Informs That Mechanical Engineering Branch Review Has Been Contracted Out to Ornl,However ORNL Will Not Perform Review of Seismic Qualification of Equipment.Forwards Question Which Will Allow Applicant to Submit Required Info
ML20114F119
Person / Time
Site: 05000000, Waterford
Issue date: 02/26/1980
From: Bonsak R
Office of Nuclear Reactor Regulation
To: Baer R
Office of Nuclear Reactor Regulation
Shared Package
ML082170562 List: ... further results
References
FOIA-84-143 NUDOCS 8003190831
Download: ML20114F119 (2)


Text

y v

EffbDU' 0$l DISTRIBUTIcN:

(Tin ter1 V' 1 e 3 liRR

1. File. M. Groff I) 055:.13 Rdg. File FEB 4 61980 Docket No.: 50-382 MEMORMEM PM:

R. L. Beer. Chief. Light Water Reacters Branch #2. OPM FMWs R. J. Sneest. Chief. Nachseical theinsering Orsach. D55 I

SWJECT:

3E37 MVIEW 0F WATERPORD 3 As you are aware, the MB review of Waterfbed 3 has been sentracted out to ORNL. However. 0WL will not perfbm a review of the seismic qualification of ecuimt. Our SQRT review of Waterford 3. as well as all other l

. '" rwisws. It currently unscheduled. We are attempting te locate a.

u meter to perfbm these 5457 revfews, but, realistically, we anticipate a 3-6 month delay bef6re our 5(RT offbrt is again active. However. in order to sinimize future delays in the 3157 review, the enclosed questfon vill allow the applicant to sukett the initial required inftmatdan.

R. J. Bosnak Chief Mechanical Engineering Branch Divistee of Systees safety Octosure Questions 119.4 cc w/o attachments to question:

R. Mattaen. OSS D. Ress. OpM S. Usrss. OPM R. Gesedict. OPM W. Pike. MPA J. 10 tight. 083 N. Ormener. D$$

5. Neu. 055 R. Stephens. DES

Contact:

R. 4. Stephens. 055:NES. W X29482 Fo / A 143 hh o...cs ). 055 MS i

DS$;MEp tMEO.

su.m)

jbl HL8 rammer A

nak.

ones). 2M80._ _ [

2/sV80 2

80

..__......-.L....

g

.c ro si.. u.

c. m,

_ ev i uova. w r..eae.ea meanm g'

?

vr o

1 110.0 MCMANICAL EMINEERING BRANCH l

l 110.4 4 review of the design adequacj of your safety-related NSSS and (3. M S0P electrical and mechanical equipment under seismic loadings l

'?

.')

will be perfomed by our Setsaic Qualification Review Team (50RT). A site visit at some future data will be necessary to inspect and otherwise evaluate selected equipment after our review of the following sted infomation. The SQRT effort will i

l be priesetly flec on the adequacy of the original single-arts, single-frequency tests or ana yses of equipment qualified per the criteria of IEEE Std. 344-1971.

The attached enclosure desCP6bes the SQRT and its procedures.

Section V.2.A requires lefamation uhtch pu should substt so that $5 T can perfb m its review.