 05000483/19970071997-04-0808 April 1997 Insp Rept 50-483/97-07 on 970216-0329.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000483/19970011997-03-26026 March 1997 Insp Rept 50-483/97-01 on 970224-28.No Violations Noted. Major Areas Inspected:Competency of Six SRO and Five RO Applicants for Issuance of Operating Licenses IR 05000483/19970041997-02-28028 February 1997 Insp Rept 50-483/97-04 on 970127-31.No Violations Noted. Major Areas Inspected:Routine Insp Reviewed Program to Maintain Occupational Exposures Alara,Training & Qualifications of Radiation Protection Organizations 1999-09-22
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000483/19990101999-10-14014 October 1999 Insp Rept 50-483/99-10 on 990913-16.No Violations Noted. Major Areas Inspected:Plant Support Re Biennial Exercise of Emergency Plan & Procedures IR 05000483/19990111999-09-22022 September 1999 Insp Rept 50-483/99-11 on 990812-20.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19990081999-09-13013 September 1999 Insp Rept 50-483/99-08 on 990725-0904.Noncited Violations Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19990071999-09-10010 September 1999 Insp Rept 50-483/99-07 on 990809-13.No Violations Noted. Major Areas Inspected:Licensed Operator Requalification Program to Determine Whether Program Incorporated Appropriate Requirements for Evaluating Operators PNO-IV-99-035A, on 990810,heater Drain Line Pipe Rupture Occurred.Caused by Flow Accelerated Corrosion in Conjunction with Moisture Impingement.Licensee Has Completed Replacement of Damage Heater Drain Piping & Conducted Insps of Piping1999-08-18018 August 1999 PNO-IV-99-035A:on 990810,heater Drain Line Pipe Rupture Occurred.Caused by Flow Accelerated Corrosion in Conjunction with Moisture Impingement.Licensee Has Completed Replacement of Damage Heater Drain Piping & Conducted Insps of Piping IR 05000483/19990061999-08-13013 August 1999 Insp Rept 50-483/99-06 on 990613-0724.One Severity Level 4 Violation Noted & Being Treated as Ncv.Major Areas Inspected:Operations,Maint & Plant Support PNO-IV-99-035, on 990810,operators Initiated Manual Rt When High Pressure Heater Drain Line Ruptured in Turbine Bldg. Licensee Is Evaluating Options for Facilitating Repair & Restarting Plant.Region IV Will Conduct Special Insp1999-08-11011 August 1999 PNO-IV-99-035:on 990810,operators Initiated Manual Rt When High Pressure Heater Drain Line Ruptured in Turbine Bldg. Licensee Is Evaluating Options for Facilitating Repair & Restarting Plant.Region IV Will Conduct Special Insp IR 05000483/19990051999-06-25025 June 1999 Insp Rept 50-483/99-05 on 990502-0612.Two Violations Noted & Being Treated as Noncited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19990031999-05-19019 May 1999 Insp Rept 50-483/99-03 on 990321-0501.Noncited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000483/19993021999-05-0303 May 1999 Exam Rept 50-483/99-302 on 990416.Exam Results:Ro License Applicant Passed Retake Written Exam & Test Matl Adequate IR 05000483/19990011999-04-0505 April 1999 Insp Rept 50-483/99-01 on 990207-0320.One Violation Occurred & Being Treated as Noncited Violation.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000483/19993011999-02-0202 February 1999 NRC Operator Licensing Exam Rept 50-483/99-301 for Exams Administered on 990111-15 ML20199D9261999-01-12012 January 1999 Notice of Violation from Insp on 981115-1226.Violation Noted:Licensee Failed to Perform Written Safety Evaluation, from 840611-980505 IR 05000483/19980181998-12-0404 December 1998 Insp Rept 50-483/98-18 on 980914-1002.Violations Noted. Major Areas Inspected:Review of Design & Licensing Basis for Essential Service Water Sys,Associated Electrical Support Sys & Review of Program Implement 10CFR50.59 ML20198A1231998-12-0404 December 1998 Notice of Violation from Insp on 980914-1002.Violation Noted:Listed Activities Affecting Quality Either Not Prescribed by Documented Instructions Appropriate to Circumstances or Not Accomplished with Procedures PNO-IV-98-059, on 981129,licensee Commenced Plant Shutdown from 100% Power to Mode 3 to Replace Fan Motor.Resident Inspector Monitored Portion of Plant Shutdown from Cr.Info Has Been Discussed with Licensee1998-11-30030 November 1998 PNO-IV-98-059:on 981129,licensee Commenced Plant Shutdown from 100% Power to Mode 3 to Replace Fan Motor.Resident Inspector Monitored Portion of Plant Shutdown from Cr.Info Has Been Discussed with Licensee IR 05000483/19980241998-11-25025 November 1998 Insp Rept 50-483/98-24 on 981026-30.Violation Noted.Major Areas Inspected:Licensee Implementation of NRC Approved Fire Protection Program ML20196G3471998-11-25025 November 1998 Notice of Violation from Insp on 981026-30.Violation Noted: on 981030,control Room Pantry Fire Door,Identified as Being Nonfunctional Without Fire Barrier Impairment Permit or Conpensatory Actions,As Required by Procedure APA-ZZ-00701 IR 05000483/19980221998-11-25025 November 1998 Insp Rept 50-483/98-22 on 980927-1114.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000483/19980231998-10-28028 October 1998 Insp Rept 50-483/98-23 on 981013-15.No Violations Noted. Major Areas Inspected:Operational Status of License Emergency Preparedness Program Was Conducted IR 05000483/19980151998-10-26026 October 1998 Insp Rept 50-483/98-15 on 980706-10.No Violations Noted. Major Areas Inspected:Guidance of Temporary Instruction 2515/137, Insp of Medium-Voltage & Low-Voltage Power Circuit Breakers IR 05000483/19980201998-10-15015 October 1998 Insp Rept 50-483/98-20 on 980817-0904.No Violations Noted. Major Areas Inspected:Operations & Maint IR 05000483/19980211998-10-0909 October 1998 Insp Rept 50-483/98-21 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering IR 05000483/19980191998-09-29029 September 1998 Insp Rept 50-483/98-19 on 980914-18.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980121998-08-21021 August 1998 Insp Rept 50-483/98-12 on 980705-0815.No Violations Noted. Major Areas Inspected:Operations,Maint & Plant Support ML20237B8931998-08-14014 August 1998 Notice of Violation from Insp on 980803-07.Violation Noted: on 980804,inspector Noted Three Containers of Dry Active Waste Stored within 10 Feet of Permanent Structure IR 05000483/19980171998-08-14014 August 1998 Insp Rept 50-483/98-17 on 980803-07.Violations Noted.Major Areas Inspected:Implementation of Solid Radioactive Waste Mgt & Radioactive Matls Transportation Program IR 05000483/19980161998-08-0606 August 1998 Insp Rept 50-483/98-16 on 980713-17.No Violations Noted. Major Areas Inspected:Plant Support IR 05000483/19980131998-07-29029 July 1998 Insp Rept 50-483/98-13 on 980714-17.Violation Noted.Major Areas Inspected:Engineering & Plant Support ML20236V3251998-07-29029 July 1998 Notice of Violation from Insp on 980714-17.Violation Noted: Grinding Needle Gun Work Performed on 2,000 Ft Elevation of Cb Liner Floor Plate W/O Performing Surveys to Evaluate Concentration or Quantities of Radioactive Matl IR 05000483/19980141998-07-17017 July 1998 Insp Rept 50-483/98-14 on 980629-0702.No Violations Noted. Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000483/19980111998-07-0808 July 1998 Insp Rept 50-483/98-11 on 980524-0704.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20248L2621998-06-0808 June 1998 Notice of Violation from Insp on 980412-0523.Violation Noted:On 980419,workman Protection Assurance 26226 Was Inadequate to Ensure Safety During Work on Valve EJHV8804A IR 05000483/19980081998-06-0808 June 1998 Insp Rept 50-483/98-08 on 980412-0523.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980071998-05-19019 May 1998 Insp Rept 50-483/98-07 on 980427-0501.Violations Noted.Major Areas Inspected:Radiation Protection Program Focussing on Refueling Outage Activities ML20247M2241998-05-19019 May 1998 Insp Rept 50-483/98-10 on 980428-30.No Violations Noted. Major Areas Inspected:Contingency Plan Developed in Response to Insp Findings in NRC Insp Rept 50-483/98-06 W/Special Emphasis on Training Process Used to Qualify People for Er IR 05000483/19980091998-05-19019 May 1998 Insp Rept 50-483/98-09 on 980428-30.No Violations Noted. Major Areas Inspected:Maint & Plant Support IR 05000483/19980051998-05-0808 May 1998 Insp Rept 50-483/98-05 on 980413-0501.No Violations Noted. Major Areas Inspected:Maintenance,Engineering & Plant Support ML20217F4491998-04-22022 April 1998 Notice of Violation from Insp on 980324-26.Violations Noted: on 970529,licensee Made Changes to Emergency Plan W/O Commission Approval,That Decreased Effectiveness of Plan & Did Not Continue to Meet Planning Standard 50.47(b)(2) ML20217F4881998-04-22022 April 1998 Insp Rept 50-483/98-06 on 980324-26.Violations Noted.Major Areas Inspected:Plant Support IR 05000483/19980041998-04-17017 April 1998 Insp Rept 50-483/98-04 on 980406-10.No Violations Noted. Major Areas Inspected:Licensee Physical Security Program IR 05000483/19980031998-04-17017 April 1998 Insp Rept 50-483/98-03 on 980301-0411.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering ML20217F1921998-03-26026 March 1998 Notice of Violation from Insp on 980202-06.Violation Noted: Licensee Did Not Demonstrate That Either Train of Auxiliary Fuel Bldg Emergency Filter Sys Adsorbers Could Comply W/Ts 4.7.7.b.2 Until Charcoal from Each Train Was Replaced IR 05000483/19980021998-03-26026 March 1998 Insp Rept 50-483/98-02 on 980202-06.Violation Noted.Major Areas Inspected:Maint,Engineering Re Bldg Emergency Filter Sys Adsorber IR 05000483/19980011998-03-0909 March 1998 Insp Rept 50-483/98-01 on 980118-0228.Violations Noted. Major Areas Inspected:Operations,Engineering & Plant Support ML20216A7971998-03-0909 March 1998 Notice of Violation from Insp on 980118-0228.Violation Noted:On 980216,instructions to Work Authorization C612323 Did Not Provide Adequate Guidance for Concrete Core Drilling Work,As Result,Licensee Personnel Drilled Into Power Cable IR 05000483/19970211998-01-27027 January 1998 Insp Rept 50-483/97-21 on 971207-980117.No Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support IR 05000483/19980251998-01-12012 January 1998 Insp Rept 50-483/98-25 on 981115-1226.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support,Including Health Physics & Security IR 05000483/19970191997-12-18018 December 1997 Insp Rept 50-483/97-19 on 971117-1211.No Violations Noted. Major Areas Inspected:Engineering IR 07100026/20120061997-12-16016 December 1997 Notice of Violation from Insp on 971026-1206.Violation Noted:Licensee Personnel Failed to Follow Documented Instructions During Preventive Maint Task to Record Differential Pressure Across Essential Svc Water Supply 1999-09-22
[Table view] |
Text
__ - __ _ . . _ _ . _ . _ _ _ . . _ _ . . _ _ - - . _ _ _ . _ _ . _ . . . . _ _ .
.
ENCLOSURE U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
- Docket No.: 50-483 License No.: NPF-30 ,
Report No.: 50-483/98-19 Licensee: Union Electric Company Facility: Callaway Plant Location: Junction Hwy. CC and Hwy. O Fulton, Missouri Dates: September 14-18,1998 Inspector: Michael P. Shannon, Senior Radiation Specialist l
. Approved By: Blaine Murray, Chief, Plant Support Branch, Division of Reactor Safety Attachment : Supplementalinformation
!
I i
!
I I- '
,
l l
l i:
l '
9810070020 980929 rr
!-
!
$DR ADOCK 05000483 PDR
L
l 2-EXECUTIVE SUMM ARY l
Callaway Plant l NRC Inspection Report 50-483/98-19
!
This announced routine inspection reviewed radiation protection program activities. Areas j reviewed included: exposure controls, controls of radioactive material and contamination, surveying and monitoring, the program to maintain occupational exposure as low as is reasonably achievable (ALARA), and quality assurance in radiation protection activitie j
!
Plant Support )
l
In general, the external exposure control program was effectively implemente Normally, all radiological conditions were reflected on radiation work permits; however, one radiation work permit ueed for work in a posted airborne activity area did not reflect the airborne conditions. All radiation areas were properly posted. Proper thermoluminesc'ent dosimeters were used for measuring neutron doses. Housekeeping throughout the radiological controlled area was very good (Section R1.1).
An effective internal exposure program was in place. Respiratory equipment was properly issued to qualified personnel. Whole-body counters were properly calibrated using NationalInstitute of Standards and Technology standards. Internal dosa ,
assessment methodologies were proper to determine internal dose (Section R1.2). l
Radioactive material, laundry, and trash containers were properly labeled, posted, and controlled. A good radioactive source inventory and leak test program was in place; i however, source inventory results were not consistently recorded. An effective portable I radiation protection instrument calibration program was maintained. Radiological surveys properly assessed personnel exposures (Section R1.3).
I
'
- In general, an effective ALARA program was implemented. The 1998 exposure goal of 15 person-rem was aggressive and on target. The station's 3-year exposure average of 149 person-rem for 1997 was a little above the industry average; however, it has continued to trend downward. The hot spot reduction program was effectively monitored; however, the involvement of departments other than radiation protectio could enhance the program. The ALARA coordinator had not followed the procedural requirements for the review of 120 of the 147 ALARA suggestions submitted in 1998 (Section R1.4).
The new superintendent of radiation protection and chemistry satisfied the requirements to fill the Radiation Protection Manager position. The two individuals assigned as health physics technical support instructor and chcmistry instructor had extensive technical and practical experience in their assigned training areas (Section R5.1).
l
- Overall, an adequate quality assurance audit program was maintained. Two operational radiation protection quality assurance surveillances were completed since May 1998,
<
which provided management with a good assessme* of the areas reviewed. The radiation protection quality assurance audit and surveillance activities had not reviewed
.
18 of 59 radiation protection program elements in more than 25 months, with the r
... - . - - . . - . _.-. . - - . .
.---.. --_....- . - . - . .
.
L l
t -
r l
.1-
~
l average time interval between reviews of approximately 41 months. The department
! self-assessment provided management with an effective critical assessment of the
! ' program areas reviewed. No negative trends were identified during the review of
. radiological suggestion occurrence solution reports written since May 1998 (Section R7.1).
)
,
l I
1
,
I I
!
l I
.l i
j
.
. -
__ .-
l-4- i
!
. Report Details l
Summarv of Plant Status The plant operated at full power during the inspectio IV. Plant Support !
!
R1 Radiological Protection and Cheralstry Controls I R External Exposure Controls i Insoection Scooe (83750)
Selected radiation workers and radiation protection personnel involved in the external exposure control program were interviewed. A number of tours of the radiological i controlled area were performed. The following items were reviewed: )
- ' Radiological controlled area access controls
- Housekeeping within the radiological controlled area Observations and Findinas The inspector observed activities at the radiological controlled area access / egress ;
~ control point and noted that station workers used the personnel contamination i monitoring and computerized log-in/out equipment properly. Radiation protection I personnel in attendance in this area provided timely response and direction to station :
workers who alarmed the personnel contamination monitors or needed assistance using l the computerized sign-in/out equipment. The inspector noted that a department self-assessment, which was performed during April 1998, identified that, due to the layout of the personnel contamination monitors at the exit point from the radiological controlled area, there was a possibility of cross contamination of personnel and/or radioactive material being released from the radiological controlled area without being monitored. When this item was discussed with station management, the inspector was informed that an assessment team was reviewing the layout of the radiological i
'
controlled area access / egress area to improve the traffic fic. cath, eliminate the possibility of cross contamination, and the unmonitored release of radioactive materia During tours of the rao.iological controlled area, the inspector observed that high )
radiation areas were property controlled and posted. All Technical Specifications i required that high radiation area doors were locked, and flashing lights were used where !
appropriate and operating properly, in general, radiation work permits (RWPs) were properly written; however, the inspector I identified that RWP 98-04420, which was used for the reactor cavity cooling fan repair
!
^
.: , _
--
.
l 5-work, did not reflect the airborne conditions in the reactor building, although the area was posted as an airborne activity area. Technical Specification 6.8.1. requires procedures for the RWP system. Section 5.1.3.7.2 of Procedure HTP-ZZ-01201, l
" Preparation and Maintenance of General and Specific Radiation Work Permits," l Revision 29, requires that prior to issuance of the RWP derived airborne concentrations (DACs) based on current surveys or historical data shal! be listed on RWPs. A review of other RWPs used for work in airborne activity areas revealed that airborne conditions were listed. The inspector concluded that the failure to document the DACs on the RWP used for the reactor cavity cooling fan repair work was an isolated inciden Therefore, the inspector determined that this f ailure constitutes a violation of minor significance and is not subject to formal enforcement action. However, tne inspector commented that radiation protection management attention to this area may be i required. The licensee acknowledged the inspector's comment and on September 16, ;
1998, documented this item in Suggestion Occurrence Solution Report 98-341 Field interviews with radiation workers revealed that they were knowledgeable of the ,
general radiological conditions in their work area and the proper response to electronic I dosimeter alarm I l
In 1988, a vendor with the assistance of the licensee conducted a spectral analysis to l determine the neutron energies inside the reactor containment building during reactor operations The analysis determined that the neutron energies ranged from ,
approximately 20 to 230 kilo-electron volts (kev). j The licensee processed its thermoluminescent dosimeters on site and was certified by the National Voluntary Laboratory Accreditation Program for all categories. Neutron doses are based on the use of correction factors that were developed using a tissue equivalent proportional counter to determine the neutron fluence and energy spectra encountered in the reactor containment building during reactor operations. From a review of data supplied by the licensee, the inspector determined that personnel entries into the reactor containtnent building during reactor operations had remained relatively constant during the past 4 years, ranging from as high as 15 in 1994 to as low as 10 in 1997. The inspector noted that the highest individual neutron dose was 283 millirem in 199 The inspector determined that housekeeping throughout the radiological controlled area was very good, c. Conclusions in general, the external exposure control program was effectively implemen'e Radiation protection personnel at the radiological controlled area access /epss control
,
point provided timely response and direction to station workers who alarmed the
'
personnel contamination monitor or needed assistance using the computerized i sign-in/out equipment. Normally, all radiological conditions were reflected on radiation work permits; however, one radiation work permit used for work in a posted airborne activity area did not reflect the airborne conditions. All radiation areas were conspicuously and clearly posted. Proper thermoluminescent dosimeters were used for
.
i i
. . . . . --. . - . -- - . .--
,
.
l- , -6-establishing personnel neutron doses. HWnkeeping throughout the radiological controlled area was very goo R1.2 Internal Exoosure Controls inspection Scoce (83750)
Selected radiation protection personnel involved with the' internal exposure control program were interviewed. The following items were reviewed:
- Respiratory protection program
.* Whole-body counting program, inc!uding the calibration of the counter
- The internal dose assessment program Observations and Findinas There were four full-faced, negative-pressure respirators issued for radiological work during July and August of this year. From a review of the respirator issue log, the inspector determined that respirators were properly issued to qualified individuals, and proper total effective dose equivalent /as low as is reasonably achievable (TEDE/ALARA) evaluations were completed to justify respiratory use. No problems were noted with the respirator issue and control progra Whole-body counters were verified to be calibrated using standards traceable to the National Institute of Standards and Technology. The inspector noted that an acceptable ;
phantom was used along with radiation sources that covered energy ranges between
'
approximately 88 -1836 kev. The inspector concluded that a proper whole-body calibration program was in plac Internal dose assessments were reviewed. The inspector noted that the highest internal ;
dose assigned, in 1998 was 51 millirem. No probleme were rioted by the inspector !
during the review of the methodologies used to determine internal dose,
, Conclusions
An effective internal exposure program was in place. Respiratory equipment was properly issued to qualified personnel. Whole-body counters were properly calibrated
- using National Institute of Standards and Technology standards. Internal dose
, assessment methodologies were proper to determine internal dose.
!
l t
!
.
!
l l
l l l-7-l \
'
R1.3 Control of Radioactive Materials and Contamination: Surveyino and Monitoring I Insoection Scope (83750)
l Areas reviewed included:
- Control of radioactive material
- Source inventory and control programs
- Portable instrumentation calibration and performance checking programs
- Adequacy of the surveys necessary to assess personnel exposure 1 Observations and Findinas l
During tours of the radiological controlled area, the inspector noted that all radioactive material containers were properly labeled, posted, and controlled. All laundry and trash containers were properly maintained. The use of holding areas with local radiation monitor alarms for laundry and trash containers waiting radiological surveys was a good licensee initiative. Contaminated areas were appropriately posted and clearly identifie l The inspector randomly selected six radioactive sources from an inventory list provided by the licensee. All six of these sources were found in their designated location and properly labeled. From a review of the last four inventory lists, the inspector noted that the inventory and source leak testing programs were performed in accordance with station procedures. However, during the review, the inspector noted that source inventory results were not recorded consistently. For example, one time a check mark ;
was used to reflect the source had been accounted for; while another time, an l individuals initials were used; and another time, the word SAT was used. The inspector I commented that not documenting the inventory consistently could cause confusion when reviewing the inventory. The licensee acknowledged the inspector's comment and on September 17,1998, documented this item in Suggestion Occurrence Report 98-3429 The inspector reviewed the portable radiation survey instrument program, including the calibration and repair of instrumentation. All instrumentation observed in use in the i radiological controlled area was properly calibrated and source response checked in accordance with station procedures. Instrumentation calibration and maintenance records were reviewed. The inspector determined that the records were well maintained, and maintenance history was properly recorded for trend purposes. Proper National Institute of Standards and Technology traceable sources were used for calibration.
! The licensee used a vendor to calibrate the portable neutron instrumentation.
l Calibration certificates documented that the neutron survey meters were calibrated I
using a moderated californium-252 source, which was traceable to National Institute of l
Standards and Technology. The meters were calibrated to exposure rates that l adequately covered the normal exposure rates encountered in the reactor containment l building at power. Prior to use, portable neutron instrumentation was source response checked using a plutonium-beryllium (PuBe) source.
!
l
'
l
l l
l
'
8-l Independent radiological measurements performed by the inspector confirmed that area radiological postings reflected general radiological conditions within the room. All l radiological postings were conspicuous and clearly poste Conclusions Radioactive material, laundry, and trash containers were properly labeled, posted, and controlled. The use of holding areas with local radiation monitor alarms for laundry and trash containers waiting radiological surveys was a program strength. A good radioactive source inventory and leak test program was in place; however, source inventory results were not consistently recorded. An effective portable radiation survey instrument program, including the calibration and repair of instrumentation was maintained. Radiological surveys properly assessed personnel exposures, i
R1.4 Maintainina Occupational Exposure As Low As is Reasonably Achievable (ALARA) Insoection Scope (83750)
,
Radiation protection personnelinvolved with the ALARA program were interviewed. The
'
following areas were reviewed-
- Exposure goal establishment and status
- Hot spot reduction program l
- ALARA suggestion program 1 Observations and Findinas l The inspector determined that the non-outage exposure goal of 15 person-rem was aggressive and established using the station's best past performance. Additionally, the l exposure goal was being properly tracked and trended monthly by the ALARA group.
!
Exposure status was distributed to, and monitored by, station departments. The inspector's interviews with the Superintendents of Maintenance and Operations
confirmed that the station management was aware of both the station's yearly exposure l goal and its department's approximate yes Ne exposure status. The inspector l
'
noted that although the station's 3-year expv * verage of 149 person-rem for 1997 was slightly above the industry average, it had w aed to trend downward. Interviews with chemistry management revealed that the addition of ammonia in the reactor coolant system appeared to be effective in the removal of cobalt-58.
l No problems were identified during the review of the hot spot reduction program. Hot i
'
spots were properly updated, tracked, and trended by the ALARA group. However, the inspector observed that the program was driven solely by the radiation protection department. The inspector commented that involving other departments, such as operations, in the removal of r.1 spots had proven to be successfulin reducing hot spots at other nuclear power facilities. The licensee acknowledged the inspector's commen Since January 1,1998,147 ALARA suggestions were submitted. All ALARA suggestions were captured in the station's suggestion occurrence solution reporting
.. -. -~ . - - - . . - - --- - - . . - - - . . --
. system, as of September 17,1998,106 have been closed; and 41 remained open in various stages of evaluation and closure. The inspector noted that of the 147 suggestions, the ALARA coordinator had only evaluated 27 suggestions. The remaining
, ALARA suggestions were evaluated and implemented, if seen fit, by the department
-
who originated the Technical Specification 6.8.1 requires procedures for the ALARA program.
. Section 5.5.6 of Procedure APA-ZZ-01001, "Callaway Plant ALARA Program,"
Revisicn 6, states, in part, that the ALARA coordinator evaluates ALARA suggestion '
The failure of the ALARA coordinator to evaluate the 120 ALARA suggestions is a violation of Technical Specification requirements; however, because of the continued downward exposure trend, the inspector determined that this failure constitutes a violation of minor significance and is not being subject to formal enforcement action. On September 16,1998, the licensee documented this item in Suggestion Occurrence ;
j Solution Report 98-341 Conclusions In general, an effective ALARA program was implemented. The 1998 exposure goal of
'
15 person-rem was aggressive. The station's 3-year exposure average of 149 person-
- rem for 1997 was slightly above the industry average; however, it continued to trend downward. The het spot reduction program was effectively monitored; however, j
'
involving departments otner than radiation protection could enhance the program. The ALARA coordinator had not followed the procedural requirements for the review of 120 of the 147 ALARA suggestions submitted in 199 ;
RS.1 Radiation Protection Staff Qualifications ; jnspection Scope (83750)
The inspecbr reviewed the qualifications of the superintendent of radiation protection and chemistry, health physics technical support instructor, and the chemistry instructo Observations and Findinas i
Due to a recent organizational change, the chemistry /radwaste and radiation protection l departments were combined. As part of this reorganization a new individual was designated to fill the Radiation Protection Manager position. Technical Specification 6.3.1.2 requires that the individual filling the position of radiation protection manager j (RPM) meet or exceed the qualifications of USNRC Regulatory Guide 1.8, September .
1975. From a review of the superintendent of radiation protection and chemistry i resume, the inspector determined that this individual satisfied the requirements of .
USNRC Regulatory Guide 1.8, September 197 l i
During the week of the inspection, the licensee's training department announced the !
selections of a new health physics technical support instructor and a chemistry instructor. From a review of the above individuals' rnsumes, the inspector determined j that both individuals had extensive technical and practical experience in their assigned j training area i
-
. . . ._.- .
_. . . . - - - _ - - - - - - .
.
.
10- Conclusions The superintendent of radiation protection and chemistry satisfied the requirements of USNRC Regulatory Guide 1.8, September 1975. The two individuals assigned as health physics technical support instructor and chemistry instructor had extensive technical and practical experience in their assigned training area R7 Quality Assurance in Radiological Protection and Chemistry Activities R7.1 Quality Assurance Audits and Surveillances. and Radiation Deoartment Self-Assessments and Radioloaical Suaaestion Occurrence Solution Heoorts Insoection Scoce (83750)
Selected personnelinvolved with the performance of quality assurance audits and surveillances and radiation department self-assessments were interviewed. The following items were reviewed:
Quality assurance audits performed since April 1,1998
=
Quality assurance surveillances performed since April 1,1998
=
Radiation protection department self-assessments performed since April 1,1998
=
Radiological Suggestion Occurrence Solution reports written since April 1,1998 Observations and Findinas Quality Assurance Audits. and Surveillances Reports No audits were performed since the last inspection of this area in May 1998. However, two operational radiation protection quality assurance surveillances were complete One of these two survoillances was performed at the request of radiation protection management and covered radiological postings, surveys, and radioactive material control programs. The other surveillance pertained to radiological controls during Refueling Outage Both surveillances provided management with good assessments of the areas reviewe Eight items were identified for evaluation and properly documented in the station's suggestion occurrence solution reporting syste The inspector reviewed the 1998 quality assurance radiation protection audit and str.vei; lance activities which were described in the licensee's coverage plan. The .
inspector noted that the quality assurance department developed coverage plans annually to identify which program elements (referred to as critical attributes) would be
- reviewed during the year. During this review, the inspector noted that 59 radiation
protection program elements were listed. However, during discuss. _ns with the lead quality assurance radiation protection auditor, the inspector was informed that only 25 of l the 59 program elements had been assessed as of September 15,1998. A further review of the program elements revealed that 18 of the 59 radiation protection elements
-
l-11-l l
had not been reviewed in more than 25 months with the average time interval between l reviews of 41 months. One area (counting room systems) had not been reviewed in 72 l months. None of the 18 program elements had a frequency requirement associated with them; however, the inspector commented that management attention to coverage plan development and adherence could help ensure a timely, comprehensive radiation l protection program review. The licensee acknowledged the inspector's comment and on September 17,1998, documented this item in Suggestion Occurr ence Solution l Report 98-343 !
Deoartment Self-Assessments One radiation protection department self-assessment was perforrr d since April 199 The self-assessment was performed by three technical specialists from other nuclear i power facilities. The inspector determined that the self-assessment was an effective I I
critical assessment, which provided management with a good overview of the radiation protection program areas reviewed. Thirteen areas were assessed and 11 recommendations were provided. All recommendations have been captured in the i station's suggestion occurrence solution reporting system,5 of the 11 recommendations i had been closed as of September 16,1998, and the remaining 6 are in various stages of evaluatio Radioloaical Suaaestion Occurrence Solution Reports The inspector reviewed selected radiological suggestion occurrence solution reports written since May 1,1998, and noted that the station identified items at the proper threshold to provide management with a good overview of radiological program area Corrective actions to prevent a reoccurrence appeared to be effective to resolve the original problem and, in general, suggestion occurrence solution reports were closed in a timely mannel. The inspector identified no negative trends during this review. Conclusions Overall, an adequate quality assurance audit program was maintained. Two operational radiation protection quality assurance surveillances were completed since May 1998, which provided management with a good assessment of the areas reviewed. The radiation protection audit and surveillance activities had not reviewed 18 of 59 radiation protection program elements in more than 25 months with the average being app rimately 41 months. The department self-assessment provided management with an effective critical assessment of the program areas reviewed. No negative trends were identified during the review of radiological suggestion occurrence solution reports written since May 1998.
R8 Miscellaneous Radiological Protection and Chemistry issues R8.1 (Discussed) inspection Follow-up Items 9807-06 This item was identified in NRC Inspection Report 50-483/9807 and involved problems with radiological controlled area access control. The inspector reviewed the actions
.
.
-12-taken by the licensee's assessment team and determined that the problem was being properly evaluated. From a review of the assessment team's implementation schedule, the inspector concluded that proposed corrective actions will be presented to management by December 31,1998, and corrective actions completed by June 1,1999, ,
'
approximately 4 months prior to Refueling Outage 10. This item remains open pending
~
a reviewed during the next inspection of this are V. Manaaement Meetinas
Exit Meeting Summary
'
X1 The inspector presented the inspection results to members of licensee management at an exit meeting on September 18,1998. The licensee acknowledged the findings presented. No proprietary information was identifie ,
!
j
l l
l
I/
s
-- - ,-
~. - _ . -- _ - . . . . . . . . .
. !
.
E ATTACHMENT l
PARTIAL L'ST OF PERSONS CONTACTED l l
'
Licensee l
G. Randolph, Vice President and Chief Nuclear Officer !
R. Affolter, Plant Manager D. Brownwell, Engineer, Quality Assurance ;
R. Farnam, Supervisor, Health Physics Operations i F. Forck, Quality Assurance Specialist J. Gloe, Superintendent, Maintenance .
C, Graham, Supervisor, Health Physics Technical Suppe-t l G. Hamilton, Supervisor Engineer, Quality Assurance ]
J. Laux, Manager, Quality Assurance i B Miller, Supervisor, Radwaste s
A. Passwater, Manager, Corporate Nuclear Services M. Reidmeyer, Engineer /NRC Interface,' Ouality Assurance i R. Roselius, Superintendent, Radiation Protection and Chemistry i M. Taylor, Manager, Nuclear Engineering NRC l B. Murray, Chief Plant Support Branch D. Passehl, Senior Resident inspector ,
l INSPECTION PROCEDURE USED 83750 ' Occupational Radiation Exposure l LIST OF ITEMS OPENED. CLOSED. AND DISCUSSED Discussed IFl 9807-06 Electronic radiation work permit / access control problem i evaluatio l LIST OF DOCUMENTS REVIEWED List of radiological Suggestion Occurrence Solution reports (05/01/98 - 09/11/98)
- Quality Assurance Department Surveillance Report SP98-061 Quality Assurance Department Surveillance Report SP98-083 Radiation Protection Self-Assessment performed April 13 - 17,1998
~ Procedures
.