Text
-
~
g
- /
e a
or w
e
+
WR I a 1981 i:
MD40RANGUM FOR: Suzanne Kablusek. Licer. sing Branch #2 Division of Licensing. NRR TliRU:
M. Srinivasan Section 8 Leader i
Instrumentation 8 Control Systems Branch Divisten of Systans Integration. NRR j
FROM:
Jack E. Rosenthal. Instruention & Control Systems Branch Division of Systems Integration. NRR
SUBJECT:
AGD eA - M ETIla AND DRAWING REVIEW FOR WATERFORD 3 ICSS staff and censultants will meet with representatives of Louisiana
?
2r and Light. C. E., and E8ASCO on April 14 through 16,1981 to discuss i
entstanding issues and conduct a drawing review. An agenda for the meeting is attached and should be forwarded to meeting participants.
j
/c//
n Jack E. Rosenthal i
3 Instnamentation & Control Systems Branch Division of Systems Integration
?
Easleeure:
As stated 1
es:
F. Rosa 4
M. Srinivesen DISTRIBUTION:
P Docket File e
ICSB Reading ile j
. b ' ~_. N 1;
J. E. Rosenthal (2 copi
' \\
Waterford Subject File l
(
h 9.tW g \\"
gi g
51
Contact:
/j Jack E. Rosenthal X29434 "h$g-8l 03 aso qgg $
Fot A-5 9 -843 lb/lo Nl.D.h....!CS8/,0Sge l
>. M e m fha st.Msetninun..........
> 7/.11/8,1,,,,,,,,,;/, g,,,g,,,
l D***"***"**"*"*
OFFICIAL RECORD COPY
'l t.
ArEflDA j
i MEETiflG AND DRAtllf4G REVIEt!
UATERFORD 3
\\ \\
APRIL 14, 15, 16, 1981_
1 April 14 and Morning April 15 - Drawing Review Electrical schematics and physical layout drawings should be used by the l
applicant to " walk through" all equipment from designated initiating sional
(
to actuated device designated below. The applicant should be prepared to I
n follow energy sources for this equipment back to electrical buses discussed
- p in Chapter 8 of the FSAR and irtstrument air supplies discussed in Chapter D
9 of the FSAR. Conformance with IEEE-279. R. G. 1.53, R. G. 1.75, R. G. 1,47, &
R. G. 1.32 should be demonstrated.
{i
~1 Pressurizer pressure transmitters (through-RPS bistables, trip logic) to
{h and including trip breakers.
aC 2.
Safety Injection Actuation Signal (SIAS) (through ESFAS Auxiliary Relay 4
p CabinetsthroughMCC)toSIpumps.
(&
3.
Neutron flux detected by nuclear safety instrumentation (through prean-N plifers)to (a) CPC's (b) high logrithmic flux bistable relay t;
o Contaltunent Spray Actuation Signal to containment spray pumps and flow control valves 2CS-F306A and 2CS-F3058.
LWk 5.
EFAS 1 and 2 to EFW isolation valves, and motor driven EFW pumps.
Modulation of EFW isolation valves from the control room, and from the
[.;
auxiliary shutdown panel. (Discuss reliability of air supply to isolation
.E valves).
(.;
t Wq i
l 4.
Shutdown cooling system isolation valve operation. interlock. control and
(,1 indication in the control room, fj'1 m
7.
$hos physical separation of auxiliary shutdown panel and transfer of power k.
g$$
and control vis a vis the control room.
8.
Indication of component cooling water to reactor coolant pumps.
);
k 4
l h
Afternoon April 15 - Meeting Discussion of preliminary responses to Questions (2) thrcugn (M).
i Morning April 16 Discussion of preliminary responses to Questions (1), (25) through (It;.
Afternoon April 16 Discussion of SER open items.
Meeting sunnary.