A UNITED STATES
{ },w y i NUCLEAR REGULATORY COMMISSION
^-
)
W ASHINGTON, D. C. 20555 June 7. 1984
,s W -f f MEMORANDUM FOR: George W. Knighton, Chief f P7 Licensing Branch #3 U
Division of Licensing Office of Nuclear Reactor Regulation FROM:
David B. Matthews, Acting Chief Emergency Preparedness Branch.
Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement
SUBJECT:
TRANSMITTAL OF FEMA'S SUPPLEMENTAL INTERIM FINDINGS ON WATERFORD 3 TO LP&L Please transmit the enclosed FEMA supplemental interim finding report on Waterford 3 offsite plans for subsequent transmittal to LP&L. FEMA's report addressed the four offsite plannirg issues specified by the ASLB, which were discussed in EPB's previous memorandum to you dated March 26, 1984.
FEMA notes that issues 1, 3 and 4 have been resolved.
Issue 2 will be resolved when letters of agreement nave been received in FEMA's Regional Office.
A draft transmittal letter is also enclosed.
Please provide this Branch with a copy of the final correspondence.
hc!:
Wf-David B. Matthews, Acting Chief Emergency Preparedness Branch Division of Emergency Preparedness and Engineering Response Office of Inspection and Enforcement
Enclosures:
- 1. Draft Memo to Region IV
. George W. Knighton cc:
E. L. Jordan, IE J. N. Grace, IE S. A. Schwartz, IE C. R. Van Niel, IE F. Kantor, IE D. J. Perrotti, IE J. Wilson, NRR C. Hackney, Region IV S. Turk, ELD l
1 l
4 ENCLOSURE
SUBJECT:
FEMA'S SUPPLEMENTAL INTERIM FINDINGS ON WATERFO The enclosed letter from Richard W. Krimm, Assistant Associate ~ Director
, Office of Natural and Technological Hazards, FEMA, dated May 11, 1984, forwarded the FEMA Region VI supplemental interim finding report on four offsite pl sues specified in the ASLB Partial Initial Decision of November 3,1982, as amend by its Memorandum and Order dated December 14, 1982.
FEMA reports that all issues have bean resolved with the exception of issu
}
2 (agreement letters fcr vehicles and drivers) and this will be resolved in the near future with the receipt of letters of agreement after all of th em have been obtained, i
It is recommended that you continue to coordinate with FEMA Region V 4
nsure that issue 2 specified by the Board is resolved in a timely manner