MONTHYEARML20217B9061999-10-0101 October 1999 Proposed Tech Specs Re Control Rod Block Instrumentation ML20212H5261999-09-27027 September 1999 Proposed Tech Specs Pages,Revising TS Re Loss of Power Setpoints for 4 Kv Emergency Buses ML20210N0801999-08-0606 August 1999 Proposed Tech Specs Incorporating Note Which Will Permit one-time Exemption Until 990930,from 90 F Limit Stated in SR 3.7.2.2 ML20210E6001999-07-21021 July 1999 Proposed Tech Specs,Deleting Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS Surveillance Requirement 3.9.1.1 ML20209F7751999-07-12012 July 1999 Proposed Tech Specs Sections 2.1.1.2 & 5.6.5,incorporating Revised SLMCPR Due to Use of Cycle Specific Analysis & Deleting Previously Added Footnotes Which Are No Longer Necessary ML20209D9861999-07-0808 July 1999 Proposed Final Tech Spec Pages Correcting Minor Administrative Errors in Figure Showing Site & Exclusion Boundaries & Two SRs ML20209B9211999-07-0101 July 1999 Proposed Tech Specs,Reflecting Change in Corporate Structure ML20196A5441999-06-14014 June 1999 Proposed Final Tech Spec Pages for License Change Request ECR 98-01802 Re Installation of Digital Power Range Neutron Monitoring (Prnm) Sys & Incorporation of long-term thermal- Hydraulic Stability Solution Hardware ML20195B8271999-05-25025 May 1999 Proposed Final Tech Specs Pages for License Change Application ECR 96-01511 Re Rev to Loss of Power Setpoints for 4 Kv Emergency Buses ML20205F6391999-03-29029 March 1999 Proposed Tech Specs Pages,Deleting Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS Surveillance Requirement 3.9.1.1 ML20207E2551999-03-0101 March 1999 Proposed Tech Specs Supporting PBAPS Mod P00507 Which Will Install Power Range Neutron Monitoring Sys Incorporate long-term T/H Stability Solution Hardware ML20198N2531998-12-24024 December 1998 Proposed Tech Specs Revising Setpoints & Limits of Allowable Values for LOP Instrumentation for 4kV Emergency Buses Contained in TS Table 3.3.8.1-1, LOP Instrumentation ML20154C8271998-09-29029 September 1998 Proposed Tech Specs SR 3.6.4.1.2,revising Wording to Maintain Requirement That Secondary Containment Is Not Breached at Any Time When Secondary Containment Is Required ML20151Y3841998-09-14014 September 1998 Revised Proposed Final TS Pages for License Change Application ECR 97-02809,incorporating end-of-cycle Recirculation Pump Trip Sys at Units 2 & 3 ML20151Y3711998-09-11011 September 1998 Proposed Final TS Pages for License Change Application ECR 98-01403,revising SLMCPRs for Unit 2 ML20151Y3651998-09-11011 September 1998 Proposed Final TS Pages for License Change Applications ECR 96-02324 & 98-00499,revising MSIV Leakage & Safety Relief Valve Surveillance Testing ML20151T0421998-08-31031 August 1998 Proposed Final Tech Specs Pages for License Change Application ECR 97-02809,incorporating end-of-cycle Recirculation Pump Trip Sys at Plant ML20236W2201998-07-29029 July 1998 Proposed Tech Specs,Supporting Installation of Mod P00271 for Unit 2 Re Replacement of Source Range & Intermediate Range Monitors W/New Wide Range Neutron Monitoring Sys ML20236R3121998-07-10010 July 1998 Proposed Tech Specs Pages for License Change Application ECR 98-01403,revising TS Section 2.0.W/non-proprietary Addl Info Re 1.10 Cycle Specific SLMCPR Cycle 13 ML20236P7531998-07-0909 July 1998 Proposed Tech Specs Supporting Installation of Mod P00271, for Unit 2 Re Facility Operating License Change Request 93-18 ML20247C2611998-05-0101 May 1998 Proposed Tech Specs Deleting Requirements for Functional Testing of SRVs During Each Unit Startup ML20217K3651998-04-28028 April 1998 Proposed Tech Specs Bases Through Unit 2 Bases Rev 17 & Unit 3 Bases Rev 19 ML20217G7531998-03-20020 March 1998 Proposed Tech Specs Re end-of-cycle Recirculation Pump Trip Sys at Plant ML20217Q4711998-03-0202 March 1998 Proposed Tech Specs Adding Requirements to Achieve Compliance w/10CFR50.36a, TS on Effluents from Nuclear Power Reactors ML20202F4201998-02-0404 February 1998 Proposed Tech Specs Revising SR 3.6.4.1.2 & Associated Bases to Reflect Changes in Requirements for Secondary Containment Doors ML20211H9281997-09-26026 September 1997 Proposed Tech Specs,Replacing Page 2.0-1 & Adding Page 5.0-21 for Unit 3 ML20211F4001997-09-22022 September 1997 Proposed Tech Specs Replacing Source Range & Intermediate Range Monitors W/New Wide Range Neutron Monitoring Sys ML20141G4871997-06-30030 June 1997 Proposed Tech Specs,Revising TS Section 2.0, Safety Limits to Incorporate Revised SLMCPRs Due to Use of GE13 Fuel Product Line & cycle-specific Analysis Performed by GE ML20140D8601997-06-0404 June 1997 Proposed Tech Specs,Revising Section 3.8.2.1 to Eliminate Inconsistency Between Requirements for ECCS Operability & auto-start & Trip Bypass of of EDGs on ECCS Initiation Signal During Listed Events in Application ML20141L0111997-05-23023 May 1997 Proposed Tech Specs Revising Section 5.5.12 to Exclude Measured Main Steam Isolation Valves Leakage from Total Type B & C Local Leak Rate Test Results ML20141E0801997-05-0909 May 1997 Proposed Tech Specs 3.6.1.3.16,replacing Frequency of Primary Containment Purge & Exhaust Valve Inflatable Seals ML20137P7561997-03-31031 March 1997 Proposed Tech Specs,Extending Surveillance Interval for Calibr of Average Power Range Monitor Flow Bias Instrumentation from 18 Months to 24 Months ML20134F6121996-10-30030 October 1996 Proposed Tech Specs,Section 2.0,revising Slmcprs Due to GE Determination That Previous Calculation Is Nonconservative ML20117L2891996-09-0606 September 1996 Proposed Tech Specs 3.3.5.1, ECCS Instrumentation, & 3.8.1, AC Sources-Operating ML20117F9471996-08-27027 August 1996 Proposed Tech Specs Re CRD Charging Water Header Pressure for Shutdown Margin Test ML20117H6761996-08-23023 August 1996 Proposed Tech Specs 2.0 Re Safety Limits ML20117M7041996-06-13013 June 1996 Proposed Tech Specs,Sr 3.3.1.1.12,for APRM Flow Biased High Scram Function,Allowing SR to Be Performed W/O Entering Associated Conditions & Required Actions for Up to Six H Provided Core Flow at or Above 82% ML20101K8131996-03-25025 March 1996 Proposed Tech Specs Section 2.0 Re Safety Limits ML20100J7591996-02-15015 February 1996 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B ML20096F1481996-01-16016 January 1996 Proposed Tech Specs Base Changes Re Implementation of Main Stack & Vent Stack Radiation Monitoring Sytems ML20095L0231995-12-22022 December 1995 Proposed Improved TS & Bases,Allowing Flexibility to Install Main Stack RMS (Mod 5386) W/O Need for Addl Licensing Actions & Addressing Annotations to Reflect pre- & post-mod Scenarios,Respectively ML20095J1321995-12-21021 December 1995 Proposed Tech Specs,Consisting of Change Request 95-08, Eliminating Outdated Matl from FOLs & Making FOL for Unit 2, Consistent W/Fol for Unit 3 ML20095J7011995-12-19019 December 1995 Proposed Tech Specs Re Administrative Change to Ventilation Filter Testing Program ML20095A1731995-11-30030 November 1995 Proposed Tech Specs,Changing Minimum Allowable Control Rod Scram Accumulator Pressure & Charging Water Header Pressure from Value of 955 Psig to Value of 940 Psig ML20094R2971995-11-22022 November 1995 Revised,Proposed TS Pages 147,157 & 158 Re Early Implementation of Improved TS Section 3.4.3 ML20094Q6801995-11-21021 November 1995 Proposed Tech Specs Re SR for High Pressure Test of HPCI & B 3.5-14 & B 3.5-28.Administrative Change Proposed to Eliminate Ref to Section Previously Eliminated ML20092A2141995-09-0101 September 1995 Proposed Tech Specs,Consisting of Change Request 95-07, Deleting License Condition 2.C ML20092A2841995-08-30030 August 1995 Proposed Tech Specs,Requesting Enforcement Discretion from Portion of FOL Condition 2.C ML20092B9871995-08-28028 August 1995 Proposed Improved Tech Specs ML20087E8881995-08-0404 August 1995 Proposed Tech Specs Re Implementation of New SR Associated W/Conversion to TS 1999-09-27
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217B9061999-10-0101 October 1999 Proposed Tech Specs Re Control Rod Block Instrumentation ML20212H5261999-09-27027 September 1999 Proposed Tech Specs Pages,Revising TS Re Loss of Power Setpoints for 4 Kv Emergency Buses ML20210N0801999-08-0606 August 1999 Proposed Tech Specs Incorporating Note Which Will Permit one-time Exemption Until 990930,from 90 F Limit Stated in SR 3.7.2.2 ML20210E6001999-07-21021 July 1999 Proposed Tech Specs,Deleting Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS Surveillance Requirement 3.9.1.1 ML20209F7751999-07-12012 July 1999 Proposed Tech Specs Sections 2.1.1.2 & 5.6.5,incorporating Revised SLMCPR Due to Use of Cycle Specific Analysis & Deleting Previously Added Footnotes Which Are No Longer Necessary ML20209D9861999-07-0808 July 1999 Proposed Final Tech Spec Pages Correcting Minor Administrative Errors in Figure Showing Site & Exclusion Boundaries & Two SRs ML20209B9211999-07-0101 July 1999 Proposed Tech Specs,Reflecting Change in Corporate Structure ML20196A5441999-06-14014 June 1999 Proposed Final Tech Spec Pages for License Change Request ECR 98-01802 Re Installation of Digital Power Range Neutron Monitoring (Prnm) Sys & Incorporation of long-term thermal- Hydraulic Stability Solution Hardware ML20195B8271999-05-25025 May 1999 Proposed Final Tech Specs Pages for License Change Application ECR 96-01511 Re Rev to Loss of Power Setpoints for 4 Kv Emergency Buses ML20206C5821999-04-20020 April 1999 Rev 4 to RW-C-100, Solid Radwaste Sys Process Control Program (Pcp) ML20205F6391999-03-29029 March 1999 Proposed Tech Specs Pages,Deleting Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS Surveillance Requirement 3.9.1.1 ML20207E2551999-03-0101 March 1999 Proposed Tech Specs Supporting PBAPS Mod P00507 Which Will Install Power Range Neutron Monitoring Sys Incorporate long-term T/H Stability Solution Hardware ML20202E6251998-12-31031 December 1998 PBAPS Unit 2 Cycle 13 Startup Rept. with ML20198N2531998-12-24024 December 1998 Proposed Tech Specs Revising Setpoints & Limits of Allowable Values for LOP Instrumentation for 4kV Emergency Buses Contained in TS Table 3.3.8.1-1, LOP Instrumentation ML20195J1651998-11-16016 November 1998 Rev D to LGS Emergency Preparedness NUMARC Eals ML20195J1541998-11-16016 November 1998 Rev D to PBAPS Emergency Preparedness NUMARC Eals ML20154C8271998-09-29029 September 1998 Proposed Tech Specs SR 3.6.4.1.2,revising Wording to Maintain Requirement That Secondary Containment Is Not Breached at Any Time When Secondary Containment Is Required ML20151Y3841998-09-14014 September 1998 Revised Proposed Final TS Pages for License Change Application ECR 97-02809,incorporating end-of-cycle Recirculation Pump Trip Sys at Units 2 & 3 ML20151Y3711998-09-11011 September 1998 Proposed Final TS Pages for License Change Application ECR 98-01403,revising SLMCPRs for Unit 2 ML20151Y3651998-09-11011 September 1998 Proposed Final TS Pages for License Change Applications ECR 96-02324 & 98-00499,revising MSIV Leakage & Safety Relief Valve Surveillance Testing ML20151T0421998-08-31031 August 1998 Proposed Final Tech Specs Pages for License Change Application ECR 97-02809,incorporating end-of-cycle Recirculation Pump Trip Sys at Plant ML20236W2201998-07-29029 July 1998 Proposed Tech Specs,Supporting Installation of Mod P00271 for Unit 2 Re Replacement of Source Range & Intermediate Range Monitors W/New Wide Range Neutron Monitoring Sys ML20236R3121998-07-10010 July 1998 Proposed Tech Specs Pages for License Change Application ECR 98-01403,revising TS Section 2.0.W/non-proprietary Addl Info Re 1.10 Cycle Specific SLMCPR Cycle 13 ML20236P7531998-07-0909 July 1998 Proposed Tech Specs Supporting Installation of Mod P00271, for Unit 2 Re Facility Operating License Change Request 93-18 ML20247C2611998-05-0101 May 1998 Proposed Tech Specs Deleting Requirements for Functional Testing of SRVs During Each Unit Startup ML20217K3651998-04-28028 April 1998 Proposed Tech Specs Bases Through Unit 2 Bases Rev 17 & Unit 3 Bases Rev 19 ML20206C5711998-04-16016 April 1998 Rev 11 to ODCM for Pbaps,Units 1 & 2 ML20217G7531998-03-20020 March 1998 Proposed Tech Specs Re end-of-cycle Recirculation Pump Trip Sys at Plant ML20217Q4711998-03-0202 March 1998 Proposed Tech Specs Adding Requirements to Achieve Compliance w/10CFR50.36a, TS on Effluents from Nuclear Power Reactors ML20202F4201998-02-0404 February 1998 Proposed Tech Specs Revising SR 3.6.4.1.2 & Associated Bases to Reflect Changes in Requirements for Secondary Containment Doors ML20202H4141998-01-31031 January 1998 Cycle 12 Startup Rept Unit 3 ML20211H9281997-09-26026 September 1997 Proposed Tech Specs,Replacing Page 2.0-1 & Adding Page 5.0-21 for Unit 3 ML20211F4001997-09-22022 September 1997 Proposed Tech Specs Replacing Source Range & Intermediate Range Monitors W/New Wide Range Neutron Monitoring Sys ML20141G4871997-06-30030 June 1997 Proposed Tech Specs,Revising TS Section 2.0, Safety Limits to Incorporate Revised SLMCPRs Due to Use of GE13 Fuel Product Line & cycle-specific Analysis Performed by GE ML20140D8601997-06-0404 June 1997 Proposed Tech Specs,Revising Section 3.8.2.1 to Eliminate Inconsistency Between Requirements for ECCS Operability & auto-start & Trip Bypass of of EDGs on ECCS Initiation Signal During Listed Events in Application ML20141L0111997-05-23023 May 1997 Proposed Tech Specs Revising Section 5.5.12 to Exclude Measured Main Steam Isolation Valves Leakage from Total Type B & C Local Leak Rate Test Results ML20141E0801997-05-0909 May 1997 Proposed Tech Specs 3.6.1.3.16,replacing Frequency of Primary Containment Purge & Exhaust Valve Inflatable Seals ML20141J0311997-05-0808 May 1997 Rev 7 to Pump & Valve IST Program Third Ten Yr Interval ML20137P7561997-03-31031 March 1997 Proposed Tech Specs,Extending Surveillance Interval for Calibr of Average Power Range Monitor Flow Bias Instrumentation from 18 Months to 24 Months ML20217M8301997-01-30030 January 1997 Rev 10 to ODCM, for Peach Bottom Atomic Power Station Units 1 & 2 ML20134A6751997-01-24024 January 1997 Cycle 12 Startup Rept Unit 2 ML20134F6121996-10-30030 October 1996 Proposed Tech Specs,Section 2.0,revising Slmcprs Due to GE Determination That Previous Calculation Is Nonconservative ML20138B0081996-09-27027 September 1996 Rev 3 to Solid Radwaste Sys Process Control Program (Pcp) ML20117L2891996-09-0606 September 1996 Proposed Tech Specs 3.3.5.1, ECCS Instrumentation, & 3.8.1, AC Sources-Operating ML20117F9471996-08-27027 August 1996 Proposed Tech Specs Re CRD Charging Water Header Pressure for Shutdown Margin Test ML20117H6761996-08-23023 August 1996 Proposed Tech Specs 2.0 Re Safety Limits ML20117M7041996-06-13013 June 1996 Proposed Tech Specs,Sr 3.3.1.1.12,for APRM Flow Biased High Scram Function,Allowing SR to Be Performed W/O Entering Associated Conditions & Required Actions for Up to Six H Provided Core Flow at or Above 82% ML20101K8131996-03-25025 March 1996 Proposed Tech Specs Section 2.0 Re Safety Limits ML20100J7591996-02-15015 February 1996 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B ML20096F1481996-01-16016 January 1996 Proposed Tech Specs Base Changes Re Implementation of Main Stack & Vent Stack Radiation Monitoring Sytems 1999-09-27
[Table view] |
Text
.
1 SLs
)
2.o
{
SAFETY LIMITS (SLs)
~
2.0 t
t 2.1 Sts 1
2.1.1 Reactdr care sLt l
1 2.1.1.1 With the reactor staan dans pressure < 785 psig or core flow < ICE rated core flow:
THEIBEL POWER shall be s 255 RTP.
)
- 2.1.1.2 with the remeter staan denn pressure a 785 psig and core l
flew a los rated care flow:
l MCPR almil be a 1.11 for two roeirculation leap operetten or a(13for s e recirculation loop operatism.
j
[I 2. a 2.1.1.3 Ranctor vessel water level shall be greater than the top of active irradiated fuel.
2.1.2 n--M ar Coolmat svstam Prens % St 1
Reactor staan deem pressure shall be s 1325 psig.
2.2 SL Violattens With any SL violation, the fallowing actions shall be completed:
2.2.1 Within I hour, notify the NRC Operations Center, in accordance with 10 CFR 50.72.
2.2.2 Within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:
2.2.2.1 Restore comp 1fance with all SLs; and 2.2.2.2 Insert all insertable centrol rods.
2.2.3 Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, nettfy the Plant Manager and the Vice Presidset-Peach Bottom Atemic Power Stattee.
l 1
( - ila W i
r-tian 13 l
l PGAPS UNIT 2
{
Z.0-1 Aambant is. #AA, 21.7 l
J 9007210360 900710 7
l PDR ADOCK 05000277i p
PDR c
Reporting Requirements 5.6 5.6 Reporting Requirements (continued) 5.6.5 CORE OPERATING LIMITS rep 0RT (COLR)
Core operating limits shall be established prior to each a.
. reload cycle, or prior to any remaining portion of a reload cycle, and shall be documented in the COLR for the following:
1.
The Average Planar Linear Heat Generation Rate for Specification 3.2.1;
{
2.
The Minimum Critical Power Ratio for Specifications 3.2.2 and 3.3.2.1; 3.
The Linear Heat Generation Rate for Specification 3.2.3; and 4
The Control Rod Block Instrumentation for Specification 3.3.2.1.
b.
The analytical methods used to detemine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents:
1.
NEDE-24011-P-A, " General Electric Standard Application
[
for Reactor F
" (latest approved version as specified I
in the COLR)
NEDC-32162P, " Maximum Extended Load Line Limit and ARTS leprovement Program Analyses for Peacn Botton Atomic Power Station Units 2 and 3," Revision 1, February, 1993; 3.
PEco-FMS-0001-A, " Steady-State Thermal Hydraulic Analysis of Peach Bottom Units 2 and 3 using the FIBliR Computsr Code";
4.
PECo-FMS-0002-A, " Method for Calculating Transient l
Critical Power Ratios for Boiling Water Reactors (RETRAN-TCPPECo)";
5.
PECo-FMS-0003-A, " Steady-State Fuel Performance Methods l
Report";
6.
PEco-FMS-0004-A, " Methods for Performing BWR Systems Transient Analysis";
~
3 afor Cycle 13, specifre. documeets were oproved in the Safety Fvaluation dated (
)N
[
to suport Lic e n se.
Amen d ment Va. (
),
f AIndmentNo.h PBAP5 UNIT 2 5.0-21 i
f
.4-;
ATTACHMENT 3 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 Docket No. 50-277 License No. DPR-44 LICENSE CHANGE APPLICATION ECR 98-01403 Letter from S. B. Shelton (GENE) to K. W. Hunt (PECO Energy), " Peach Bottom Unit 2 Cycle 13 Safety Limit MCPR," dated June 10,1998 l
i I
L
e i
ATTACHMENT 4 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 Docket No. 50-277 License No. DPR-44 LICENSE CHANGE APPLICATION ECR 98-01403 Non-Proprietary Version l
i
N n-Propriet:ry Attachment Additional Information Regarding the 1.10 June 9,1998 Cycle Specific SLMCPR for Peach Bottom Unit 2 Cycle 13 References
\\ \\} General Electnc BWR Thermal Analysis Basis (GETAB): Data, Correlation and Design Application, NEDO-10958-A, January 1977.
\\ 2} General Electric Standard Applicationfor Reactor Fuel (GESTAR 11), NEDE-24011-P-A-11, November 1995.
L 3} General Electric Standard Applicationfor Reactor Fuel (GESTAR 11), NEDE-240 l 1-P-A-l 3, August 1996.
\\ 4] General Electric Fuel Bundle Designs, NEDE-31152-P, Revision 6, April 1997.
( 5} Methodology and Uncertaintiesfor Safety Limit MCPR Evaluations, NEDC-3260 lP, Class m, December 1996.
\\ 6} R-Factor Calculation Methodfor Gell. GE12 and GE13 Fuel, NEDC-32505P Revision 1, June 1997.
Control Rod Pattern Development for the Peach Bottom Unit 2 Cycle 13 SLMCPR Analysis Projected control blade patterns for the rodded bum through the cycle were used to deplete the core to the cycle exposures to be analyzed. At the desired cycle exposures the bundle exposure distributions j
and their associated R-factors were utilized for the SLMCPR cases to be analyzed. The use of different rod pattems to achieve the desired cycle exposure has been shown to have a negligible impact on the actual calculated SLMCPR. An estimated SLMCPR was obtained for an exposure point near beginning of cycle (BOC), middle of cycle (MOC), and the end of cycle (EOC) in order to establish which exposure points would produce the highest (most conservative) calculated SLMCPR.
He Safety Limit MCPR is analyzed with radial power distributions that maximize the number of bundles at or near the Operating Limit MCPR during rated power operation. This approach satisfies the stipulation in Reference 1 that the number of rods susceptible to boiling transition be muimirA GENE has established criteria to determine if the control rod pattems and resulting radial power distributions are acceptable based on importance parameters described later. Different rod patterns were analyzed until the criteria on the above parameter was satisfied. The rod pattern search wm narrowed by starting from a defined set of patterns known from prior experience to yield the flattest possible MCPR distributions. This was done for the two most limiting exposure points in the cycle I
since the BOC point was excluded by criteria as non-limiting based on the value from the estimation procedure. A Monte Carlo analysis was then performed for the MOC peak hot excess point and the EOC-1 GWd/STU exposure point to establish the maximum SLMCPR for the cycle.
l l
l Comparison of the Peach Bottom Unit 2 Cycle 13 SLMCPR to the Generic GE13 l
1 SLMCPR Value Table i summarizes the relevant input parameters and results of the SLMCPR evaluation for both the j
generic GE13 and the Peach Bottom Unit 2 Cycle 13 core. He generic evaluation and the plant / cycle specific evaluations all were perfonned using the methods described in GETABI4 The evaluations
(( GENE Proprietary Information ))
page1of3
(( enclosed by double brackets ))
Nen-Proprietary Attachment AdditionalInformation Regarding the 1.10 June 9,1998 Cycle Specific SLMCPR for Peach Bottom Unit 2 Cycle 13 yield difrerent calculated SLMCPR values because the inputs that are used are different. The quantities that have been shown to have some impact on the detemunation of the safety limit MCPR (SLMCPR) are provided. Much of this information is redundant but is provided in this case because it has been provided previously to the NRC to assist them in understanding the differences between plant / cycle specific SLMCPR evaluations and the generic values calculated previously for each fuel productline. (())
Prior to 1996, GESTAR Ilt 21 stipulated that the SLMCPR analysis for a new fuel design be performed for a large high power density plant assuming a bounding equilibrium core. The GE13 product line generic SLMCPR value was determined according to this specification and found to be 1.09. Later l
revisions to GESTAR li 'l that have been submitted to the NRC describe how plant / cycle specific SLMCPR analyses are used to confirm the calculated SLMCPR value on a plant / cycle specific basis using the uncertainties dermed in Reference [ 4].
He Peach Bottom Unit 2 Cycle 13 core is a mixed core with GElland GE13 fuel. 'Ihe latest reload consists of GE13 fuel makmg up (( )) of the total bundles in the core. The fresh GE13 fuel has an average bundle enrichment of (( )), as compared to a core average enrichment of (( )). By way of comparison, the generic GE13 equilibrium core has batch and core average enrichments of (( )).
Higher enrichment in the fresh GE13 fuel for the Peach Bottom Unit 2 Cycle 13 core (compared to the average of the core) produces slightly higher power in the fresh bundles relative to the rest of the core.
((ll
((ll
(())
(( ))
The core MCPR distribution for the Peach Bottom Unit 2 Cycle 13 analysis is by all measures much flatter than the MCPR distribution assumed for the generic GE13 evaluation. (( ))
((11
(( )) From this comparison (( )) it can be concluded that the core MCPR distribution for Peach Bottom Unit 2 Cycle 13 is flatter overall than the MCPR distribution evaluated generically for GE13 and that based on this reason alone the calculated SLMCPR for Peach Bottom Unit 2 Cycle 13 should be higher than the 1.09 generic GE13 SLMCPR.
The uncontrolled bundle pin-by-pin power distributions were compared between the Peach Bottom Unit L
2 Cycle 13 bundles and the b. dies used for the generic GE13 evaluation. Pin-by-pin power distributions are characterized in te.ms of R-factors using the methodology defined in Reference [ 6]. ((
))
The flatness of the pin R-factor distribution within a particular bundle is characterized (( ))
(( GENE Proprietary information ))
page 2 of 3
(( enclosed by double brackets ))
_ = _ - _ _ _ _ _ _ _
N n-Pr:prietary Attachment AdditionalInformation Regarding the 1.10 June 9,1998 l
Cycle Specific SLMCPR for Pench Bottom Unit 2 Cycle 13 l
l l
(())
Table 1 Comparison of Generic GE13 and Peach Bottom Unit 2 Cycle 13 Core and Bundle Quantities that impact the SLMCPR (( ))
Summary The calculated nominal 1.10 Monte Carlo SLMCPR for Peach Bottom Unit 2 Cycle 13 is consistent with what one would expect (( )) the 1.10 SLMCPR value is appropriate.
Various quantities (( )) have been used over the last year to compare quantities that impact the calculated SLMCPR value. These other quantities have been provided to the NRC previously for other plant / cycle specific analyses using a format such as that given in Table 1. Rese other quantities have also been compared for this corc/ cycle (( )) The key parameters in Table I support the conclusion that the Peach Bottom Unit 2 Cycle 13 core / cycle has a much flatter radial power distribution than was used to perform the GE13 generic SLMCPR evaluation. This fact is significant enough to more than compensate for the fact that the Peach Bottom Unit 2 Cycle 13 bundles are less flat than the bundles used for the generic GE13 SLMCPR evaluation.
Based on all of the facts, observations and arguments presented above, it is concluded that the calculated SLMCPR value of 1.10 for the Peach Bottom Unit 2 Cycle 13 core is appropriate. It is reasonable that this value is higher than the generic GE13 SLMCPR evaluation.
For single loop operations (SLO) the safety limit MCPR is 0.02 greater than the two-loop value. (( ))
Prepared by:
Verified by:
Rh4 S.B. Shelton G.M. Baka Technical Program Manager Technical Program Manager Nuclear Fuel Engineering Nuclear Fuel Engineering i
f
(( GENE Proprietary information ))
page 3 of 3
_ (( enclosed by double brackets ))
_ _ _ _ _ _ _ _ _ _ _