Rev 6 to GP-23, Diesel Generator Outages
ML20086A553
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/29/1994
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20086A499 List:
References
GP-23, NUDOCS 9507030281
Download: ML20086A553 (32)


Text

, . --

I

, hlicabloDiesel GP-23 I Rev. 6 100 Iog Entry / Page 1 of 29

. Date Time E B:abb Psm Enersy o=oany i Peach Bottan Unit 2 and 3 l l

GP-23 DIESEL GENERATOR CC7DGES l 1.0 REPOSE

'Ibe purpose of this s.-- tm is to provide the administrative -4.svls for removirq an energency diesel generator fran service Wienever the emergency diesel generators are required to be operable. 'Ihis s. ettre also provides the r:--- +y requi&_A to ensure ocupliance with Todt spec 3.0.D and 4.9.B.3. ,

2.0 PREPJDOUISTJES Procedure Use E i IE a. diesel p=retur has been declared inoperable, 21gE 'Dscil Spec's requires the performance of step 3.9 of this g - ettre DelEDIATELY. (Step 3.9 directs the perfonnance of ST-O-054-950-2, "Offsite Ibwer Breaker Alignment and Voltage Check". Only steps 6.1, 6.2.1 and 6.3.1 of ST-O-054-950-2 needs to be performed within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.)

2.1 This vp ettm should be performed prior to removing an emergency diesel generator frun service for scheduled Inaintenance 2 within one hcxtr of declaring an emergency diesel generator irarr.rable e for unscheduled cutages. This ensures ocmpliance with Tedi spec 4.9.B.3.

2.2 Section 3.0 is applicable to all four emergency diesel generators AND )

shall be performed prior to intentionally renoving a diesel fran an  ;

operable status. Additionally, this s ucedure contains four P rate l appendices Wiich are specific to endi diesel v a-reter being remcned l from service. 1 2.3 This g etire is H2r intended to be an all inclusive list of every load supplied by a specific diesel generator or its a - 4=ted  ;

=ai-spq buses, but rather is intended to provide the rwmaaavy l administrative controls to permit a diesel generator to be renoved j frun service while meeting the requit ta of 7kd1 Spec 3.0.D and '

4.9.B.3. Certain loads (e.g. ISW booster punp, RHCIT pung, etc.) cri diesel generator buses were specifically excluded fran this g wirre 5 l because of their design tw=a or application and need not be reviewed d 1 prior to removing a diesel frun service. Therefore, this prdtre P should not be used as a diesel generator load list. C ,

)

d 2

9507030281 950607 PDR ADOCK 05000277 P PDR

- .. -. - . _ _ . . - - - . ~ - _ ~ - - . . . -

.m=14r=hlo Diemal GP-23 # >

Rev. 6 '

-l IID Iog Bitry / Page 2 of 29- i Date Time EHB:ahb ,,

l 2.4 Since this 3.- two is administrative in nature, steps may be '

l acoceplished in any logical ceder provided all steps have been either  ;

otapleted, marked not applicable, or a variance h=wited in the "GP-23 Procedure Variance Form" prior to intentionally removirg a  ;

dis W fram service.

2.5 1his r. #tre is cmly required to be parfamed man for endt dinaal p- h outage based on the assumption that all equipment / trains will reesiin in the same operable status as idian this wh ides .i' first performed. However,.if any Tech Spec equipment's operability status should change during the dinaal p--i.us outage, it is rMle that the required Tech Spec action will be dictated by a  ;

ocabination of the inoperable diesel generator and the Tech Spec IID )

for the ir%.ble Tech Spec 9'iM. '1herefore, this 3.- two i shall be referanood in order to determine the action required if any '

Tech Spec ami==rit's ep u.obility status should change prior to restoring the diesel generator to an operable status. - _

2.6 If Plant Status should change while the dimaal is cut of service (e.g. .

shutdown to refuel, potential to drain the vammal, etc.) star etaps )

that were previcusly not applicable may har== applicable. 'iherefore, l this p.- tma should be referenced if a plant status change which .

requires a diange in Tech Spec equipnent ei-obility is planned with ,

a dianal already out of service.  !

l 2.7 Only one Tech Spec, 3.2.F Instrument Failure, was a===ad in the

development of GP-23. Tech. Spec. Table 3.2.F Instruments were excluded frt
n GP-23 since a diesel cutage concurrent with sg33 ,

ir% ble redundant instrument, not pcuared off the ir.p.1..ble i diesel, would not result in a plant shutdcun in less than seven days, i.e., the instrument Ico would be bounded by the diesel IID. However, if .t3s redundant 3.2.F instruments were to har- ire ble in additics to the instrument supplied by the irw ble diesel, then it .)

is possible for the unit to be in an 100 note restrictive.than seven days. This situation is not addressed by GP-23. As a result, two inoperable 3.2.F instruments in conjunction with an ir.p = ble diesel should be reviewed to ensure ocmpliance with table 3.2.F.

3.0 PERFWMANCE S'IEPS E

H a diesel generator has been declared ire ble, 3 Tech Spec's requires the performance of step 3.9 of this p - itnt DeGlDryn!Lv.

3.1 Record the emergency diesel generator to be runoved from service.

e, a ,v,n_- v -

,,-,-,g -

m,_ e . _ _ , . . _ _ , . . , . - _ ,_,

.- . L i

E. Applimh19 Diesel GP-23  :

Ihrv. 6 I IID Iog Entry / Page 3 of 29 l Date Time- IIHB:ehb  !

Initia1Mata/ Time  !

3.2 Verify that a REumSE has been obtained fra the Ioad -i Di.344e.r for removirq the affected diesel p-.^wc j fra service AND record the release raamber. / / .

. Ra1 - ber  :

3.3 2 the diesel generator is beirq removed fra service for its 2 year p- ^wr inspecticm, M verify 3 3G-I-52B-911(912, 913, 914)-2, " Diesel Generator End j Bearing Insulation Test", has been performed prior to ,

removirg the diesel from service. / / l i

l NZDE i l

1. An initial in Table 1 AND 2 of Appendix I thru IV signifies '

that the redundant trairg/+- t listed in the table is not known to te inoperable based on existing Iro entries and known v4= ant status. It does not signify'that the listed redundant trairV-p=:(,t has been proven to be ==rable.

~

2. If a unit is shutdown, equipnent specific to the unit in shutdown 2nny not be required to be operable by Tecf1 Specs and would also not be required to be operable by this r. - tww.

'Iberefore, the staps in the appendices listirq this equipment may be marked as "N/A". However, otminen systems powered off of the shutdown units 'E' bus any still be applirmhla.

3.4 Ocuplete the applicable Appendix, Table 1 and 2 for the diesel to be removed fra service. / / -

3.5 H a redundant traizVW->L is ir%.ble AND the i diesel has not yet been renoved fra service, M:  ;

I 3.5.1 Enter the word "INDP" in the " Initial" column instand of initialing.

3.5.2 Review action listad in the " Action Required if Redundant, Train or C-N->L narman Irup-oble" colunn to detamine if the diesel may still be removed from service.

3.6 H a tv6 aidant trairVw-it har=== irirpm ble after the diesel  !

has hte rencved from service, m couply with the actions listed in j the "Acien Required if Redundant Train or W-,t nar=== -

Ir % ble" column. I 1

3.7 H a trairV+== t listad under the "Affected Cup.-ste" column  !

is inoperable for a reason unrelated to the diesel generator outage, l M consider the traizV+=ist inoperable AND refer to the i epplicable Tects spec section. j l

l

_- ., . . . . _ - . _ .__ - - , - - . . . . ~ . , -, , - - l

Applicable Diesel 23' ,

l Bev. 6 IID Log Entry - / Page 4 of 29 Date Time EHB:ehb -

~

Initial /Date/Ilas 3.8 E the diesel generator is being reunaved fran service for an unplanned cutage, M inform the Maintenance Unit coordinator E the Diesel System Manager to determine if any additional maintesiance can be performed dLIring the diesel cutage. / /

Shift ih- , at M

Tedt Spec 3.9.B.4 permits contimed operatic 1 with one ir % .ble off-site startup source E an irwable diesel generator.

However, Operations Management has deramined that this shall not be done intentionally. Reference SO 53.7.A and SO 53.7.B.

3.9 Ensure both off-site startup scuroes E the 4KV buses operable by performirg ST-O-054-950-2, "Offsite Power Breaker Ali,-::ut and Voltage Check" prior to removing the diesel fran service 2 within cr:e hour of hlaring the diesel irwable (Tedi Spec 4.9.B.3). / / i Shift Maxwynant 3.10 H the diesel generator hara w inoperable for any reason other than preplanned preventative maintenance

@ testing E it can E be determined that the remaining operable diesel generators are not inoperable due to cczanan cause failure, M perform ST-O-052-501(502,503,504)-2, "IID Test for El (E2, E3, E4) Diesel Generator" on the operable three diesels within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of daclaring the diesel inoperable (Tech Spec 4.9.B.3). / /

Shift Management 3.11 Enter the irwable diesel generator in the ICO Iog. / /

Shift % ,t 3.11.1 Complete Exhibit G M 12:3 to regtlize that ST-O-054-950-2 be capleted every eicfit hours (Tedi Spec 4.9.B.3) . /____/

Shift Mar-r-se 3.11.2 H the diesel generator is being removed frun service for any reason other than planned preventative maintenance 3 testirg, E it can E be determined that the remaining

- - operable diesel generators are not ircydable dtn to ocanman cause failure, M cceplete Exhibit QM 12:3 to require that the remaining operable diesels be tested every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in accordance with ST-O-052-501(502,503,504)-2, cfdierwise NA this step E continue with step 3.11.3 (Tedi Spec 4.9.B.3) . / /

Shift Manimp -:=4L

4 Applicablo Dismal GP-23 Rev. 6 IID Ia3 Entry / Page 5 of 29 Date Time DIB:ehb 3.11.3 Irput Date/ Time IID Iag entry is made en the space pIUvided on page 1. / /

Shift % d 3.12 Make an entry in the Potential IID Iog to reference GP-23. / /

Shift "iarg r ,L ,

3.13 R the diesel generator became iri w eible for any reasun other than preplanned preventative maintenance

.CB testingi 21E2i perform ST<r-052-505-2, " Diesel Generator Failure Reporting". / /

Shift Mar %it 3.14 Prorwhnt has been reviewed and the diesel generator

  • is ready to be removed fr m service. / /

Shift Ma m p -=4L

4.0 REFERENCES

4.1 PBAPS IER 2-90-12 ('ID0934) 4.2 Ltr frm D.M. Smith to NRC dated 8/15/90, subj: PBAPS Respciais to Violation 50-277/90-200 and 50-277/90-06.

P 1

i

+

t l

l l

I l

1 4

GP-23 Bev. 6 Ptege 6 of 29 HIB:etib APPERSIX I B-1 EDG OUD 2 Table 1 Reauired Redundant nudr==t for E-12 Tech Spec Affected Redundant Actics) Required if Redundant System Canoonents Train /Gawor= d. Initial Train or Cauconent Becauses Incoerable 00EtB SPRAY 2A Core 2B Cure Plant Shutdown in accordance with T.S. 3.0.D Spray Icop Spray Icop LPCI 2A IICI 2B LPCI Plant Shutdown in accordance with T.S. 3.0.D IDOP loop 00emLIIGGENT FO-2-10-89A PD-2-10-89C 'Ihe 'A' contalrunent Cooling 000 LING loop is is %41e. Ctniply l with T.S. 3.5.B E 4.5.B for one ir % -s le loop 2AP42 2CP42 (1) H 2CP42 is li%41e, 2133 (HPSW PP) M consider the 'A' Contairunent

'B' contairunent dooling loop inoperable cooling Icop E comply with T.S. 3.5.B E 4.5.B for one lim.ya,.41e locp.

(2) R 2CP42 m the 'B' contalrunent cooling loop are irrparnble, 2135 consider the 'A' E 'B' containment cooling Icop limies s.41e 3 shutdown per -

T.S. 3.0.D. .

e e

GP-23 ,.

Rev. 6 Page 7 of 29 m B:ehb APPEN)IX I (OCEfrINUED) E-1 EDG OUDGB Table 1 Reauired Redundant Eouinnent for E-12 Tedi Spec Affected Redundant Action Required if Redundant System Otmoonents Train /Cuwere:nt Initial Train or Cu-ami:st narmaa Incoerable sBIC 2AP40 2B SBIC Consider both punps irq =1.able E (SBIC PP) Train plant shutdown to hot shutdown within 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> in accorGanoe with T.S. 3.4.D.

seer OAV20 OBV20 (1) H OBV20 is inoperable, M consider (SBGP Fan) OCV20 OAV20 M OBV20 irq =aable E shutdown Unit 2 in accordance with T.S.

3.0.D. Continue Uhit 3 operation while cxmplying with T.S. 3.7.B.3 for two irw able SBGP fans.

(2) H OCV20 is ir @ able, M consider QAV20 M OCV20 ir % able. Continue operation of Unit 2 E Unit 3 while ocuplying with T.S. 3.7.B.3 for two

' limspi:1.able SBGP fans.

OAE65 'B' SBGP Consider both trains irq =rable (Heating 0011) Train M plant shutdown of both units in accordance with T.S. 3.0.D EBW 2AV60 2BV60 Consider both fans ir % able 3 (Supply Fan) establish tw1.ory farm in accordance with T.S. 3.9.C.4

GP-23 ,

Rev. 6 Page 8 of 29 EHB:ehb g.- t APPB M I I (C M ) B-1 E E QUIs m Table 1 Beauired Redundant Baliciumt for E-12

~

\

! Tech Spec Affected Redurdant Action Required if Redundant Systen Ocamonents Train /Ocimonent Initial Train or Ocamonent Boomes Incoerable EDW (cont.) 2AV83 2BVB3 consider both' fans inoperable E (Exhaust Fan) establish temporary fans in accordance with T.S. 3.9.C.4 3AV60 3BV60 Consider both fans inoperable M  ;

(Supply Fan) establish ^%.my fans in accordance with T.S. 3.9.C.4 3AV83 3BVB3 Consider both fans inoperable AND (Exhaust Fan) establish Mary fans in amnrdance with T.S. 3.9.C.4 CRD 2A CAC/C30 2B 0%C/ChD Restore the inoperable analyzer to %able H2 /02 Analyzer H2 /02 Analyzer status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> 13 plant shutdown to

'a hot shutdown within next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in accordance with T.S. 3.7.A.6.C 125V 2AD03 2CD03 Plant Shutdown in accordance with T.S. 3.0.D '

cm .a s - (Battery G=up) 2I0 03 Plant Shutdown in amnrdance with T.S. 3.0.D 20D03 Plant Shutdown in mmrwdance with T.S. 3.0.D

. e 4

.- , . , . - - - - - ~-,,v. .=-r-,..r,-,.,--, - - - . . .-,,...--.-.,--r-. - - . . - . , , , , - . - - - - - , - - . - - - ~ - , - . - - , - r - w---- . m+e + " ' " -

GP-23 .

- Rev. 6 '

Page 9 of 29 DiB:ehb APPERGIE I (OCEffDMD) E-1 EDG OUDGE Table 1 B!!alired Redundant hh==1t for E-12 ,

Tedi spec Affected Redundant Action Required if Redundant System Otroonents Train /Cumu-mit Initial Train or Cumciunt Beccanes Inoperable RAD OAV21 OBV21 JE OBV218tg) OCV21 became in-MATERIAL (Main Stack OCV21 operable, 3M consider OAV21 Dilution Fan) irwable 8tg) shutdown both units in accordance with T.S. 3.0.C PRIMhlaf 10-2-12-15 P0-2-12-18 Imediately close 8tB deenergize CONTADGE3ff (RWCU Inlet) 70-2-12-15 g 1D-2-12-18. Verify SYBTIBE position of 7D-2-12-15 g ID-2-12-18 as applicable in accordance with SIM)-007-400-2, "Irmrable Isolation Valve Raition Daily log".

PD-2-2-74 PD-2-2-77 Imediately close 8tg) doenergize (MSL Drain) 70-2-2-74 2 70-2-2-77. Verify

' position of 1D-2-2-74 310-2-2-77 as applicable in accordance with ST-O-007-400-2, "LWable Isolation Valve Rmition Daily log".

90-2-14-070 70-2-14-71 Imediately close 8tg) deenergize

('1brus Filter Isol) 10-2-14-70 2 7D-2-14-71. Verify position of 7D-2-14-70 2 70-2-14-71 as applicable in accordance with ST-O-007-400-2, "Lwable Isolation Valve Ibsition Daily Iog".

f

. GP-23 Rev. 6 Page 10 of 29 BIB:ehb APPDWIX I (OuttfDWD) B-1..EDG OUrmos Table 1 PLaruiiru$ Redundant nustr==1t for E-12 Tech Spec Affected Redundant Action Requirux! if Redundant Systern Ctuponents Train /Conoonent Initial Train or r ---- a. h Lxhable 00ermnaestr PO-2-23-15 70 23-16 - Innediately close 8t!D deenergize surrEMS (HPCI Steam Inbd Inj) 70-2-23-15 g 70-2-23-16. Declare (cont.) HPCI 1r w able. Verify position of PO-2-23-15 2 70-2-23-16 as applicable in accordance with SP-O-007-400-2, "Lwable Isolation valve Position Daily Ing".

t e

4 0

0 e en

..r ,, . .-, - - - , < . + - _ _ _ _ _ _ _ _ -

_m ._ _ . _ _ _ -_

-- 1 r--

GP-23 ,

Rev. 6 . .

Rige.11 of 29

  • HIB:ehb APPEWII I (CCRErIMUEH B-1 EMI OUINE Table 2 i Rarnif red M=riant muilr==rit for E-13

, Tecti Spec Affectal Redundant Action Recpinnd if Redundant Systen Ocumanes.ts Train /Otmiponent Irtitial Train or Ommonent Becomes Inocerable CORE 3A Core 3B Oore Plant Shutdown in accordance with T.S. 3.0.D SPRhY Spray Loop Spray Icop IJCI 3A IECI . 3B IFCI Plant Shutdown in accordance with T.S. 3.0.D Icop IncP C Wi m D EERIff PD-3-10-89A IO-3-10-89C __

Consider the 'A' Containment Cooling cootme loop inoperable. Omiply with T.S.

4.5.B for one inoperable loop.

3AP42 3CP42 (1) H 3CP42 is inoperable, ' DEN consider the (HPSW PP) Al!D 'A' Containment Cooling loop inoperable AtB

'B' Cantainment

  • comply with T.S. 3.5.B A19 4.5.B for one -

Cooling Icop ir%41e loop.

(2) R 3CP42 AtB the 'B' Contairment Cooling lotp are inoperable, 2tEt! consider the 'A' AtB 'B' Cantainment Cooling loop inoperable Atg shutdown in accordance with T.S. 3.0.D.

SBIC 3AP40 3B SB[c Oansider both pumps inoperable Alp plant (SMc PP) Train shutdown to hot shutdoun within 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> in accordance with T.S. 3.4.D.

GP-23

' Rev. 6 Ptege 12 of 29 -

EHD:ehb

, APPERGIX I (00tEFI140EID) B-1 EG OUm(E Table 2 Reauired Redundant nudr=arit for E-13 l Tech Spec Affected Redundant Action Required if Redundant i

system Otomanents Train /C - mint Initial Train or Quemonent Baconnes Inocerable l

CRD 3A CAC/ CAD 3B CAC/ CAD Restore the i>+Mle analyzer to upei6ble-H2 /02 Analyzer H2 /02 Analyzer status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> 3. plant shutdown to a hot shutdown within next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in avuva.aur= with T.S. 3.7.A.6.C 125 V 3AD03 3CD03 Plant Shutdown in accordance with T.S. 3.0.D I

BR3TERIES (Battery Charger) 31003 Plant Shutdown in accordance with T.S. 3.0.D 30003 Plant Shutdown in amnrdance with T.S. 3.0.D PRIMRRY MO-3-12-15 1D-3-12-18 T-aritately close 8tB C&gize 30-3-12-15' 00EETAIIGERET (RWCII Inlet) *3 30 3 12 18 Verify position of 10 12-15 SYSTERW @ 10 12-18 as applicable in accordance with ST-o-007-400-3, " Inoperable Isolation valve Position Daily Ing".

3D-3-14-70 10-3-14-71 Inunediately close 8tC C-vize 10-3-14-70 (Torus Filter Isol) @ ID-3-14-71. Verify position of 30-3-14-70 g ID-3-14-71 as applicable in accordance i with SIH)-007-400-3, " Inoperable Isolation valve Position Daily Ing". -

O e .

,- .,- -n-, ,a_, e- -, , , - -. -- , , , , - , , , + - . , ,- - - . , - , - - ,r, .- ,--.a e ,- -- - - - - - - - . - - - - - - - -u.-- --- -- ----e - - - ~ ' - '

GP-23 Rev. 6

' Page 13 of 29

  • HIB:ehb .
APPEIGIX I (CCNfINLED) E-1 EDG OUB W l Table 2 i Reauired Redundant nmimant for E-13 1

Tedt Spec Affected Redundant Action Required if Redundant System com onents Train / Cum;uimit Initial Train or Cuwus== L narv=aa Irhable l

l PRDERY PO-3-2-74 70-3-2-77 Innediately close 8tlD deenergize i CONDJBMElNF (MSL Drain) 70-3-2-74 2 70-3-2-77. Verify SYBHSB position of 20-3-2-74 3 PD-3-2-77 (Omff.) as applicable in accordance with ST-o-007-400-3, "Ir % =ble Isolation Valve Position Daily Log".

70 23-15 10-3-23-16 Innediately close 8t!D deenergize (HPCI Steam Inbd Inj) PO-3-23-15 @ 10-3-23-16. Declare HPCI irw able. Verify position of 20-3-23-15 2 70-3-23-16 as applicable in accordance with SP-O-007-400-3, "Irm able Isolation Valve Position Daily Log".

B al- o

.+ GP-23 Rev. 6 Page 14 of 29 l DiB:ehb l

s APPEICIX II B-2 EDG OUplGR Table 1 Reauired Redundant Estirmarit for E-22 a  !

Tech Spec Affected Redunaant Action Required if Redundant i system Omponents Train /C h ait Initial Train or C-w t narr=a= Irwable 00RE 2B Core 2A Core Plant Shutdown in accordance with T.S. 3.0.D SPRAY Spray Icop Spray Icop 1

LPCI 2B IICI 2A IICI Plant Shutdown in accordance with T.S. 3.0.D IDoP IDCP 00NrhDBERE 2BP42 2DP42 (1) H 2DP42 is ir%4le, ' DEN COOLING (HPSW PP) M consider the 'B' Oontairunent

'A' containment .

Cooling loop ir%41e 8t!D l cooling Icop conply with T.S. 3.5.B &l!D 4.5.B for one irsp=m41e loop.

t (2) H 2DP42 8t!D the 'A' containment cooling loop are lawsle, 332!  ;

consider the 'A' 8t!D 'B' Contairunent l cooling loop inoperable 8t!D shutdown in accordance with T.S. 3.0.D.

70-2-10-89B PQ-2-10-89D Consider the 'B' contairunent cooling loop inoperable. Comply with T.S.

4.5.B for one inoperable loop .

O

GP-23 ..

Rev. 6.

  • Page 15 of 29

'~

HIB:ehb APPEIMI II (GEffDMD) B-2 EG OUIRGE ,

L Table 1 Reauired Redundant hirumarit for E-22 Tech Spec Affected Redundant Action Required if Redundant Systen Otmoonents Train /Gmars a. Initial Train or tvumnrient h Lwable SBIC 2BP40 2A SBIC Consider both plasps inoperable 8tg plant (SBIC PP) Train shutdown to hot shutdown within 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> "

in accordance with T.S. 3.4.D.

ESN OAP57 OBP57 Plant Shutdown in accordance with T.S. 3.0.D (A ESW PP) 2BV60 2AV60 Consider both fans inoperable Atg (Supply Fan) establish temporary fans in accordance with T.S. 3.9.C.4 2BV83 2AV83

  • Consider both fans inoperable Atg (Exhaust Pan) establish temporary fans in accordance ,

with T.S. 3.9.C.4-3BV60 3AV60 Consider.both fans inoperable 8tg (Styply Fan) .

establish 'waiy fans in accordance with T.S. 3.9.C.4 3BVB3 3AV83 Consider both fans inoperable 8tp (Exhaust Fan) establish temporary fans in amnrtience with T.S. 3.9.C.4

GP-23 Rev. 6 Page 16 of 29:

B B:ehb' APPEIMX II (CN) B-2 BIG OUDE Table 1 Rar=>lred Redundant F*=ni-arit for E-22 Tects Spec Affected Redundant Action Required if Redundant Systein Ocamonents Train /CumaiE==it. Initial Train or Ocuponent Beccines Inocerable BBGT ~OBV20 OhV20 (1) H OhV20 is inoperable, M consider I-(SBGP Fan) OCV20 OBV20 E OAV20 inoperable E i

shutdown Unit 2 in accordance with l T.S.~3.0.D. Continue 'Jhit 3 operation while complying with T.S. 3.7.B.3 for two inoperable SBGP fans.

I (2) R OCV20 is intperable, M consider OBV20 E OCV20 inoperable E shutdown Unit 3 in mmredence with T.S. 3.0.D. Contirman thit 2 up at. ion while ocuplying with T.S. 3.7.B.3 for two inoperable SBGP fans.

CAD 2B ChC/ CAD 2A ChC/ CAD ' Restore the inoperable analyzer to wa,le H2 /02 Analyzer H2 /02 Analyzer status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> SE plant shutdown to a hot shutdown within next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> in accordance with T.S. 3.7.A.6.c.

125V .

BRTTERIES 2BD03 2AD03 Plant Shutdown in accordance with T.S. 3.0.D (Battery Guup) 2CD03 Plant Snutdown in accordance with T.S. 3.0.D .

20003 Plant Shutdown in annnedance with T.S. 3.0.D.

O e- e,

--..-~..w, , s.-.-. - . .~ , e.---n. r- w---- . . . . ..,.y --. ~ -- - . ...we..:.-._ 1

GP-23 Rev. 6 -

Page 17 of 29 +

DIB:ehb .

APPERSIX II IODEfrINUED) D-2 EDG OUmGB 4

Table 1 Reauired Redundant shdr==1t for E-22 Tech Spec Affected Redundant Action Required if Redundant '

System 0:aconents Train /Cuwc= ==it. Initial Train or Ocamonent Beacunes Incoerable FIRE OOP64 00P63 Declare 00P64 8tB 00P63 limsparci,le SYEmms (Motor Driven (Diesel Fire and establish M _p water supply Fire Pump) Punp) within 24 hrs in accordance with Tedt Spec 3.14.A.3 PRDGEY PD-2-13-15 MD-2-13-16 Inunediately close 8tB deenergize 00ermIIGElff (RCIC Steest Inbd Isol) 3D-2-13-15 g 3D-2-13-15. Declare SYImms RCIC Ir % d ule. Verify position of PD-2-13-15 g PD-2-13-16 as applicable in'accordance with ST-O-007-400-2, "Ir % ci,le Isolation valve Ecsition Daily Log".

b.

l GP-23 i

Rev. 6 i

Page 18 of 29 DiB:ehb APPEROIX II (O NFINUED) E-2 EX3 OUTAGE l Table 2 l Reauirtxl Redurdant Frutit=rit for E-23 I

Tech Spec Affected Redundant Action Required if Redundant System Otmoonents Train /ha;ca sit Initial Train or C-=it % a Incoerable 00RE 3B Core 3A Cbre Plant Shutdown in accordance with T.S. 3.0.D SPRAY Spray Icop Spray Icop LPCI 3B IPCI 3A IPCI Plant Shutdown in accordance with T.S. 3.0.D IDOP IDOP CONDLDMENT MO-3-10-89B FO-3-10-89D Consider the 'B' Containment Cooling COOLING IDop incperable. Ocuply with T.S.

4.5.B for one lia;pa s le loop 3BP42 3DP42 (1) H 3DP42 is irareusle, 21g2! consider (HPSW PP) btg) the 'B' Containment Cooling loop

'A' Containment inoperable Alg) ocuply with T.S. 3.5.B Cooling Isop 'b!E) 4.5.B for one irsepaule loop. ,

(2) H 3DP42 8tg) the 'A' Containment cooling loop are irm;pasle, 21g2!

consider the 'A' 8tg) 'B' Contalment cooling loop lisuvasle 8tE) shutdown -

in accordance with T.S. 3.0.D.

SBIC 3BP40 3A SBIC Consider both plays irmspusle Atg} plant -

(SBEC PP) '

Train shutdown to hot shutdown within 20 lxxirs 7 in accx)tdance with T.S. 3.4.D.

s Q

^ ^ ~ , _ _ _ _ _ _ _ ,

q GP-23 ,

. Rev. 6 Page 19 of 29 '

gg.ehb *-

APPEROIX II (00NrDGD) D-2 EDG OUDGB Table 2 Reauired Redundant swdr=arit for E-23 Tech Spec Affected Redundant Action Required if Redundant System Carroonents Train /Cuimu ail Initial Train or n----,t nar=== Incoerable BBGP OBE65 A SBGP Consider both trains inoperable 8tg (Heating Coll) Train plant shutdown of both units in accordance with T.S. 3.0.D CRD 3B CAC/ CAD 3A CAC/ CAD Restore the inoperable analyzer to operable H2 /02 Analyer H2 /02 Analyer_ status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> g plant shutdown to a-hot shutdown w/in 12 hrs in accordance with T.S. 3.7.A.6.C 125 V 3I003 3CD03 Plant Shutdown in avuus.a-ax with T.S. 3.0.D BATTERIES (Battery Qiarger) 3AD03 Plant Shutdown in accordance with T. S. 3.0.D 30D03 Plant Shutdown in accordance with T.S. 3.0.D PRIMARY CONERDMENT PO-3-13-15 10 13-16 T W lately close 8tB deenergize SYSTEMB (RCIC Steam Inbd Isol) 70-3-13-15 g 10-3-13-16. Declare RCIC incperable. Verify position of 10-3-13-15 g PD-3-13-16 as applicable in accordance with SIM)-007-400-3, " Inoperable Isolation Valve Position Daily log".

GP-23:

Rev. 6

, Bage 20 of 29 DIB:ehb me APPBWIX III E3 EDG OUDGB Table 1 Rarmittd Redundant FM{rmart for E-32 Tech Spec Affected Redundant Action Required if Redundant Systm 0:moonents Train /C - =it. Initial Train or therment F- - -- Ii h able 00RE 2A Cbre 2B Core Plant Shutdown in amnedance with SPIULY Spray Loop Spray Icop Tedt Spec 3.0.D LPCI 2A IECI 2B IPCI Plant Shutdown in accordance with Icop loop Tech Spec 3.0.D EBW OBP57 OAP57 Plant Shutdown in accordance with (ESW PP) Tedt Spec 3.0.D 00NMIIGENF PO-2-lO-89C MD-2-10-89A 'Ihe 'A' contairunent cooling loop is -

COOLING inoperable. Comply with T.S. 4.5.B for one inoperable loop.

2CP42 '2AP42 (1)'H 2AP42 is inoperable, M consider (HPSW PP) 8l9 the 'A' Cantainment Cooling loop

'B' Contairunent ir @ aisle &lE comply with T.S. 3.5.B Cooling Icop 819 4.5.B for one inoperable loop.

(2) H 2AP42 Atp the 'B' Contairunent Coolirq loop are inoperable, M consider the 'A' Alp 'B' containment coolirq loop inoperable 8tg shutdown in accordance with T.S. 3.0.D. -

6

GP-23 Rent. 6 Page 21 of 29

  • MfB:ehb -

APPEICIX III (00EfrD00ElDLE3..EDG OUDG:

Table 1 Reauimd Redundant hh=arit for E-32 Tech Spec Affected Redundant Action Required if Redundant Systm Ocznponents Train /Cuwvisemit Jpitial Train or Cumuin:ul %-" Incoerable 00tfrADMENE 2A Torus 2B Torus Plant Shutdown in avuutG= x with T.S. 3.0.D 000LDIG Spray Icop Spray Icop (cont.)

2A Drywell 2B Drywell Plant Shutdown in accordance with T.S. 3.0.D Spray Icop Spray Loop 2A Torus 2B Torus Plant Shutdown in accordance with T.S. 3.0.D Cooling IIxp Cooling Icop 00tfrROL OAV30 OBV30 Shutdolm both units in accordance with RON IMER. T.S. 3.0.D VENTIIATIN RIS-0760A RIS-0760B Place um^uul room ventilation in cu=:tps,f - --

control Room control Roma in accordan.3e with SO 40D.7.B 8tg) perform Vent Supply 'A' Vent Supply 'B' ' applicable steps of m 115.

Rad Monitor Rad Monitor RAD OCV21 OAV21 IE OAV21815) OBV21 beatae liaspassle, -

MRTERIAL (Dilution fan) OBV21 2132f consider OCV21 lia;patsle 8[g) refer to T.S. 3.8.C.4

GP-23 Rev. 6 Page 22 of 29 DiB: ebb l

APPERWIX III (CGffIIEW) 53 Exp 00pm Table 2 Reauired Parkwriant hir=arit for E-33 Tedi Spec Affected Redundant Action Required if Redundant System CNoonents TrainKumunit Initial Train or 0 - _- a. narv=aa Incoerable 125V 2G03 2AD03 Plant Shutdown in accordance with T.S. ' 3.0.D BMTERIES (Battery Charger) 2BD03 Plant Shutdown in au.mdaiic.= with T.S. 3.0.D 20003 Plant Shutdown in accordance with T.S. 3.0.D l

00RE 3A Core 3B Core Plant Shutdown in accordance with T.S. 3.0.D SPRRY Spray Isop Spray Icop IJCI 3A LPCI 3B IPCI Plant Shutdown in accordance with T.S. 3.0.D IcoP 100P l

1 00emmeester 3CP42 3AP42 (1) R 3AP42 is inoperable, 21E2! consider COOLDG (HPSW PP) 815) the 'A' Contairunent Cooling loop

'B' Oontainment liwd,le 8tg emply with T.S. 3.5.B Oooling Icop 8tg 4.5.B for one inoperable loop.

(2) H 3AP42 8tg the 'B' contairunent Cooling loop are inoperable, 2132[

l consider the 'A' 8lg) 'B' Contairunent '

I ocoling loop inoperable 8tB shutdown

  • in accordance with T.S. 3.0.D. .

-- _ --_____m _.__ _ . . ..____ _ _ _ _ _ _ _ _ , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , _ _ _ _ _ _ . _ _ . _ , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___

v'v v l'"J e-

. GP-23

  • Rev. 6 Page 23 of 29 *:

EHB:ehb -

APPEtcII III (Otaff35EED)_53_EDG.OUUWE Table 2 Damimi Redundant nutr==1t for E-33 Tedt Spec Affected Redundant Action Requiral if Redundant System CtmExments Train /Cumsu=:ut Initial Train or n=vvient nar-ma Lmamiable CONMIIGIElfr PD-3-10-89C M)-3-10-89A 'Ihe 'A' containuunt cooling loop 000LIN3 is Irw able. Ocuply with Tedt (cont.) Spec 4.5.B for one inoperable loop.

3A Drywell 3B Drywell Plant Shutdown in accordance with Spray Loop Spray Loop Tedt Spec 3.0.D 3A Torus 3B Torus Plant Shutdown in accordance with Cooling Loop Cooling Icop Tedt Spec 3.0.D 3A Torus 3B Torus Plant Shutdown in accordance with Spray Imop Spray Icop Tedt Spec 3.0.D i

~

SBGP OCV20 OBV2O (1) H OBV2O is inoperable, 'DEl! consider (SBGP Fan) OhV20 '0BV20 815) OCV20 inoperable Alg) shutdown Unit 3 in accordance with T.S. 3.0.D. Continue Iktit 2 operation l

t while complying with T.S. 3.7.B.3 for two inoperable SBGP fans.

(2) R OhV20 is inoperable, 2llW consider OhV20 8l@ OCV2O inoperable. Continue operation of Unit 2 8tE) Unit 3 while l

complying with T.S. 3.7.B.3 for two inoperable SBGP fans.

4 l

9 I

a t

1 e

2 h h h 369b t 2x t t t 2 2h n a u iii w w

. e l w

Pvf: xi e e  !

t GeoB wI c c E

c R I n n a 4H 2

hr a a a c dr dr dr e

g a

P-f i e o

c o

c ca o

c ca P B c a D t D 0 n.n.n.

l a in3n3n3

0. i 0. i 0 i

e r r-w a

R - cc wccoc w

lup e l u ede B n0 pt p 3 o 'u uSuS M 3 ir h S'h h E

U E

- to c ShShSh c c c O Ani tetete r nTnTnT a a la G o a r l l D f P P P E T t t

3 u E +

m

) r i

m u

t u

r 2F l m a et i m l n t b da i n

u a I

( Tnu I d I e I R X d I e r

O R i E u ti P a i s

P e i A R t a n

a u 3 0

3 0

3 0

d n u D D 0 t

C A B 0 hr / 3 3 3 a n Ri a

r T )

r e

g

s. r de it a t 3C h

c w 0 Dy f

eG Cr f m 3 e A O -

t t

a B

(

ce B pn D Set VR 5E hscy 2T 1TA eS T B ll llI i

. w GP-23 Rev.~ 6 *-

Phge 25 of 29 i-DIB:ehb .

APPRDIX IV E4 EDG OUpm Table 1 Rwnihtui Redundant naalrumt for E-42 Tedi Spec Affected Redundant Action Required if Redundant Train or.Commonent Becomes Inaperable System Caemonents Train /Gawvise:nt. Initial CORE 2B Oore 2A core Plant Shutdown in accordance with-SPRRY Spray Icop Spray Icop Teda Spec 3.0.D LPCI 2B IPCI 2A IFCI Plant Shutdown in accordance with Icop Inap Tedt Spec 3.0.D ,

b 00BmLDetENT 10-2-10-89D PO-2-10-89B Consider the 'B' contairment cooling 000Lnes loop is inoperable. Casply with T.S. 4.5.B for one ir==rnble loop 2DP42 2BP42 (1) H 2BP42 is inoperable, Bell consider (HPSW PP) 8t!D the 'B' cantairment Cooling loop

'A' contairment inoperable Alg) cxmply with T.S. 3.5.B Oooling Icop '8?g) 4.5.B for one inoperable loop.

(2) H 2BP42 Alg) the 'A' Contairement cooling loop are inoperable, Egt[

consider the 'A' 8tg) 'B' Contairement Cooling loop inoperable Alg) sh in accordance with T.S. 3.0.D.

2B Drywell 2A Drywell Plant Shutxtown in anvirdance with Spray Icop Spray Icop Tedt Spec 3.0.D

'l

' GP-23 Rev. 6 Pege 26 of 29 HIB:ehb

%e %

Arrrawa IV (umu.mmu) E4 EDG OUDW Table 1 Remdred Redundant Ehdtnarit for E-42 Tedi Spec Affected Redundant Action Required if Redundant System Ocaruxmts Train /Cv w urr_ui Initial Train or r.- .- .L h Irsimsable -

00NIADeqElff 2B Tonts 2A 'Ibrus Plant Shutdown in accordance with COOLING Oooling Inop Cooling Loop Tedt Spec 3.0.D (cont.)

2B Torus 2A Torus Plant Shutdown in a-1. Jars with Spray Loop Spray Loop Tedt Spec 3.0.D RAD OBV21 OAV21 JE OAV21 Ng} OCV21 barv=a iriupei.able, MimIRIAL (Dilution Fan) OCV21 Vg2{ ocnsider OBV21 inoperable Ng}

refer to Tedt Spec 3.8.C.4 125V 20003 2AD03 Plant Shutdown in accordance with BATHERIES (Battery Qiarger) Tedt Spec 3.0.D 2BD03

  • Plant Shutdown in accordance with Tedt Spec 3.0.D 2Q03 Plant shutdown in accordance with Tech Spec 3.0.D CONFROL OBV30 OAV30 Shutdown both units in acce1.do .x with ROC 3t EMER. T.S. 3.0.D VElffIIATIGE .

RIS-0760B RIS-0760A Place uan^uul recen ventilation in emergency ,

Control Room Control Roan in accordance with 90 40D.7.B Ng} perform ,

Vent Supply 'B' Vent Supply 'A' applicable steps of CN 115 Rad Monitor Rad Monitor ,

r

  • - ., 4 - - - - - , _ _ _ , , ,

f . o I

GP 23 .-

Rev. 6  :

Page 27 of 29 - ,

I!HB:ehb i

APPRMI IV (m) 54 EMI 005m Table 2 Reauired Redundant h'ir=amit for E-43 Tech Spec Affected Redundant Action Required if Redundant systen 0:aconents Train /O:soonent Initial Train or c. _ _ ma. narv=== Ir-----

Ale 00RE 3B Oxe 3A core Plant Shutdown in accordance with SPRAY Spray Loop Spray Icop Tedt Spec 3.0.D a

LPCI 3B LPCI 3A IPCI Plant Shutdown in accordance with Icop Loop Tech Spec 3.0.D cas e m emarr PD-3-lO-89D PD-3-10-89B 'Ihe 'B' contairunent cooling loop is tyrw.vnn inoperable. Ocuply with Tech Spec 4.5.B for one inoperable loop, 3DP42 3BP42 (1) H 3BP42 is inoperable,-3l3 consider

.(HPSW PP) Blg} the 'B' Contairunent cooling loop

'A' contairunent liedle Alg) ocuply with T.S. 3.5.B cooling Loop 'Alg) 4.5.B for one inoperable loop.

(2) R 3BP42 Alg) the 'A' Cbntainment Cooling loop are inoperable, Big consider the 'A' alg) 'B' contairunent cooling loop inoperable 819 shutdown in accordance with T.S. 3.0.D.

3B Drywell 3A Drywell Plant Shutdown in armetlance with Spray Ioop Spray Icop Tech Spec 3.0.D

GP-23 Rev. 6 Pege 28 of 29 DE:ehb APPIBOIX IV (006) B4 EDG OUme!

Table 2 Beauired Redundant Fm{rmorit for E-43 Tech Spec Affected Redundant Action Required if Redundant System Oomonents Train /Cuwvient Initial Train or C-wit nan =aa Iihable 00NmDMDff 3B Torus 3A Torus Plant Shutdown in svuui a m= with 000LDE Cooling Icop Cooling Icop Tedi Spec 3.0.D (cont.)

3B Torus 3A Torus Plant Shutdown in hisuu with Spray Icop Spray Loop Tech Spec 3.0.D 125v 30003 3AD03 Plant Shutdown in accordance with BMTERIES (Battery Charger) Ted Spec 3.0.D 3B003 Plant Shutdown in accordance with Tech Spec 3.0.D 3CD03 Plant Shutdown in accordance with Tedi Spec 3.0.D s

e 0 _.

~~

__ _ _ _ . . ., . - - - - ----- r -

J,--- d - i ' '~- 4 GP-23 l

Ihrv. 6 l Page 29 of 29 '

HE:ahb GP-23 PROCEDURE VARIANCE FCEM P W tre Step Reason for Non-Performance SSV ard SM Signature Ntaber O

e e

h e

4

5. .

. i NRC REQUEST #1 The Tech Spec should include:

Verification that the required systems, subsystems, trains, components and devices that depend on the remaining diesel generatort as a source of emergency power are operable before removing an EDG for preventative l maintenance.

Positive measures should be provided to:  !

Preclude subsequent testing or maintenance activities on these systems, subsystems, trains, components and devices while the EDG is inoperable.

l PECO Response:

Existing Tech Spec 3.0.D requires that we verify status of redundant equipment ,

before removing a diesel from service.

I Existing procedure GP-23 " Diesel Generator Outages" implements Tech Spec 3.0.D.

GP-23 provides a systematic and comprehensive mechanism to determine when a diesel can be removed from service based on availability of redundant equipment.

1 Existing Tech Spec required actions listed in GP-23 preclude the removal of l redundant equipment for testing or maintenance.

LCO 3.0.D provides an adequate, positive measure to account for redundant equipment status during diesel outages. Therefore, no additional T.S. changes are necessary.

e

  • / ,, o Tech Specs involved Operability definition  ;

A system, subsystem, train, component, or device is OPERABLE or has OPERABILITY when it is capable of performing its specified function and all instrumentation, controls, normal and emergency electrical power sources, cooling or seal water supplies, lubrication systems, and other auxiliary equipment that are required for the system, subsystem, train, component, or device to perform its function are also capable of performing their relatsd support function.

Limitir.3 Jondition for Operation 3.0.D When a system, subsystem, train, component or device is determined to be inoperable solely because its emergency power source is inoperable, or solely because its normal power source in inoperable, it may be considered OPERABLE for the purpose of satisfying the requirements of the Limiting Condition for Operation, provided: (1) its corresponding normal or emergency power source is OPERABLE; and (2) all of its redundant systems, subsystems, trains, components and devices are OPERABLE, or satisfy this specification. Unless both conditions (1) and (2) are satisfied, the unit shall be placed in HOT SHUTDOWN within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in COLD SHUTDOWN within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. This specification is not applicable in Cold Shutdown.

l 4

P

1 The licensee also noted that the alternate train EDG testing proposed by the staff seemed to run counter to staff positions in Generic Letter (GL) 84-15 and several recent Peach Bottom specific license amendments. The staff provided a detailed history of staff positions in GL 84-15. The staff indicated that it would further consider the information provided by the licensee and would respond to the licensee in the near term.

/S/

Joseph W. Shea, Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-277/278

Enclosures:

1. Meeting Attendees
2. Licensee Draft Response
3. Licensee Meeting Handout cc w/encls: See next page DISTRIBUTION w/ enc 1 1: QLSJ1 w/ all encls:

WRussell/FMiraglia BGrimes Docket File AGill RZimmerman CGrimes PUBLIC CBerlinger SVarga ACRS(4) PDI-2 Reading APal I

JZwolinski EJordan JShea JLazevnick JStolz WDean NGilles DThatcher CAnderson, RGN-I M0'Brien 0Chopra FTalbot OGC ETomlinson p

. N,b . . W y OFFICE PDI-2/LA PDI-2/PM [ , EELB/[ M PDI-2/D/)//

NAMEhe Mb JShear[S CBerl$geI JStolz M l DATE 6/G/95 $//L/f5 (///, /95 t /7 /95 0FFICIAL RECORD COPY DOCUMENT NAME: G:\SHEA\ PEACH \MAYPBEDG. SUM

)