Category:CORRESPONDENCE-LETTERS
MONTHYEAR05000482/LER-1999-002, Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl 05000482/LER-1994-014, Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl1999-10-15015 October 1999 Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl ML20217F7481999-10-14014 October 1999 Informs That Based on Approval of Core Assessment Damage Guidance in WCAP-14696,rev 1 for Westinghouse Nuclear Power Plants,Licensee May Use WCAP-14696,rev 1 at Wolf Creek Generating Station ML20217F8701999-10-13013 October 1999 Provides Summary of Meeting on 991007 with Representatives of Wolf Creek Nuclear Station in Burlington,Kansas Re Status of Licensee Radiation Protection Program.List of Meeting Attendees & Licensee Presentation Encl ML20217C1721999-10-0707 October 1999 Forwards Insp Rept 50-482/99-09 on 990830-0903.No Violations Noted.Purpose of Insp to Perform Routine Operational Status Insp of Emergency Preparedness Program & to Resolve Questions Re Revised Emergency Plan ML20217A4881999-09-29029 September 1999 Forwards Changes to Plant Data Point Library,Iaw 10CFR50,App E,Section VI.3.a.ERDS Point Affected Is RDS0001 ML20216H9291999-09-29029 September 1999 Informs That Licensee Responses to GL 97-06, Degradation of Steam Generator Internals Acceptable & Did Not Identify Any New Concerns with Condition of SG Intervals at Plant ML20212G1681999-09-24024 September 1999 Notifies NRC of Change in Status of Licensed Individual at Plant,Per 10CFR50.74.RL Acree Holds License OP-42654 at Plant,But Has Been Permanently Reassigned from Position for Which Plant Has Certified Need for RO License ML20216F9591999-09-22022 September 1999 Forwards Withdrawal of Amend Request Re Ultimate Heat Sink Temp for Wolf Creek Generating Station ML20212G5641999-09-20020 September 1999 Forwards Insp Rept 50-482/99-13 on 990725-0904.Three Violations Being Treated as Noncited Violations 05000482/LER-1999-011, Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I1999-09-17017 September 1999 Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I 05000482/LER-1999-010, Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util1999-09-16016 September 1999 Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util ML20212D9381999-09-16016 September 1999 Informs That NRC Staff Completed Midcycle PPR of WCGS on 990818.Areas of EP & Engineering Warranted Increase in NRC Action.Nrc Plan to Conduct Add Insp Beyond Core Insp Program Over Next 7 Months to Address Listed Questions 05000482/LER-1999-006, Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl1999-09-15015 September 1999 Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl ML20212C9211999-09-15015 September 1999 Forwards NRC Form 536, Operating Licensing Examination Data, in Response to NRC Administrative Ltr 99-03 ML20216F1641999-09-14014 September 1999 Forwards Insp Rept 50-482/99-12 on 990816-20.No Violation Noted.Determined That Solid Radwaste Mgt & Radioactive Matls Transportation Programs Were Properly Implemented 05000482/LER-1999-009, Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER1999-09-10010 September 1999 Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER ML20212A5651999-09-10010 September 1999 Informs of Completion of Review of & Encl Objectives for Wolf Creek Generating Station 1999 Emergency Preparedness Exercise Scheduled for 991117.Determined Exercise Objectives Appropriate to Meet EP Requirements 05000482/LER-1999-008, Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER1999-09-0303 September 1999 Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER ML20211M7151999-09-0303 September 1999 Forwards Changes to Wolf Creek Generating Station Data Point Library.Emergency Response Data Sys Points Affected Are EJL0007 & EJL0008 ML20211N0081999-09-0202 September 1999 Informs That NRC Staff Has Reviewed Submittals & Concluded Util Adequately Addressed Actions Requested in GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power- Operated Gate Valves ML20211K8301999-09-0202 September 1999 Forwards marked-up TS Page Deleting Inequality Signs from Trip Setpoints in SR 3.3.5.3 & Reflecting Info on Calibr Tolerance Band,Per 990708 Application to Amend License NPF-42 ML20211K1941999-08-31031 August 1999 Forwards Rev 31 to WCGS Physical Security Plan,Safeguards Contingency Plan & Training & Qualification Plan,Iaw 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 ML20211H1491999-08-26026 August 1999 Forwards Insp Rept 50-482/99-16 on 990809-13.No Violations Noted.Insp Focused on Low as Is Reasonably Achievable Program,Training Program for Contract Radiation Protection Personnel & Radiation Protection QA Program ML20211A8581999-08-18018 August 1999 Forwards Insp Rept 50-482/99-08 on 990316-0724.One Violation Being Treated as Noncited Violation ML20211G2201999-08-17017 August 1999 Forwards Exam Rept 50-482/99-301 on 990726-29.Exam Evaluated Six Applicants for SO Licenses & Three Applicants for RO Licenses ML20210U0991999-08-13013 August 1999 Forwards Insp Rept 50-482/99-11 on 990712-16.No Violations Noted.Insp Was to Review Radiological Environ Monitoring Program ML20210U9751999-08-13013 August 1999 Informs That Licensee Identified That Answer Key for One Question on 990720 Written Exam & Event Classification for on Job Performance Measure Required Mod.Description & Justification for Proposed Mod,Including Technical Ref,Encl ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210R5621999-08-12012 August 1999 Forwards Monthly Operating Rept for July 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Revised Repts for Apr,May & June 1999,correcting Number of Hours Reactor Critical,Encl ML20210P7491999-08-0909 August 1999 Ack Receipt of ,Which Transmitted Wolf Creek Radiological Emergency Response Plan 06-002,Rev 0,under Provisions of 10CFR50,App E,Section V ML20210N0061999-08-0303 August 1999 Forwards Response to NRC 990401 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Motor-Operated Gate Valves ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210H2551999-07-29029 July 1999 Provides 180-day Response to NRC Request for Info Re GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20210J1371999-07-29029 July 1999 Requests NRC Approval of Methodology for Determining RCS Pressure & Temp & Overpressure Mitigation Sys PORV Limits. Attachment I Provides Proposed Changes to Improved TS ML20210F5931999-07-27027 July 1999 Forwards semi-annual Fitness for Duty Performance Data Rept for Wcnoc,Per 10CFR26.71(d).Rept Covers Period of 990101- 0630 ML20210F5881999-07-23023 July 1999 Submits Response to Administrative Ltr 99-02, Operator Reactor Licensing Action Estimates, ML20210B8191999-07-20020 July 1999 Ack Receipt of ,Which Transmitted Wolf Creek EP Implementing Procedure 06-005,Rev 1.Implementation of Changes Will Be Subj to Insp to Confirm That Changes Does Not Decrease Effectiveness of EP ML20209H5411999-07-15015 July 1999 Forwards Insp Rept 50-482/99-07 on 990614-18.No Violations Noted.Insp Focused on Radiation Program During Normal Operating Conditions ML20209H0441999-07-14014 July 1999 Forwards Response to NRC 990326 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. Summary of Util Commitments Provided in Attachment 2 ML20209H0751999-07-14014 July 1999 Forwards Monthly Operating Rept for June 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Max Dependable Capacity Has Been Updated from 1163 to 1170,as Determined by Calculations Based on Capacity Test Results of July 1998 ML20209G9871999-07-14014 July 1999 Informs of Changes Affecting Wolf Creek Security Plan,Per 10CFR50.54(p)(2).Encl Provides Description of Changes & Justification for Changes ML20209E3581999-07-12012 July 1999 Discusses Util 980925 Response to GL 92-01,Rev 1,Suppl 1, Rv Structural Integrity, Issued on 950519 to Wolf Creek Generating Station ML20209E0611999-07-0808 July 1999 Forwards Addl Pages to Rev 12 of USAR & Commitment Changes, Inadvertently Omitted from 990311 Submittal ML20196K8231999-07-0606 July 1999 Submits Kansas Electric Power Cooperative,Inc Ltr Pursuant to Commission Direction in Memo & Order CLI-99-19.Addresses Disposition of Existing Antitrust Conditions Attached to License for Wolf Creek Unit 1 Re Proposed License Transfer ML20209C6031999-07-0606 July 1999 Provides Applicants View as Result of 990618 Memo & Order Directing Parties to Address Proper Disposition of Existing Antitrust License Condition Attached to OL for Facility Due to Planned Changes in Ownership of Facility.With Svc List ML20196K0501999-07-0202 July 1999 Forwards Insp Rept 50-482/99-06 on 990502-0612.Three Violations Occurred & Being Treated as Noncited Violations, Consistent with App C of Enforcement Policy ML20209B7131999-07-0101 July 1999 Submits Response to NRC Request for Info Re GL 98-01, Suppl 1, Y2K Readiness of Computer Sys at Npps. Response on Status of Facility Y2K Readiness Was Requested by 990701.Disclosure Encl ML20209A7461999-06-29029 June 1999 Informs of Changes in Project Mgt Staff Assigned to Wcgs. Effective 990628,J Donohew Will Assume PM Responsibilities ML20209B5151999-06-29029 June 1999 Informs That Util Completed Analyses & Modifications to Address Items Discussed in GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions 1999-09-03
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEAR05000482/LER-1994-014, Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl1999-10-15015 October 1999 Forwards LER 94-014-00 Re Util Identification of Missed Surveillance Required by TS Prior to Changing Modes.List of Commitments Made by Licensee,Encl 05000482/LER-1999-002, Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl1999-10-15015 October 1999 Forwards LER 99-002-00,re Identification of Surveillance Performed in Modes Other than Those Required by TS SR 4.6.3.2.a.Commitments Made by Util Are Encl ML20217A4881999-09-29029 September 1999 Forwards Changes to Plant Data Point Library,Iaw 10CFR50,App E,Section VI.3.a.ERDS Point Affected Is RDS0001 ML20212G1681999-09-24024 September 1999 Notifies NRC of Change in Status of Licensed Individual at Plant,Per 10CFR50.74.RL Acree Holds License OP-42654 at Plant,But Has Been Permanently Reassigned from Position for Which Plant Has Certified Need for RO License 05000482/LER-1999-011, Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I1999-09-17017 September 1999 Forwards LER 99-011-00 Re Identification of Missed Surveillance Due to Exceeding Flow Rate Specified in TS for Ccps.List of Util Commitments Contained in Attachment I 05000482/LER-1999-010, Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util1999-09-16016 September 1999 Forwards LER 99-010-00,re Failure to Correctly Perform TS Surveillance 4.3.3.6.Encl Identifies Actions Committed to by Util 05000482/LER-1999-006, Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl1999-09-15015 September 1999 Forwards LER 99-006-01,re Identification of Failure to Enter LCO for TS 3.6.1.1 While Taking Containment Atmosphere Samples During Power Operation.Commitments Made by Util Are Encl ML20212C9211999-09-15015 September 1999 Forwards NRC Form 536, Operating Licensing Examination Data, in Response to NRC Administrative Ltr 99-03 05000482/LER-1999-009, Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER1999-09-10010 September 1999 Forwards LER 99-009-00 Re Util Identification of Fire Suppression Issue Affecting Safe Shutdown Components. Attachment I Identifies Actions Committed to by Licensee in Encl LER 05000482/LER-1999-008, Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER1999-09-0303 September 1999 Forwards LER 99-008-00,re Efsa at Plant.Attachment I Identifies Actions Committed to by Licensee in LER ML20211M7151999-09-0303 September 1999 Forwards Changes to Wolf Creek Generating Station Data Point Library.Emergency Response Data Sys Points Affected Are EJL0007 & EJL0008 ML20211K8301999-09-0202 September 1999 Forwards marked-up TS Page Deleting Inequality Signs from Trip Setpoints in SR 3.3.5.3 & Reflecting Info on Calibr Tolerance Band,Per 990708 Application to Amend License NPF-42 ML20211K1941999-08-31031 August 1999 Forwards Rev 31 to WCGS Physical Security Plan,Safeguards Contingency Plan & Training & Qualification Plan,Iaw 10CFR50.54(p).Encl Withheld,Per 10CFR73.21 ML20210U9751999-08-13013 August 1999 Informs That Licensee Identified That Answer Key for One Question on 990720 Written Exam & Event Classification for on Job Performance Measure Required Mod.Description & Justification for Proposed Mod,Including Technical Ref,Encl ML20210R5621999-08-12012 August 1999 Forwards Monthly Operating Rept for July 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Revised Repts for Apr,May & June 1999,correcting Number of Hours Reactor Critical,Encl ML20210N0061999-08-0303 August 1999 Forwards Response to NRC 990401 RAI Re GL 95-07, Pressure Locking & Thermal Binding of SR Motor-Operated Gate Valves ML20210J1371999-07-29029 July 1999 Requests NRC Approval of Methodology for Determining RCS Pressure & Temp & Overpressure Mitigation Sys PORV Limits. Attachment I Provides Proposed Changes to Improved TS ML20210H2551999-07-29029 July 1999 Provides 180-day Response to NRC Request for Info Re GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal ML20210F5931999-07-27027 July 1999 Forwards semi-annual Fitness for Duty Performance Data Rept for Wcnoc,Per 10CFR26.71(d).Rept Covers Period of 990101- 0630 ML20210F5881999-07-23023 July 1999 Submits Response to Administrative Ltr 99-02, Operator Reactor Licensing Action Estimates, ML20209G9871999-07-14014 July 1999 Informs of Changes Affecting Wolf Creek Security Plan,Per 10CFR50.54(p)(2).Encl Provides Description of Changes & Justification for Changes ML20209H0441999-07-14014 July 1999 Forwards Response to NRC 990326 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs. Summary of Util Commitments Provided in Attachment 2 ML20209H0751999-07-14014 July 1999 Forwards Monthly Operating Rept for June 1999 for Wolf Creek Generating Station,Per TS 6.9.1.8 & GL 97-02.Max Dependable Capacity Has Been Updated from 1163 to 1170,as Determined by Calculations Based on Capacity Test Results of July 1998 ML20209E0611999-07-0808 July 1999 Forwards Addl Pages to Rev 12 of USAR & Commitment Changes, Inadvertently Omitted from 990311 Submittal ML20209C6031999-07-0606 July 1999 Provides Applicants View as Result of 990618 Memo & Order Directing Parties to Address Proper Disposition of Existing Antitrust License Condition Attached to OL for Facility Due to Planned Changes in Ownership of Facility.With Svc List ML20196K8231999-07-0606 July 1999 Submits Kansas Electric Power Cooperative,Inc Ltr Pursuant to Commission Direction in Memo & Order CLI-99-19.Addresses Disposition of Existing Antitrust Conditions Attached to License for Wolf Creek Unit 1 Re Proposed License Transfer ML20209B7131999-07-0101 July 1999 Submits Response to NRC Request for Info Re GL 98-01, Suppl 1, Y2K Readiness of Computer Sys at Npps. Response on Status of Facility Y2K Readiness Was Requested by 990701.Disclosure Encl ML20209B5151999-06-29029 June 1999 Informs That Util Completed Analyses & Modifications to Address Items Discussed in GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20196G9681999-06-22022 June 1999 Informs NRC That BC Ryan Will Be Leaving Ks State Univ for Position with Wolf Creek Nuclear Operating Corp,Effective 990701 05000482/LER-1999-007, Forwards LER 99-007-00,re Condition in Which Wolf Creek Generating Station TS 3.3.2 Was Not Met.Commitments Made by Util Also Encl1999-06-18018 June 1999 Forwards LER 99-007-00,re Condition in Which Wolf Creek Generating Station TS 3.3.2 Was Not Met.Commitments Made by Util Also Encl ML20196A0251999-06-17017 June 1999 Requests That Written Exams for Reactor Operator & SRO for Plant Be Administered Beginning Wk of 990719 & Followed by Operating Exam During Wk of 990726 to Personnel Listed in Attachment.Proprietary Info Encl.Proprietary Info Withheld ML20195K0641999-06-15015 June 1999 Forwards MOR for May 1999 for Wolf Creek Generating Station & Corrected Page 2 of 2 of Apr 1999 Mor,Adding That Unit Entered Intomode 5 for Restart During Month of Apr & Correcting Shutdown Duration Hours from 672 to 671 ML20195G4391999-06-11011 June 1999 Provides Details for Missed Rept Re 10CFR50.46 Thirty Day Rept of ECCS Model Revs.Attachment I Provides Summary of Commitments Made in Submittal 05000482/LER-1999-005, Forwards LER 99-005-00,re Esfa.Commitments Made by Util Are Encl1999-06-11011 June 1999 Forwards LER 99-005-00,re Esfa.Commitments Made by Util Are Encl 05000482/LER-1997-027, Forwards LER 97-027-00 Re Identification of Missed Surveillance Required by TS 4.3.3.5.2.Encl 1 Identifies Actions Committed to by Util1999-06-0404 June 1999 Forwards LER 97-027-00 Re Identification of Missed Surveillance Required by TS 4.3.3.5.2.Encl 1 Identifies Actions Committed to by Util ML20195B9811999-05-26026 May 1999 Forwards 1998 Annual Repts for Ks Electric Power Cooperative Inc,Ks City Power & Light Co & Western Resources,Inc, Including Wholly Owned Subsidiary Kg&E Co ML20196L3361999-05-18018 May 1999 Forwards Rev 1 to Cycle 11 COLR for WCGS, IAW TS Section 6.9.1.9 05000482/LER-1999-004, Forwards LER 99-004-00 Re Failure to Maintain Containment Closure During Fuel Movement as Required by TS 3.9.4.c. Attachment I to Ltr Identifies Actions Committed to by Plant in Encl LER1999-05-12012 May 1999 Forwards LER 99-004-00 Re Failure to Maintain Containment Closure During Fuel Movement as Required by TS 3.9.4.c. Attachment I to Ltr Identifies Actions Committed to by Plant in Encl LER ML20206Q8141999-05-11011 May 1999 Requests NRC Work with Industry to Resolve Generic Changes to Allow Permanent Change to TSs Prior to June 2000.Encl Provides TS Limited Duration Action Statement Until 990930 05000482/LER-1999-003, Forwards LER 99-003-00,re Failure to Perform TS SR 4.9.2.c Prior to Entering Mode 6.Commitments Made by Util Are Encl1999-05-10010 May 1999 Forwards LER 99-003-00,re Failure to Perform TS SR 4.9.2.c Prior to Entering Mode 6.Commitments Made by Util Are Encl ML20206K5141999-05-0707 May 1999 Provides Info Re Number of Tubes Plugged in Each Sg,As Required by TS 4.4.5.5.ISI of SGs B & C Completed on 990424,resulting in Mechanical Plugging of One Tube in SG B & Five Tubes in SG C ML20206J0711999-05-0505 May 1999 Forwards Guarantees of Payment of Deferred Premiums for Owners of Wolf Creek Generating Station,As Required by 10CFR140.21 ML20206D9551999-04-29029 April 1999 Forwards 1999 Annual Radioactive Effluent Release Rept 22, for Reporting Period Jan-Dec 1998,per Section 6.9.1.7 of WCGS Ts.Attachment to Ltr Identifies Commitments Resulting from Correspondence ML20206C7321999-04-22022 April 1999 Provides Notification of Changes at WCGS Affecting Plant Physical Security Plan,Per 10CFR50.54(p).Changes Identified in Attachment I Will Be Incorporated Into Plan by 990831. Commitments Made by Util Are Included in Attachment II ML20206B2051999-04-20020 April 1999 Forwards Revs to RERP Implementing Procedures,Including Rev 1 to EPP 06-001, CR Operations, Rev 1 to EPP 06-002, TSC Operations, Rev 3 to EPP 06-004, Public Info Organization & Rev 1 to EPP 06-005, Emergency.. ML20205L7431999-04-0606 April 1999 Confirms 990401 Telcon with NRC Re Late Payment Notice That Util Received for Invoice RL0295-99.Licensee Understands Invoice to Be Cancelled ML20205F1601999-03-30030 March 1999 Forwards Rept Re Status of Decommissioning Funding for WCGS, Per 10CFR50.75.Kansas Gas & Electric Co Decommissioning Trust Agreement,Encl ML20205K9481999-03-26026 March 1999 Responds to NRC Ltr Re Violations Noted in Insp Rept 50-482/98-05.Corrective Actions:Training Was Provided to Mrep Members Through Use of Contract Individual Experienced in Maint Rule Programs.Change to Commitment Date,Encl ML20196K7261999-03-26026 March 1999 Forwards Certified Copy of ITS & ITS Bases,As Committed in Licensee to Nrc.Summary of Editorial Corrections, Also Encl ML20205A1961999-03-25025 March 1999 Provides Suppl 2 to 970515 Application for Amend to License NPF-42,providing Changes to TS Based on 990310 & 19 Discussions with NRC Re Conversion to Improved TS 1999-09-03
[Table view] |
Text
_ .__ _ _ . . . . _ _
l l .
1 . .
. I W$LF CREEKNUCLEAR OPERATING CORPORATION l
l Otto L Maynard ve.er ioent eionion ton. February 2, 1996 WO 96-0014 I
l U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-137 Washington, D. C. 20555
Subject:
Docket No. 50-482: Request for Relief From ASME Section XI Hydrostatic Testing of Class 1 and Class 2 Pressure Boundaries Gentlemen:
Pursuant to the requirements of 10 CFR 50. 55a (a) (3) , Wolf Creek Nuclear ,
operating Corporation requests relief from the requirements of ASME Section XI, 1980 Edition through and including Winter 1981 Addenda, Table IWB-2500-1,
" Examination Category B-P," Item Numbers B15.51 and B15.61 and Table IWC-2500-1, " Examination Category C-H, " Item Numbers C7.40 and C7.80 for Wolf Creek Generating Station.
Relief is requested on the basis that the proposed alternative provides an acceptable level of quality and safety. In addition, compliance with the specified requirements would result in a hardship without a compensating l increase in quality and safety. Attachment I provides the basis for this relief request and the proposed alternative provisions.
If you have any questions concerning this matter, please cortact me at (316) 364-8831, extension 4450, or Mr. Richard D. Flannigan, at extension 4500.
l Very truly yours 9602060024 960202 PDR Q
ADOCK 05000482 PDR
[/ /ft//'A
'T
/
otto L.'Maynard q OLM/jra Attachment l
cc: L. J. Callan (NRC), w/a W. D. Johnson (NRC), w/a i i J. F. Ringwald (NRC), w/a J. C. Stone (NRC), w/a b
\
i\
"***""'""*'"*****"""**~**'
060CG0 An Equal Opportunity Employer M/F/HC/ VET
, , - - - - - _ ~ - . - - - .. -- .. - - - - . - - . . . . . . . . . - . . . _ _ _ _ - -
4 .
Attachment to WO 96-0014 4
Pdge 1 of 6 i
INSERVICE INSPECTION RELIEF REQUEST Cn=ponent Applicable to ASME Class 1 and Class 2 pressure boundaries on Reactor Coolant System (RCS) branch connection between the RCS Pressure Isolation Valves as follows:
- 1) RCS Hot Leg Recirculation Lines (4 independent loops) from Safety Injection (SI) System
- 2) RCS Cold Leg Safety Injection Lines (4 independent loops)
- 3) RCS Cold Leg High Pressure Safety Injection Lines (4 I loops common supply)
Categorvt ASME Section XI, 1980 Edition through and including Winter 1981 Addenda, Table IWB-2500-1, Examination Category B-P, Item Numbers B15.51 and B15.61 and Table IWC-2500-1, Examination Category C-H, J Item Numbers C7.40 and C7.80. 1 i
Demeription:
Hydrostatic testing of ASME Class 1 and Class 2 pressure boundaries between RCS Pressure Isolation Valves (subject boundaries utilize check valves). These pressure boundaries include a Class 2 piping connection from the Class 1 portion of piping to the associated Safety Injection System Test Line Isolation Valve (Reference Figure 1).
Code Recruir-- nt Table IWB-2500-1, Category B-P and Table IWC-2500-1, Category C-H require that a system hydrostatic test per IWB-5222 and IWC-5222, respectively, be performed each 10-year inspection interval on pressure retaining components.
Basis for Relief and Proposed Alternative ProvisiSDA1 Pursuant to 10 CFR 50. 55a (a) (3) (i) , relief is requested on the basis that the proposed alternative provides an acceptable level of quality and safety and pursuant to 10 CFR 50.55a (a) (3) (ii) compliance with the specified requirements would result in a hardship without a compensating increase in quality and safety.
l i
l j
- ,-w-n p, -
-r,,. ,- ., , -n- -- - , , - -
Attachment to WO 95-0014
. Page 2 of 6 Code testing requirements for the subject boundaries include testing at 1.02 times operating pressures for the Class 1 portions and 1.25 for the Class 2 portions with a 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> hold time for insulated portions of systems which includes the subject pressure boundaries of this request for relief. Waiting for the required hold time with subsequent visual examination can substantially extend outage time (e.g., testing of the subject branch connections with the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> hold time can result in an additional 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> of critical path time). Personnel exposure is also greatly affected because the subject pressure boundaries are located within the primary personnel protection wall, typically referred to as the "bioshield." Insulation removal to reduce the ASME Code required hold time to ten minutes is not a viable option since this would require a substantial increase in the number of man-hours spent within the bioshield which is typically a high radiation dose area. This also creates a personnel hazard associated with reinstallation of the insulation on the greater than 500*F piping surface. In addition, testing at the elevated hydrostatic testing pressures causes considerable hardship. To minimize schedule impact, this testing would be performed in conjunction with other plant startup activities such as RCS pressure Isolation valve testing. To attain the required conditions for the other testing, it would require an additional cycle of RCS pressurization as discussed below.
As part of Wolf Creek Generating Station's (WCGS) NRC Safety Evaluation Report (SER) for use of ASME Code Case N-498-1, Alternative Rules for 10-Year System Hydrostatic Testing for Class 1, 2, and 3 Systems, it was stated that, "the system hydrostatic test is not a test of the structural integrity of the system but rather an enhanced leakage test. That the original intent was an enhanced leakage test is documented in a paper by S.H. Bush and R.R. Maccary, ' Development of 'In-Service Inspection Safety Philosophy for U.S.A. Nuclear Power Plants,' ASME, 1971." The safety evaluation further states, "The industry indicates that experience has demonstrated that leaks are not being discovered as a result of hydrostatic test pressures propagating a preexisting flaw through wall. They indicate that leaks in most cases are being found when the system is at normal operating pressure." The safety evaluation continues to state that considering the minimal amount of increased assurance resulting from the higher hydrostatic test pressures and the hardship associated with performing the ASME Code required hydrostatic test, the NRC staff identified that, " compliance with the Section XI hydrostatic testing requirements results in hardship and/or unusual difficulty for the licensees without a compensating increase in the level of quality and safety."
Recognizing that hydrostatic tests result in hardship and/or unusual difficulty without a compensating increase in the level of quality and safety, Wolf Creek Nuclear Operating Corporation proposes two alternatives to confirm that no boundary leakage is present at the subject locations. The description and technical basis of these alternatives are discussed as follows:
l Attachment to WO 96-0014
. Page 3 of 6 Alternative 1) Pressure boundaries at adequate pressures WCGS Technical Specification Surveillance Requirement 4.4.6.2.2 requires that each RCS Pressure Isolation Valve specified by Table 1 3.4-1 is demonstrated to be OPERABLE prior to entering Mode 2 following completion of the unit's refueling outage. To satisfy l this requirement for the second isolation valve, the Class 1 and Class 2 pressure boundary located between the first and second isolation valves is pressurized by means of a hydrostatic testing pump to approximately 50 poig below the RCS pressure and then valve leakage is measured through the safety Injection System Test Line (line 2 on Figure 1). Upon completion of each valve test, the pump is secured without venting or draining the pressure boundary.
Because the WCGS Technical Specifications require re-performance of the leakage test whenever flow occurs through one of the RCS Pressure Isolation Valves, it is necessary to raise the RCS pressure to approximately 2300 (which is > 1.02 times normal RCS operating pressure) and limit the pressure between the valves at 2235 psig to preclude flow through the first isolation valve. As discussed in the WCGS SER for use of Code Case N-498-1, the normal operating pressure is reasonable for use as the pressure for pressure boundary leakage examinations.
Although the subject pressure boundaries are isolated from the hydro pump while at test pressures following completion of valve testing, it is understood that valve leakage may occur over time.
This leakage will occur until equalization of the volume upstream and downstream of the valve occurs. Leakage may also occur in such a way as to maintain pressure in the subject boundary, i.e.,
leakage from the first isolation valve. The presence of pressure was verified by performance of pressure measurements in January 1996 (approximately 13 months into the current fuel cycle). Most of the subject boundaries were pressurized greater than 2200 psig which is near the RCS normal operating pressure of 2235 psig
Attachment to WO 96-0014
, Page 4 of 6 In March, 1988, Generic Letter 88-05, " Boric Acid Corrosion of Carbon Steel Reactor Presspre Boundary Components in PWR Plants,"
was issued to all licensees of operating PWRs. A boric acid corrosion monitoring program was developed in response to the requirements of the generic letter. Th program in place at WCGS consists of a method to detect evidence of boric acid leakage at the beginning of each refueling outage and other times as directed by WCGS Management. Essentially, the full Class i system and a majority of the Class-2 systems containing boric acid are walked down each refueling outage by personnel certified to a minimum Level II Visual Examination VT-2. This inspection identifies any sources of leakage, including pressure boundary leakage. On-insulated portions of a system, evidence of leakage is observable; however, the' exact source of the leakage may not be identifiable until portions of the insulation is removed and additional testing l is performed. to allow direct observation. The inspection performed by the boric acid corrosion monitoring program is sufficient to confirm that no pressure boundary leakage is present in the subject-locations.
For ' the subject . pressure boundaries verified as maintaining a pressure of at least 2000 psig (which is approximately 90% of RCS operating pressure) for the Code required hold. time of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during the current fuel cycle (cycle 8), WCNOC requests relief from the First 10-Year Inservice Inspection Interval Section XI l requirements for performing the 10-year system hydrostatic testing l
of the Class 1 and Class 2 pressure boundaries located between the RCS Pressure Isolation Valves. Relief is requested on the basis that the verification of pressure greater than 2000 psig for a minimum of four hours in combination with the inspections implemented as a result of Generic Letter 88-05 provide an alternative which provides an acceptable level of quality and safety. The implementation of a separate test to apply ASME l
Section XI 10-year system hydrostatic test pressure and hold time requirements to these pressure boundary locations would result in
, a hardship to WCNOC in the form of additional testing, financial burden and additional dose to personnel without a compensating increase in quality and safety.
Alternative 2) Pressure boundaries not at adequate pressures l During the pressure measurements of the subject pressure l boundaries discussed above, a few locations were measured at less !
l than 2000 psig. Although these locations were measured at less l than 2000 psig, they were initially pressurized to the RCS operating pressure of 2235 psig during valve testing. It is probable that any pressure boundary leakage will still be identified by the boric acid monitoring inspections. However, i since the length of time at pressure greater than 2000 psig cannot be determined, a flow test is proposed to supplement the boric acid monitoring program inspections. During RCS Pressure
- Isolation Valve leakage testing, following a pressurization hold time of 10 minutes, the amount of water used as the pressure source and the identified valve leakage can be measured and
_ _ ._ _ _. - - .- __-. - ,. ~ . . _ -
)
Attachment to WO 96-0014
'. P$ge 5 of 6 compared. If a discrepancy is identified between the measurements, it will be evaluated taking into consideration the impact from other sources of leakage and equipment inaccuracies.
This flow test supplementing the boric acid monitoring program inspections will adequately confirm that no pressure boundary leakage is present in the subject locations.
l For the subject pressure boundaries verified as not maintaining a pressure of at least 2000 psig for the Code required hold time of 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during the current fuel cycle (cycle 8), WCNOC requests relief from the First 10-Year Inservice Inspection Interval Section XI requirements for performing the 10-year system hydrostatic testing of the Class 1 and Class 2 pressure boundaries located between the RCS Pressure Isolation Valves. Relief is requested on the basis that the combined boric acid monitoring program inspections implemented as a result of Generic Letter 88-05 and the comparison of the pressure source and leakage measurements, provide an alternative which provides an acceptable level of quality and safety. The implementation of a separate test to apply ASME Section XI 10-year system hydrostatic test pressure and hold time requirements to these pressure boundary locations would result in a hardship to WCNOC in the form of additional testing, financial burden and additional dose to personnel without a compensating increase in quality and safety, l
4 I
l
Attachment to WO 96-0014
" .'
I i
l l
l l
l To SI' Test Lines for leakage; measurement I Line 2 Line 1 x Z I Piping from branch connection to SI Test Line is Class 2
- Class 1 l Reactor Coolant j System.
Primary Loop; Piping I Second.RCS First RCS Pressure Pressure Isolation Valve Isolation Valve Piping from branch connection to hydro pump test connection Hydro pump isolation valve is -test Class 2 connection FIGURE 1 General RCS Pressure Isolation Valve Pressure Boundary Representation (Bold lines represent boundary subject to relief)