ML20114F892

From kanterella
Jump to navigation Jump to search
Forwards List of Items Requiring Verification for SER & Suppls.Based on Current Fuel Load Schedule,Response Required by 830301
ML20114F892
Person / Time
Site: 05000000, Waterford
Issue date: 11/29/1982
From: Novak T
Office of Nuclear Reactor Regulation
To: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML082170562 List: ... further results
References
FOIA-84-143 NUDOCS 8212080563
Download: ML20114F892 (4)


Text

-

E Ul'. i RillMT 10%

Sectament Control (bo.Hus 40%.

m2 rRc sys em

'Ll483 Readin y, ! i...... -

Jt.ee JWilson TNovM Docket No.: 53-382 GKnigh*on EMDRANDUM FOR: James E. Gagliardo. Dtructor Division of Resident Reactor Pmject and Engineering Progrees Region IV FHtM:

Thoms M. Novak, Assistant Director for Licensing Division of Licensing SLBJECT:

ERIFICATION OF CONFIRf% TORY ITET FOR 1ATERFORD 3 The idaterford SER and its supplements have identiffed certain itens which are typically considered to be within the scope of your inspection program. A list of the items requiring your staff to vertfy is attached.

Based on the current fuel load schedule your detemination of the status of coepletion of thee items is mquired by March 1.1983.

Thomas M. Novak. Assistant Director for Licensing Division of Licensing Attaclement:

As stated

$agse3 pog g_pp3 a/ss h6Y h m.1

.I NS

..[

sumenest gg-..

TT7 p C ' U7 an=3 g i

suspenmeegm easum me OFFICIAL RECORD COPY v E*

A

~

-1

L ! '. !

'r t't.F l i"i f h: v i t e:"3 !.

.. ' : W.

  • lr,) Mr i " ifRlr!ED iW R E T. D i'i I V !*.4Pi'!!~N W"l-sii dect'09 Descriotten of item e..'

1 Review ECr5 Test Program A Results i

L'stcw Pr.:; arcs f;r :tr 74.11 11

?

- ( t H F ' ', 4 charcat t '

e e r.'t T

11.2.cc

eri fy testing of RAS ventila tion sys ten in accordance with ANSI N510-1980.

22.2 II.A.2.3 Verify that all instruc~ters have completed an SRO examination prior to fuel leading.

11.B.1 Review operating procedures and te:t orocecures for RCS vent system prior to operation above 5% power.

11.9.4 Verify training program before fuel load; verify training prior to operation above 51 power.

II.E.4.1 Review plant procedures for hydrogen recombiner use.

!!.F.1 Verify instillation of systems

!!.K.1 Review procedures concerning ECCS valve operations

!!.<.2.17 D,eview program for reporting ECCS outages.

11.0.1.1 Review leakage monitoring program e

i I

i J

8

r

~~~~

I s

Docket No.: 50-382

/

MEMO MNDUM FOR: James E. Gagliardo. Director Division of Resident Reactor Pro.1ect tid Engineering Programs. Region IV FROM:

Darrell G. E1canhut. Director

/

Division of Licensing Office of huclear Reactor tion

$USJECT:

VERIFICATION OF CONFIID14 ITDts FOR WATERFORD 3 The Waterford SER and its supplements we identified certain items which are typically considered to be WIthin the scope of your inspection program. A list of the 1 tans which would like your staff to verify is attached.

It will he necessary for you to to en SSER on these itens, on a schedule to be devolepod.

Oorfell S. Eisenhut. Director Divisten of Licensing Office of meclear neoctor megulation Attactueest:

As stated Distribution:

Document to rol 50-382 PRC System i

LB83 Fil JLee JWils TNov l

G ghton senhut

  • See previous concurrence l

,,, o.M.6.e.f%.

. 9.L.!.LB,f,3,,,,,,

,.DL:Ag,:L,,

pL:plR l

)

~ >

JW11 son ph

..GKnighton

  • TNovak DEisenhut l

1

==,.9....,.,...,....,..,..,.......g gy........ygy..

..y,gy,gy...

g.g,........y...

m u sie sio w w w a m OFFICIAL RECORD COPY l....

I i

E,.. *

.u.

DISTRIHilfl0N

[kn unent con t rol ';o-t.>.

ILRA LBe3 Readinq JLee SBlack JKerrigan Docket No : 50- 110 s

M MORANDUM FOR: James E. Gagitardo. Director Division of Resident besctor Project & Engineering Programs FROM:

Darmll G. Eisenhut. Director Division of Licensing Office of Nuclear Reactor Regulations SUSJECT:

VERIFICAT10ft OF 00NFIRMATORY ITEMS FOR WATERFORD 3 The Waterford SER and its supplements have identified certain itens unich am typically considered to be within the scope of your inspection program. A list of the items which we would like your staff to verify is attached.

It will not he necessary to write an SSER on these items, however, we would like you to document them in your inspection reports. Any deficiencies should be reported to MRR prior to license issuance.

Darrell G. Eisenhut. Director Division of Licensing Office of Nuclear Reactor Regulations

Attachment:

As stated

/

/

, %.:.L8.9..s... %.!M..d...L

.D(,: D,1,,R,,,,,,,,,,,,

581acust...... JKa.1 san...... :

L........ DreE.1senhu.t...

t 10../. 7..../. 8.. 2.......

1.0../..../.82

.'......J....M...........

10../...../. 8. 2.......

L M99) e roaw om**s mcm==

OFFICIAL RECORD COPY

~ ~

Z