MONTHYEARML20217B9061999-10-0101 October 1999 Proposed Tech Specs Re Control Rod Block Instrumentation ML20212H5261999-09-27027 September 1999 Proposed Tech Specs Pages,Revising TS Re Loss of Power Setpoints for 4 Kv Emergency Buses ML20210N0801999-08-0606 August 1999 Proposed Tech Specs Incorporating Note Which Will Permit one-time Exemption Until 990930,from 90 F Limit Stated in SR 3.7.2.2 ML20210E6001999-07-21021 July 1999 Proposed Tech Specs,Deleting Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS Surveillance Requirement 3.9.1.1 ML20209F7751999-07-12012 July 1999 Proposed Tech Specs Sections 2.1.1.2 & 5.6.5,incorporating Revised SLMCPR Due to Use of Cycle Specific Analysis & Deleting Previously Added Footnotes Which Are No Longer Necessary ML20209D9861999-07-0808 July 1999 Proposed Final Tech Spec Pages Correcting Minor Administrative Errors in Figure Showing Site & Exclusion Boundaries & Two SRs ML20209B9211999-07-0101 July 1999 Proposed Tech Specs,Reflecting Change in Corporate Structure ML20196A5441999-06-14014 June 1999 Proposed Final Tech Spec Pages for License Change Request ECR 98-01802 Re Installation of Digital Power Range Neutron Monitoring (Prnm) Sys & Incorporation of long-term thermal- Hydraulic Stability Solution Hardware ML20195B8271999-05-25025 May 1999 Proposed Final Tech Specs Pages for License Change Application ECR 96-01511 Re Rev to Loss of Power Setpoints for 4 Kv Emergency Buses ML20205F6391999-03-29029 March 1999 Proposed Tech Specs Pages,Deleting Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS Surveillance Requirement 3.9.1.1 ML20207E2551999-03-0101 March 1999 Proposed Tech Specs Supporting PBAPS Mod P00507 Which Will Install Power Range Neutron Monitoring Sys Incorporate long-term T/H Stability Solution Hardware ML20198N2531998-12-24024 December 1998 Proposed Tech Specs Revising Setpoints & Limits of Allowable Values for LOP Instrumentation for 4kV Emergency Buses Contained in TS Table 3.3.8.1-1, LOP Instrumentation ML20154C8271998-09-29029 September 1998 Proposed Tech Specs SR 3.6.4.1.2,revising Wording to Maintain Requirement That Secondary Containment Is Not Breached at Any Time When Secondary Containment Is Required ML20151Y3841998-09-14014 September 1998 Revised Proposed Final TS Pages for License Change Application ECR 97-02809,incorporating end-of-cycle Recirculation Pump Trip Sys at Units 2 & 3 ML20151Y3711998-09-11011 September 1998 Proposed Final TS Pages for License Change Application ECR 98-01403,revising SLMCPRs for Unit 2 ML20151Y3651998-09-11011 September 1998 Proposed Final TS Pages for License Change Applications ECR 96-02324 & 98-00499,revising MSIV Leakage & Safety Relief Valve Surveillance Testing ML20151T0421998-08-31031 August 1998 Proposed Final Tech Specs Pages for License Change Application ECR 97-02809,incorporating end-of-cycle Recirculation Pump Trip Sys at Plant ML20236W2201998-07-29029 July 1998 Proposed Tech Specs,Supporting Installation of Mod P00271 for Unit 2 Re Replacement of Source Range & Intermediate Range Monitors W/New Wide Range Neutron Monitoring Sys ML20236R3121998-07-10010 July 1998 Proposed Tech Specs Pages for License Change Application ECR 98-01403,revising TS Section 2.0.W/non-proprietary Addl Info Re 1.10 Cycle Specific SLMCPR Cycle 13 ML20236P7531998-07-0909 July 1998 Proposed Tech Specs Supporting Installation of Mod P00271, for Unit 2 Re Facility Operating License Change Request 93-18 ML20247C2611998-05-0101 May 1998 Proposed Tech Specs Deleting Requirements for Functional Testing of SRVs During Each Unit Startup ML20217K3651998-04-28028 April 1998 Proposed Tech Specs Bases Through Unit 2 Bases Rev 17 & Unit 3 Bases Rev 19 ML20217G7531998-03-20020 March 1998 Proposed Tech Specs Re end-of-cycle Recirculation Pump Trip Sys at Plant ML20217Q4711998-03-0202 March 1998 Proposed Tech Specs Adding Requirements to Achieve Compliance w/10CFR50.36a, TS on Effluents from Nuclear Power Reactors ML20202F4201998-02-0404 February 1998 Proposed Tech Specs Revising SR 3.6.4.1.2 & Associated Bases to Reflect Changes in Requirements for Secondary Containment Doors ML20211H9281997-09-26026 September 1997 Proposed Tech Specs,Replacing Page 2.0-1 & Adding Page 5.0-21 for Unit 3 ML20211F4001997-09-22022 September 1997 Proposed Tech Specs Replacing Source Range & Intermediate Range Monitors W/New Wide Range Neutron Monitoring Sys ML20141G4871997-06-30030 June 1997 Proposed Tech Specs,Revising TS Section 2.0, Safety Limits to Incorporate Revised SLMCPRs Due to Use of GE13 Fuel Product Line & cycle-specific Analysis Performed by GE ML20140D8601997-06-0404 June 1997 Proposed Tech Specs,Revising Section 3.8.2.1 to Eliminate Inconsistency Between Requirements for ECCS Operability & auto-start & Trip Bypass of of EDGs on ECCS Initiation Signal During Listed Events in Application ML20141L0111997-05-23023 May 1997 Proposed Tech Specs Revising Section 5.5.12 to Exclude Measured Main Steam Isolation Valves Leakage from Total Type B & C Local Leak Rate Test Results ML20141E0801997-05-0909 May 1997 Proposed Tech Specs 3.6.1.3.16,replacing Frequency of Primary Containment Purge & Exhaust Valve Inflatable Seals ML20137P7561997-03-31031 March 1997 Proposed Tech Specs,Extending Surveillance Interval for Calibr of Average Power Range Monitor Flow Bias Instrumentation from 18 Months to 24 Months ML20134F6121996-10-30030 October 1996 Proposed Tech Specs,Section 2.0,revising Slmcprs Due to GE Determination That Previous Calculation Is Nonconservative ML20117L2891996-09-0606 September 1996 Proposed Tech Specs 3.3.5.1, ECCS Instrumentation, & 3.8.1, AC Sources-Operating ML20117F9471996-08-27027 August 1996 Proposed Tech Specs Re CRD Charging Water Header Pressure for Shutdown Margin Test ML20117H6761996-08-23023 August 1996 Proposed Tech Specs 2.0 Re Safety Limits ML20117M7041996-06-13013 June 1996 Proposed Tech Specs,Sr 3.3.1.1.12,for APRM Flow Biased High Scram Function,Allowing SR to Be Performed W/O Entering Associated Conditions & Required Actions for Up to Six H Provided Core Flow at or Above 82% ML20101K8131996-03-25025 March 1996 Proposed Tech Specs Section 2.0 Re Safety Limits ML20100J7591996-02-15015 February 1996 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B ML20096F1481996-01-16016 January 1996 Proposed Tech Specs Base Changes Re Implementation of Main Stack & Vent Stack Radiation Monitoring Sytems ML20095L0231995-12-22022 December 1995 Proposed Improved TS & Bases,Allowing Flexibility to Install Main Stack Rms (Mod 5386) W/O Need for Addl Licensing Actions & Addressing Annotations to Reflect pre- & post-mod Scenarios,Respectively ML20095J1321995-12-21021 December 1995 Proposed Tech Specs,Consisting of Change Request 95-08, Eliminating Outdated Matl from FOLs & Making FOL for Unit 2, Consistent W/Fol for Unit 3 ML20095J7011995-12-19019 December 1995 Proposed Tech Specs Re Administrative Change to Ventilation Filter Testing Program ML20095A1731995-11-30030 November 1995 Proposed Tech Specs,Changing Minimum Allowable Control Rod Scram Accumulator Pressure & Charging Water Header Pressure from Value of 955 Psig to Value of 940 Psig ML20094R2971995-11-22022 November 1995 Revised,Proposed TS Pages 147,157 & 158 Re Early Implementation of Improved TS Section 3.4.3 ML20094Q6801995-11-21021 November 1995 Proposed Tech Specs Re SR for High Pressure Test of HPCI & B 3.5-14 & B 3.5-28.Administrative Change Proposed to Eliminate Ref to Section Previously Eliminated ML20092A2141995-09-0101 September 1995 Proposed Tech Specs,Consisting of Change Request 95-07, Deleting License Condition 2.C ML20092A2841995-08-30030 August 1995 Proposed Tech Specs,Requesting Enforcement Discretion from Portion of FOL Condition 2.C ML20092B9871995-08-28028 August 1995 Proposed Improved Tech Specs ML20087E8881995-08-0404 August 1995 Proposed Tech Specs Re Implementation of New SR Associated W/Conversion to TS 1999-09-27
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217B9061999-10-0101 October 1999 Proposed Tech Specs Re Control Rod Block Instrumentation ML20212H5261999-09-27027 September 1999 Proposed Tech Specs Pages,Revising TS Re Loss of Power Setpoints for 4 Kv Emergency Buses ML20210N0801999-08-0606 August 1999 Proposed Tech Specs Incorporating Note Which Will Permit one-time Exemption Until 990930,from 90 F Limit Stated in SR 3.7.2.2 ML20210E6001999-07-21021 July 1999 Proposed Tech Specs,Deleting Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS Surveillance Requirement 3.9.1.1 ML20209F7751999-07-12012 July 1999 Proposed Tech Specs Sections 2.1.1.2 & 5.6.5,incorporating Revised SLMCPR Due to Use of Cycle Specific Analysis & Deleting Previously Added Footnotes Which Are No Longer Necessary ML20209D9861999-07-0808 July 1999 Proposed Final Tech Spec Pages Correcting Minor Administrative Errors in Figure Showing Site & Exclusion Boundaries & Two SRs ML20209B9211999-07-0101 July 1999 Proposed Tech Specs,Reflecting Change in Corporate Structure ML20196A5441999-06-14014 June 1999 Proposed Final Tech Spec Pages for License Change Request ECR 98-01802 Re Installation of Digital Power Range Neutron Monitoring (Prnm) Sys & Incorporation of long-term thermal- Hydraulic Stability Solution Hardware ML20195B8271999-05-25025 May 1999 Proposed Final Tech Specs Pages for License Change Application ECR 96-01511 Re Rev to Loss of Power Setpoints for 4 Kv Emergency Buses ML20206C5821999-04-20020 April 1999 Rev 4 to RW-C-100, Solid Radwaste Sys Process Control Program (Pcp) ML20205F6391999-03-29029 March 1999 Proposed Tech Specs Pages,Deleting Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS Surveillance Requirement 3.9.1.1 ML20207E2551999-03-0101 March 1999 Proposed Tech Specs Supporting PBAPS Mod P00507 Which Will Install Power Range Neutron Monitoring Sys Incorporate long-term T/H Stability Solution Hardware ML20202E6251998-12-31031 December 1998 PBAPS Unit 2 Cycle 13 Startup Rept. with ML20198N2531998-12-24024 December 1998 Proposed Tech Specs Revising Setpoints & Limits of Allowable Values for LOP Instrumentation for 4kV Emergency Buses Contained in TS Table 3.3.8.1-1, LOP Instrumentation ML20195J1651998-11-16016 November 1998 Rev D to LGS Emergency Preparedness NUMARC Eals ML20195J1541998-11-16016 November 1998 Rev D to PBAPS Emergency Preparedness NUMARC Eals ML20154C8271998-09-29029 September 1998 Proposed Tech Specs SR 3.6.4.1.2,revising Wording to Maintain Requirement That Secondary Containment Is Not Breached at Any Time When Secondary Containment Is Required ML20151Y3841998-09-14014 September 1998 Revised Proposed Final TS Pages for License Change Application ECR 97-02809,incorporating end-of-cycle Recirculation Pump Trip Sys at Units 2 & 3 ML20151Y3711998-09-11011 September 1998 Proposed Final TS Pages for License Change Application ECR 98-01403,revising SLMCPRs for Unit 2 ML20151Y3651998-09-11011 September 1998 Proposed Final TS Pages for License Change Applications ECR 96-02324 & 98-00499,revising MSIV Leakage & Safety Relief Valve Surveillance Testing ML20151T0421998-08-31031 August 1998 Proposed Final Tech Specs Pages for License Change Application ECR 97-02809,incorporating end-of-cycle Recirculation Pump Trip Sys at Plant ML20236W2201998-07-29029 July 1998 Proposed Tech Specs,Supporting Installation of Mod P00271 for Unit 2 Re Replacement of Source Range & Intermediate Range Monitors W/New Wide Range Neutron Monitoring Sys ML20236R3121998-07-10010 July 1998 Proposed Tech Specs Pages for License Change Application ECR 98-01403,revising TS Section 2.0.W/non-proprietary Addl Info Re 1.10 Cycle Specific SLMCPR Cycle 13 ML20236P7531998-07-0909 July 1998 Proposed Tech Specs Supporting Installation of Mod P00271, for Unit 2 Re Facility Operating License Change Request 93-18 ML20247C2611998-05-0101 May 1998 Proposed Tech Specs Deleting Requirements for Functional Testing of SRVs During Each Unit Startup ML20217K3651998-04-28028 April 1998 Proposed Tech Specs Bases Through Unit 2 Bases Rev 17 & Unit 3 Bases Rev 19 ML20206C5711998-04-16016 April 1998 Rev 11 to ODCM for Pbaps,Units 1 & 2 ML20217G7531998-03-20020 March 1998 Proposed Tech Specs Re end-of-cycle Recirculation Pump Trip Sys at Plant ML20217Q4711998-03-0202 March 1998 Proposed Tech Specs Adding Requirements to Achieve Compliance w/10CFR50.36a, TS on Effluents from Nuclear Power Reactors ML20202F4201998-02-0404 February 1998 Proposed Tech Specs Revising SR 3.6.4.1.2 & Associated Bases to Reflect Changes in Requirements for Secondary Containment Doors ML20202H4141998-01-31031 January 1998 Cycle 12 Startup Rept Unit 3 ML20211H9281997-09-26026 September 1997 Proposed Tech Specs,Replacing Page 2.0-1 & Adding Page 5.0-21 for Unit 3 ML20211F4001997-09-22022 September 1997 Proposed Tech Specs Replacing Source Range & Intermediate Range Monitors W/New Wide Range Neutron Monitoring Sys ML20141G4871997-06-30030 June 1997 Proposed Tech Specs,Revising TS Section 2.0, Safety Limits to Incorporate Revised SLMCPRs Due to Use of GE13 Fuel Product Line & cycle-specific Analysis Performed by GE ML20140D8601997-06-0404 June 1997 Proposed Tech Specs,Revising Section 3.8.2.1 to Eliminate Inconsistency Between Requirements for ECCS Operability & auto-start & Trip Bypass of of EDGs on ECCS Initiation Signal During Listed Events in Application ML20141L0111997-05-23023 May 1997 Proposed Tech Specs Revising Section 5.5.12 to Exclude Measured Main Steam Isolation Valves Leakage from Total Type B & C Local Leak Rate Test Results ML20141E0801997-05-0909 May 1997 Proposed Tech Specs 3.6.1.3.16,replacing Frequency of Primary Containment Purge & Exhaust Valve Inflatable Seals ML20141J0311997-05-0808 May 1997 Rev 7 to Pump & Valve IST Program Third Ten Yr Interval ML20137P7561997-03-31031 March 1997 Proposed Tech Specs,Extending Surveillance Interval for Calibr of Average Power Range Monitor Flow Bias Instrumentation from 18 Months to 24 Months ML20217M8301997-01-30030 January 1997 Rev 10 to ODCM, for Peach Bottom Atomic Power Station Units 1 & 2 ML20134A6751997-01-24024 January 1997 Cycle 12 Startup Rept Unit 2 ML20134F6121996-10-30030 October 1996 Proposed Tech Specs,Section 2.0,revising Slmcprs Due to GE Determination That Previous Calculation Is Nonconservative ML20138B0081996-09-27027 September 1996 Rev 3 to Solid Radwaste Sys Process Control Program (Pcp) ML20117L2891996-09-0606 September 1996 Proposed Tech Specs 3.3.5.1, ECCS Instrumentation, & 3.8.1, AC Sources-Operating ML20117F9471996-08-27027 August 1996 Proposed Tech Specs Re CRD Charging Water Header Pressure for Shutdown Margin Test ML20117H6761996-08-23023 August 1996 Proposed Tech Specs 2.0 Re Safety Limits ML20117M7041996-06-13013 June 1996 Proposed Tech Specs,Sr 3.3.1.1.12,for APRM Flow Biased High Scram Function,Allowing SR to Be Performed W/O Entering Associated Conditions & Required Actions for Up to Six H Provided Core Flow at or Above 82% ML20101K8131996-03-25025 March 1996 Proposed Tech Specs Section 2.0 Re Safety Limits ML20100J7591996-02-15015 February 1996 Proposed Tech Specs Re Implementation of 10CFR50,App J, Option B ML20096F1481996-01-16016 January 1996 Proposed Tech Specs Base Changes Re Implementation of Main Stack & Vent Stack Radiation Monitoring Sytems 1999-09-27
[Table view] |
Text
-. .. .
J l
t i ATTACHMENT 2 PEACH BOTTOM ATOMIC POWER STATION UNIT 2 4
Docket No. 50-277 1 License No. DPR-44 Facility Operating Ucense Change Request l ECR 96-02011 1
"APRM Flow Biased High Scram 1 Surveillance Requirement 3.3.1.1.12" l
l' i
List of Revised Pages 3.3-5 J i
B 3.3-33 l
4 n 1-9606100722 960613 PDR ADOCK 05000277 P PDR. i
. RPS Instrumentation 3.3.1.1 SURVEILLANCE REOUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.3.1.1.9 Perfom CHANNEL FUNCTIONAL TEST. 92 days SR 3.3.1.1.10 ------------------NOTE-------------------
Radiation detectors are excluded.
Perform CHANNEL CALIBRATION. 92 days SR 3.3.1.1.11 ------------------NOTES------------------ -
l
- 1. Neutron detecto's r are excluded. j
- 2. Not required to be performed when entering MODE 2 from MODE 1 until ,
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering MODE 2. ;
Perform CHANNEL CALIBRATION. 184 days :
1 SR 3.3.1.1.12 ------------------NOTES------------------
- 1. Neutron detectors are excluded.
- 2. For Function 2.a, not required to be performed when entering N0DE 2 from MODE 1 until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after entering 4... MODE 2.
Perform CHANNEL CALIBRATION. 18 months SR 3.3.1.1.13 Verify Turbine Stop Valve-Closure and 24 months Turbine Control Valve Fast Closure, Trip 011 Pressure-Low Functions are not bypassed when THERMAL POWER is 2: 30% RTP.
3, ne & + ten 2. f, us,] ccyledson o( e l es< ye M eb in l0 << Moc o a f ee C o.s.ptav ave els h e.usi.s<<n,4,pe.r{f 8 af he A1e~ han le s msycle gb el h" vP h
\
4 e n. pw de< ,w uF .ibwe 92LW<>e PBAPS UNIT 2 3.3-5 Amendment No. 210 CxCvfbon N .i u " w e fla n c t- }?epaire, .,f ive h 2, , ,
v A .O ' ' N .. ,... _
RPS Instrumentation
(
B 3.3.1.1
)
i BASES l SURVEILLANCE SR 3.3.1.1.10. SR 3.3.1.1.11. SR 3.3.1.1.12.
REQUIREMENTS SR 3.3.1.1.15. and SR 3.3.1.1.1% (continued)
L
}
calibrations, consistent with the current plant specific
! setpoint methodology. SR 3.3.1.1.16, however, is only a i calibration of the radiation detectors using a standard j i radiation source, j 4
j As noted for SR 3.3.1.1.11 and SR 3.3.1.1.12, neutron l
' detectors are excluded from CHANNEL CALIBRATION because they are passive devices, with minimal drift, and because of the
! difficulty of simulating a meaningful signal. Changes.in neutron detector sensitivity are compensated for by T l
performing the 7 day calorimetric calibration (SR 3.3.1.1.2)
' _ and the 1000 MWD /T LPRM calibration against the TIPS (SR 3.3.1.1.8). A second note is provided for SRs 3.3.1.1.11 and 3.3.1.1.12 that allows the APRM and IRM SRs to be performed within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of entering MODE 2.from MODE 1. Testing of the MODE 2 APRM and IRM Functions cannot
- be performed in MODE 1 without utilizing jumpers, lifted i leads or movable links. This Note allows entry into MODE 2 l l from MODE 1, if the 184 day or 18 month Frequency is not met i
- ) per SR 3.0.2. Twelve hours is based on operating experience and in consideration of providing a reasonable time in which j
l
/ [p to_ complete _the_SR.A.As noted for SR 3.3.1.1.10, radiation detectors are excluded from CHANNEL CALIBRATION due to ALARA reasons (when the plant is operating, the radiation
, detectors are generally in a high radiation area; the steam 4 tunnel). This exclusion is acceptable because the radiation l
detectors are passive devices, with minimal drift. The i radiation detectors are calibrated in accordance with l
! SR 3.3.1.1.16 on a 24 month Frequency. )
i j The 92 day Frequency of SR 3.3.1.1.10 is conservative with
- respect to the magnitude of equipment drift assumed in the i setpoint analysis. The Frequencies of SR 3.3.1.1.11 and j SR 3.3.1.1.12 are based upon the assumption of a 184 day or ;
~
an 18 month calibration interval, respectively, in the i
determination of the magnitude of equipment drift in the
- setpoint analysis. The Frequencies,of SR 3.3.1.1.15 and SR 3.3.1.1.16 are based upon the assumption of a 24 month calibration interval in the determination of the magnitude
- of equipment drift in the applicable setpoint analysis.
(continued) i i
PBAPS UNIT 2 B 3.3-33 Revision No. 1 J