Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20196E997 | 24 May 1999 | Rev 3 to NTP-203, Emergency Plan Training | |
ML20204H259 | 16 March 1999 | Rev 0 to STD-100-237, Procedure for Modification of RCS Pressure Boundary for Installation of Mechanical Nozzle Seal Assemblies (Mnsa) for Waterford Nuclear Generating Station Unit 3 | Boric Acid Hydrostatic |
ML20204H251 | 16 March 1999 | Rev 1 to C-NOME-EP-0189, Engineering Procedure for Installation of Mechanical Nozzle Seal Assemblies for Waterford 3 | |
ML20248H787 | 25 May 1998 | Rev 1 to Waterford Unit 3 Second Interval ISI Plan | Non-Destructive Examination Nondestructive Examination VT-2 Dissimilar Metal Weld |
ML20202C291 | 1 December 1997 | Rev 0 to Pump & Valve Inservice Test Plan for Second 10-Yr Interval. Page 23 of Incoming Submittal Not Included | Boric Acid High Radiation Area Stroke time Excess Flow Check Valve Power-Operated Valves Scaffolding |
ML20217M022 | 28 October 1997 | Rev 8 to RW-001-210, Process Control Program | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Annual Radiological Effluent Release Report Power change |
ML20217H593 | 14 October 1997 | Revised Page of App B of FOL, Environ Protection Plan (Nonradiological) | |
ML20141B044 | 8 May 1997 | Performance Improvement Plan | Safe Shutdown Ultimate heat sink Stroke time Scaffolding |
ML20138D895 | 6 October 1996 | Rev 5 to Odcm | Offsite Dose Calculation Manual |
ML20117A568 | 28 July 1996 | Ldcr 97-0047-Location of Cabinets C-3A(B) & C-4 Outside Cvas Boundary - Rev 1 | Safe Shutdown Post Accident Monitoring Fire Protection Program |
ML20116B144 | 17 April 1996 | Rev 6 to Procedure NTC-216, Emergency Plan Training Initial | |
ML20116B153 | 17 April 1996 | Training Course Description Emergency Plan Continuing Training | |
ML20138D889 | 11 January 1996 | Rev 7 to RW-001-210, Process Control Program | Process Control Program |
ML20086C019 | 31 May 1995 | Basement Monitoring Program Rept 6 | |
ML20070P870 | 17 February 1994 | Rev 7,change 5 to Waterford III Pump & Valve IST Plan | |
ML20056F206 | 19 August 1993 | Rev 7,Change 4 of Waterford Unit 3 IST Plan for Pumps & Valves | |
ML20118A718 | 16 September 1992 | Rev 5 to Waterford 3 Steam Electric Station 10-Yr Inservice Insp Program,First Interval | Non-Destructive Examination Hydrostatic Nondestructive Examination VT-2 Liquid penetrant Dissimilar Metal Weld |
ML20114C771 | 12 June 1992 | Rev 2 to Administrative Procedure UNT-005-014, Odcm | Boric Acid Grab sample Offsite Dose Calculation Manual Process Control Program Power change |
ML20101B832 | 29 May 1992 | EDG Reliability Program Description & Comparison W/Nrc Reg Guide 1.155,Section 1.2 | Boric Acid Condition Adverse to Quality |
ML20141M428 | 21 June 1991 | Rev 1 to Technical Procedure UNT-005-021, Safety-Related Radioactive Matl & Radioactive Sources Purchase,Receiving, Surveying,Opening & Disposal | |
ML20058P119 | 14 June 1991 | Mgt Manual Vol IV to Site Policy W1.501, Quality Reporting | |
ML20141M427 | 25 May 1991 | Rev 4 to Administrative Procedure UNT-005-001, Safety- Related Waste Mgt & Control | Grab sample |
ML20141M425 | 25 April 1991 | Rev 7 to Technical Procedure HP-001-152, Safety-Related Marking,Handling & Storage of Radioactive Matl | |
ML20141M424 | 4 January 1991 | Rev 1 to Technical Procedure HP-002-223, Waste Monitoring | |
ML20065N756 | 24 August 1990 | Rev 4 to Administrative Procedure RW-001-210, Process Control Program | Safe Shutdown Boric Acid Process Control Program Fire Protection Program |
ML20059A563 | 13 August 1990 | Rev 4 to 10-Yr Inservice Insp Program First Interval 1985-1995 | Hydrostatic VT-2 Liquid penetrant Dissimilar Metal Weld |
ML20065N748 | 3 August 1990 | Rev 0 to UNT-005-014, Odcm | Boric Acid Grab sample Offsite Dose Calculation Manual Process Control Program Power change |
ML20116B122 | 11 December 1989 | Rev 2 to Nuclear Training Procedure NTP-203, Emergency Plan Training | |
ML19325E468 | 31 October 1989 | Summary of Change 2 to Rev 6 to Pump & Valve Inservice Test Plan. | |
ML20246E017 | 4 August 1989 | Change 1 to Rev 6 of Pump & Valve Inservice Test Plan | Boric Acid Stroke time Power-Operated Valves Power Operated Valves |
ML20245D016 | 19 June 1989 | Change 1 to Rev 5 of Pump & Valve Inservice Test Plan | |
ML20082M278 | 9 May 1989 | Rev 3 to Administrative Procedure RW-1-210, Process Control Program | Boric Acid Process Control Program |
ML20195H927 | 18 November 1988 | Rev 0 to UNT-5-013, Administrative Procedure Fire Protection Program | Safe Shutdown Fire Barrier Hydrostatic Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch Early Warning Fire Detection |
ML20154S194 | 22 September 1988 | Rev 6 to Pump & Valve Inservice Test Plan | |
ML20154B376 | 11 May 1988 | Rev 0 to Procedure OP-100-012, Post-Trip Review | |
ML20238D009 | 7 December 1987 | Rev 2.1 to Nuclear Operations Procedure NOP-003, Records Mgt Sys | |
ML20195G933 | 1 December 1987 | NSID-TB-87-11, Westinghouse Circuit Breakers Type Ds/Dsl: Welds on Breaker Pole Shaft | |
ML20236L334 | 15 October 1987 | Rev 3 to 10-Yr Inservice Insp Program Waterford Steam Electric Station Unit 3 | |
ML20082M273 | 10 July 1987 | Rev 2 to Administrative Procedure RW-1-210, Process Control Program | Process Control Program |
ML20147D798 | 7 July 1987 | Rev 6 to Surveillance Procedure HP-1-230, Offsite Dose Calculation Manual | Boric Acid Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report |
ML20235G605 | 30 June 1987 | Functional Design Spec for SPDS Enhancement Program | Safe Shutdown Fuel cladding |
ML20238D027 | 26 June 1987 | Rev 1 to Radwaste Dept Administrative Procedure RW-1-200, Record Preparation,Filing & Storage | |
ML20234B017 | 26 June 1987 | Rev 1 to Nuclear Plant Island Structure Basemat Surveillance Program | Hydrostatic |
ML20238D025 | 24 June 1987 | Rev 0 to Maint Departmental Procedure MD-1-008, Collection & Transmittal of Maint Records & Documents | |
ML20216E832 | 12 June 1987 | Public Version of Emergency Plan Implementing Procedures, Including Rev 7 to EP-2-052, Protective Action Guidelines & Rev 10 to EP-2-060, Radiological Field Monitoring | |
ML20238D015 | 14 January 1987 | Rev 2 to QA Procedure QAP-010, QA Records | |
ML20114B724 | 20 September 1986 | Rev 5 to Technical Procedure RW-2-200, Packaging Radioactive Solid Waste (DAW) for Dispsosal | |
ML20206D468 | 16 June 1986 | Rev 2 to 10-Yr Inservice Insp Program | |
ML20151Z052 | 31 January 1986 | Rev 3 to CEN-39(A)-NP, CPC Protection Algorithm Software Change Procedure | |
ML20151Z064 | 31 January 1986 | Rev 0 to CEN-323-NP Reload Data Block Constant Installation Guidelines |