o n,.e-o acc n

(;. '... -

-g ll 5 r.

v I 6. $3 PLANT PROTECTION SYSTDi 5

FIELD MODIFICATION FROCEDURE

'FOR LOUISIANAPOWER&LIGHf

~

WATERFORD 3 REY. 01 wm.

/.T &

1 Prepared By:

1,.r.

+e /.-

Date:

5 /.;//E3 T.F. Racera A;;:reved By:

'dd M"*v/.

' aw."

Cate:

3/.dC. 'd * ~

P.L. Yanosy.

4 poi 4-2Y-Ad4 8510010369 850227 I)

PDR FOIA BERNABEB4-206 PDR

-.. - - - -. - -. - -. - -... -. - - - -.. _ ~..-

Descrittien i

A design review cf the Plant Pr: taction Systam has indicated that disc:nnection of si-her ccnnect:r AP21C? Or 0P3109 will resu!: in fuli R?S and ESFA5 actua:i:ns through the de-enargiati:n of all FPS trip ;sths. This is in::nsistent with the C-E design philes:phy for the system. Therefere, this cesign change is being i=;1emented to rectify this concern.

Field Action Recuired In:orporate the wiring changes and perform testing as outlined in this Field Mcdification Procedure.

The documentation affected by this modification is the PPS. Tech Manual Figures 8-19, 20 and 21 and the Relay Card Rack Wi:re Lists Ch. A tio. 31270 Rev. 05 and. Ch. D No. 31373 Rev. 05.

1.0 Scece The modifications listed in this procedure, exchange wires between the connectors AJ3109 and AJ!110 and also Between connectors DJ3109 and DJ3110.

These wiring changes prevent all four R?S and ESFAS trip paths frem being de-energi:ed upon disconnection of either connec :c, thus eliminating full RPS and E5FAS actuations.

.0 list of Ecuic=ent Accrex. Oty.

~

  1. 15 AWG wire, White EXAR 400 P/N 581519 100 ft.
  1. 22 AWG Wire, White EXAR 400 P/N 552207 200 ft.

Temipoints - AMP 6-3.T0495 25 75 Airbrn c:nnect:r pins K15167 Airborn connector sockets - K1516S 25

  • ~

. Cable ties 20 Te=ipoint gun (!Z2 AWG) - A".P 255575-1 (Pneumatic) semipoint gun (!Z2 AWG) - AMP 69526-2-Z(Manual )

Temipoint pull test - AMP 69358-2 Tr.mipoint extractor - AMP 69357-3 Cable tie installation tool - Dennisen CS-840 Oigital Multimeter Wire Strippers (!22 AWG and #16 AUG) Ideal Strip =as er W/L 55550 Die set Extraction tool - Airborn 243K Cri=p tool for Airborn pins and sockets Airborn connector pins - K1620 P 2.C Intentionally Slank 4.0 P-ocedure Cautien - Plan

  • Ecuiment and Status l

- While modifications to the PPS Cabin'et are being performed, the system l

wil.1 initiate full reactor trip and a11 Engineered Safety Features Actuatien l

Signals.

tiecessary precautions need to be tal:en :s disable actuated ecuipment.

In ' addition, all PPS associated annunciation will be enabled.

dauti:n cersen.e1 Fretecti:n To prevent a safety ha:ard, persennel perfor-ing this precedure mus:

e:en ne FPS Vi al AC ir.put breaker (On :he AC is ri:u.icn Fanel -

T1 D;) 1) and ras:.*e all c:nr.ect:rs fe:: the 7.51ay Card.aci. Assently l

1 in.he char.nel un'dergoing m:dificati:n before beginnny v.srk.

(

I L

This proceduct is to be performed on The-Relay Card Rack assemblies in Channels A and D.of the ??S Cabinet.

b Ensure that the ab:ve CAUTIC:G have been ctseryed.

-5 4.1 On ~the Relay Card Rack asse=bly rc ve the sar panel (.s) in ceder to allow access tp the cabling going to the J31C3 and J3110 conna: ors.

Refer to Table I for the wiring changes ass::ia:ed wi:n the Channel A Relay Card Rack and Table II f:r Channel C.

4.2 In order to reduce the amount of rer:uting and rewiring within the card ra:k the pr.rsennel perfoming the m:dificatien shall make the following observations before removing both end points of any wire c nnection present1f within the assembly. The modification involves the exchanging of the wires / pins in the J3109 and J3110 cennectors.

A simple m'ethod of making the change s:uld be t: merely swap the c:n-nections.

In order to ac:omplish this it =ust be determined whether sufficient wire length exists to make the exchange.

If this method of r:cdification is possible.after cc=pleting each wire pair swap, initial the appropriate " Mod Sy* colu=n in the Table. ~

Sheuld insdfficient wire length be available the wire change must be accomplished in accordance with the following procedure.

Open the Nelay Card Rack assembly frem the front of the ??S and remove 4.3 the side panels to expose the card edge connector wiring en the card cage slide assembly.

4. 4 In order to gain access to the Relay Card Rack Card Cage Asse=bly, the

~

Matrix Test Module Assembly must br removed.

4. 5 Extend the Bistable-Control Panel and lock in positien.

Remove.the top coven on the Relay Card Rack.

4. 6 Re=cve the " Zipper Tubing" and Ty-Rap fasteners en the cable bundles coming from J3109 and J3110 c:nnectors and scing to the relay card edge connector.
4. 7 Re=ove the two (2) wires between the ::nnecticas listed in item 1 of the Table (in the Remove C nnection Column).
4. 8 Install two (2) new wires between the c:r.nections listed in item 1 cf the Table (in the Install Cannection Colu=n).

Initial the c r esp nding column',of'the Table upon completion cf each change.

4.g

  • Aftar c:=pletien of all bring changes, independant f wiring :hange
,ethods, a continuity test is to tre perfer=ed on all wires in the

" Install C:nnectien" colu=n of the Table..

4.10 Reassemble the Rear panel of the Relay Card Rack and remake all Card Rack c:nnectors.

Ensure ali c:nnect:rs -and Matrix Test I'.:dule Assembiy are securely fastened.

4.11 Reinstall the Relay Card Rack T:p covers 'and inser.: the Eistable C:n rel Panel inte, the ??5 cabir.at.

9

4.12 'Re ssemble the Relay Card eage c:nhect:r' covers in the fr:nt ci the card rc k, as ne:cssary.

r

/d -

/

cate 5~-/ F-23 4.13 Rework By:

/

-e_

^

t/O

's -

Date 5 -1 T-M D'. QA Sign-of':

D Ca te c CM.,@

y--

se 4

O 9

8 G

O e

0 e

O O

D 0

e S

G G

9 0

4 S

O O

I 9

4

5.0 Remarks / Corrections (Reference : age and paragra:h/line nu=ber)

Y D 4'IO.; & / - W A + G pr p,, fg_-_

"^ ^

A

~

&g'*.2p N/o.9 m A 4 e,f wm s ~ Q~_.y*3~Aheaf w aoto w 1,p dM dd_a.

,.,_N. -

r OW --l%

(7~f 4'39,o ggbuA IQ~ala-Q)

Q

- G4s 3 a - % - 4 m non ~ un ~,an.,

r,

. ca,i,J,- sm.so,s.n

/ e n,mx n,,,,,,tr,i,,

wo, s.ec ensursso.

.;.gir.,44 w.a::

, mis //, o,.,i,ngs

$4pped // s'Ce nre.

sir WtW"/i'/4df C ri wpipf

<yg,,p litti /4 ls w Uti

?,

3 /.*.'9e" 4 >!.

%is ca.*xts* i.s cle:ptu/ wo cars si s//if f*A cw.cisov6e Meo,fannce.ps n eco,,u //. rap.

7

[

~I Corrections Made By:

deu Oate: Wf-

5. 0 Certificatien The rework and replaced ecmpenents acce=;11shed in Section 4 cf this precedure cc.:;1y with the Quality Recuirements ir.;csed by the original order.

Eli Quality Assurance:

j&

p

-Date: #M M J

t e

9 e

a e

e G

9 9

9 0

0

TESTING

  • 7. 0 U;cn c:--letion of all modifidatiens and reassentl

~

racks, and ::nnect:rs, riquest the f:llowing fr = y of the relay card personnel.

the L?&L Operations 1) buti:n Panel in Chanr.els A and D cf the PPS.A a

4 stri-2)

Assistance in-clearing system trips su:h that all matrices trip paths are energised.

trips shall be made by LP&L site persennel.Any adjustments to c and CAUTION - PLANT EQUIPMENT The following tests may reinitiate RPS cr E5FA5 actuatie LP&L personnel must ensure that this is acceptable and ns.

aeversely affect the plant.

not 7.1 Rack and cbserve the folicwing en the frcat of P y Card RP5 and the 1 and 3 matrix lights for each ES t

or the ed.

All other matrix lights are illuminated.

ve extinguish-On the " Status Panel", for each ESF system, the red and g are extinguished, the blue. and yellow lights' are illuminated

~

een lights the RPS Trip Paths, the 1 an'd 21Tghts, are extinguished Ecr lights are illuminated.

, and 3 and 4 listed above are illuminated. Remake the connector, reset all g ts as 7.2 Remove connector D7310s and cbserve the same above.

Remake the c nnector and reset all indicators.

r AP1109

7. 3 Remove AP3110 arjd observe the'following:

On the AD Matrix Test Module, a111ndicators remain illumina On the " Status Panel" for each ESF System, the yellow and bl e.

are extinguished and the red and green lights are illuminated ue lights For the RPS Trip Paths, the 3 and 4 lights are extinguish d 1 and 2 lights are illuminated.

e and the Remthe the cennector, reset all indicators and ensure all li ht ifsted above are 111c=inated.

g s as

_ o i

c

.i 4'

?.em.cVe c:nnector DF3110 and cbserve the same indica:icns as for AF3110.

Remake the connector and reset all indicators,

7. 5 Perform the AD Matrix Logic Tests for the RPS and E5F Systems as detailed in the LP&L Surveillance Pro:edures. Observe that all indicators pertaining to the O Matrix and Status Panel illu:.inate and extinguish as required oy that procedure.

e t.,

e 4

?

r N

e a

1 e

9

(

e O

9 9

e e

o a

9 e

one o en e +

se emo k

et 8

e 9

6 0

e O

5 M

i I,

a e

e B

9 e

o e

e e

\\

O f

e 8

e

~. -.. -

,_..____,_,,,__,_._,._,___,7

s m: :....4

. -:- Te--.ina ti:n To Temina:ica Fre: Te.inaticn T: Temination AJ31 5'43 AJ3075-02 m st he changed ::

M311 C-39 M3075-02 06 AJ3110-ZS AJ3111W must be enan'ged =

AJ310943

- M3111W pG AJ3105-50 M3076-02 must be changed te M3110-30 M3075-02 DG AJ3110-30 AJ2074-G2 must he changed to M3105-50 M3074-02 06

' A'J310S-51 AJ3079-02' must be changed t:

AJ3110-23 AJ3079-02/ 06 AJ3130233 M3111-X must he changed to M310s-51 AJ3111-X 08 M3105-52 AJ3080-02 must he changed to AJ3110-34 M 3030-02 CO AJ3110-34 M3078-02 must he changed :s M3105-52 M3073-02 c6 AJ3109-53 M307S-13 must be changed :b M3110-37 M3079-13/ 06 M3110 AJ2017 must be changed to AJ3105-53 M3017-05 06

' M3109-54

  • AJ3080-13 must be changed to M3110-38

'M3030-13 /00 AJ3110-38

., AJ3078-13 must be change,d to M3109-54 M3073-13 06 AJ3103-55 AJ3079-20 must he chang'ed to M3110-41 M3079-20 90 AJ3110-41 AJ3017-34 must be changed to AJ3109-55 M3017-342 OS M3109-56 AJ3080-20 musi.he changed to M3110-42 M3030-20 CA

, M3110-42.

M3078-20 must be changed.to A03105-55 M3078-20 96

/

M3109-51 M3079-31 must be changed ts M3110-45

. M3079-31 00 M3110-45 AJ3111-C-mst be changed to M3109-57 M3111-C 06 M3105-58 AJ3080-31 must be c' hanged ::

$J3110-45 M3030-31 96 A33110-46 AJ3073-31 must he changed to M3109-58 M3078-21 US M3105-59 M30Sh-02 must be changed to M3110 49

'AJ3033-02 C6 M3110-49 AJ3311-E must be cha,nged :s M3105-59 M3111-I CG

' AJ3102:.60 M3034-02 must he changed ::

A:r3 c-50 M3034-02 /90 M3110-50 AJ3082-02 must be changed o.

M3105-50 AJ30E2-02 06 AJ3 05-61 AJ3083-13 must be changed to M3110-53 AJ3033-13 CS M 110-53 M3111-M must he changed =

M3105-51 M3111-M ce M3105-51 M3054-13 must be changed ::

AJ3110-54 M30S4-13 A C' AJ:11C-54 AJ3032-13. must he changed =

AJ3105-i2 AJ3C32-13 OG

/

.AJ3*,;;-53 AJ3:E2-20 =ust he changed ::

AJ311.0-57 AJ3053-20 C8

J3110-57 M3111-7 must be changed =
031C9 -u AJ3111-?

cs A;;;;.;-5$

A03:5*-30 muskteenan;ed'n A;3;'. -55 AJ3:34-I /cc-A;211J-52 AJ2052-20 must he ::anged =

AJ3103-5' AJ3:33-20 og

$)Un ppsk

~

T431.E II 0

- = Te -.i.ati en 7: Terminatien Frem Te-.ination To Te-=ination J3105-43 DJ2075-34 must be changed ::. CJ3.110-!!

DJ2075-24 4

J3110-25 D03073-34

=ust'be changed t:

DJ31.05-43 DJ2073-34 $

DJ3109-50 DJ3' 111-W ' must be changed to DJ311b-20 DJ3111W rC6' CJ3110-30 DJ3074-34 '- must be changed to DJ3109-50 DJ3074-34*M @

DJ3105-51

  • DJ3079-34 must be changed to DJ3110-31 DJ3079-34 M 4 D3:110-33

, DJ3077-34 must be changed to DJ3109-51 DJ3077-34 #2-CJ310S-52 DJ31'11-Kj must be change 3 to DJ3110-34 DJ3111-K A! 4 003110-34 DJ3078-34 must be changed to DJ3109-52 DJ3078-34 4 4'

~

DJ310S-53 DJ3079 47 must be changed to DJ3110-37 DJ3079-474C5@-

DJ3110-37 DJ3077-47.,must be changed to DJ3109-53 DJ3077-47 s 4-f

  • CJ3105-54 ' '

DJ3017-05' must be changed to DJ3110-23 DJ3017-05

^

003110-23

,,DJ 3078-47 must be changed to DJ3109-54 DJ3078-47 CJ3103-55 DJ3079-50 must be changed to DJ3110-41 DJ3079-5 CJ3110-41 DJ3077-50 must be changed to DJ310ii-55 DJ3077-50,

DJ2103-55 DJ1017-02 must, be changed to DJ3110-42 DJ3017-02

/

CJ3110-42

'DJ3078-50 must.be changed to DJ310S-55 DJ3078-50 m'

C03109-57 D'J3079-63 must be changed to DJ3110-45 DJ3079-53 DJ3110-45 DJ3077-53 must be ~ changed to DJ3109-57

DJ3077-53 DJ3105-53 DJ3111-C must be changed.ts DJ3110-45 DJ3111-C M-003110-45 DJ3078-63 must be changed to DJ3105-53 DJ2078-53 R 0J3105-59

. DJ3CS3-34 cust be changed to. DJ3110-29 DJ3053-34 N

- J3110-49 DJ3C31-34

=ust be changed to DJ2109-59 DJ3031-34 M T DJ3111-5 h '

DJ3105-50 CJ3111-E must be changed to DJ3110-50 0J3110-50.

DJ3032-34

,must be changed to.

DJ3109-50 DJ3C32-34/IT

,0031 03-61

~ 0J3033-47 must be changed s DJ3110-53 DJ3033-47N C03110-53 DJ3081-47 must be changed to DJ3109-51 DJ3031-47 M.< -

A<

0031 05-52' DJ3111'-M must be changed to DJ3110-54 DJ1111-M[g~

J3i10-54 DJ3032-47 nust be changed to 003105-52 DJ20S2-47 s

-f31Ci-53 DJ3033-50 k DJ2033-50 cust be changed o

DJ3110-57 J3110-57 023051-50 must be chan;ed to DJ3109-53 DJ3031-50g/y -

Md

3*.;I-54
03111-?

=s be chan;ed ::

OJ311 C-53 DJ3111 : 3

,*3 1 -55
J3052-53, =st ha changed t

003105-54 003:52-50

.t/.;s??

(w)'.Wh {y t

I I

. ~. -

e Joo ? 2 ',:

r.

t**

g.

s_

r S 14 (3 PLANT PROTECTION SYSTEM s

FIELD MODIFICATION PROCEDURE

'FOR f.0UISIANAPOWER&LIGhi

~

WATERFORD 3 REY. 01 Prepared By k

Date:

J/;

SS T.F. Roberts Approved By:

d Swe: v Date:

J / 6. 'd " ~

P.L. Yanosy.

e e

yo,g.p. zo t f

3

-..n.,,,-.._,,~

s,

,,,..e.

--n-

-. - ~.. -.. - -.. -, ~

?

s..

Deicriction A design review of the Plant Protection System has indicated that disconnection of either connector AP3109 or OP3109 will result in full RPS and ESFAS actuations through the de-energization of all PPS trip paths.

This *is inconsistent with the C-E design philosophy for the system.

Therefore, this design change is being i=plemented to rectify this concern.

Field Action Recuired In:orporate the wiring changes and perform testing as outlined in this Field Modification Procedure.

The documentation affected by this modification is the PPS. Tech Manual Figures 8-19, 20 and 21 and the Relay Card Rack Wilre Lists Ch. A fic. 313.70 Rev. 05 a,nii Ch. D No. 31373 Rev. 05.

1.0 Scoce The modifications listed in this procedure exchange wires between the connectors AJ3109 and AJ3110 and also Between connectors DJ3109 and DJ3110.

These wiring changes prevent all four R?S and ESFAS trip paths from being de-energized upon disconnection of either connector, thus eliminating full RPS and ESFAS actuations.

2.0 List of Eauie=ent Acorox. Oty.

!15 AWG wire, White EXAR 400 P/N 581619 100 ft.

  1. 22 AWG Wire, White EXAR 400 P/N 582207 200 ft, Termipoints - AMP 6-33b495 25 75 Airborn connector pins K1616P Airborn connector sockets - K1516S 25 Cable ties 20

~

Termipoint gun (f22 AWG) - AMP 265575-1 (Pneumatic)

Termipoint gun (!22 AWG) - AMP 69526-2-2(Manual)

Termipoint pull test - AMP 69358-2 Tr.rmipoint extractor. AMP 69357-3 Cable tie installation tool - Dennison 08-840 Digital Multimeter Wire Strippers (!22 AWG and #16 AWG) Ideal Strip: aster W/L 55550 Die set Extraction tool - Airborn 243K Cri=p tool for Airborn pins and sockets Airborn connector pins - K1620 P 2.0 Intentionally Blank 4. 0-Procedure.

Caution - Plant Ecuiement and Status

- While codifications to the PPS Cabinet are being perferned, the system wil1 initiate full reactor trip and all Engineered Safety Features. Actuation Signals.

T'eces.sary precautions need to be taken to disable actuated e cui r,mant.

In addition, all PPS associated annunciation will be enabied.

auti:n - Fers:n el Frotection To prevent a safety ha:ard, persennel perforcing this procedure must 0:en the FPS Vi al AC input brcaker (Cr. -he AC Dis ribu.icn Fanel -

Ti D.) 1) anf ras:ve all c:nnectors. fe:: the 7.tiay Card :.aci. Asse.tiy in :.e enannel un'dergoing modification :sfore teginnr.g v.ork.

l

I This procedure is to be 1erformed on The Relay Card Rack assemblies in Channels A and D of the DPS Cabinet.

1 G.

Ensure that the above CAUTIO;l3 have been obseryed.

\\

4.1 On the Relay Card Rack assembly remove the rear panel (.s) in order to allow access to the cabling going to the J3109 and J3110 connectors.

Refer to Table I for the wiring changes associated with the Channel A Relay Card Rack and Table 11 for Channel D.

4.2 In order to reduce the amount of rerouting and rewiring within the card rack the pt.rsonnel performing the modification shall make the following observations before removing both end points of any wire connection presentif within the assembly. The modification involves the exchanging of the wires / pins in the J3109 and J3110 connectors.

A simple method of making the change sould be to merely swap the con-nections.

In order to accomplish this it must be detennined whether sufficient wire lpngth exists to make the exchange.

If this method of rodification is possible,.after completing each wire pair swap, initial the appropriate " Mod By" column in the Table. '

Should insu' ficient wire length be available the wire change must be f

acccmplished in accordance with the following procedure.

4. 3 Open the Relay Card Rack assembly from the front of the PPS and remove the side panels to expose the card edge connector wiring on the card cage slide assembly.

4.4 In order to gain access to the Relay Card Rack Card Cage Assembly, the Matrix Test Module Assembly must be removed.

4. 5 Extend the Bistable Control Panel and lock in position.

Remove the top covers on the Relay Card Rack.

4. 6 Remove the " Zipper Tubing" and Ty-Rap fasteners on the cable bundles coming from J3109 and J3110 connectors and goir.g to the relay card edge connector.
4. 7 Remove the two (2) wires between the connections listed in item 1 of the Table (in the Remove Connection Column).
4. 8 Install two (2) new wires between the connections listed in item 1 of the Table (in the Install Connection Column).

Initial the corresponding column'.of the Table upon completion of each change.

4.9 ' After completion of all wiring changes, independent of wiring change methods, a continuity test is to be performed cn all wires in the "Ir. stall Connection" column of the Table..

4.10 Reassemble the Rear panel of the Relay Card Rack and remake all Card Rack connectors.

Ensure all connectors and Ma rix Test Module Assembiy are securely fastened.

l 4.11 Reinstall the Relay Card Rack Top covers and insert the Sistable Ca...:rol panel into, the PPS cchinet.

1

- _. _, - _. _ -. -, _ _ _ _. ~.

., - 4.12 ' Reassemble the Relay Card edge conhector' covers in the front of the card rack, as necessary.

4.13 Rework By:

/

i-m Date 0 -/F-83

~

E

's -

4 Date 5 -)?- 7%

EM QA Sign-off. -

& 8,y -

r Datec f/9.)28 3

./

O e

G 0

0 9

9 9

0 e

O 9

e O

l

1 4'

5.0 Remarks / Corrections (Reference page arid paragraph /line nu=ber)

W ! 4 'I

  • M / - 2 % e s 4,, A,
  • _

m-Q &

C, Q _ A g 'a.4b./ h.S. C

  • L. u.,# A e c,4 wm g

s% un_

~

?

-' Y'A ' M w 30/o w,,

.co n l h(/

^ '

fr,as aya yEs4 lo-ala-93)

/1 m

kgkS f 4- [ - litr/!)b w'/L ooe*O Fsp 1 4 o t w.o r t rie g re Coup // dets :7/p&,nMrser as f 4.9 Arren iscoisitsems woa s.ec e**/ussis.

.g/rs.14 w.n;i,aina//) wipgo

$4/,4yJ // Otwanstx Jr 7'#t W " / C'4 df C A/ Whiff

<,yg,,e,

lil/1/4 lS WGXi ?e $4 f.9CEJ. k/S fdMii /4 I

t ew.ciasso elepiu/.wo pers,vir.u/rer M

>> oi pseenc<? es secco,nskrei&p.

gp f, w s) % &

Corrections Made By: lArj Y

Date: Cf~/9.}

/ ~

6. 0 Certification The rework and replaced components accomplished in Section 4 of this procedure comply with the Quality Requirements imposed by the original order.

EM Quality Assurance:

M>&

-Date: ef"l/JP d3 j

i 4

g e

l I

TESilHG-

  • 7. 0 Upon completion of all modificatic'ns and reassembly of the g-racks, and connectors,. riquest the following from the LP relay card personnei.

rations 1)

Authorization to close vit:1 AC pcwer breakers en the bution Panel in Channels A and D of the PPS.sr-2)

Assistanc'e in clearing system trips such that all matric trip paths are energized.

trips shall be made by LP&L site persennel.Any adjustments to i3UTION - PLANT EQUIPMENT The following tests may reinitiate RPS or ESFAS actuatio LP&L personnel must ensure that this is acceptable an

. adversely affect the plant.

7.1 Rack and observe the following on the front of P r

RPS and the I and 3 matrix lights for each E e

ed.

All other matrix lights are illuminated.

nguish-On the " Status Panel", for each ESF system, the red and gre are extinguished, the blue. and yellow lights are illuminated n lights the RPS Trip Paths, the 1 and 2 lights are extinguishedEcr lights are illuminated.

, and 3 and 4 listed abeve are illuminated. Remake the connector, reset a s as 7.2 Remove connector DP3109 and observe the same

.above.

Remake the connector and reset all indicators.

r AP3109

7. 3 Remove AP3110 and cbserve the following:

On the AD Matrix Test Module, all Indicators remain illuminated are extinguished and the red and green lights gnts For the RPS Trip Paths, the 3 and 4 lights are extinguished I and 2 lights are illuminated.

and the

~

Remake the connector, reset all indicators and ensure all li ht listed above are illuminated.

g s as e

e w

5. 4' P.e:nove connector DP3110 and observe the same indications as for AP3110.

Remake the connector and reset all indicators.

7.5 Perform the AD Matrix Logic Tests for the RPS and ESF Systems as detailed in the-LP&L Surveillance Pro:edures.

Observe that all indicators pertaining to the AD Matrix and Status Panel illuminate and extinguish as required by that procedure.

e w

e 6

g e

e O

f

1 TABLE I 1

i.:,.

.r'*

1

Tem.ination To Termination '.

Frc= Termination To Terminatior 1105'-49 AJ3075-02 must be changed to AJ3110-29 dr////

A,J3075-02 d6 3110-29 AJ3111W must be chan'ged to AJ3109-49 AJ3111W po l

AJ3110-30

%///// AJ3075-02 06 3109-50 AJ3076-02 must be changed to 1110-30 AJ3074-02 must be changed to AJ3109-50 M d/sy AJ3074-02 OS l 4

l 3109-51 AJ3079-02' must be changed to AJ3110-33 E9 rA>///.hJ2079-02 / DS 3130.:33 AJ3111-X.

must be changed to AJ3109-51 AJ3111-X 08 310S-52 AJ3080-02 must be changed to AJ3110-3

  1. r/viv' <AJ3030-02 CO 3110-34 AJ3078-02 must be changed to AJ3109-53 er/e/e4 iAJ3078-02 c6 l

3109-53 AJ3079-13 must be chanced t'o AJ3110-37

@ r/ogr-AJ3079-13 !C6 '

3110 AJ3017 must be chan[oed to AJ3109-53'

&r/ohr ~. AJ3017-05 06

\\

3109-54

- AJ3080-l'3 inust be changed to AJ3110-38

  1. bs>fNAJ3050-13 /06 3110-38 AJ3078-13 must be changed to AJ3109-54 29 @/fr 4J3078-13 06 <

1 3109-55 AJ3079-20 must be chang'ed to AJ3109-55' he/a/ry 4J3079-20 90 AJ3110-41 Mr 3110-41 AJ3017-34 must be changed to yre'AJ3017-34:. cG s

3109 AJ3080-20 must.be changed to AJ3110-42

@ r/u/py<AJ3050-20 98 3110-42_,

AJ3078-20 must be changed to AJ3109-55 M r/e/n. AJ3078-20 96 3103-51 AJ3079 must be changed to - AJ3110-45 l 49 r/v/ry /AJ3079-

/

3110-45 AJ3111-C must be changed to-AJ3109-57 2 ? ? '/c

%J3111-C p6 3109-58 AJ3080-31 must be c' hanged to J3110-45 ; /20 rAdy4J3030-31 96

'3110-45 AJ3078-31 must be changed to AJ3109-53 M rA/sy.AJ3078-31 US I

3109-59 AJ30Sh-02 must be changed to AJ3110 49 /Lir r/> >/FW AJ2053-02 06 3110-49 AJ3311-E must be cha,nged to AJ3109-59, AJ3111-5 CO

-3109-60 AJ3084-02 must be changed to A Juc-So ' #r/w/f/ ' AJ2034-02 M 3110-50 AJ3052-02 must be changed to.

AJ3109-50 M :@'//*

AJ3052-C2 C6 3' 09.-61 AJ3053-13 must be changed to AJ3110-53 /2P r/v/py. AJ3053-13 96 3110-53

.AJ3111-M

-must !;e changed to AJ3109-61 AJ3111-M CG 3109-52 AJ3054-13 must be changed to AJ3110-54 5 Y"//Y AJ3054-13 #C, 311f-54 AJ3032-13. cust be changed to AJ3iO9-52 @ rh>/r'<

A;3c3g_;3 og i

3.23-53 A23:52-20 must be changed o

AJ3. i,0 57: f M rf>h A33C33-20'C6 3110-57 AJ3111-P must be changed to C3109 -U AJ3111-p cs I

5-5I A23054-30 nust be chin;sd A;3;i".-53 " W*h'fv A;3
3f-
/cc-3110-55 AJ2052-20 cus; be char.;id
2 AJ310.:-5 '

/W, 43:33-23 cg

() I Y ~

/

l%y?64. IM

'/

t7 e

m,_.-.--.,-e

-.n,e

-,_m.,,.,

m,

,,-g,,

,a

,.m-

- +,, - - -, -, -

w+-e-

,-r-w y

~m

,n,-

IA5Lt II

..s? -

. r:. Te:.ination To Termination Frem Termination To Te -.Yrhti'e-J3105-49 J3075-must be changed to. DJ3.110-29 gr/ shy dT3i75D 4Ilf J3110-25 Du to /aA v TJ3073T31$ ;

34 must'be changed to DJ3109-49 r

J3109-50 DI3111-W must be changed to DJ311b-20 I

G6 DJ3074-34 DJ3111W i

J3110-30 DJ3074-34 '- must be changed to DJ3109-50 /+ r/uh y J3'109-5 DJ3079-34 must b'e changed to DJ3110 M rhi/.ry DJ3079-34M

~

1 @ 3-A,4y / DJ3077-3 J3110-33 DJ3077-34 must be changed to DJ3109-51 J310S-52 DJ31'11-Kj must be changed to DJ3110-34,

DJ3111-X sts J3110-34 DJ3078-34 must be changed to DJ3109-52 49 r# >/r1 DJ3078-34 /DT DJ3110-37 l 19 yA; #DJ3079-47

~

J3109-53 DJ3079-47 mu'st be changed to '

J3110-37 DJ3077-47. must be changed to DJ3109-53 ; 49th>. v DJ3077-47 C4

/

J3iO9-54 * -

DJ3017-05' must be changed to DJ3110-38 f 9 s%$y DJ3017-05 fUif t

'J3110-35 DJ3078-47 must be changed to DJ3109-54 4G 3f. var. DJ3078-47 4W

.J3103-55 DJ3079-50 must be changed to DJ3110-41, Wh4v/v DJ3079-50h.

Q3110-41 DJ3077-50 must be changed to DJ3109-55 Ap r/;;/ry DJ3077-50 p

1J3109-55 DJ3.017-02 must. be changed to DJ3110-42

/9r4// -DJ3017-02 t gf

'J3110-42 DJ3078-50 must be changed to DJ3109-55

><h r/o tr-DJ3078-50 m

03109-57 DJ3079-53 must be changed to DJ3110-45 : Ap 4r DJ3079-53 ett' r$>/ty - DJ3077-53
J3110-45 DJ3077-53 must be' changed to DJ3109-57 p>
J3105-53 DJ3111-C must be changed,to DJ3110 45 ;

DJ3111-C /$$

1:3110-45 DJ3078-53 must be changed to DJ3109-53 ',c9 r/v/f y DJ2078,53 (ts'

. s -c

.J3105-59 DJ30S3-34 must be changed to DJ3110 29 g.f r/////y-DJ3053-34gt A @k y DJ3031-344N
J3110-49 DJ3031-34 must be changed to DJ3109-59 b3109-50 DJ3111-5 must be char'.ged to DJ3110-50 DJ3111-5 Y
J3110-50 DJ3082-34

,must be changed to.

DJ3109-50. /4 rgd 7 DJ3032-34h

031 05-51 DJ3053-47 must be changed to DJ3110-53 Xfd>#rDJ3053-47N17
J3110-53 DJ3031-47 must be changed to DJ3109-51. fe;7 s-/uhy. DJ3031-47 M.9 2 t

i

.s

33105-52 DJ3111'-M must be ch'anged to DJ3110-54 '

DJ3111-M $ N

.J3110-54 DJ2032-47 must be changed to DJ3109-52 lu, spdr DJ2052-47$

' 31C?-53

. 003033-50 cust be chen;ed to DJ3110-57

  1. fr4>/rr DJ3C33-50.

J3110-57 DJ3031-50 must be chan;ed to DJ3109-53 M S-/nhi DJ305i-50G

..s

. 3..h-5

)J3) b * *I *'h b l3110-55

J3052-50, must h Chl 5id S 0J3109-54 >EerfohY D '3033-50 Eh' t/J3lhy Y.Whd

-,----.---u.,,,nn--

,--w+,

- - -, - - - - +

-~--~-.,,,,r,-,n,--,

y

,y.~

e c-

1 1

I i

{

l SC*13N 4-MAINTENANCE PZYEW 9-PMGd100 3 DE 2 1

-..._..r,....,..'.,.

......i.r....

- i ~.n i33

. i.

'.. '.. ". /. 0..T..

~.

i3'

.I..:..

.n....,

l 135 Mi........:

r.

,,.r....

5 l36lh....

......,i......

.. i

..... ' '.. i f. f. t'.

.r....c.

/ r. r. '. i.

. /, ~.J..-

- ~"

g

. [

.:.n..

1

. 35 El.i......~ v......

=

i 35l$21....., i,,....

.......e i

40 M

., f.. T , /, *.

.r,^.

il

.7...'.

.'..e e / ', r.

et g

..~... :,.., e rf i 'I.

,'.?

.e

,r.i...r,.

,. r,<.4.r,e.v n.r..;,.....',.-

t l

4ap,-...,,,..,,+,,

,0.i.c.e,r,c....,,r.

l4sjtEi

,n

,,,'. c..., ~.., 0. c. is,. c..... v..... - *. e. e, /...

4415%

m e om amme or ens caramon came w muase semsema i

iEE: E:?sp 152) (SELEL'T_p M 2)

LSELEL'T WP W 21 gg E 91 e

5E

$5 e.

c 1

~

FE

=

als

=

e e

cb a.

5 E!! EI y

i E

.!'h."e d,8, 3

g w g

I 38 7.m m!.8, 2 L

.EE E8 Ei E s

g

.s I. zus5:

s[

. =

x

, t

=s-5= = r

=

.s a

s:s

-! D.

g,s 3,,,). mgM,.

9 E

,E,sEv ss 9.,

m. d.

w R

g l

!!Ei I

9 gE

=p-g ':

g:$1 g3Ei B.s.:i!. M,g!. alif.i.]s Eliea"l'ai_si.:

E 5

E.!

5 E.aRE ig ss

... =' 99

=ME at *. *' 9*: =t-t *: El t==t*!*.8 999994 E M-7.=J..z..al e ote

,O e -.,. -. g =.

.. gt gt ;g===g;.-.

ggg p g-7 ; = s gigg;; gig: ggt;;=gg j

4 s i i e ili 6 ist i i i iieieit t i i s e i s s i i e e i 616

i nteli eisiit 1 i i i l e

ease oi, i= e==

ises.az-o

- ac-me wese=*>-'es em: mon wruroccms O w i

I.

  • r N

i e

a li.s S

i, O

w

.e 4

3 8

3 g

I 4

3 I I hl E

m3 j

=5" i f n!

Ei'lli 55 s E

"dga

==s.M g

2

.T g =

e=

mm,,s.;=-

a mr%c) 3

-4Eg sur:q

=

a d

-1.. n i::

9. L-9q V;8

-e :

gsn.ii.:e. w.e=.=.M 4 '.I*

.,.s !. d..iE._".3"a,,I.@.=.,.

8-i 1

Q.,.H*,.~

u w-u.m:ssisoss i

-.=.=

a....
  • t !* * *1
  • Dat
  • t *t *
    • 1 t !*'*"'9"!99"l*t'1 i

?

~.

1

-a=

-3

!* ' d' Sm2

  • 2:=.orete-m..ma.et : =i ::::::::::teiEi- --
;=:::: **---

its=::E:3tF;; ::13:30G:' 8 iie ie iiie ii 6 t i 31 6 i i trtt I t it t I t

W 6 ie..I i'I 8 i.*8 8 : 1 I I

  1. +I J

s i

me,use coco se.=% amp.s.I w a anst Iwar m_.

~ '~

I. N E

h a

get ign, pesem enes6 2.&

900.

IlW ITEAE 34 8

e be No

as las ao tua
f. I I 48 samansD P fl

! I I I I I

I II 1l i I I I l I f 3as no

.. ~.

_.n.--,,,._.-,_.--n

KEYPUNCH USE ONLY UNIT WATERFORD NUCLEAR STATION y

Z

,,_, _,,, !,ou!s?ti,A R

CONDITION IDENTIFICATION WORK AUTHORIZATION ))l/l[,

-. * =

C11.Oz I

6 evaiEM I UNID 2 C MP NENT DESCRIPTION 3 Q A TYPE 4 amtmrm. e,.. O.

$ rirl,s1 NO D Ir lr II Ic 14 I rlzl a Inl t'Ir leltl/ldl21els1 lhi olol, e i le lei r zjolel I

  • * " " " ' - od' o"*

A CiWA s RE0uEST DATE 6 raituRE STARTifD T TECn.' SPEC. DATE 8 E,i*igY 9 ""'Iff."0"10 PRIORITY ll 12 T

"""S*"*"'-

=*

=av va.

aa.

==i.

me.

av vn.

an.

i==.

me.

nav min.

O 17lrldi/ /Is ilt el'/ bly s lat i

I l

l l

l l

v"I a"I I fisitif1718 l11Il

/ir. " "' "^""

1

'(ini,iAt PROeLEM OR ran.URE DESCRIPTION R

/

is #u /ee-r/-'ec o f /W^'r m vo ~ P N >r *e o g$fs 2Ct/ Of, SCcl'%C 7' 0

~W Y SE "#h p

a

"" ""I#"I j

S

'A

"'E ^

WORK I4 essen,seesv. otssan 15 comosvioserumuert CRGINATOR 16 EXT.

DEPT.

SS/

{

M Dg/

\\

S'V

'* "edi~

E Mscr/-ez_

lllE mz.

MMw

- /$/dS-osna e

i 18 EVALU DISPOSITION INVALIDATION COMMENTS SIGN

[

D kE

}

.P g

( /9 ff 4

'g O INVALID 0 NONC0ff0RMANCE MREWORK O RER. ACE SEE ADDE DUM f%GE O O TRotAILE SHOOT O TECH. EVAL.

O REPAIR O USE AS IS

% MAINT ITEM O OTHER SS/CRS SIGN ATURE DATE i

19 DISrOSITION CONCURRENCE YEs O No O C AUSE & CORRECTIVE ACTION / TECH EVALUATION RESULTS P

SisNATuRE DATE E

SEE ADDENDUM PAGE D TASK DESCRIPTION 20 DATE DUE 21 p M/SR, PR, RQ No.23 1

RIEL 7Tel4TT I M SI IP Ela Iclablulelg IFulet_1bl 1h1012014 /lel/4 71/la h"h b Yb#

N 1

cominots arouinto as was wo PROCEDURES 25 WORK INSTRUCTIONS 29 i

O s

g/j f) pe<j;,,,,,.- u%g x o,f i p.s re, e o co.n.,,,,,,,,,,,,

v

,","$,',[" ** " ""

DRAWING S 26 '

div Ber/c/r T/e's M##

  1. E i

nattet V

l

)

P enernciseen er RETEST PROCEsuRES 2T ere s t'/'S ao menwn~ A'<<<o-~t

g) p,.,, p,,,,, w 7,,,,,,. [/

7 g,

if.

g i

A renn enosecs on enness v

i s%

,,,,,s L s ia.

xc., i u / msc-u q '3

,y,v,e2 s d o /,,, 7,

C senciat reece....

A TECHNICAL MANUALS 28 ef g g,fes,v,ec rrs4 gret I

bl K

c^""<**~**"*'-

" "W-t'r 7 N N /rr N.

A PREPAR.ED BY 31 j

44 G

ggg, SEE ADDENDUM PAGE O f

hb

$-gk Yi5 N. O.

hh 70 w i -r u s s.s M~W

-o.n...., p,y c-r sai<r re.sr-c

~

i w,- m m 2 av3

k J

STA. NQ 35 RIS. NQ 36 ROS.NQ 37 MATL. COST 39 ESTIMATED UAN HOURS 30 f'

b ELEC.

MECH.

NST.

OPER.

HPHY.

CHER TECH SCTY.

OTH[H-I III L II LLI LLLII I

II II I

dDM i

lI i i lI i l i I M AIN TENANCE SUPERVISOR DATE TIME 34 SS/C DATE IME 40 WR/J TAG SS/CRS BEGN.END on

_~

$7/b82.'

Y99$fIe3o /

7l/bA f,'"fu,'"l,g,"%' _ ^,T'/'ocedu ec~ad.scoA2 % o ' h' P/s he/d mod.M.%

'6"

  • Pedo' r%Anle- )?D S skn /enDre s s. lev L Inc./d: y.5ee}.%

el m J.x 7; g y

rf.u/eV Pe go,. d een).R u Ny e4 s<k o n a ll "' s I/d ** O ' i ~ d M'h T'a i le L 'JA 'el 9 o So 453 / / ' " A *'e A

<~s * "c,*

  • I' *7 e.x ee,sf

-fo r C o '<< s on f* N J U I

ais o 6.0 %s s an T.ble L aL'ck 1#

try3111 uct bZJIII MoY A5donn% N a e ye.

4 y i+ i;s no+ known e.und/y eAd.s :p als en %L Gh ?

a ve.

A Hw t he s a.

en 4 fe-S, nel 14eak H<

e~ern~es D

c, p c/ f,s e,,,,,,,g,-

y-g,,,e, j % A s is w ho to #1, SEE ADDENDUM PAGE O W

START WORK 43 COMPLET10N DATE 44 ACTUAL MANHOURS 45 RAD. WORK PERMIT 96 FIRE PROT. PERMIT 47 0

ma car v n.

un.

uin ma oav v.

un cur ucca mn

==

u cuem vaca scvr on.in R

gir;lt finie 3lvalralhiyJll A6 I I II />Dld II II Ii l

lI II

' PARTS REPL ACED 48 H & TE 49 R

ROS/ PO PART NO.

QTY DESCRIPTION M S TE CAL DUE DATE USE DATE ik -Lik lC 'l.I,

? i ll1 u 'l -

?,,ldi

-Y M +/avrv

>,,r -e r -i o. n

> lrh i fln/M WORK COMPLETE MAINTENANCE SUPERVISOR 54 DATE

,D ATE gh7h f M [gg/

LE D W RKER 50 DATE SS/C

)?ffY gjknYs

$.~ff~lf<l A40NCCNFO6 NANCE LLOSEOUT Q RET

'T S

'/'

~

QC SUPERVISOR 55 DATE

~

T E STE R 52 DATE SS/CRS 53 PE REVIEW 56 DATE