e ESAsco SERVICES INCORPORATED k,4~l WATERFORD STEA". ELECTRIC STATION - UNIT NO 3 l
FRCCDURE FOR. C.".CADING AND/OR HA','DLING EEAW OR SPECIAI.!:ED EQUIPMENT PROCEDURE NRCER:
ASP-I"-22 ISSUE SL'Mu.ARY 5
5 ISSUE /DATE l
PREPARED l
APPROVED l
RD". ARKS l
g 5
B C a.Q "A" Draft R. Jathi=
Q 7-8-77 W
b "A"
(z. 3b
.)- C. Ze -C$
7-29 -77 R.
- his J. O. Booth
-This procedure supersedes p
M U
f CP-424.
=
"3" Draft R.
him N
/
i j
6-12-78
_-4 l
y y
R ' s.
1 u
"B" R. J chis J.. Cruick.
Revised to incorporate reorgan-N' g,
6-29-78 ization of EMD Group.
2 "C" DRAFT h
2-9-82 J. Mearkle 8
toe P
3 E
S 4s 3
I 85100202W e50 $
9 hhhNAB -206 M tw-sy-pos FoltM NO.
ASP-III-1-3 (10-13-75)
.0//6
I'v. 3g7_7.,._ n I
i EEASCO SEPNICES TSCORPO!:.\\TUD
~~
C
, WA EnrohD STE.V! C'.CC nIC STATION - UNIT NO 3 PACE:1 or 5
ISSUC:
i 1.0 purnose I
1.1
~he purpose of this procedure 1.s to. provide a general guide with inst' ructions for the handling of equip ent requiring special and/or cont
- rolled =etheds while under Ebasco control.
t 2.0 Scope 2.1 his procedure shall be applicable to the unloading and handling to varehouse or in-place storage of heavy or speciali:ed equipment While under Ebasco control. The requirements of See:1on 6.2 and 6.3 of this procedure shall apply to site contractors when the g
5 equipnent listed in 6.2 cr 6.3 is under their control, except that the centractors may use tnel: Handling Request for:s. Resp onsible
~
3 parties shall take action as required by the procedure to make it applitable to the specific equipment that is to be unloaded.
rj 2.2 This procedure is intended as a general guide to methods and g
materials and is not intended to eliminate the exercising of sound professional judge =ent during the activities covered.
D Q---
-3 A-Re f e renc e s,
36 3.1 ANSI N45.2.'2, " Packaging, Shipping, Receiving, Storage and Handling of Ite=s for Nuclear Pqwer Plants". -
=o e4 N,
3.2 ASP-IV-10, " Material Receiving, Warehousing, and Control".
wT 3.3 WQC-1., "_ Control of Receiving, HanE31ng and Storage Materials, Soils and u
Concrete.
er is 5
4.0 Definitions 5o C
4.1 Equipment Maintenance Department - the depart =ent headed by_the.
_Equiy=ent.'d.aintenance. Supervisor under the direction of.the..,
Construe:1on Start-up Superintendent.
t!-
~
ti z
4.2 The complaced procedure - this* document together with completed form (s), applicable drawings and any other material that is
(
required to ensure that the purpose of the procedure is fulfilled.
h 4.3 N.'A.
"Not Applicable", to be used on forms.
H
~0-4.4 Specialized Equipment - items that require special handling instructicus because of weight, ~ size, susceptability to shock
)
damage, high oil ductility transition temperature, or any other condition that warrants special instructions.
4.5 Hoisting Equipment and Rigging - equipment that is to be used for h =d W g " specialized" equipment, defined in 4.4 s
6 e
o e
o ee Q
g y
t.. v *- g 1.-
y g..
l I,,... r.[p. ).. :.,-![,!J.I:L.EIEM
.a s
f- }
I I
e.
'5 r
crn a
hb k
- . n
- ,
h[
+
b c'
se e....
l M
W As7_y_;2 l
ECASCO SERVICES ItiCORNRAT1;D i' ACE: 2 Or 5
. MATERTonD STCAM C1.CCTRIC STATIC:! - UNIT NO 3 ISSUC:
.C t
5.0 Re sponsibility_
shall be responsible f or imple=enting 5.1 The Project Superintendent this pfocedure.
I' The Equip =ent Maintenance Supervisor, or his designee and or his designee, shall 5.2 the Construction Superintendent, collectively be respensible for deter =ining if special handling and unloading instructions are required for equipment or material, as outlined in section 6.2, arriving at the jobsite or already on the jobsite.
The Equipment Maintenance Supervisor, or his designee shall be responsible for review of all " Equipment / Material Unloading /
5.3 Handling Request Record" forms.
[
or his designee, shall be Ci l
The Construction Superintendent, responsible for the performanc to 5.4 a,
form and supervise unloading and handling operations in accordance k2 or his designee shall be vith approved methods. The Construction Supt.
responsible for review of Handling Request for=s submitted by Contractor a I
~~
The., Materials Ad=inistrator 3h-me Tesponsible;for_.nocifying y
-~
f the site Engineering and Construction, Depart =ent Personnel.o 2
5.5 i==inent or actual,arriva,1s,of, equ_ p=ent, and shall ensure that h.
i requiring special handlinc. remains undisturbed until-U equipment construction assu=es responsibility under this procedure.
E3
- =
- i 6.0 Procedure pi Equipment or material requiring special unloading and handling
- o C
6.1 g.
instructions.
When, as outlined in Section 5.2, it is deter =ined
- s that certain equipment or material requires special 6.1.1 s'
unloading and handling instructions, the Construction Superintendent, or his designee, shall prepare
- 3 8
an " Equipment /Materitl Unloading and Handling Request us; Record", Form ASP-IV-22.1.
=:
Af ter a request is-prepared per Paragraph 6.1.1, it e
6.1.2 2j shall be routed to the Equipment Maintenance Department for review of the handling method prior to u,.
gj.
unloading or handling of.the item.
s e
Q e
)>
e
'w
,o
1 EnASco StavlCES mccaromTw
- 30. Asr-Iv-::
ISSUC:
MATEnrORD STr>3 C1.CCTRIC STATION - UNIT NO 3 i'ACC: 3 Or5
~9 6.1.3 he Equipnent Maintenance Supervisor, or his, designee, i
shall review the ne: hod preposed by Construction along with the vendor's rece= ended practice (if available). The I
' vender nay be centacted a: the discre: ion of the E(uip.en: Maintenance Superviser, or his designee, for l
additicnal instructions or approval.
I i
6.1.4 After review of the above, the Equipnent Maintenance Supervisor, c: his designee, shall sign and date the request fo= and return it to the Construction Superintendent.
- d 6.1.5 After review by the Equipnent Maintenance Supervisor, s
or his designee, and prior to. start of work, the
[
Construction Superintendent, or his, designee _, shall, by.,.
A sub=itting a copy of ASP-IV-22.1, notify the QC Supervisor for' ' ~ ~ ~
~
inspection as required per % C-l.'
~ ~
n:>g C
6.1.6 The Materials Quality Control Supervisor, or his designee,
'~
shall inspect special handling operations during unloading U
and storage of Category A & B ite=s for co=pliance with E.-
approved-handling-instructions.
f 6.1,.7 The Construction Superintendent, or his designee, shall G
perfom handling / unloading as required per request, and at E
co=pletion, sign the fom ASP-IV-22.1 and f orward to QC for i
verification of the crocess.
,I
- c r
.w C
7 ~6. 2 Ca:egory A '- Iteis classified in Category A'are those that require E
specially selected equietnent and detailed crocedures (reference form ASP-IV-22.1) for handling operations because of large size and weight.
Z Sone but not all of the items assianed to this category are:
22
~
{
~
6.2.1 Reactor vessel and its cor's succort barrel, core support-core v,
shroud assembly and upper guide structure.
6.2.2 Stea= Generators
=.
6.2.3 Primary system pressurizer z
6.2.4 Spenr fuel _. casks n.
C 6.3 Category B - Items classified in Category B are those that may l
, {'
be handled with conventional equipment and require detailed instructions (reference form ASP-IV-22.1) because of their susceptibility to damage. Some but not all of the ite=s assigned to this category are:
~
6.3.1 ~Primar g olant Pumps 6.3.2 Control..Eod Drive Mechanism i
.N" O
e eg f
A r. -._ -
L ET_**
+
e
'M
e ELASCO S;nVICT.5 I::ConWnA;w No. ASP-IV-22 l
ISSUE:
C WA;;arono 3 rf.sg ::y. n:C STATIO:: - C::!T ::o 3 i'AC:.: 4 CT $
l
. N 6.3.3 New Fuel j
=
6.3.4 Instrunent Cabinets (including those provided under NY-403402, 562, 571, 575, 576, and 577) 6.3.5 Control Boards (including those provided under l,
NY-403583 and 594) 6.3.6 480V Motor Control Centers (including those provided under NY-403455, 456, 497, and 498) w 6.3.7 4.16 KV and 6.9 KV Switchgear (including those provided under NY-403453 and 454)
~
6 6.3.8 Static Uninterruptable Power Supply (NY-403515 and 516) w u
6.3.9 Containment Electrical Penetrations E
6.4 Category C - Icess classified in Category C are those that =ay
_ __ E _
be k = n ai. A tif e h rnnventionat aquipment_uring standard. rigging 9
practice by experienced personnel. Procedures are not required for this category. Included in this category are both construction
~
[
and permanent plant nacerials not included in Categories A and B.
U w
6.5 Inspection of Hoisting Ecuipment and Rigging m
$i 6.5.1 Special visual and dynamic load tests shall be required only for y
hoisting equipment used in handling items listed in Category A E
in Section 6.2.
Non-destructive examinations shall be specified on a case by case basis.
z K3 6.5.2 For categories B and C, it shall be optional either to visually 8
inspect hoisting equipment and rigging every six months or to vi visually inspect before each use.
E!"
6.5.3 Existance of manufacturer's certification of hoisting equipment E
and acceptability of the hoisting equipment and rigging shall y
be documented. For Ebasco, this shall be accorplished on C
Fonn ASP-IV-22.1, by the Construction Superintendent, or his I:
designes.
?
E 7.0 Attachments 7.1 Form ASP-IV-22.1, " Equipment / Material Unloading and Handling Request Record".
+
EQUl? MENT / MATERIAL UNLOADIN0/ hah ING REQUEST RECORD 1-e
.Ite: Description Category AO 3C i
Cr. No.
P. 0 No.
Vender j
f Dwg. Ref.
E.st k*gt.
Overall Di=en.
I Equipment / Material te be used for unicading/ handling - =inimum crane size, bees i
i length, working radius l
i Mini u= requirements for slings - lengths, diameters, & number required Mini =us require =ents for shackles - size and number required j
l j
Jacks - =ini=u= sizes and number required i
Sof teners and blocking - sizes and numbers required l
_.4 __
Other or special Equipment / Material - List l
Steps / Methods to be used j Hoisting Equipment Certified by manufacturer Hoisting Equipment & Rigging Acceptable Construction Superintendent Date Co=unents o
Date Equipment Maintenance. Supervisor, Review Detailed procedure available:
Yes No O Equipment: Soecial O Conventional O -
Materials QC Supervisor
~Date k'ork Complete Date~
~
~ " "
C5n'struction Superintendent Handling verified Q.C. Supervisor
-Date Form ASP-IV-22.1