Ma nWys
't EPJIndex-2
., 0' 00ETROLLID AP1ROVID'00P Rev 6
l:l VOID PREVIOUS ISSUE PEACH BOTTOM UNITS.2 AND 3' 09/09/87
- DISTRIBUTION PER A-2 Q
Review Rev.' Revision Number
- Title, Date N o.~
Date-s EP-101 Classification of Emergencies 08/10/87.
17.- 08/10/87' EP-102 Unusual Event Response.
09/09/87 17 09/09/87
- EP-103 Alert Response-09/09/87 ~ ~ 161: 09/09/87 *-
EP-104-Site" Emergency Respcnse 09/09/87 17 09/09/87'*
EP-105 General Emergency Response-09/09/87 16' 09/09/87
- EP-110 Personnel Accountability.
12/20/85 2.01/06/86 EP-201 TechnicalSupportCenter(TSC)
Activation 12/20/85 9 01/07/86 EP-202 Operations Support Centers (OSC)
Activation 10/07/86 9 01/05/87 EP-203 Emergency Operations facility (EOF)
Activation 12/16/85 9 01/08/86
-(
EP-203A Alternate Emergency Operations Facility-(EOF) Activation 10/12/84 0 10/12/S4 EP-205 0ELETED 09/12/84 EP-205A Chemistry Sampling and Analysis Team 10/16/85 6 10/16/85 EP-205A.1 Operation of Post Accident Sampling Station 10/02/86 7 01/05/87 EP-205A.2 Obtaining Drywell Gas Samples From Containment Atmosphere Dilution Cabinets 03/20/87 2 03/20/87 EP-205A.3 Retrieving L' Changing Sample Filters &
Cartridges from Orywell Radiation Monitor During Emergencies 10/16/85 2
10/16/85
)
EP-205A.4 Obtaining Drywell Gas Samples From Drywell Radiecion Monitor Sampling Station 10/15/85 1
10/15/85 EP-205A.5 Obtaining Reactor Water Samples from Sample Sinks following Accident Conditiens-03/12/87 2 03/12/87 EP-205A.6 Obtaining Canal Discharge Water Samples Following Radioactive Liquid j
Releases After Accident Conditions 03/19/87 4 03/19/87 EP-205A.7 Obtaining lodine & Particulate Samples 8710210023 B71008 ADOCK05GOfy7 DR
.EP lhdex *
{
EMERlENCY PLAN PROCEDURES.INDEX '
Page"2' i
Rev. 66-*
PEACH 8OTTOM UNITS 2 AND 3.
09/09/87 *
}. l Review Rev.' Revision-Humber
, Title Date No.
Date j
From' Main-Stack & Roof Vents Following 1
Accident Conditions 10/16/84-3 -10/16/84 EP-205A.8 Obtaining Liquid Padwaste Samples From Radwaste Sample Sink Following Accident Conditions 10/16/85 l'L10/16/85 EP-205A.9 Obtaining Samples From Condensate Sample Sink Following Accident Conditions 10/15/85 1
10/15/85 EP-205A.10 Obtaining Off-Gas Samples From Off-Gas Hydrogen Analyzer Following Accident Conditions 10/15/85 1
10/15/85 EP-205A.11 D E L E T E D - Incorporated into EP-205A.13 12/20/85 sEP-205A.12 Sample Preparation & Handl.ing-of Highly t- -
Radhmetive Particulate Filters &
lodine Cartridges 10/15/85 4 10/15/85 EP-205A.13 Sample Preparation & Handling of Highly
]^,
Radioactive Liquid & Gas Samples 03/13/87 5 03/13/87 EP-205A.14 Off-site Analysis of High Activity Samples 12/10/86 1
10/15/85 EP-205A.15 Guideline For Order of Analysis on Post-Accident Samples 03/09/87 3 03/09/87 EP-205A.16 Storage of Post-Accident Samples 12/10/86 0 09/12/85 EP-205A.17 Obtaining a Gas Sample From Main Stack Under Accident Conditions 03/19/87 1 03/19/87 EP-2058 0 E L E T E D - Replaced by EP 207G &
EP-210A 12/20/85 EP-205C DELETEO 08/07/85 EP-206 0ELETED 04/27/83 EP-206A Fire Fighting Group 07/24/87 9 07/24/87
-l EP-2068 Damage Repair Group 12/20/85 4 01/07/86 EP-207 Personnel Safety Team Activation 09/12/85 7 09/12/85 i
~
EP-207A First Aid / Search & Rescue Group 07/09/87 5 07/09/87 EP-2078 0ELETED 04/27/84
l EP-Index l
EMERGENCY PLAN PROCEDURES INDEX Page 3 i
4 Rev. 66
- i j
PEACH 80TTOM UNITS 2 AND 3 09/09/87
- I t
(
e Review Rev. Revision i
Number Title Date
'No.
Date _
i
.s
)
EP-207C D E L C T E 0 - Incorporated into 207A 06/26/85 EP-2070 Evacuation Assembly Group 09/16/85~
4 09/16/85 EP-207E 0 E L E T E D - Incorporated into 2070 08/28/85r I
l EP-207F' 0 E L.E T E D - Incorporated into 2070*
08/28/85:
EP-207G Plant Survey Groupi.
09/09/85' 0 09/09/85 EP-207H Dosimetry,. Bioassay, & Respiratory Group
-09/16/05 0 09/16/85 EP-208 Security Team Actuation 12/18/85 2 01/03/86 1
EP-209 Telephone List for Emergency Use 09/03/87 12 01/02/87
.. EP-209 0 E L E-T E D + Incorpcrrated;into Appendix A EP 102, 103, 104 & 105 as Needed 12/02/86 EP-209 0ELETED 11/04/81
{>
Appendix 8 EP-209 Peach Bottom Station Supervision Appendix C 09/03/87 24 09/09/87
- i EP-209 On Site Emergency Team Leaders Appendix 0-1 09/03/87 21 09/08/87
- EP-209 Dose Assessment Team Appendix 0-2 09/03/87 24 09/08/87
- i EP-209 Fire and Damage Team Appendix 0-3 09/03/87 23 09/08/87
Appendix 0-5 09/03/87 20 09/09/87
- EP-209 Re-Entry & Recovery Team Appendix 0-6
.09/03/87 7 01/02/87 EP-209 Technical Support Center Group Appendix 0-7 09/03/87 24 09/03/87
- EP-209 Chemistry Sampling & Analysis Team 09/03/87 10 09/08/87
- Appendix 0-8
o v
EP index.
EMERGENCY PLAN PROCEDURES INDEX Page 4-
.Rev. 66 * :
PEACH BOTTOM UNITS 2 AND 3 09/09/87
- Review Rev. Revision,
h Number Title Date.
No.
Date-EP-209 Corporate Emergency. Team Leaders &
' Appendix E Support Personnel 09/03/87 21.09/09/87 *-
EP-209 U. S. Government Agencies-Appendix F 09/03/87 12 09/03/87
- EP-209 Emergency Management Agencies Appendix G 09/03/87.
14 '09/08/87
- EP-209 Compsny Consultants
{
Appendix H 09/03/87 17 09/03/87
- EP-209 Field Support' Personnel A sendix I-1 09/03/87 27 09/09/87
- EP-209 Chemistry & Health Physics Contractor Appendix I-2 Call. List 09/03/87 25 09/03/87 *
. EP-209 oNearby Public and-Industrial Users of r Appendix J ' Downstream Waters
'09/03/87 14 09/03/87 * "
EP-209 Miscellaneous-c-
Appendix K 09/03/87 14 09/09/87 *
)
EP-209 Local PECo Phones Appendix L 09/03/87 11 09/08/87
- EP-209 0ELETED 10/21/84 Appendix M EP-209 Medical Support Groups Appendix N 09/03/87 12' 01/02/87 EP-209 Staffing Augmentation - 60 Minute Appendix P Call Procedure 09/03/87 18 09/09/87
- EP-210 Dose Assessment Team 10/01/86 3
10/06/86 EP-210A Field Survey Groups 12/18/85 1 01/15/86 EP-211 Emergency Radiation Exposure Guidelines
& Controls 06/28/85 0 06/28/85 EP-212 Technical Support Team Activation 02/21/86 1 02/21/86 EP-301 Operating Evacuation Alarm & Pond Page System 09/09/85 2 09/09/85
)
EP-303 Partial Plant Evacuation 08/30/85 3 08/30/85 EP-304 0ELETED 12/04/81 l
.__.__.---------x-sm'A"^-
y t
EP !adex
? EMERGENCY ~ PLAN PROCEDURES INDEX
.Page 5 q
4
~Rev. 66 o PEACH BOTTOM UNITS 2 AND 3-09/09/87 '
1
'm Review Rev. Revision Number Title
_ Oate-No.
Date
+1 EP-305 Site Ev'acuation 12/20/85
-6. 01/07/86 EP-306 0 E L'E T E D - No Replacement 01/17/86, l
. Reception & Orientation of Support 8
Personnel 09/16/85 2 09/16/85 EP-311 Contaminated Injury 07/09/S7-5 07/09/87 EP-312 Radioactive Liquid Release (Emergency DirectorFunctions) 12/16/85 2 09/20/84 EP-313 Control of Thyroid Blocking (KI) l Tablets 09/12/85 2 09/12/85
..]
EP-315 Operation o' Peach Bottom Computer Ocsed Model 09/17/86 1_ 09/17/86 EP-316 Cumulative Population. Dose Calculations For.Airbourne Releases Manual Method
~07/15/87 9 07/15/87 j
EP-316 Worksheets/ Meterological Calculations
.(
Appendix A 09/17/85 8 09/17/85
~
EP-316 Activity After Reactor Shutdown Appendix B 09/17/85 7 09/17/85 EP-316 Index of X/Q Outputs for Off-Gas Appendix C Stack Releases 09/17/85 7 09/17/85 EP-316 Relative Dispersion Values for Emer-Appendix 0 gency Dose Calculation Procedure 09/17/85 7 09/17/85 EP-316 SGTS Efficiency vs Decontamination Appendix E Factor 09/17/85 7 09/17/85 EP-316 Percent Composition of Isotopic Appendix F Distribution 09/17/85 7 09/17/85 EP-316 Composite Whole Body Dose Conversion Appendix G Factors vs Time Since Reactor Shutdown 09/17/85 7 09/17/85 EP-316 I-131/I-133 Composite Thyroid Dose Appendix H Conversion Factors vs Time Since Reactor Shutdown 09/17/85 7 09/17/85 EP-316 Population Distribution by Compass Appendix I Sector-Sumer Day 09/17/85 0 09/17/85 EP-316 I/131/I-133 Percent Abundance vs Time Appendix J Since Reactor Shutdown 09/17/85 0 09/17/85
EP Index -
'q EMERGENCY PLAN PROCEDURES INDEX'
.Page 6 Rev. 66
- PEACH BOTTOM UNITS 2'AND-33 09/09/87
- j
"' } - )
Review Rev Revision.-
Number Title.
Date-No.
Date EP-316 P8APS Iodine Source Term From TSC Appendix K Field Data 09/17/85 0 09/17/85-EP-316 Index of Plume Shine Outp.ats For.
Appendix L.
Off-Gas Stack Releases' 09/17/85 0 09/17/85 Ep-316.
Plume Shine Value for Emergency Appendix M Dose Calculation Procedure 09/17/85.
0 09/17/85 EP-316 Refined' Dose Assessment of Unmonitored Appendix N Ground Release 09/17/85-0 09/17/85 EP-316A 0 E L'E T E D No longer Required-01/28/87 EP-3168 0 E L E T E D - No Longer Required 01/28/87 1
EP-316C D E L E T E O - No Longer Required 01/28/87
)
- EP-317 Determtmation of Protective Active
.. Recommendations
~10/01/86 6 10/06/86
~
EP-318 Liquid Release Oose Calculation Method N)
For Intake Water at Downstream j
Facilities 05/27/86 3 06/27/86 EP-319 Liquid Release Oose Calculation i
Method for Fish 05/27/86
~3 06/27/86 l
EP-320 Procedure for Leaking Chlorine 12/16/85 1 03/12/82 EP-325 Use of Containment Radiation Monitor to Estimate Release Source Term 10/01/86 2 10/06/86 i
EP-401 Entry For Emergency Repair & Operations 12/18/85 6 01/03/86 i
EP-500 Review & Revision of Emergency Plan (FSARAppendix0) 09/08/86 0 04/01/81 e
l 003TROLI.ED APPROVED COPY-EP-102 A-g VOID PREVIOUS ISSUE Page 1 of 9. Rev. 17 I) DISTRIBUTION PER A-2 RAK;jdw
~
1*
PHILADELPHIA ELECTRIC COMPANY
/
F' PEACH BOTTOM UNITS 2 AND 3
/
'- T EMERGENCY' PLAN IMPLEMENTING PROCEDURE
} g; 3
EP-102 UNUSUAL EVENT RESPONSE
.6 L
i PURPOSE:
?
(
f
\\~
i The purpose of this procedure is to provide guidelines for response to an Unusual Event.
RESPONSIBILITIES:
1.1 The Shift Superintendent or designated alternate thall assume the duties of the Emergency Director and implement this procedure, until relieved.
1.2 The Station Manager or designated alternate, when he arrives, shall relieve the Emergency Director, assume the duties of Emergency Director and continue implementing this procedure.
ACTION LEVELS:
This procedure shall be implemented when any event occurs that is classified as an Unusual Event per EP-101, Classification of Emergencies.
PR
_ ECAUTIONS:
l Planned radiation exposures should be limited to the Administrative Guidelines in EP-211, Emergency Radiation Exposure Guidelines and Controls.
PROCEDURE:
1.0 IMMEDIATE ACTIONS 1.1 The Emergency Director shall:
1.1.1 Verify the cmergency classification as determined in EP-Ini, Classification of Emergencies, unless determination has just been made.
1.1.2 Complete Appendix EP-102-1, Unusual Event Notification Message, and sign it. Direct a comu'11cator(s) to complete the notification of appropriate parties as specified in Appendix EP-102-2, unusual Event Telephone List, within 15 mi nu tes.
l l
1.1.3 Direct the evacuation of affected areas, as necessary.
Refer to the following procedure:
GP-15 Local Evacuation 1.1.4 Contact the Station Supervision, if necessary, and the Shift Technical Advisor, inform them of the situation.
EP-102 :
Page 2 of 9. Rev. 17
]
l L
1.1p 0'esignate a communicator to man the ied phone if requested by the NRC during notification.
1.1.6 For Sample _s, contact Stift Chemistry Technician.
If w e,pp FT g g {p ] feam;s y! y, g!e
,A, Chemistry Sampling and Analysis q te e q S
.- g g
6s fj 9%?
. N.4 4 j h
by' ~ Wii 4 U 1.1:7 #ForpIn Pl;aat: kr
'taminated injury, contact a Shift
$( j#j h* k*U$bitMgMdtnicUrf.7 If nMess'Hy implement EP-207, Personnel
"*~
3-*
Safety Team Activation.
1.1.8 For Damage Repair, contact the Maintenance Shift Assistant Foreman.
If necessary, implement EP-2068, Damage Repair Group.
1.1.9 For Airborne Releases, contact the Dose Assessment Advisor.
If necessary, implement EP-210, Dose Assessment Team.
1.2 Shif t Clerk and/or communicator (s) shall:
.;7 1.2.1 Perform the notification of the off-site agencies and riersonnel within 15 minutes as directed by the Emergency
)
Director using Appendix EP-102-1, Unusual Event Message and Appendix EP-102-2, Unusual Event Telephone Listing.
~
2.0 FOLLOW-UP ACTIONS:
2.1 Emergency Director shall:
2.1.1 Periodically reevaluate the event classification in accordance with EP-101, Classification of Emergencies, and escalate or de-escalate the classification, as necessary.
2.1.2 If classification has de-escalated, complete Appendix EP-102-3, unusual Event De-Escalation Message and sign it. Direct the communicator to perform the notifications in accordance with Appendix EP-102-2.
2.1.3 Determine which support personnel are nect.ssary for emergency functions and direct the Shift Clerk to contact those personnel.
If Shift Clerk is not available, this function shall be assigned to an available individual.
2.1.4 Perform actions necessary to mitigate conditions of the errergency situation.
2.1.5 Direct the control room personnel to make periodic public
)
address announcements to keep station personnel aware of plant conditions.
l 2.1.6 Obtain the following information as necessary to formulate
)
further actions:
]
EP-102 Page 3 of 9, Rev. 17.
l b
- A.
Sample analysis from Shift Chemistry Technician or
'~ T
. Chemistry Sampling and Analysis Team Leader.
i
. r:
B.
In-plantsurveysorstatusofcontaminatedinjuryfrom 1
Shift HP Technician or personnel, j
p C.
Fire / damage repair status from the Maintenance Shift Assistant Foreman or Fire and Damage Team Leader.*
l
__. r:e D.
Airborne release calcula m Shift Oose
~ Assessment Advisor or.Do leader.
Y E.
Notification results from communicator.
r 1
2.2 ShirtClerkand/orCommunicator(s)'shall:
2.2.1 Perform notifications as directed by Emergency Director to off-site agencies and inform the Emergency Director of the results.
i 2.2.2 Notify additional support personnel to report to the stction as directed by. the. Emergency Director and inform the Emergency " '
~
Director of the results.
l(
FINAL CONDITIONS:
Plant is in a stable condition and present station conditions 00 NOT meet any Unusual Event classifications as delineated in EP-101, Classification of i
l Emergencies.
l APPENDICES Appendix EP-102-1, Unusual Event Notification Message Appendix EP-102-2. Unusual Event Notification Telephone Listing Appendix EP-102-3, Unusual Event Oe-Escalation Message 1
REFERENCE PBAPS Emergency Plan EP-101 Classification of Emergencies GP-15 Local Evacuation EP-209 Telephone Listing for Emergency Use NUREG-0654, Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants.
l EP-211 Emergency Radiation Exposure Guidelines and Controls l
EP-210 Dose Assessment Team l
EP-205A Chemistry Sampling and Analysis Team l
EP-207 Personr.e1 Safety Team Activation l
EP-206B Damage Repair Group EP-206t Security Team A-7 Shift Operations l
l
\\
l l
l a
j s
i i
EP-102 Page.4 of 9 Rev.17 s
g,,
APPENDIX EP-102-1 Y~ UNUSUAL ~ EVENT' NOTIFICATION: MESSAGE FORMT THIS. (IS) (15 NOT) A..Di.Lt&c' REPEAT THIS (IS) (IS NOT) A DRILL.
l THIS IS PEACH BOTTOM ATOMIC POWER STATION CALLING TO REPORT AN UNUSUAL EVENT
{
pw <; n HAS BEEN DECLARED FOR UNIT NO.
MY NAME IS TELEPHONE UMBER IS OR OMNI #
PEACH 0{TOMIS REPORTING Aid UNUSUAL EVENT =AT "
THE BASIC PROBLEM (24hourclock, time)
(date) q(
c.
THERE (HAS) (HAS NOT) BEEN AN (AIRBORNE) (LIQUID) RADIOACTIVE RELEASE FROM THE PLANT. THE PLANT CONDITION IS (STABLE) (IMPROVING) (DEGRADING). THERE ARE NO PROTECTIVE' ACTIONS BEING RECOM4ENDE0 AT THIS TIME. THIS (IS) (IS NOT)
~
A DRILL. REPEAT. THIS (IS) (IS NOT) A DRILL.
1 l
1 l
Emergency Director j
1 I
l l
e l
i h
i I
a
\\
l<.-
EP-102 i
Page.9 of 9. Rev. 17 l
f m
1 g,,
APPENDIX EP-102-3 j
"UNbuALEVENTDE-ESCALATIONMESSAGEFORMAT
^
~
I THIS(IS)(ISNOT)AORILL. REPEAT, THIS (IS) (IS NOT) A ORILL.-
THIS IS PEACH BOTTOM ATOMIC POWER STATION CALLING TO REPORT A CHANGE IN THE l
. EMERGENCY CLASSIFICATION FOR UNIT NO.
MY NAME IS' TELEPHONE NUMBER I t$.
OR OMNI i
. THE UNUSUAL.
EVENT HAS BEEN TERMIN,w.. TIMEj AND D.AT.E: AREc_
ATED
... -., p -
~.,e 4.
^*
(24 hr. clocx time) l THE PLANT STATUS IS (STABLE) (IMPROVING). THIS (IS) (IS NOT)
A DRILL, REPEAT, THIS (IS) (IS NOT) A DRILL.
e 4
'Is
(
i EMERGENCY DIRECTOR 1
9 e
an.
4
t C ": T. ". '
.:./JC COPY EP-103 h 2,1-l n. 7Ji Iss ;E Page 1 of 17. Rev. 16 t
"- ' : :4 2::.T.
t RAK:jdw h
Y 9/9/77
~
{
PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM UNITS 2 AND 3 t y ENERGENCY-1 IMPLEMENTING PROCEDURE l
EP-103 ALERT RESPONSE' PURPOSE:
The purpose of'this procedure:is to provide'guidel nes for site response o an Alert.
RESPONSIBILITIES:
1 1
1.0 Shif t Superintendent or designated alternate sna11 assume the role of the j
l Energency Director and this procedure until relieved.
1.2 The Station Manager or designated alternate shall report to the Control Room or Technical Support Center, assume the role of Emergency Director and continue implementing this procedure as necessary and relieve the Shift Superintendent of the responsibilities as the Emergency Director.
I ACTION LEVELS:
This procedure shall be implemented when any event occurs that is classified as j
an Alert per EP *01, Classification of Emergencies.
4 PRECAUTIONS:
1.
Planned radiation exposures ' iould be limited to the administrative guide levels in EP-211, Emergency Radiation Exposure Guidelines and Controls.
PROCEDURE:
l 1.0 IMMEDIATE ACTIONS 1.1 Emergency Director shall:
l 1.1.1 Verify the Emergency Classification as determined in EP-101, i
Classification of. Emergencies, unless determination has just I
l been made.
i 1.1.2 Fill Out Appendix EP-103-1, Alert Notification Message, sign it, and give it to the communicator. Appoint an HRC Communicator.
1.1.3 Direct the comranicators to complete notification of the appropriate parties as specified in Appendix EP-103-2, Alert Phone List (Initial Notification) or Appendix EP-103-3, Alert l
Phone List (Escalation /De-Escalation Notification) within 15 I
minutes.
i
y yj
..j EP-103 Page 2 of 17, Rev. 16
]
hl I
~A CO M UNICATOR SHALL MAN THE HRC RED TELEPHONE ON A CONTINUOUS BASIS.UNTIL THE NRC DISCONNECTS If THE COMMUNICATOR IS REjUIRAFe ( U NT/L T0 di RELATED TO THE EMERGENCY,
~ E s.
/
at
,{' p{ - '
1 TM WiprURS ESC OlFSE RIN d
E SHOULD BE OBTAINED FROM
,t 2 ' HR,C ' PR E IR SEtVR GT S 4EL HONE.
i k
j%8? 3 F'
i %
t8 hhift Technical Advisor
/
1 tact St 104 S er to a u
A)fon tWic io ' *in he f the situation.-
1.1.5 Depending on plant and environmental conditions, consider the-implementation of:
GP Local Evacuation.
EP-303 - Partial Plant Evacuation.
l EP-305 - Site Evacuation.
1.1.6 For off-hours, direct the Shift Clerk to begin the activation of the TSC and EOF using EP-209 App P, Telephone List for Emergency Use.
If Shift Clerk is not available,'this function.
shall be assigned to any available individual.
1.1.7
<0irect one of the on-shif t !&C Technicians to activate the I
Technical Support Center and Emergency Operations Facility in
~
y/ )
c accordance with EP-201 and EP-203.
Inform Shift Clerk which 3
I&C Technician will activate the centers at Unit 1.in order that the clerk will know which remaining I&C Technician to call for the prompt mobilization procedure, i
1.1.8 Direct the Shift Dose Assessment Advisor or Dose Assessment Team Leader to perform off-site dose calculations in accordance with EP-315.
i 1.1.9 Direct off-site radiation surveys to be initiated as-I nacessary, in accordance with EP-210A, Field Survey Group.
1.1.10 Direct the Personnel Safety Team Leader to initiate on-site i
radiation surveys as necessary, in accordance with EP-207G, 4
Plant Survey Groups and activate the Auxiliary OSC in accordance with EP-202.
1.1 A1 Assign an Operations Support Center Coordinator (shift P0 or
)
call in a Shift Supervisor at the discretion of the Emergency
.,# Oirector) and direct available shift personnel to report to.
the Operations Support Center on 135' elev.-Turbine Building
)
and to activate it in accordance with EP-202, if habitable.
i If this Operations Support Center is NOT habitable, direct shift personnel to report to the Control Room.
1.1.12 Closely monitor conditions to determine present hazards to personnel and potential accident %nditiens that may develop.
1.1.13 For samples, direct the on-shir.,t Chemistry Technician (o Chemistry Sampling and Analysif-Tram Leader to implemeft EP.
205A, Chemistry Sampling and Anebsis Team Activations i
- n m
, )
q_
w 76 "? g c,
- y -
j q
+
.... !EP-103:.
. 3
~
N Page 3 of 17, Rey ( 16 f o
a
}
i
't y
- g
[F f
1.1 14, For fireLand damage' repair, direct the Maintenance Shift' d
Assistent. Foreman or.the Fire and. Damage Team Leader!to-2 0 T implement EP-206A.. Fire Fighting lGrou'p;and/or EP-206B. Damage:
'.j 8
Repair Group.
1 l
l1.1.15 Forflihidrelease, implement;EPf312,; Radioactive;Liguid-Release, if required.o 1.1.16 For?secutity' matters,. cont'act Security Shift Supervisor and direct 1 implementation of EP-208, SecurityiTeam. Activation,iif;
- j necessary.1 1.1.17 Direct the
- Cor. trol Room to provideistation< personnel?witb
- instructions over the Public. Address System:on a.ny36;)or i
changes in Station status, classificationLescalEcion'or-de-escalation, etc., using'~theifollowing message:-
]
~
DECLARATIONJMESSAGE
+
THIS (IS) (IS NOT) A DRILL,. REPEAT, THIS-(IS)l(IS NOT) AL DR I L L'.. ATTENTION ALL PERSCJ4NEL.-. ATTENTION ALL PERSONNEL. THE.
THERGENCY DIRECTOR'HAS DECU, RED. AN ALERT. ALL SHIFT PERSONNEL i
REPORT TO THE CONTROL ROOM. ALL MEMBERS OFuTHE EMERGENCY '
Ll RESPONSE ORGANIZATION REPORT T0 YOUR EMERGENCY FACILITY.0R i
EMERGENCY LOCATIONS. ALL' NON-ESSENTIAL PERSONNEL ' AND" VISITORS :
AWAIT FURTHER PUBLIC ADDRESS INSTRUCTIONS.
THIS'(IS) (IS NOT)!
A DRILL, REPEAT, THIS (IS) (IS MOT) ALORILL.-
l
~
DE-ESCALATION MESSAGE-l.
T THIS(IS)(ISNOT)ADRILL',REPEATrTHIS(IS)'(ISNOT).A' ORILL.. ATTENTION ALL PERSONNEL.
ATTENTION ALL PERSONNEL.
THE ALERT CLASSIFICATION HAS BEENLDE-ESCALATED TO.AN (UNUSUAL:
- l EVENT OR TERMINATED)..ALL PERSONNEL SHALL WAIT' INSTRUCTIONS
'l FROM THEIR TEAM LEADERS OR' SUPERVISORS..THISl(IS)-(IS'NOT) A.
DRILL, REPEAT, THIS-(IS)-(IS NOT) A.0 RILL.
2.0 FOLLOW-UP ACTIONS l
l.
2.1 The Emergency Director shall:
2.1.1
' Verify that the Technical Support Center'(TSC), Operations Support Center (OSC), Auxiliary OSC, and. Emergency Operations-Facility (EOF) have been activated.
2.1.2 Periodically evaluate' the event classification'in accordance
~
with EP-101, Classification of Emergencies, and esca14te.,
L maintain or deescalate the classification, as necessary.
2.1.3 If the. classification is de-escalated, complete Appendix EP-103-4, Alert Oe-Escalation Notification Message and/give'it to; the communicator and direct.the communicator to perform the-notifications in accordance with ' Appendix EP-103-3 Alert Phone-List-(Escalation /De-escalation Notifir*' ion).
s
- e p
{-
s.
.(,
c' u
o EP-103 Page 4 of 17, Rev. 16 a
fM j l
2.lb ' Keep the Bureau of Radiation Protection informed of any
)
'. T significant changes in radiological conditions'..
-.j l
2.1. 5 - Obtain the following information as necessary to formulate
' j further actions:-
A.
Security status from Security Team Leader, l
B.
Sample analysis from Shift Chemistry Technician or:
{
Chemistry Sampling and Analysis Team Leader.
1 C.
In-plant surveys from Shift HP Technician or Personnel Safety Team Leader.
O.
Field surveys from Health Physics Technicians or Dose
{
Assessment Team Leader.
4 E.
Dose projections and protective action recommendations r
from Shift Dose Assessment Advisor or Dose Assessment Team
]
Leader.
l b
- F.. Fire / damage repair status from the Maintenance Shift-Assistant Foreman or Fire and Damage Team Leader.
]
G.
Notification results from communicator (s).
2.1.6 Determine which additional support personnel are necessary for emergency functions and direct the Shift Clerk or other assigned comumicator in TSC to contact those personnel, using l
the appropriate Appendix to EP-209, Emergency Telephone Listing.
{
2.1.7 Provide site personnel with P.A. speaker announcements for any major changes in plant. emergency status, such as changing I
emergency action levels and evacuations.
I 2.1.8 Perform actions as necessary to mitigate conditions of the j
cmergency situation.
j i
2.1.9 If applicable, brief the Site Emergency Coordinator.
2.2 The Communicator (s) shall:
1 1
2.2.1 Inform Emergency Director when appropriate notifications have been made and submit completed copy of Appendix EP-103-2, Alert Phone List (Initial Plant Notification Phone List) or i
Appendix EP-103-3, Alert Phone List (Escalation /De-Escalation i
Notification) for Emergency Director's signature.
2.2.2.
Notify additional support personnel to report to the station
/l as directed by the Emergency Director.
Refer to the I
appropriate Appendix of EP-209.
Inform Emergency Director when personnel have been notified.-
a a m_ - mm m._.
m m
n
\\-
o t
EP-103 Page 5 of:17, Rev. 16
,s q
^
3 I
,2,3[1's.l Notify.the Erdrgency Director when the Operations Supoort Center is activated.
J 1.61 Provide support to the Control Room and Shift Supervision as
'necessary.
y 2.4 Audliary Operations Support Center Coordinator shall:
4\\
2.4.1 Nct.ify the Personnel Safety Te m Leader or Emergency Director x
'h.at the. Auxiliary Operations Support Center is activated.
,/t
's.
2 4.2 Provide Health Physics support to teams as directed by q
Personnel Safety Team Leader.
i
/4. 3 Send Health Physics Technician to initiate field survey.
,,/
2.S Dose Assessment Team Leader or Dose Assessinent Advisor shall:
_I l T
2.5.1-Report progress and results of EF-315, Operation of Peach Bottom Computer Dose Model and offsite radiation surveys to the. Emergency Director or. Site Emergency Coordinator, as necessary.
2.6 Pqrsonnd Safety Team Leader shall:
2.6 1 Report progress and results of onsite radiation surveys.to the Emergency Director as necessary.
2.7 Shift ILC Technician shall:
2.7.1 Inform the Emergency Director when the TSC and E0F are activated.
2.7.2 Man the TSC and EOF data display (CCTV) positions as directed by the Emergency Director.
2.8 Chemistry Sampling and Analysis Team Leader shall:
2.8.1 Report progress and results of any sampling activities and their results, as appropriate, to the Emergency Director.
1
)
2.9 Security Ta d,Leacer shall:
s a*
i 2.9.1 Provide a briefing of the tecurity shuation, as required, to
,i the Emerge.ncy Director, providing status on the Security Force l I manning.
/l 2.10 Fire and Camage Team La d v shall:
l i
(
2.10 5 x Frcvide a briefing on fire and damage assessment activities to
,the'En tgency Director, as apornpriate.
s t
i
\\
l w.
w
o EP-103 5
Page 6 of 17, Rev. 16 g
~
2.11TechgicalSupportTeamt.eadershall:
'2.11bL %ispatch available communicators, status bcard keepers, etc..-
to support the activities in the various emergency response j
centers.-
i 2.11.2 Provide engineering assessments on the emergency situation,',as requested by.the Emergency Director.
I FINAL CONDITIONS:
O 1.-
Plant conditions are improving and present station conuitions 00'NOT meet any Alert Classification as delineated in EP-101, Classification-of-Emergencies, and is therefore being downgraded-to an Unusual Event' or terminated..
2.
Plant conditions are deteriorating and present station conditions meet a Site Emergency classification'as delineated in EP-101, Classification of Emergencies, and is therefore being upgraded to a Site Emergency.
APPENDICES:
, Appendix EP-103-1, Alert Notification Message-Aprendix EP-103-2, Alert Phone List (Initial Notification)
Appendix EP-103-3, Alert (Escalation /De-escalation Phone List Notification) i Appndix EP-103-4, Alert De-Escalation Message 1
\\.
% t x
p s
e 3
N.
~
EP-1M j
Page 7 of 17. Rev. 16
]
R
'l
/
\\
I~
j
REFERENCES:
'T j
PBAPS Emergency Plan NUREG0654,CriiAriaforPreparationandEvaluationofRadiologicalEmergency Response, Performance, and Preparedness in Support of Nuclear Power Plants
+
1 EP-101, Classification of Emergencies
-j i
l GP-15,
' Local-Evacuation.
l 4.
4
.q:,
p EP-303,TIPartial Plant Evacuation.
,/
- L
. EP-305, Site Evacuation
.,./
l
,/
1 EP-211 Emergency / ram a' tion Exposure Guidelines l
EP-203, Emen wn'c'y Operations Facility' Activation
+
l EP-21 4, Field Survey Groups i
EP-207G Plant Survey Groups EP-202, Operational Support Center Activation EP-206A, Fire Fighting Group EP-206B, Damage Repair Group EP-312 Radioactive Liquid Release l
EP-208, Security Team Actin. tion EP-209, Emergency Telephone Listing EP-201, Technical Support Center Activation EP-315 Operation of. Peach Bottom Computer Dose Model 1
4 i
EP-103 Page.6 of 17, Rev. 16 D
APPENDIX EP-103-1 8
't ALERT NOTIFICATION HESSAGE' FORMAT Message: This ~(;:) (is not)' a drills' Repeat this (is) (is not) a drill.
.This is Peach Bottom Atomic Powc.- Station calling to report an Alert has been declared on Unit No.
My name is
, telephone number i or OHN! l Peach Bottom 1: reporting an Alert at The basic problem is i
(24hrclock)
(Date) l
~
l 1
There (has been) (has not been) (is potential for) an (airborne) (liquid) radioactive release from the plant. -The plant status is (stable) (improving)
(degrading). There are no protective actions being recomended at this time.
}
l This (is) (is not) a drill. Repeat this (is) (is not) a drill.
l l
Emergency Director t
.=
=
.t.
~ ~.. ~...._ _Page 17 of 17 Rev. 16
"~~~~~s
~..,. _ ~ ~..
j APPENDIX EP-103-4 8
T ALERT DE-ESCALATION NOTIFICATION MESSAGE THIS (IS) (IS NOT) A DRILL. REPEAT,THIS(IS)(ISNOT)ADRILL. THIS IS PEACH BCUOM ATOMIC POWER STATION CALLING TO REPORT A CHANGE IN CLASSIFICATION. MY NAME IS __, _
, TELEPHONE NUMBERL!S or OMN! #
THE ALERT ON UNIT NO..
HAS/BEEN TIME AND DATE (DE-ESCALATED TO AN UNUSUAL EVENT) (TERMINATED).
THE PLANT STATUS IS (STABLE)
ARE (24 hr. clock)
(0 ate)
(IMPROVING). THIS- (19)..,(1S NOT) A DRILL. REPEAY, it!!S (IS) (!$ NOT) A CRILL.
~~~m,,,,
' *Ws4.9,.
y
- *LWRt%t*ygom, i
l 0
- e 1
e
~
% i'
.s.
Page 1 of 16, Rev. 17 Lr RAX:Jdw/tf
' ~ m_
[.
PHILADELPHIA ELECTRIC COMPANY
' " b
_.. PEACH BOTTOM UNITS 2 AND 3 EMERGENCY PLAN-IMPLEMENTING PROCEDURE HTEEMERGENCYRESPONSE EP-104 E
PURPOSE:
The purpose of this procedure is to provide guidelines for response to a Si Cn scrcy.
]
RESPONSIBILITIES:
1.1 Shift Superintendcht or designated alternate shall assume the role of Emergency Director and implement this procedure, until relieved.
1.2 The' Station Manager or designated alternate shall assume the rcle of the j
Emergency Director, report to the Technical Support Center or Control Room and relieve the Shift Superintendent of the responsibilities as the Emergency Director.
1 1.3 Site Emergency Coordinator shall report to the' Emergency Operations Facility or the Alternate Emergency Operations Facility and implement the
]
appropriate section(s) of this procedure, if necessary.
ACTION LEVELS:
This procedure shall be implemented when an event occurs that is classified as a Site Emergency per EP-101, Classification of Emergencies.
J PRECAUTIONS:
Planned radiation exposures should be limited to the Administration Guide Levels in EP-211. Emergency Radiation Exposure Guidelines and Controls.
PROCEDURE:
1.0 IMMEDIATE ACTIONS 1.1 Emergency Director shall:
1.1.1 Verify the emergency classification as determined in EP-101, i
Classification of Emergencies unless determination has just been made.
1.1.2 Fill out Appendix EP-104-1, Site Emergency Notification Message, sign it, and give it to the Communicator.
1.1.3 Direct the communciator to complete notification of the appropriate parties as specified in Appendix EP-104-2, Site Emergency Phone List (Initial Notification) or Appendix EP-104-3, Alert Phone List (Escalaton or De-escalation) within 15 minutes.
EP-104 Page 2 of 16, Rev. 17 l
- ^)
j. THE COWUNICATOR SHAll. MAN THE NRC RED TELEPHONE ON A y CONTINUOUS BASIS UNTIL THE,NRC M SCONNECTS.
{
1.1.4 C taqt t S%tiogSuphrvi ein and the Shift Technical M:;
i Q, b;[.,c.13,c 5 4. If ?there ais a A\\ ' d ))'!A
[h)iradiologicalrelease is fi rpnjhM offthe fuation, if not already done.
k,,
dQ V
'4 j1 Potent >ia or tot 4 N A,.
i 'ireplement E n.
e c ta : s{-305,rSjtet. Evac (fj
,$/ x
'33)(;3.63fnotalreadyaccomplishedattheALERTstage,directtb.a 4
m v., S i
1 1
Sh'if t-Cletk to activate the 60 minute ca." 1M.t m ng EP-209 Accendiv P.'?%iR C~as k is not available, this function I
may be assigned to any available individual.
l 1.1.7 Direct one of the on-shift I&C technicians to activate the Technictl Support Center and Emergency Operations facility in i
cco~rTiince with EP-201'and 203, if not already activated.
If not already performed previously, inform the shift clerk which
.7 I&C Technician will activate the centers at Unit 1 in order to
~
let'the clerk know which remaining I&C Technician to call for I
T the prompt mobilization procedure.
i 1.1.8 Direct the Junior Technical Assistant or Dose Assessment Team Leader to perform offsite dose calculations in accordance with EP-315.
1.1.9 Uira.:t th Ns? Assessment Team Leader to initiate offsite radiation surveys, as necesshry, in dccordyce with EP-210A.
Field Survey Groups.
1.1.10 Direct the Personnel Safety Team Leader to initiate onsite radiation surveys as necessary, if not already done in accordance with EP-207G, Plant Survey Groups and activate the Auxiliary OSC in accordance with EP-202.
1.1.11 Assign an Operations Support Center Coordinator (Shift PO or call in a Shift Supervisor at the discretion of the Emergency Director) and direct available shift personnel to report to the Operations Support Center on 135' elev., Turbine Building, and to. activate it in accordance with EP-202 if habitable.
If the Operations Support Center is not habitable, direct shift personnel to recort to the control room.
1.1.12 Closely monitor conditions to determine present hazards to personnel and potential, accident conditions that may develop.
1.1.13 For samples, direct on-shift Chemistry Technician or Chemistry Sampling and Analysis Team Leader to implement EP-205A, Chemistry Sampling and Analysis Team Activation.
1.1.14 For Fire and Damage Repair, direct the Maintenance Shift Assistant Foreman or the Fire and Damage Team Leader to implement EP-206A, Fire Fighting Group and/or EP-2068, Damcge.
R.epair Group.
,j N
-Page.3 of'16.- Rev. 17
)
t -
J
(',
l
-1.1j15, ' For a liquid release, implement EP-312,' TiiiT6EcttvM4qu.id
)
~ ~ ~ ~
Release, if required.
',' -Q y g 1.1.16 For Security matters, contact Security ~ Shift Supervis, ion and direct implementation of EP-208, Security Team Activation, if-necessary.
1.1.17 Direct the control room to provide station personnel with
)
instructions over the Public Address System on any major
[N changes in station status, classification, escalation or de-escalation, etc., using,the following messages:
%g
'N DECLARATION MESSAGE.
THIS (IS) (IS NOT) A DRILL, REPEAT, THIS (IS) (IS NOT) A A DRILL.
ATTENTION ALL PERSONNEL.
ATTENTION ALL PERSONNEL.
]
T'RHIFT PERSONNEL REPORT TO THE CONTROL ROO THE EMERGENCY DIRECTOR'HAS DECLARED A SITE EMERGENCY. 'ALL ON i
ALL MEMBERS OF MIEEMERGENCYRESPONSE'ORGANIZATIONREFORTTOYOUREMERGENCY A CILITIES OR EMERGENCY LOCATIONS. A SITE EVACUATION HAS BEEN DECLARED. ALL NON-ESSENTIAL PERSONNEL SHALL REPORT TO (THEIR I
WORK LOCATIONS) (NORTH SUB STATION) (PRESIDENT'S UTILITY
~
BUILDING) (DELTA SERVICE BUILDING). ALL VISITORS WILL REPORT WITH THEIR ESCORTS TO THE CECURITY ADMINISTRATION BUILDING AND AWAIT FURTHER INSTRUCTIONS.
THIS (IS) (IS NOT) A DRILL,.
)
REPEAT, THIS (IS) (IS NOT) A DRILL.
-~~~* w,
0,E-ESCALATION MESSAGE
^
THIS (IS) (IS NOT) A DRILL, REPEAT THIS (IS) (IS NOT) A DRILL.
ATTENTION ALL PERSONNEL.
ATTENTION ALL PERSONNEL.
THE SITE EMERGENCY HAS BEEN (DE-ESCALATED TO AN (UNUSUAL EVENT) (ALERT) (TERMINATED).
ALL PERSONNEL SHALL AWAIT INSTRUCTIONS FROM THEIR TEAM LEADERS OR SUPERVISOR.
THIS (IS)
(IS NOT) A DRILL, REPEAT, THIS-(IS) (IS NOT) A DRILL.
1.1.18 If necessary, direct Dose Assessment Team Leader to initiate EP-317 Determination of Protective Action Recommendations.
2.0' FOLLOW-UP ACTIONS
~
2.1 Emergency Director shall:
2.1.1 Verify that the Technical Support Center, Operations Support Center and Aux. OSC have been activated.
2.1.2 Periodically evaluate the event classification in accordance with EP-101, Classification of Emergencies and escalate or de-escalate the classification, as necessary.
2.1.3 If the classification is de-escalated, complete Appendix EP-104-4, Site Emergency De-Escalation Notification Message and give it to the Communicator to perform notifications in accordance with Appendix EP-104-3.
o EP-104 Page 4 of 16, key. 17
.s
]
2.1 d Obtain the.results of the EP-315, Operation of Peach Bottom
- T omputer Dose Model from the Dose Assessment Team Leader and j
onsite radiation surveys from the Personnel Safety Team j
Leader, as necessary, i
1 2.1. f Notify the Bureau of Radiation Protection of any changes in radiological conditions.
2.1.6 Obtain the following information as necessary to formulate further actions:
i A.
Security status from Security Team Leader.
i 8.
Sample ana'ysis frem Shift Chemistry Technician or Chemistry Sampling and Analysis Team Leader.
l C.
In-plant surveys from Shift HP Technician or Personnel Safety Team Leader.
D.
Field surveys from Shift HP Technician or Dose Assessment
)
Team Leader.
7 E.
Dose projections and protective actions recommendations 3<
from Shift Technical Advisor or Dose Assessment Team s/
Leader.
F.
Fire / damage repair status from the Maintenance Shift Assistant Foreman or Fire and Damage Team Leader.
i G.
Notification Results from Communicator.
2.1.7 Provide appropriate information eom the previous evaluations to Communicator in the EOF for notification of the Bureau of
)
Radiation Protection.
2.1.8 Discuss protective action recommendations with the Site l
Emergency Coordinator.
j 2.1.9 Determine which additional support personnel are necessary for emergency functions and direct the Shift Clerk or other assigned Communicator to contact those personnel, using the appropriate Appendix to EP-209, Emergency Telephone Listing, 2.1.10 Direct the control room to provide site personnel with public address (PA) announcements for any major changes in plant l
emergency status, such as changing emergency action levels and evacuations.
2.1.11 Perform actions as necessary to mitigate conditions of the emergency situation.
2.1.12 If applicable, brief the Site Emergency Coordinator.
EP-104 Page 5 of 16 Rev. 17 f?~
^
2.2 The Coinu'nicator shall:
~2.2.'1 T Inform the Emergency Director when. appropriate 'nc Jifications
~
have been made and submit completed. copy of Appendix EP-104-2, Site Emergency Phone List (Initial-Notification) or. Appendix EP-104-3, Site Emergency Pnone List (Escalation or.De-escalation) for Emergency Director's signature.
2.2.2 Notify additional support personnel to report to the' station as directed by the Emergency-Director.
Refer to the-appropriate Appendix of EP-209.
Inform the Emergency Director when personnel have been notified.
2.3 Operations Support Center Coordinator shall:
2.3.1 Hotify the Emergency Director when the Operations Support Center is activated.
2.3.2 Provide support to the Control Room'and Shift Supervision as necessary.
2.4 Auxiliary Operations Support Center Coordinator shall:
2.4.1 Notify the Personnel Safety Team or Emergency Director that the Auxiliary Operations Support Center.is activated.
2.4.2 Provide Health Physics support to teurs as directed by Personnel Safety Team Lender.
]
a.
2.5 Dose Assessment Team Leader shall:
1 2.5.1 Notify the Emergency Director when the Emergency Operations Facility is manned.
2.5.2 Report progress and results of EP-316, Cumulative Population Dose Calculations and off site radiation surveys.
2.5.3 Notify the Site Emergency Coordinator of the need for assistance from Radiation Management Corporation.
2.6 Personnel Safe +y Team Leader shall:
2.6.1 Report progress and results of on-site radiation sur eys'to the Emergency Director as necessary.
2.6.2 Notify Emergency Director or Site Emergency Coordinator when the additional support personnel have been notified.
2.7 I&C Technicians shall: (if not already performed as per EP-103)
)
2.7.1 Inform the Emergency Director when the centers are activated, if not previously done.
j i
2.7.2 Man the TSC or EOF data display (CCTV) positions as directed
'by the Emergency Director.
1
EP-104 Page 6'of 16, Rev. 17 g
i 2.9 Chegis,trySamplingandAnalysisTeamLeadershall:
.2i,8Il T Report progress and results of any sampling activities and their results, if appropriate to the Emergency Director.
2.9 Security Team Leader shall:
j 2.9.1 Provide a briefing of the security situation, as required, to l
the Emergency Director..providing status on'the Security Force manning.
2.10 Fire and Damage Team Leader shall:
2.10.1 Provide a briefing on fire and damage assessment activities to the Emergency Director, if appropriate.
2.11 Technical Support Team Leader shall:
2.11.1 Dispatch available communicators, status board keepers, etc.
to support the activities in the various emergency response centers.
2.11.2 Provide engineering assessments on the emergency situation, as s
requested by the Emergency Director.
J.
FINAL CONDITIONS:
I 1.
Plant conditions are improving and present station conditions 00 NOT meet
{
any Site Emergency classification as delineated in Ep-101, Classification i
of Emergencies and is therefore being downgraded to an Alert or Unusual Event.
2.
Plant conditions are deteriorating and present station conditions meet a General Emergency classification as delineated in EP-101, Classification of Emergencies and is therefore being upgraded to a General Emergency.
APPENDICES:
Appendix EP-104-1, Site Emergency Notification Checkoff List Appendix EP-104-2, Initial Site Emergency Notification Telephone List Appendix EP-104-3, Site Emergency Escalation & De-Escalation Notification Telephone List Appendix EP-104-4, Site Emergency De-Escalation Notification Hessage
\\
.4 s
I EP-104 Page 8 of 16, Rev. 17 e
- 4. d -
APPEN0!X EP-104-1 31;,4 3
a
'T
$!TE. Et4ERGENCI NOTIFICATION CHECK 0FF LIST
- .v. \\,.-g g.
4
,v
+
-Messace: This (is) (is not) a drill. Repcat, this (is) (is not) a drill.
ThisisPeachBottomAtomicPowerStationcallidgtoreportthataSite Emergency has been declared on Unit No.
.. My name is l
telephone number i r OHN! #
Peach ttom is reporting a l,
Site Emergency at The basic problem is (24 hr clock)
(Date) 7 There (has been) (has not been) (is potential for) (airborne) (liquid) radioactive release from the plant. The plant status is (stable)-(improving) (degrading). There are no protective actions being
.)
s I
recomended at this time. This(is)(isnot)adrill. This (is) (is not) a i
drill.
Emergency Director
[
l 4
e 4
EP-104 Page 7 of 16 Rev. 17 l
1
(~
REFERENCES:
g, PBAPSEmergencyElan g
NUREG 0654, Rev.1 Criteria for Preparation and. Evaluation.of Radiological f~
Emergency Response' Plans.and Preparedness in Support of Nuclear Power Plants EP-101, Classification of Emergencies EP-303,. Partial Plant Evacuation.
EP,-305, Site Evacuation 9
y?i4 f:j GP-15 Local Evacuation EP-211 Emergency Radiation Exposure Guidelines EP-201, Technical Support Center Activation y.EP-203, Emergency Operations Facility EP-210A, Field Survey Groups
~
- EP-207G, Plant Survey Groups EP-206A,' Fire Fighting Group EP-2068, Damage Repair Group i EP-312, Radioactive Liquid Release (Emergency Director Functions)
EP 208, Security Team EP-315, Operation of Peach Bottom Computer Dose /Model EP-209 Telephone List for Emergency Use EP-205A, Chemistry Sampling and Analysis Team 9
D
=....... _.
(
l
)
EP-104 I
Page 16 of 16 Rev. 17
@J APPENDIX EP-104-4 T
- sTE' EMERGENCY DE-ESCALATION NOTIFICATION MESSAGE a g,Qt;
- :..s&.:, 2
.gx, s'
4 l
THIS(IS);(IS' HOT}.ADRILL,, REPEAT.THIS(IS).,(ISNOT)ADRILL.
THIS IS aq
,g r ; -
m~--
..s PEACE 80TTON ATOMIC POWER STATION CALLING TO REPORT'A' CHANGE IN THE
?%
EMERGENCY.CLASSIFICATI0H MY NAME. IS
, TELEPHONE-n gt; oigI p Mp'T%MTEEMERGENCYONtinitNo.'
' HAS'8EEN DEESCALATED TD (AN UNUSUAL EVENT) (AN ALERT) (TERMINATED).
l l,.
..e.,.
4 w
TIME AND DATE ARE THE PLANT STATUS IS (STABLE)
(24 hr clock)
(Data)
(IMPROVING). THIS (IS) (IS NOT) A DRILL. REPEAT, THIS (IS) (!$ NOT) A DRILL.
1 i
t l
U)..
EMERGENCY DIRECTOR I
l l
l h
l l
i
-jf '
^
EP-105 00RTFZ LE A??HOVED copy.
Page 1 of 16. Rev. 16 g Ts.'D ??ICOUS issue RAK: sic MSTIL'Knoy 27.g 6-2
/1/f7 PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM UNITS 2 AND 3 EMERGENCY PLAN IMPLEMENTING PROCEDURE EP-105 GENERAL EMERGENCY RESPONSE PURPOSE The purpose of this procedure is to provide guidelines f response-to-a-Generai -
Emergency.
RESPONSIBILITIES:
1.1 Shift Superintendent or designated alternate shall assume the role of Emergency Director and implement this procedure until relieved.
1.2 Station Manager or designated alternate shall report to the Technical 4
Support Center or Control Room, relieve the Shift Superintendent, and g
continue. implementing.this procedure, if necessary.
=
1.3 Site Emergency Coordinator shall report to the Emergency Operations Facility or the Alternate EOF and perform the appropriate sections of this procedure, if necessary.
f L.
ACTION LEVELS:
This procedure shall be implemented when an event occurs that is classified as a General Emergency per EP-101, Classification of Emergencies.
PRECAUTIONS:
Planned radiation exposures should be limited to the Administrative Guide levels in EP-211 Emergency Radiation Exposure Guidelines and Controls.
PROCEDURE:
1.0 IMMEDIATE ACTIONS
^
1.1 Emer'gency Director shall:
1.1[1 Verify the emergency classification as determined in EP-101, Classification of Emergencies unless determination has just been made.
1.1.2 Fill out Appendix EP-105-1, General Emergency Notification Hessage, sign it, and give it to the communicator.
1.1.3 Direct the communicator to complete notification of the appropriate parties as specified in Appendix EP-105-2, General Emergency Phone List (Initial Notification) or Appendix EP-105-3, General Emergency Phone List (Escalation or De-escalation) within 15 minutes.
a EP-105. '
Page 2 of 16,. Rev. 16 -
[~
'}
THE C0tNUNICATOR SHALL MAN'THE NRC RED TELEPHONE ON A
~
. CONTINUOUS BASIS UNTIL THE HRC DISCONNECTS.
1.1.4.
IF A GENERAL EMERGENCY IS DECLARED WITHOUT PRIOR EMERGENCY CLASSIFICATI0HJ P TIE ACTION, RECOMMENDATIONS MUST BE
{g&,g 0TVENSITH+1N51A TFICATION AS INDICATED ON APPENDIX EP-
' ? g" N N }l g: rpm ~ p,y105-1...i [., f i
9, g
3 d
t 1 DW' 1 v.
y,,4
~
Vf
$14 C tfct (gt a
d
- ~ e.do.g.,isor,jheStat up vision and the Shift Technical ~
n
(%
)3
.dhf(irm em of the situation, if not already done.
1.1.6 If there is an actual or potential radiological release, implement EP-305, Site Evacuation.
1.1.7 If not already accomplished at the ALERT or SITE EMERGENCY stage, direct the Shift Clerk to activate the 60 minute call list using EP-209, Appendix P.
If Shift Clerk is not available, this function may be assigned to any available individual.
-?
1.1.8 Direct one of the on-shift.I&C. Technicians to activate the w
'aTechnical Support Centerrand the> Emergency' Operations Facilitt 1
in accordance with EP-201 and 203, if not already activated.
1.1.9 Direct' the Junior Technical Assistant or Dose Assessment Team 3
Leader to perform offsite dose calculations in accordance with
/'
1.1.10 Direct the Dose Assessment Team Leader to initiate offsite
~. -
radiation surveys, as necessary, in accordance with EP-210A, Field Survey Groups.
1.1.11 Direct the Personnel Safety Team Leader to initiate on-site radiation surveys as necessary, in accordance with EP-207G, Plant Survey Groups, if not already done.
1.1.12 Assign an Operations Support Center Coordinator (Senior P0 or call in a Shift Supervisor at the discretion of the Emergency Director) if not already done and direct available shift 1
personnel to report to the Operations Support Center and to
, activate it in accordance with EP-202,~if habitable.
If the Operations Support Center is NOT habitable, direct shift I
personnel to report to the control room.
I 1.1.13 Closely monitor conditions to determine present hazards to l
personnel and potential accident conditions that may develop.
I i
1.1.14 For samples, direct onshift Chemistry Technician or Chemistry l
Sampling and Analysis Team Leader to implement EP-205A, I
Chemistry Sampling and Analysis Team Activation.
1.1.15 For fire and damage repair, direct the Maintenance Shift Assistant Foreman or the Fire and Damage Team Leader to implement EP-206A, Fire Fighting Group and/or EP-2068 Damage Repair Group.
. i.
EP-105 i
'Page: 3 of 16, Rev. 16 l
,. e 1.1.16 For a liquid release, implement EP-312, Radioactive Liquid l
', Release, if required.
1
?
1.1.1J For security matters, contact Security Shift Supervisor and direct. implementation of EP-208, Security Team Activation, if..
.A necessary.
1.1.18 Direct the control room to provide station personnel with-instructions over the Public Address System on any major changes in station status, classification; escalation or de.
escalation, etc., using the fol. lowing nessages:-
DECLARATION MESSAGE -
THIS (IS)-(IS NOT) A DRILL,' REPEAT, THIS (IS)'(IS NOT) A DRILL. ATTENTION ALL PERSONNEL.
ATTENTION'ALL' PERSONNEL.
' THE EMERGENCY 0! RECTOR HAS' DECLARED A GENERAL EMERGENCY. : ' ALc ON SHIFT PERSONNEL REPORT.TO THE CONTROL 1R00M. 'ALL MEMBERS'0F.
THE EMERGENCY RESPONSE 0 ORGANIZATION SHALL~ REPORT TO THEIR EMERGENCY FACILITIES OR. EMERGENCY LOCATIONS. ALL NON-ESSENTIAL PERSONNEL AND VISITORS SHOULD-EVACUATE THE STATION I
ANDRE-ASSEMBLE.AT.iTHEJ(NORT.H'SUB. STATION):(PRESIDENT'S' 7
UTILITY SUILDING) (DELTA SERVICE BUILDING).
THIS (IS) (IS NOT)ADRILL, REPEAT,THIS(IS)(ISNOT)ADRILL.
1
{
DE-ESCALATION MESSAGE THIS (IS) (IS NOT) A DRILL, REPEAT, 1HIS (IS) (IS NOT) A DRILL. ATTENTION ALL PERSONNEL. ATTENTION ALL PERSONNEL.
1 2
THE GENERAL EMERGENCY HAS BEEN ((DE-ESCALATED TO AH-(UNUSUAL 1
EVENT) (ALERT) (TERMINATED)). ALL PERSONNEL SHALL AWAIT INSTRUCTIONS FROM THEIR TEAM LEADERS OR SUPERVISOR.
THIS (IS)
(IS NOT) A ORILL, REPEAT, THIS (IS) (IS NOT) A DRILL.
1.1.19 If necessary, direct Dose Assessment Team Leader to initiate EP-317, Determination of Protective Action Recommendations.
2.0 FOLLOW-UP ACTIONS i
2.1 Emergency Director shall:
2.1.1 ' Verify that the Technical Support Center,.0SC, Aux. OSC, and EOF have been activated.
2.1.2 Periodically evaluate the event classification in accordance with EP-101, Classification of Emergencies.- If the conditions change, de-escalate to an appropriate classification.
2.1.3 If classification is'de-escalated, complete Appendix EP-105-4, General Emergency De-escalation Hessage and direct the communicator to perform notifications in accordance with Appendix EP-105-3.
2.1.4 Obtain the results of the EP-315, Operation of. Peach Bottom.
Computer Dose Model, from the Oose Assessment Team Leader and onsite radiation surveys from the Personne1' Safety Team Leader, as necessary.
=
l i.Lbi t__
v '
+
f * :
4 -+l
=
l
- EP-iO5 W
- ]lI lPage!.4 of.16,LRev.' 16
~
2.1.5, Notify the. Bureau of Radiation Protection"of'any changes.ini
. radiological-conditions.
L
.2.1.4 Obtain the following information as necessary to formulate
'further actions:-
9 A.,. Security Status;from Security < Team. Leader..
B.L Sample analysis from. Shift Chemistry Technician or Chemistry. Sampling and Analysis Team Leader.
C. iIn 41 ant surveys from Shift HP: Technician or' Personnel L
Safety Team Leader..
, 0; ' Field surveys. from Shif t HP Technician or Dose Assessment:
Team Leader.
E.
Dose projections.and protective' action recommendations, from' Shift Technical Advisor or Dose Assessment Team-2
=
leader..
(
o E
F.
Fi re/damagenrepa ir., statu s. f rom ~.the. Mai nt enance' Shi f t -
2 Assistant Foreman or. Fire and Damage Team Leader.
G.
Notification results from Communicator._
],
2
~
[
2.1.7 Provide appropriate information from the previous. evaluations
~
to Communicator in the EOF for notification'of'the Bureau of' l
Radiation Protection.
i b
2.1.8 Discuss protective action reccmendations with the Site
~
Emergency Coordinator.
i l
2.1.9 If not already performed, determine which additional support personnel are necessary for ' emergency functions andLdirect the-Shift Clerk or other assigned person to contact those personnel.
2.1.10 -Direct the control room personnel to. provide site personnel with public address (PA) speaker announcements for any' major.
changes in plant emergency status, such as changing emergency
~
taction levels.
i
'L 2.1.11 ' Perform actions as necessary to mitigate conditions of the.
1 emergency situation.
2.1.12 If applicable, brief the. Site Emergency Coordinator.
2.2 The Communicator shall:
2.2.1 Inform the Emergency Director when appropriate notifications have been made and submit completed copy of Appendix EP-105-2, General Emergency Phone List'(Initial Notification) or Appendix EP-105-3, Escalation or,De-escalation for Emergency.
Director's signature.
a i
\\
cw t
t.
EP-105 I
m7
.Page'~5 of.16, Rev. 16 2.'2.2 _ Notify. additional' support Personrel.to report to the station
- l
'.as directed by the Emergency Dirt. tor.
Refer to the 1
appropriate Appendix of EP-209; inform the Emergency 0$ rector:
when personnel have been notified.
2.3 Operations Support Center Coordinator shell:
i 2.3.1 Notify the Emergency. Director when the Operations Support' i
Center is activated.
l 2.3.2 SupportLthe. Control Room and Shift Supervision as necessary.
{
2.4 Auxiliary Operations Support' Center Coordinator shall:
l 2.4.1 Notify the Personnel. Safety Team or Emergency Director that the Auxiliary Support Center is activated.
i i
2.4.2 Provide Health Physics support to teams as directed by J
Personnel Safety Team Leader.
j i
2.5 Dose Assessment Team Leader shall:
s.
-)
1 4
2.5.1 Notify.the Emergency Director when the Emergency Operations R
Facility is' activated.
(- -
2.5.2 Report progress and results of EP-316 Cumulative Population Dose Calculations and off site radiation surveys to the Emergency Director, as necessary.
2.5.3 Notify the Site Emergency Coordinator of the need for assistance from Radiation Management Corporation.
2.6 Personnel Safety Team Leader shall.:
l 2.6.1 Report progress and results of onsite radiation survey to the Emergency Director as necessary.
2.7 I&C Technicians shall: (if not already performed as per EP-103 or EP-
)
104) 2.7_1.
Inform the Emergency Director.when-centers are activated.
2.7.2 Man the TSC and EOF data display (CCTV) positions as directed by the Emergency Director.
2.8 Chemistry Sampling and Analysis Team Leader shall:-
2.8.1 Report progress and results of any samp11ng ectivities and their results, if appropriate to the Emergency Director.
2.9 Security Team Leader shall:
2.9.1:
Pr0 vide a briefing of the security situation, as required, to l
the Emergency Director, providing status on the Security force manning.
2.10 Fire and Damage Team Leader shall:
f.
1 EP- 05v~~
Page 6' of;16,.;Rev. 16
- e 2.10.1. Provide A. briefing on fire and damage assessment activities to'
- i
~
.the Emergency Director,' if appropriate.
2.11 Technical Support Team Leader shal1.:
2.11.1. Dispath.h available communicators,, status boa' d keepers, etc.,
r to support the activities in the various ~ emergency-response centers.
2.11.2 Provide' engineering assessments.on the emergency situation, as requested by.the. Emergency Directdr.
FINAL CONDITIONS:
1.
Plant conditions are improving,and present station conditions DO NOT meet any General Emergency classification as delineated !n-EP-101, Classification of Emergencies and is therefore being downgraded to a 3ite Emergency, Alert, or Unusual Event.
2.
' P.lant conditione meet-th? requirements for entering the' Recovery Phase andK EP-C-320 is being implemented.
APPENDICES:
']
Appendix EP-105-1, General Emergency Notification. Checkoff List Appendix EP-105-2, General Emergency Notification Telephone List-s j
Appendix EP-105-3, General Emergency Escalation & De-Escalation Notification i
Telephone List Appendix EP-105-4, General Emergency De-Escalation Notification Hessege l
I a
-4 f
_.3 EP-105 y,. _
Page 7 of 16. Rev. 16 L
3~-
.f p.
l
REFERENCES:
6 s
PBAPS Emergency P'lan..
~
= -
.NUREG 0654, Criteria for Preparation and Evaluation of Radiological Emergency Response,.
j Plans and Preparedness in Support of Nuclear Power Plants j
LP-101, Classification of Emergencies.
EP-303, Partial Plant' Evacuation EP-305, Site Evacuation j
GP-15, Local Evacuation EP-211, Emergency Radiation Exposure Guidelines EP-201, Technical Support Center Activation
(
EP-203, Emergency Operations Facility ER-210A, Field Survey-Groups 5
i F:
EP-207G, Plant Survey Groups j
EP-206A, Fire Fighting Group EP-2068, Damage Repair Group e
EP-312 Radioactive Liquid Release (E:rcrgency Director Functions) s EP-208 Security Team I
EP-315, Operation of Peach Bottom Computer Dose /Model EP-209, Telephone List for Emergency Use
~
EP-205A, Chemistry Sampling and Analysis Team i
e e S
i
+
+-
( qY l
u.
EP-105 I
Page 8 of 16,' Rev. 16 APPENDIX EP-105-1 4
GENERAL EMERGENCY NOTIFICATION CHECK 0FF LIST
' Y3 '
~
%N MESSAGE: THIS(IS)(I$fM0T)ADRILL. REPEAT, THIS (IS) (IS NOT) A DRILL.
THIS IS PEACH BOTTOM ATOMIC POWER STATION CALLING TO REPORT THAT A GE EMERGENCY HAS BEEN DECLARED'ON UNIT NO.
MY NAME.IS TELEPHON MBERf E
or OMNI #
. PEACH BOTTOM IS REPORTING A GENERAL EMERGENCY AT _
^
.THE BASIC PROBLEM IS l
(24hr, clock)
(Data)
~
- pi THERE (HAS BEEN) (HAS NOT MEN) (IS POTFNTIAL FOR) AN-(A!RSORNE).(
.._a 3 RADIOACTIVE. RELEASE FROM THE PLANT.- THE. PLANT STATUS..IS (STABLE m.
=
1
}
(DEGRADING).
} REC 0tHENDED PROTECTIVE ACTIONS tZ (NONE) i i
O THE AFFECID POPULATION AREA IS-(NONE)
,.w. _....
THIS (IS) (IS NOT) A DRILL. REPEAT, ThIS (IS) (IS NOT) A DRILL.
1
.a i
3 t
.r EMERGENCY 01. RECTOR
,o
.*,m..
'..,e.
4
.W.
w '4.8.,
T. i
) k
-[
EP-105 Page 16 of 16, Rev. 17
,.m
')
' APPENDIX EP-105 4 GENERAL ENERGENCY DE-ESCALATION NOTIFICATION MESSAGE gvj i.* u 4
~
dEp.'dTdlS;{!$) (IS NOT) A ORILL; REPEAT THIf,'(IS) '(IS NOT) A DRILL.
THIS IS PEACH BOTTON ATONIC. POWER STATION CALLING'T0 REPORT. A CHANGE IN THE EMERGENCY CLASSIFICATION. NY NAME IS
,,TELEPiiGHE
.,i'.GNUMiE
,e u
,.._ # or GNNI i THE GENERAL 4 EMERGENCY ON ihm. v ~
.qgJ. UNIT $0. W N N..,,.<; N' yn: e
- c. of." '
- b4ff A,..
d,'
sEEN SCALATED TO (AN UNUSUAL EVENT) (AN ALERT),(A SITE
" 1 E4ERGENCY) (TERMINATED). y TM, AM DATE ARE
. THE
~
~ '
(24 hr e dck)
(Date)
PLANTSTATUSIS(STABLE)(IMPROUPO). TXl5(ii)(ISNOT)ADRILL.
REPEAT. THIS (M)(15NOT).AORILL.
~
,s.
~
4 g
9 N
EMERGENCY DIRECTOR 4
l N;'
_-t
EP.209 COETE0! LID AIFRO'iE3 c0?Y-APPENDIX P VOID PREVIOUS li! SUE Page 1 of 4, Rev.18 DISTRIBUTION TER A-2 RB:jdw
]
c)/977
~ '
PHILADELPHIA ELECTRIC COMPANY
~~
PEACH BOTTOM UNITS 2 AND 3 l'
EMERGENCY PLAN IMPLEMENTING PROCEDURE 4
EP-209 APPENDIX P -
PURPOSE:
This appendix provide.
t ting ey staff onnel o will, i
in-turn, notify sufficient support personnel to meet the one-hour, staffing requirement. hit is usedffffan EmergeggPlan Alert, Site Emergency, on l
General Emergency is dec1ered.._ _' '
i _
m
__g
~
1.
The following' steps shall be ps rfomed, in sequence, by the Shif t Clibrk:or
~ _.
o other assigned personnel.
. 2.
Inform each person. contacted.of.the event' classif.ication..and that 60 minute staffing is required.
3.
Call pager number if the phone is basy, if there is no answer, or if you know that the individual is "on-the-pager".
Individuals may, of course.
(..-
supply temporary numbers which should be called first.
4.
Contact two staff senicr engineers.
iontacted by the l
Communicator and counts as one contdtt.
, all Drew Smith if the I
Communicator has successfully reached him. Attempt to contact the "Outy" and
/or csil " Site Coord." engineers first.
If you are unsuccessful, continue to
' call or page personnel on the list until you contact two individuals who can be at the site in less than 60 minutes, y
pyt e
- sa L
l
{
s-k' S
l r
.f
. l;k Q
.1
~#
.. "6
(
APPENDIX P v
Page 3 of 4 Rev. 18
.A
.h
- 7.. Contact one ~of the representatives from the. Chemistry Sampling. and Analysis.
Team.11steL be. low and request the call-in of. required. Chemistry TA: and Technicians. Make the calls in the listed order unless individuals are-known not to be available. This step may be omitted if Dennis Oltmans was centactedjn} Step 4.
- ?#pnggg m37 8t.;W plantCconta'ct the orpshift; Maintenance Sub-Foreman via phone (at; Ext. 471 s
)
,?+4(preferrably o;sy, stem"and"rei uest.a call-in of two maintenance mechanics page l
ne electrician and'one fitter or machinist) from their own support personnel call list..
"A g
Maintenance Sub-Foreman Mcs..
~-
'N sT,ime; Contacted
... w
~.:;,.
by w
9.
Cc9 tact the on-shift I&C technician via plant phone (at ext. 4238) or plant.
paging system and request a call-in of two. additional;I&C Technicians from
(,
their own support personnel call list.
!&C Technician contacted Time Contuted By
- 10. Contact one of the representative of the Engineering Support Group below and request the call-in of' required Engineers and TAs. Call in the listed g
order unless individuals are known not to be available. This step may be
%p i.ceitted if N.?A. Fulvio was contacted in Step: 4.
.,]., k., ]
i in
- ime Disposition Called
' rJ_ lame _7 ty l,
,P_hoLne 11ed No Ans.-Busy-Contacted 82 a
'h.
,,9 i% {
~
,1.
) V i
)
g
~~
[-
aa.
/:ep.20p
~
4
-APPENDlX f'.
3 Pe98 4 4f 4. Rev. 18-
/
a
-}
m
~11. Contact onDQ,or APB on list providryf 7 S/SSVind call-in for work as.
S Radwaste Onera. tor.4 -(If-thepersoniscontactair,heisrequired.tocometo plant). This step may be waived by Shift Supervision if an extra PO or APO.
for Radwaste is already on shift.
'l P0 or APO Contacted Est Arrival Time v
- - v.
Time Contacted by 3
- 12. At the discretion of the Shift Superintendent, call in a Shift Supervisor to act as OSC Coordinator. Use EP-209 APP. C for pFone numbers..
r Supervisor Contactedg%
istidatedArr10iitT'me i
Time Contacted Contacted By
- g
.r.. -.y
+
- 13. Contact the Radwaste Supervisor or the Electrical Supervisor.las required, at the discretion.of the Shif t St;perintendent for help in responding (to the.
plant condition.
1 P.
g.pc
(
.=
1 Time Disposition Called Name Phone Called
.No. Ans.-Busy-Contacted h w
- 14. Attempt to contact all other senior engineers listed in Step 4.
Document
)'
in Step 4.
l 15.NotifyEmergencyDirector(ShiftSuperintendent)when i
notifications are complete and inform him of any discrepancies, j;
Motified at I t p Discrepancies e
~^
~
Y c
e.
' '. h?
hA.
j 6
,.W, h, :
l, S
.y $
ys 3-1 1
. [ $.., W n..
- ~
1 1
~
1 4b L
f
.}.
l
.i.
I p
C t