Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20206U9041999-05-19019 May 1999 Summary of 990504 Meeting with EOI in Rockville,Maryland Re Integrated Nuclear Security Plan Being Proposed by EOI for All EOI Sites.List of Meeting Attendees & Copy of Meeting Presentation Matl Encl ML20198G5501998-12-18018 December 1998 Summary of 981201-02 Workshop with Entergy Operations,Inc in Taft,La Re Licensing Processes,Licensing Submittals & Other Topics That May Affect Licensing Processes & Submittals. Copy of Slides Presented During Workshop Encl ML20155H3931998-11-0202 November 1998 Summary of 981007 Meeting with Util Re Review Status of Standard Quality Assurance Manual for All Util Sites.List of Meeting Attendees Encl ML20151X0011998-09-10010 September 1998 Summary of 980827 Meeting W/Util to Discuss Status of Review of Std QA Manual.List of Attendees Encl ML20236M0501998-07-0808 July 1998 Summary of 980702 Meeting W/Entergy Operations,Inc to Discuss Review Status of Std QA Manual for All Entergy Sites.List of Attendees Encl ML20216B8511998-05-0606 May 1998 Summary of 980219 Meeting W/Entergy Operations,Inc in Rockville,Maryland Re Spent Fuel Pool Re-Rack & Spent Fuel Pool Cooling at Waterford Steam Electric Station,Unit 3 ML20217K5141998-04-24024 April 1998 Summary of 980416 Meeting W/Entergy Corp Re Standardization of site-specific Security Plans.List of Meeting Attendees & Agenda for Meeting Encl ML20217K3461998-04-24024 April 1998 Summary of 980401 Meeting W/Entergy Operations,Inc Re Licensing Issues & Regulatory Performance Efficiencies.List of Attendees & Agenda for Meeting Encl ML20217F4811998-03-26026 March 1998 Summary of 980319 Meeting W/Licensee to Discuss Status of Development of Std QA Manual for All Entergy Sites.List of Attendees Encl ML20203B5741998-02-11011 February 1998 Summary of 980122 Meeting W/Entergy in Rockville,Maryland Re Licensing Issues & Standardization of Licensing Documents. List of Meeting Attendees & Meeting Agenda Encl ML20212G8521997-10-29029 October 1997 Summary of 971022 Meeting W/Entergy Svcs,Inc Re Development & Implementation of Common or Std QAP for All Sites.List of Meeting Attendees & Viewgraphs Encl ML20141D0881997-06-24024 June 1997 Summary of 970423 Meeting W/Licensee in Killona,La to Discuss Design & Licensing Basis of Certain Essential Containment Isolation Sys at Plant.List of Attendees & Licensee Presentation Encl ML20141C6361997-06-24024 June 1997 Summary of 970321 Meeting W/Licensee in Rockville,Md to Discuss Design & Licensing Basis of Certain Essential Containment Isolation Sys at Plant.List of Attendees & Licensee Presentation Encl ML20149M3611996-12-11011 December 1996 Summary of 96111 Meeting W/Licensee in Rockville,Md to Discuss Comments Developed in Response to NRC Advance Notice of Proposed Rulemaking on Financial Assurance Requirements for Decommissioning Nuclear Reactors.List of Attendees Encl ML20134M6611996-11-21021 November 1996 Summary of 961114 Meeting W/Listed Licensees in Rockville,Md to Discuss Results of Self Assessment of Accuracy of Info in FSARs for Four Nuclear Reactor Sites.List of Attendees & Licensee Handout Encl ML20129G2581996-04-11011 April 1996 Summary of ACRS Fire Protection Subcommittee Meeting on 960229 in Rockville,Md to Gather Info Re Probabilistic Risk Assessment (PRA) Model for Evaluating Fire Risk During self-induced Station Blackout (Sisbo) ML20058P4491993-12-15015 December 1993 Summary of 931206 Meeting W/Entergy Operations,Inc in Rockville,Md Re 931021 Submittal of Proposed Alternative to 10CFR50.55a(f) & (g),10-Year Inservice Insp & Inservice Testing Update. List of Attendees Encl ML20059A6861993-10-0808 October 1993 Discusses 931006 Operating Reactors Events Briefing 93-38 Which Informed Senior Managers from Listed Ofcs of Selected Events That Occurred Since Last Briefing on 930929.Attendees Listed in Encl 1 ML20056D9881993-08-0202 August 1993 Summary of 930715 Meeting W/Util Re Shutdown Cooling Alternatives During Next Refueling Outage.Attendance List & Handouts Encl ML20046C8411993-07-0606 July 1993 Summary of Operating Reactors Events Meeting 93-23 on 930623 ML20217C5121991-07-0303 July 1991 Summary of Operating Reactors Events Meeting 91-12 on 910626 ML20058D5941990-11-0101 November 1990 Summary of 900912 Meeting W/Util Re Proposed Changes in Security Plan.List of Meeting Attendees Listed ML18057A3271990-07-0909 July 1990 Summary of 900625 Meeting w/C-E Regulatory Response Group in Rockville,Md Re Control Element Assembly Failure Mechanisms. List of Attendees & C-E Presentation Handout Encl ML20043B5241990-05-23023 May 1990 Summary of 900418 Meeting W/Util Re Settlement Monitoring, Basemat Crack Monitoring & Groundwater Level Monitoring Programs.Establishment of Rebar Corrosion Sample Program Suggested.List of Attendees Encl ML20043D0761990-05-18018 May 1990 Summary of 900510 Meeting W/Util Re Proposed Use of Common Tap for Reactor Vessel Level Indication Sys.List of Attendees & Viewgraphs Encl ML20033H2881990-04-0505 April 1990 Summary of 900329 Meeting W/Util Re Control Room Ventilation Sys & Proposed Improvements to Tech Specs. Handouts Encl ML20042E0571990-03-30030 March 1990 Summary of 900313 Meeting W/Util at Site to Discuss Diesel Generator Starts - Reduction Program.W/Five Oversize Drawings ML20011F6111990-02-28028 February 1990 Summary of Operating Reactors Events Meeting 90-05 on 900228 ML20006E7251990-02-12012 February 1990 Summary of Operating Reactors Events Meeting 90-03 on 900207.List of Attendees & Viewgraphs Encl ML20005E8421989-12-27027 December 1989 Summary of Operating Reactor Events Meeting 89-045 on 891227.List of Attendees & Significant Elements Discussed Encl ML20005D8121989-12-18018 December 1989 Summary of Operating Reactors Events Meeting 89-044 on 891213.List of Attendees & Viewgraphs Encl ML19332G0601989-12-0707 December 1989 Summary of Operating Reactors Events Meeting 89-43 on 891206.On 891128,high Cycle Fatigue Failure of Master Connecting Rod Assembly Occurred at South Texas,Unit 2.RHR Leakage Noted on 891201 at Braidwood,Unit 1 ML20005D6871989-12-0101 December 1989 Summary of Operating Reactors Events Meeting 89-042 on 891129.List of Attendees & Viewgraphs Encl ML19332D8551989-11-21021 November 1989 Summary of 891107 Meeting W/Util in Arlington,Tx Re Violations Detailed in Insp Rept 50-382/89-28.Attendance List & Viewgraphs Encl ML19332D2821989-11-16016 November 1989 Summary of Operating Reactors Events Meeting 89-040 on 891115 ML19327C0541989-11-0202 November 1989 Summary of 891019 Meeting W/Sys Energy Resources,Inc, Louisiana Power & Light & Arkansas Power & Light Re Antitrust Concerns W/Consolidation of Operations Under Entergy Operations,Inc.List of Attendees & Viewgraphs Encl ML19325E8981989-11-0101 November 1989 Summary of Operating Reactors Events Meeting 89-38 on 891101 to Brief Senior Managers from Nrr,Aeod,Res,Region Ofc & Commission on Selected Events That Occurred Since 891018 Meeting.List of Attendees Encl ML19325E1761989-10-24024 October 1989 Summary of Operating Reactors Events Meeting 89-37 on 891018.List of Attendees & Events Briefing Encl ML19325D9211989-10-19019 October 1989 Summary of 891012 Meeting W/Sys Energy Resources,Inc, Arkansas Power & Light,Inc & Louisiana Power & Light,Inc at NRC Headquarters to Discuss Consolidation of Operations Under Entergy Operations,Inc.List of Attendees Encl ML20247R0161989-09-21021 September 1989 Summary of Operating Reactors Events Meeting 89-34 on 890920 to Brief Senior Managers & Regional Offices on Selected Events That Occured Since Last Meeting ML20247E3641989-09-0606 September 1989 Summary of 890717 Meeting W/Numarc,B&W Owners Group & Representatives of Lead Plants Re Status of STS Amends & Outstanding Issues Associated W/Lead Plant STS Submittals ML20247D5291989-09-0505 September 1989 Summary of Operating Reactors Events Meeting 89-31 on 890830.Significant Event for Input Into NRC Performance Indicator Program Identified ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20247K2471989-08-24024 August 1989 Trip Rept of Staff 890718-19,21 & 0801-02 Visits to Nuclear Power Plants to Gather Info Re Industry Actions to Address Loss of Oil Malfunctions of Rosemount Models 1153 & 1154 Transmitters ML20245G5421989-08-0303 August 1989 Summary of Operating Reactors Events Meeting 89-28 on 890802.List of Attendees,Events Discussed & Significant Elements of Events & Summaries of Reactor Scrams for Wks Ending 890723 & 30 Encl ML20248B5171989-08-0303 August 1989 Summary of 890725 Interface Meeting W/Util in Birrmingham,Al Re Sonopco/Util Corporate Organization Including Generic Activities & Initiatives Re Plants.Agenda & Viewgraphs Encl ML20246P7771989-07-13013 July 1989 Summary of Operating Reactors Events Meeting 89-26 on 890712.Events Discussed & Significant Elements of Events Presented in Encl 2.List of Attendees Also Encl ML18153B7971989-07-0606 July 1989 Summary of 890612 Meeting W/Util in Rockville,Md Re Plant Configuration Mgt Program.Informs That Goal of Program Is to Confirm That as-built Plants in Conformance W/Licensing Design Basis as Described in FSAR ML20246F8691989-06-22022 June 1989 Summary of Operating Reactors Events Meeting 89-24 on 890621.On 890615,potential Unmonitored Primary Coolant Release Path to Environ Discovered at WPPSS-2.On 890617,loss of Offsite Power Occurred at Brunswick,Unit 2 ML20245G6411989-06-15015 June 1989 Summary of Operating Reactors Events Meeting 89-23 on 890614.On 890607,multiple Electrical Distribution Sys Problems Occurred at Oconee,Units 1,2 & 3.On 890610,unit Power Signal Caused Scram 1999-05-19
[Table view] Category:TRIP REPORTS
MONTHYEARML20247K2471989-08-24024 August 1989 Trip Rept of Staff 890718-19,21 & 0801-02 Visits to Nuclear Power Plants to Gather Info Re Industry Actions to Address Loss of Oil Malfunctions of Rosemount Models 1153 & 1154 Transmitters ML20154L1661988-05-10010 May 1988 Trip Rept of 880412-15 Mgt Team Visit to Plant Sites,Two Matls Licensees & Region I Ofcs.List of Team Members & Summary of Observations & Perceptions from Visit Encl.Info Deleted ML20196F9951988-02-24024 February 1988 Partially Withheld Trip Rept of 880209-11 Mgt Team Visit to Region V & San Onofre & Trojan Sites Re Integrated Assessment of Mgt Effectiveness Associated W/Regionalized NRR & NMSS Programs ML20151W0041987-03-12012 March 1987 Submits After Trip Rept ML20210C2061986-09-11011 September 1986 Trip Rept of Attendance at 860829 Basemat Confirmatory Analyses Audit in New York,Ny W/Bnl,Util & Ebasco Re Calculations & Results for Horizontal Analysis.List of Attendees Encl ML20147E8911986-08-20020 August 1986 Trip Rept of 860721-25 Visit to Plant to Observe INPO Accreditation Team Evaluation of Six Training Programs, Including Instrumentation & Control Technician,Mechanical Maint & Electrical Maint.List of Team Members Encl ML20213F8661986-07-31031 July 1986 Trip Rept of 860514-15 Site Visit Re Seismic Design Issues Concerning Cable Trays,Conduit Qualification,Hvac Concerns, CRD Return Lines,Ie Bulletins 79-14 & 79-02 & Nonessential Piping.Request for Addl Info Re Vermont Yankee Encl IA-86-778, Trip Rept of 860514-15 Site Visit Re Seismic Design Issues Concerning Cable Trays,Conduit Qualification,Hvac Concerns, CRD Return Lines,Ie Bulletins 79-14 & 79-02 & Nonessential Piping.Request for Addl Info Re Vermont Yankee Encl1986-07-31031 July 1986 Trip Rept of 860514-15 Site Visit Re Seismic Design Issues Concerning Cable Trays,Conduit Qualification,Hvac Concerns, CRD Return Lines,Ie Bulletins 79-14 & 79-02 & Nonessential Piping.Request for Addl Info Re Vermont Yankee Encl ML20206J6561986-06-23023 June 1986 Trip Rept of 860612 Training Session in Lacey,Wa Re Federal Radiological Emergency Response Plans & Meeting W/Utils & State of Wa Concerning Potential Emergency Preparedness Issues.Attendees Listed & Training Agenda Encl ML20244D8391986-05-0707 May 1986 Trip Rept of 860415 Site Visit Re Demonstration for Ultrasonic Exam Procedure of Statically Cast Stainless Steel Primary Loop Welds.Issue of Preservice Ultrasonic Exam of Welds Resolved.Trip Repts by Inel & Bnwl Encl ML20244D8401986-04-22022 April 1986 Trip Rept of 860415 Site Visit Re Demonstration of Ultrasonic Exams Performed on Cast Stainless Steel Primary Piping Welds.Exam Procedure Appears to Meet or Exceed ASME Code Requirements.Written Procedure Not Available ML20154L9181986-03-0606 March 1986 Trip Rept of 851021-24 Site Visits Re Wrong Unit/Wrong Train Events to Determine Whether Simple,Low Cost Improvements Can Be Identified & Implemented ML20237C9681986-02-19019 February 1986 Trip Rept of Attendance at State of Il 860213 Meeting Re Training Session on NRC Incident Response Program & NRC Participation in 860408 Plant Emergency Exercise.List of Attendees & Partial Agenda Encl ML20141H8551986-01-10010 January 1986 Trip Rept of 851112-15 Site Visits Re Wrong Unit/Wrong Train Events.Visit Conducted as Part of short-term Effort to Determine If Low Cost Improvements Can Be Identified & Implemented to Reduce Frequency of Events ML20138A1201985-09-23023 September 1985 Trip Rept of 850617-20 Site Visits Re Reduction of Wrong Unit/Wrong Train Events at Facilities ML20147E2301985-06-0303 June 1985 Trip Rept of 850420-22 Visit to Port Gibson,Ms,To Participate in Field Test of Draft Training Review Criteria & Procedures at Plant.Nrc Teams Observed Licensed Operator & Nonlicensed Operator Training ML20133B8781985-03-15015 March 1985 Trip Rept of 850315 Site Visit Re Presentation of Licenses to Senior Reactor Operators & Reactor Operators.Subjs Discussed During Visit Stated ML20133B8521985-02-26026 February 1985 Trip Rept of 850207-08 Site Visit Re Status of Licensee Performance Enhancement Program & Status of Action Plan Being Used to Improve Overall Training Effort ML20136F6871985-02-0505 February 1985 Trip Rept of 841203-07 Visit to Bechtel in Norwalk,Ca Re Structural Engineering Design Audit Based on Util 841031 Submittal of Design Rept.List of Attendees,Agenda & Addl Info Required for Satisfactory Question Response Encl ML20199G3181985-01-15015 January 1985 Trip Rept of 841114-16 Site Visit Re Meetings W/Qa/Qc Inspectors to Emphasize That All Safety Issues Must Be Resolved Before Units Can Be Licensed ML20147E0431985-01-10010 January 1985 Trip Rept of 850930-1004 Observation of INPO Accreditation Team Evaluation of Plant Training Programs,Including Licensed Reactor Operator,Nonlicensed Operator & Shift Technical Adviser.Inpo Evaluation Team Member List Encl ML20237D0071985-01-10010 January 1985 Trip Rept of 871112-15 Visit to Sites to Determine Whether Simple,Low Cost Improvements Can Be Identified & Implemented to Reduce Frequency of Wrong Unit/Wrong Train Events ML20127G2061984-09-27027 September 1984 Trip Rept of 840910 & 13 Visits to Taft,La to Review Program Being Utilized to Resolve Issues Stated in ML20209D3321984-09-21021 September 1984 Trip Rept of 840816-22 Visits to Lasl & Plant Re DHR & Unresolved Safety Issue A-45 ML20136F1681984-08-31031 August 1984 Trip Rept of 840621-22 Site Visits to Examine Clastic Dikes of Coastal Plain ML20127G1721984-08-15015 August 1984 Trip Rept of 840809 & 10 Visits to Taft,La Re Review of Verification Program for Qa/Qc Personnel Qualifications, Qualifications of Reviewers & Qualifications of Third Party Performing Overview of NRC Task Force Findings ML20136F1281984-08-0707 August 1984 Trip Rept of 840724 Site Visit Re Radiation Protection Facilities.Attendee List Encl ML20133B9461984-07-0505 July 1984 Trip Rept of 840703 Site Visit Re Training Organization & Programs.Program Not Implemented Due to Lack of Senior Mgt Support IA-85-160, Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria Confirmed1984-04-13013 April 1984 Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria Confirmed ML20127B5101984-04-13013 April 1984 Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria Confirmed ML20149B6101984-03-28028 March 1984 Trip Rept of 840323 Visit to INPO to Respond to INPO Concerns Re Training & Qualifications Rulemaking Package (SECY-84-76).Accreditation Team Rept on McGuire Station Read & Questions Answered ML20115A0941984-02-0909 February 1984 Trip Rept of 830124-25 Site Visit Re Control Room Habitability.Hvac Sys Generic General Concerns & Overall Perspective Addressed ML20138M9741983-12-20020 December 1983 Trip Rept of 831129-30 Site Visit Statistical Analysis of Backfit Insp Program ML20132B6931983-11-21021 November 1983 Trip Rept of 831104-05 Site Visit & Meeting to Formulate Final Objectives,Guidance & Schedule for Initial full-scale Exercise ML20080D2631983-10-31031 October 1983 Draft Trip Rept of Caseload Forecast Panel 830222-24 Site Visits Re Const Progress Review & Estimating Resource Needs for Licensing Activities ML20080D2771983-10-31031 October 1983 Trip Rept of 830622-24 Caseload Forecast Panel Site Visit Re Plant Status Review.Projected Fuel Load Date Comparisons Listed ML20209C3391983-08-0808 August 1983 Trip Rept of Attendance at 830727 Meeting in San Francisco, CA Between Idvp & Util Re Status of Closure Efforts on Open Items in Idvp Final Rept.Projected Date for Issuance of Idvp Final Rept Suppl Is mid-Sept 1983 ML20080D2971983-07-27027 July 1983 Summary of 830622-24 Caseload Forecast Panel Site Visit Re Plant Status Review ML20151H8231983-07-26026 July 1983 Trip Rept of 830712 & 15 Site Visit Re Fire Protection Site Audit.List of Agreements & Concerns Discussed Encl ML20209C3101983-07-25025 July 1983 Trip Rept of 830607 Visit to San Francisco,Ca to Observe Test Program Developed by Util & Bechtel.Program Was to Determine Statistically Spot Weld Capacity of Superstrut Matl Installed at Plant ML20209C2311983-06-30030 June 1983 Trip Rept of Attendance at 830512 Technical Interchange Meeting W/Util & Independent Verification Program Staff Re Containment & Turbine Bldgs & Control Room.Attendee List Encl ML20209C1171983-04-29029 April 1983 Trip Rept of 830425 Visit to Bechtel in Gaithersburg,Md to Review Grand Gulf Cable Tray Support Calculations for Use in Resolution of Allegation Concerning Superstrut Spot Welds at Diablo Canyon ML20080D2551983-03-18018 March 1983 Marked-up Draft Summary of Trip Rept of Caseload Forecast Panel 830222-24 Meetings Re Const Progress Review & Mgt Decision on Allocation of Staff Resources During Licensing Review ML20205T5371983-02-15015 February 1983 Trip Rept of 830126 Meeting in Bethesda to Discuss Question of Corrective Actions to Be Required of Util Re Finding of Uncertified QC Inspectors at Site ML20209B9941983-02-14014 February 1983 Trip Rept of 830126 Meeting W/Rl Cloud & Assoc in Berkeley, CA to Clarify Items Re Interim Technical Rept (Itr) 12, Independent Design Verification Program (Idvp) - Piping & Itr 17, Idvp - Piping,Addl Samples ML20209B8411983-01-10010 January 1983 Trip Rept of 821202 Meeting W/Teledyne Engineering Svcs, Bechtel,Bnwl,Norton,Burke,Berry & French,Util,State of CA, Hhb & Urs/Blume to Discuss Listed Portions of Independent Design Verification Program ML20070V1351982-12-20020 December 1982 Trip Rept of 820913-17 Visit to Facility to Review Seismic & Dynamic Qualification Methods,Procedures & Results for safety-related Mechanical & Electrical Equipment & Observe Field Installation of Equipment ML20209B7941982-11-30030 November 1982 Trip Rept for 821112 Info Exchange Meeting Between Teledyne Engineering Svcs & Util in Waltham,Ma to Review Corrective Action Plans for Annulus Structure ML20209B7801982-10-28028 October 1982 Trip Rept of 820920-23 Visit to Site & Escondido,Ca Re NRC & Us Coastal Engineering Research Hydrologic Engineering Review Comments on Breakwater/Intake Structure Repts for Jul 1982 ML20134B4611982-09-16016 September 1982 Trip Rept of 820830-31 Visit to Bechtel,Norwalk,Ca to Observe Region IV Insp Concerning Effectiveness of Util/ Bechtel Processing of Field Change Notices for Facility Const.Supporting Documentation Encl 1989-08-24
[Table view] |
Text
,/,
),,
UNITED STATES M
y 3s.
NUCLEAR REGULATORY COMMISSION
/
- e
. l W ASM N G TON, D. C. 20555
.?
November 21, 1983 MEMORAND11M FOR:
Record FROM:
Donald J. Perrotti, Emergency Preparedness Specialist Emergency Preparedness Branch Division of Emergency Preparedness and Engineering Response
SUBJECT:
WATERFORD 3 TRIP REPORT A meeting was held at Waterford 3, near Taft Louisiana on November 4, 1983, between representatives of Louisiana Power and Light Company, Louisiana Office of Emergency Preparedness, Louisiana Nuclear Energy Division, St.
Charles and St. John Parishes, FEMA Region VI and the NRC. The purpose of the meeting was to formulate the final objectives, guidance and schedule for the initial full-scale exercise for Waterford 3.
The minutes of the meeting are enclosed. The applicant has scheduled a series of training sessions to be held during November 15, 1983 to January 19, 1984, with the exercise-for-record en February 8, 1984.
(See Enclosure 2)
Following the meeting on November 4 and during the morning of November 5, 1983, an operability and acoustical test was performed on the Alert Notifi-cation System (sirens) in St. John the Bapist Parish. The test, performed by Acoustic Technology, Inc. (ATI) and members of the St. John Parish Emergency Organization, consisted of simultaneous actuation of the 19 fixed sirens throughout the parish followed by actuation of selected, individual sirens. The individual sirens selected were those that had been either re-located or added on the basis of a previous test by ATI. The test consisted of checking all the functions of the sirens: voice broadcast, steady and wailing siren, air horn, rotation of siren, and in the case of the selected sirens, a sound level mesurement was performed by ATI to determine the acoustical contour of the re-located and added sirens.
NRC and FEMA represen-tatives observed testing of the sirens located at the Missouri Pacific Railroad tracks in f,illona, Louisiana, Camellia St. and Riverlands Country Club in La Place, Louisiana and the tailer-mounted mobil siren located behind the St. John EOC.
/'
y4Bnz@2dVU g
Waterford 3 Trip Report ;
i A status report on the Alert Notification System for the 10-mile EPZ, including the results of the November 4-5 test, will be submitted by Louisiane Power and Light Company in @ proximately 2 months.
Jkt/9Auf I
Donald J. Perrotti, Emergency Preparedness Specialist Emergency Preparedness Branch Division of Emergency Preparedness 4
and Engineering Response
Enclosure:
1.
Minutes of 11/4/83 Meeting 2.
Training / Exercise Calendar cc: See Attached I
i l
~
P P
i
. -,. ~. - _ _ _
s i
inclosure 1 ATTENDANCE Paul Backes LP&L Ren Perry LP&L David Zaloudek
.ver LNED The as Laiche LNED Bill Spell LEED Tom Carr ECI James Byers ECI Tracy A. Flippo NRC Donald J. Perrotti NRC, IE:HQ Bertra= Madere St. John Civil Defense Ikey Lucas St. Charles Emergency Preparedness Al Lookabaugh FEMA, Region VI Gary Jones FEMA, Region VI D. C. Jensen LOEP Sam J. Marcello LOEP Roy Chiappini EG & G Notes The purpose of the =eeting was to discuss objectives, guidelines and schedule for the upce:ing Waterford 3 exercise-for-score. The meeting began with a report on the status of the Waterford 3 Public Infor ation Booklet.
Ron Perry reported that a revised final draft would be made available for Federal agency review by 11/21/83.
The remainder of the
.=eeting involved specific discussions of prop sed objectives, guidelines and an exercise schedule.
I.
Obj ectives
- 1. g.
Mr. Perrotti requested that off-site monitoring be added to this objective statement.
It was agreed that specific cention of off-site monitoring will be added to item 1. g.
- 1. 1.
Mr. Perrotti inquired as to how far in-depth recovery would be de=enstrated. Roy Chiappini responded that recovery activities would be demonstrated to the point that emergency canagement personnel can show how the recovery effort would be organized.
This would involve the initial steps of recovery only.
1.-k.
Mr. Perrotti stated that the NRC will require a full demonstration of accountability procedures before the issuance of a full-power license. The question was asked, does LP&L intend to demonstrate full-scale accountability on the exercise? Paul Backes responded by stating that only the concept of accountability would be demonstrated for the exercise.
I l
i Fage 2.
- 1. 1.
Mr. Jensen asked a question concerning the level of security play inticipated in the exercise.
Paul Backes responded by saying that the security response would be consistent with that required by the scenario.
- 2. c.
Mr. Madere inquired as to whether the com=unications reference in this item concerned only LNED and LOEP or all State agencies.
Ron Perry responded that this objective item ref erred principally to the Operational-Hot-Line and was intended to include only LNED and LOEP.
Mr. Lookabaugh requested that the Federal agencies notified directly from the Waterford 3 site be added to this item.
~
It was agreed to add " Federal agencies" to this ites.
- 2. p.
Mr. Spell inquired as to whether the current references to recovery in the State Plan will be adequate to demonstrate re cove ry.
Mr. Lookabaugh stated that it would.
Additional cc:=ents:
Mr. Zaloudek asked Mr. Lookabaugh whether the recent FEMA guidance on exercise objectives would apply as a regulation to this exe cise.
Mr. Lookabaugh responded that the FEMA infor=ation.as only guidance.
II.
Guidelines A.'.
To= Carr requested information on the depth of play to traffic and access control points.
Mr. Lookabaugh stated that it would be necessary to demonstrate the ability to stop traffic and to issue proper instructions. The actual stoppage of traffic would not be necessary.
A.6.
Mr. Zaloudek requested clarification concerning observers acco:panying field monitoring teams.
It was agreed that a change would be made to the second paragraph of item A6 to read:
"Each utility radiological monitoring field team will be accompanied by an observer throughout the exercise."
A.8.
Mr. Lookabaugh and Mr. Spell inquired as to whether actual EBS messages would be broadcast during the exercise.
In response to these comments, item A8 will be modified to read as follows:
i Page 3.
"Ar, appropriate, Emergency Broadcast System (EBS)
anhounce=ents will be prepared and passed to the appropriate stations. Local cable TV, WCKW and WKQT will broadcast limited emergency messages.
WWL will broadcast only standard EBS test messages."
A.12.
In response to ec=ments raised, the following changes will be =ade to item A.12:
(1) Under State of Louisiana, the Louisiana State Police will Isi deleted.
(2) Under St. Charles Parish, " Office of Civil Defense" will be changed to " Department of E=erge:cy Preparedness".
Both the Sheriff's Departnent and the St. Charles Parish School Board-vill be deleted.
In their place " Participating Response Agencies" will be inserted.
(3) Under St. John the Baptist Parish, the St. John the Baptist School Board will be deleted.
In its place," Participating Response Agencies" will be inserted.
(4) The paragraph which begins " Active participation in this exercise" and ends " testing com=unications only." will be deleted in its entirety.
Additional ce==ents:
Mr. Perrotti requested that an additional guideline statecent be added as follows:
"17. If an actual emergency should occur either on or off-site during the exercise, the exercise will be halted to deal with the situation."
III. Schedule and Milestones A s'chedule of drill and exercise activities and a listing of milestones were also presented to meeting participants. These listings and suggested changes are attached to this memorandum.
l l
L
f V
e Ah> pt i WL.
J ORGANIZATION PETICIPATIJ4 CALDOAR N
^
ORGEIIATION Car..
EOF TAE.E DOSI ASSMT DOSE ASSMT RADCORIPED DRL S3-4 mL M -11 R N-1 A%rd.
E"E MILL TOP m!U. TA?.E T0" m IL!.
m!U.
SITE DRIU. SITE m !LL SITE M ILI. EIETCISE F
11/15/83 11/17/83 11/22/83 11/22/83 12/2/83 12/15/83 1/5/M 1/19/M 2/8/M 1300 0830 0800 1300 0830
.ON SHIFT EMERG. 20
++++++++
++++++++ +++++ m e++ m ++
++++w ++
ON $!TE EMERG ORG.
+++# +++
++++++++ ++++++++
++++++M
++++++++ +++++** ++++***
+++++++e EAR SITE EERG. ORG.
+++*+H
++++* ++
H++++++
M*+++M
+++++ Me
++H ++++ ++++++++ +++ m ++ ++++++++
OFF SITE EERG. MG.
H++**
M** * + "**" * * *++
ST. CmRLES E00
H+MH+
++mH+
M ++4+++
ST. J0m ECC
++++++++
++++++++ e +++++e
++++++++ ++++++++
LNED
+++++**
m e++++
++++++M we++ m ++ m ** m * +++
UE8
m *++++ +++*+++
e+m+H
[
l@9#1LLE WD
OSOMR ICSPITAL H+++M+
[
EST JFFERSON HOSP.
++++++++
REV 1, 11/1/1983
)
m l
l
t O
a WATERFORD 3 QUALIFICATION CARD y
LOUISIANA NUMBER POWER & LIGHT N N SYS $
__.7 s
' PREPARED B 6
DATE:
4N h,'@
0 DATE:
f/24/[N REVIEWED BY:
IRAINING SUPERVISOR I 28 !#5 APPROVED BY:
p DATE:
GROUP /DE ARIMENT HEAD
/
/
APPROVED BY:
C DATE:
f/2Mfr IRAININ UPERIN TENDENT TRAINEE DATA NAME SSN:
LAST FIRST M.I.
DEPARTMENT:
COMPANY:
SIGNATURE:
COMPLETED:
DATE:
TRAINING SUPERVISOR TRAINING RECORD UPDATED BY:
DATE:
RECORD VERIFIED BY:
DATE:
s
/'o /A -/y. 2.od, Wry UNT-3-025 REVISION 0 ATTACMMNMT A1 m af 9)
?
j
~
BADIATION MONITORING SYSTEM 1
PRACTICAL FACTORS GUIDE NAME 73 s
I.
Perform or Simulate the following in accordance with applicable procedure on:
A.
RM-23 1.
Display all available information
/
SE DATE 2.
Acknowledge Alarm
/
SE DATE 3.
Source Check
/
SE DATE 4.
Advance filter on applicable monitors
/
(Simulate)
SE DATE 5.
Purge monitor
/
SE DATE 6.
Start /Stop Monitor flow (pump)
/
(Simulate)
SE DATE 7.
Lamp Check
/
SE DATE 8.
Change Alarm Setpoint
/
SE DATE 9.
Initiate Grab Sample on applicable monitors
/
SE DATE B.
CP-6 Console Operations 1.
Display Manus
/
SE
- DAIF, 2.
Display Grids
/,
SE DATE 3.
Display Monitor a.
Monitor History a Alarms
/
SE DATE b.
Monitor Trend
/
SE DATE 1
I c.
Source Check
/
sr DATE d.
Advance filter on applicable monitors
/
(Simulate)
SE DATE e.
Purge Monitor
/
SE DATE
' f.
Start /Stop Monitor flow (pump)
/
(Simulate)
SE DATE g.
Change Alarm Satpoints
/
SE DATE h.
Displays Trends
/
SE DATE C.
NMC Process Monitors 1.
Pre Release Test
/
SE
.DATE 2.
Change Alarm Setpoint
/
SE DATE 3.
Source Check
/
SE DATE II. Discuss A.
Local Operation of RM-80
/
SE DATE B.
Automatic Actions on Applicable Monitors
/
SE DATE C.
System interface with CEPADAS
/
SE DATE D.
Potential Alarms and Operator Response
/
SE DATE E.
Discuss application of various displays and menus.
/
SE DATE III. Successfully Completed Practical Factors
/
shift supervisor DATE IV. Attended System Lecture in Requalificr*fon Training
/
Training Supervisor DATE 2
- - -. - _. _. -.., _. _ - - _ -