Notification of 810414-16 Meeting W/Util & Ebasco to Discuss Outstanding Issues & Conduct Drawing Review.Agenda Encl
ML20114F530
Person / Time
Site: 05000000, Waterford
Issue date: 03/18/1981
From: Rosenthal J
Office of Nuclear Reactor Regulation
To: Keblusek S
Office of Nuclear Reactor Regulation
Shared Package
ML082170562 List: ... further results
References
FOIA-84-143 NUDOCS 8103260981
Download: ML20114F530 (3)


Text

-

~

g

/

e a

or w

e

+

WR I a 1981 i:

MD40RANGUM FOR: Suzanne Kablusek. Licer. sing Branch #2 Division of Licensing. NRR TliRU:

M. Srinivasan Section 8 Leader i

Instrumentation 8 Control Systems Branch Divisten of Systans Integration. NRR j

FROM:

Jack E. Rosenthal. Instruention & Control Systems Branch Division of Systems Integration. NRR

SUBJECT:

AGD eA - M ETIla AND DRAWING REVIEW FOR WATERFORD 3 ICSS staff and censultants will meet with representatives of Louisiana

?

2r and Light. C. E., and E8ASCO on April 14 through 16,1981 to discuss i

entstanding issues and conduct a drawing review. An agenda for the meeting is attached and should be forwarded to meeting participants.

j

/c//

n Jack E. Rosenthal i

3 Instnamentation & Control Systems Branch Division of Systems Integration

?

Easleeure:

As stated 1

es:

F. Rosa 4

M. Srinivesen DISTRIBUTION:

P Docket File e

ICSB Reading ile j

. b ' ~_. N 1;

J. E. Rosenthal (2 copi

' \\

Waterford Subject File l

(

h 9.tW g \\"

gi g

51

Contact:

/j Jack E. Rosenthal X29434 "h$g-8l 03 aso qgg $

Fot A-5 9 -843 lb/lo Nl.D.h....!CS8/,0Sge l

>. M e m fha st.Msetninun..........

> 7/.11/8,1,,,,,,,,,;/, g,,,g,,,

l D***"***"**"*"*

OFFICIAL RECORD COPY

'l t.

ArEflDA j

i MEETiflG AND DRAtllf4G REVIEt!

UATERFORD 3

\\ \\

APRIL 14, 15, 16, 1981_

1 April 14 and Morning April 15 - Drawing Review Electrical schematics and physical layout drawings should be used by the l

applicant to " walk through" all equipment from designated initiating sional

(

to actuated device designated below. The applicant should be prepared to I

n follow energy sources for this equipment back to electrical buses discussed

  • p in Chapter 8 of the FSAR and irtstrument air supplies discussed in Chapter D

9 of the FSAR. Conformance with IEEE-279. R. G. 1.53, R. G. 1.75, R. G. 1,47, &

R. G. 1.32 should be demonstrated.

{i

~1 Pressurizer pressure transmitters (through-RPS bistables, trip logic) to

{h and including trip breakers.

aC 2.

Safety Injection Actuation Signal (SIAS) (through ESFAS Auxiliary Relay 4

p CabinetsthroughMCC)toSIpumps.

(&

3.

Neutron flux detected by nuclear safety instrumentation (through prean-N plifers)to (a) CPC's (b) high logrithmic flux bistable relay t;

o Contaltunent Spray Actuation Signal to containment spray pumps and flow control valves 2CS-F306A and 2CS-F3058.

LWk 5.

EFAS 1 and 2 to EFW isolation valves, and motor driven EFW pumps.

Modulation of EFW isolation valves from the control room, and from the

[.;

auxiliary shutdown panel. (Discuss reliability of air supply to isolation

.E valves).

(.;

t Wq i

l 4.

Shutdown cooling system isolation valve operation. interlock. control and

(,1 indication in the control room, fj'1 m

7.

$hos physical separation of auxiliary shutdown panel and transfer of power k.

g$$

and control vis a vis the control room.

8.

Indication of component cooling water to reactor coolant pumps.

);

k 4

l h

Afternoon April 15 - Meeting Discussion of preliminary responses to Questions (2) thrcugn (M).

i Morning April 16 Discussion of preliminary responses to Questions (1), (25) through (It;.

Afternoon April 16 Discussion of SER open items.

Meeting sunnary.