Rev 0 to GENE-771-54-0894, Project Instruction Shroud Repair for H1 Through H7 Welds for PECO Energy Peach Bottom Atomic Power Station
ML20073F533
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 08/31/1994
From: Hudson K, Lenz M
GENERAL ELECTRIC CO.
To:
Shared Package
ML20073F527 List:
References
GENE-771-54-089, GENE-771-54-89, NUDOCS 9410030148
Download: ML20073F533 (11)


Text

. .

I GEMI-771-54-0394 Rev.O.

. DIF B13-01732 ADUUST 1994 4

PROJECTINSTRUCTION SHROUD REPAIRFORH1 THROUGHB7 WELDS FOR PECO ENERGY PEACH BOTTOM ATOMIC POWERSTATION Prepared By: . Av6. 3/, /ff@

Mark O. Lanz,Sankar Engineer Date Raastor Design F=P--%

u,,,,al. Gol/2k KA. Esdson, F --l ' -" ' Eagiaaer shh+

Dite' l PECO Energy l f$k LE.Tschantre, GE Project Manager 8~% \-94 Date Peach Bottom Shroud RepairFreject GE NUCLEARENERGY San Jose, Califerata 1

4 9410030148 940916 PDR ADOCK 05000277 PDR p

& -- _m-. .4 a. 4 . _--4a. J a . .m,d l

s GENE-771-54-0894 Rsv.0 ,

DRF B13-01732 AUGUST 1994 i

Revision Status Revision Date DESCRIPTION O 6 August 94 Draft 0 For Review 0 31 August 94 InitialIssue L

6 I

)

i i

r

]

l

\

I i

a GENE-771-54-0894 Rev.0.

DRF B13-01732 AUGUST 1994 IMPORTANT NOTICE REGARDING t THE CONTENTS OF THIS REPORT  !

Please Read Carefully The only undertakings of the General Electric Company (GE) respecting the information in this ,

document are contamed in Contract No. PB263848 between PECO Energy and GE Nuclear Energy, and nothing contained in this document shall be construed as changing the contract. The use of this information by anyone other than PECO Energy, or for any purpose other than that for which it is intended under such contract is not authorized, and with respect to any unauthorized use, GE makes no representation or warranty, and assumes no liability as to the completeness, accuracy, or usefulness of the information contained in this document, or that its use may not infringe upon privately owned rights. ,

l i

i

)

$k

GENE-771-54-0894 Rev.0.

. DRF B13-01732 AUGUST 1994 TABLE OF CONTENTS 1.0 SCOPE 1

2.0 REFERENCES

1 3.0 PROJECT OPERATIONS 3 4.0 DESIGN REQUIREMENTS 3 5.0 DESIGN 5 6.0 DESIGN ANALYSIS 5 7.0 OTHER EVALUATIONS 5 8.0 DESIGN FREEZE 5 9.0 DESIGN DOCUMENTATION 6 10.0 FABRICATION 6 11.0 INSTALLATION REQUIRENENTS 6 12.0 SAFETY ANALYSIS 6

~

13.0 HARDWARE DELIVERABLES 7 14.0 TOOLING 7 .

15,0 TRAINING 7 16.0 INSTALLATION 7 17.0 QUALITY ASSURANCE 7 o

k

GENE-771-54-0894 Rev.0.

DRF B13-01732 AUGUST 1994 1.0 SCOPE This document establishes the technical and project administrative process to be used by the GE Nuclear Energy (GE) and PECO ENERGY (PECO) shroud repair project team.

The process applies to the development of repair design (s) for the H1 through H7 shroud welds for the Peach Bottom Unit 2 reactor, including delivery and instaIlation of the hardware at the site. Project work includes concept development, selection and approval, qualification of the design by analysis, approval of the design by both PECO and by GE, one NRC ?resentation, specification and procurement of materials, and fabrication of the repair harc ware. Also included is the design, fabrication and qualification of the tooling including mockups and training, the installation of the repair including required inspections, and preparation of the appropriate PECO documents for installation. ,

All project activities shall be in accordance with GE Proposal No. 893-1ET2H-HE0 and PECO Purchase Order No. PB26384, unless mutually agreed and documented otherwise by PECO and GE Project Managers. Conflicts between this document and design specifications, design drawings, or any other documents pertaining to the shroud repair shall be brought to the attention of the GE Project Manager for resolution. This document records Customer Technical Requirements applicable to the shroud repair in accordance with GE Engineering Operating Procedure 25-4.00 and Procedure 10-12 of GE Nuclear Energy Policies and Procedures.

2.0 REFERENCES

2.1 General Electric Documents. The following GE documents apply to the design, qualification, and fabrication of shroud repair components. The hst below is not all inclusive and may be expanded as the project progresses.

Subiect Document Number

a. Arc Welding of Austenitic Stainless Steel P50YP102
b. Seismic Analysis of Peach Bottom 2 Reactor Vessel and 383HA691 Rev. O Internals
c. Sensitization Tests for Austenitic Stainless Steel, E50YP13 Modified ASTM A262 Practice E
d. Reload Seismic Analysis - Peach Bottom 2 and 3 386HA474 Rev. O
e. Determination of Carbide Precipitation in Wrought E50YP20 Austenitic Stainless Steel (Modified ASTM A262 Practice A)
f. Proposal for RPV Core Shroud Repair for Peach Bottom GE Proposal No.

Atomic Power Station 893-lET2H-HE0

g. Examination for Intergranular Attack E50YP11 h Age Hardening of NI-CR-FE Alloy X-750 P10JYP2
i. Liquid Penetrant Examination .

E50YP22A

GENE-771-54-0894 Rev.0. .'

DRF B13-01732 l AUGUST 1994  !

i 2.2 Codes and Standards. The following documents of the latest issue (or specified issue) apply to the design, qualification, and fabrication of shroud repair components.

2.2.1 American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel }

(B&PV) Code. -

a.Section III, Appendices,1989 Edition
b.Section IX, Welding and Brazing Qualifications,1989 '

Edition

c.Section III, Subsection NG,1989 Edition j
d. Sec" XI, Rules for Inservice Inspection,1980 Edition .

with J enda through Winter 1981 l 1

c. Section ii.,1965 Edition with Addenda through Winter 1965 2.2.2 American Society for Testina & Materials (ASTM)  !
a. ASME A182, Specification for Forged or Rolled Alloy-Steel Pipe Flanges,  !

Forged Fittings, and Valves and Parts for High Temperature Service. .

b. ASTM A240, Specification for Heat Resisting Chromium and Chromium- l Nickel Stainless Steel Plate, Sheet, and Strip for Pressure Vessels. l
c. ASTM A276, Specification for Stainless and Heat Resisting Steel Bars and Shapes.  !

t I

d. ASTM A479, Specification for Stainless and Heat-Resisting Steel Bars and Shapes for Use in Boilers and Other Pressure Vessels. l t
e. ASME A480, Specification for General Requirements for Flat-Rolled Stainless and Heat Resisting Steel Plate, Sheet and Strip.  !

ASTM B637, Specification for Precipitation Hardening Nickel Alloy Bars, i f.

Forgings, and Forging Stock for High Temperature Service. j

g. ASTM A262, Standard Practices for Detecting Susceptibility to  !

Intergranular Attack in Austenitic Stainless Steels. {

I t

s 2

GENE-771-54-0894 Rev.0.

  • DRF B13-01732 AUGUST 1994 2.3 PECO Enerev Documents
a. Peach Bottom 2 and 3 UFSAR, Chapter 3 and Appendix C.
b. PECO Energy Specification for RPV Core Shroud Repair, NE-225
c. PECO Energy Purchase Order No. PB263848 3.0 PROJECT OPERATIONS The repair design will be prepared by GE in consultation with PECO, in accordance with internal GE practice for Safety Related reactor internals; except that unverified working level information in the form of sketches, hand calculations, and drafts will be released to PECO prior to design verification and issue, as needed. This variance from normal GE practice for Safety Related equipment will be implemented in the interest of timely mformation exchange and on-schedule completion of project work which meets both GE and PECO requirements. Similarly, GE will order matenal and fabrication in advance of having some of the documentation formally in place in order to meet PECO schedule requirements. This process can only work if the 3roject is carried out on a good faith, mutual trust basis which is assumed by both GE anc PECO.

Design specifications, analyses, and fabrication drawings will be reviewed and approved by PECO. GE will support the PECO reviews by submitting a review package to PECO for each review topic, according to the Project Schedule. Review comments resolution will be handled in the most effective manner, i.e., the preferred method is by FAX and telephone conferences, but face to face working meetings in San Jose will be used if  ;

necessary. Whatever method is used, it will be in accordance with the Project Schedule.

Changes requested by PECO which are beyond the project scope and schedules as agreed to, may result in additional time and material charges by GE.

GE will incorporate necessary changes, freeze the design, issue design documentation, and formally release procurement / fabrication on completion of the above process.

4.0 DESIGN REOUIREMENTS i

~

Shroud circumferential welds H1 through H7 were originally required to provide venical and horizontal support for the core top guide, core suppon plate and shroud head, and to prevent core flow bypass to the downcomer region in the shroud /RPV annulus. The core top guide and core suppon plate provide horizontal support for the fuel assemblies, and maintain the correct fuel channel spacing to permit control roa insenion. The purpose of l the shroud repair is to stmeturally replace welds H1 through H7, assuming welds Hi -

through H7 are structurally ineffective due to cracking and/or cracking indications. The '

shroud repair will fulfill all of the original design requirements for the shroud as defined in "

the Peach Bottom 2 and 3 UFSAR. The shroud repair will be designed to support the top t guide, core support plate, the fuel assemblies and the shroud head for all design conditions. The stabilizer assemblies and associated hardware will be designed for the remaining life of Peach Bottom 2 and 3, including possible life extension.

l l

1 l

GENE-771-54-0894 Rev.0.

. DRF B13-01732 AUGUST 1994 l i

The replacement of welds H1 through H7 with the stabilizers will change the seismic response of the reactor internals. The existing seismic model will be modified to incorporate the effects of the stabilizers. The stabilizers will be sized to produce the  :'

m:mmum possible adverse affect on the seismic loads to the reactor internals. It is possible that the new seismic analysis, including the stabilizers, will increase the loads  !

outside of the reactor pressure vessel and its supports. The consequences of these l potentially increased loads on other components such as piping, will be evaluated.

i The pressure differences across reactor internals shall be those values corresponding to the licensed increase in core flow and Power Rerate operation.

The shroud repair shall not produce an adverse impact on reactor or ECCS system performance. The shroud repair shall be removable, i.e., installed with bolted or quick disconnect connections to the shroud and shroud support plate. In-vessel welding is not permitted. Nuts and bolts shall be locked with mechanical devices instead of tack welds. '

The number of fasteners and fastener size shall be minimized.

The shroud repair components are classified as non-AShE code components consistent with the original shroud design. A Section XI Repair Plan is required to be prepared by PECO.

The shroud repair components are Safety Related components. Material procurement and fabrication shall be performed under a 10CFR50 Appendix B Program. 10CFR Part 21 applies to materials supplied to ASTM or AShE Specifications, which are acceptable for the repair components. CMTRs shall be provided for all components. Materials shall be resistant to IGSCC and IASCC (to the extent possible)in BWR water. Finished products i

shall be designed, fabricated, and installed according to processes and procedures which result in stress corrosion resistant components. Cold work shall be controlled to satisfy hardness requirements. Components made of annealed F304, F304L, F316, or F316L ,

stainless steel material per ASTM (or AShE) A182, A240, A276, or A479 with a carbon content not to exceed 0.020% are acceptable. Materials should be provided with cobalt control (less than 1.0%) if the project schedule permits. Material properties shall be ,

obtained from AShE Section III Appendices (Paragraph 2.2.1.a), and welding i qualifications shall be performed per ASNE Section IX (Paragraph 2.2.1 b).

The tie rods may be made of annealed XM-19 material per ASTM (or ASME) A479 with a carbon content not to exceed 0.04%.

1 The stabilizer springs shall be made of age hardened NI-CR-FE alloy X-750 per ASTM B637. The material shall be provided with cobalt control (less than 1.0%). The alloy X- l 750 material shall be age hardened per Paragraph 2.1.g. t Other parts such as pins, bolts, nuts, washers and retainers shall be made of any of the materials listed above, as required by the design. If ASTM A240 or A276 is used, the material must be annealed and the carbon content shall not exceed 0.020%. ,

T

=

i

~

' GENE-771-54-0894 Rev.0.  !

- DRF B13-01732 AUGUST 1994  ;

l Structural criteria, loads, load combinations, stress intensity limits, deflection limits, etc.

will be derived considering the UFSAR for Peach Bottom 2 and 3 (Paragraph 2.3.a  !

?

above). All design requirements will be formally documented in a design specification which is created, reviewed and approved in accordance with Paragraph 3.0. Installation j requirements important to the design and satisfaction of all design criteria will be, in part, a result of the detailed design work performed to demonstrate that design requirements  !

are met. Installation requirements will be set forth in an installation specification (s) discussed in Paragraph 11.0 below. The UFSAR will be updated as necessary to reflect .

i the installation of the shroud stabilizers.

l 5.0 DESIGN The repair design will be based on the original design load combinations, the revised  !

seismic loads, and Power Rerate conditions. The prime consideration, beyond that of l satisfying the basic requirements, will be to minimize the extent ofin-vessel work and the i critical path time needed for installation. The repair hardware will be designed so that it may be mstalled at either Peach Bottom Unit 2, or at Unit 3.  ;

6.0 DESIGN ANALYSIS i

Design analysis will be performed to demonstrate compliance with all design requirements.

Seismic analysis will be performed taking into account new shroud stabilizers stiffness and i mass, as well as degradation of the shroud welds. If possible, the number of stabilizer j assemblies will not exceed 4, which will minimize the time needed for installation.  ;

The design analyses for the stabilizer assemblies and shroud will be documented in a stress report. The AShE Code Section III, Subsection NG will be used as a guide for the y

design analysis of the shroud stabilizers and for the shroud. The forces imposed by the '

stabilizers on the reactor pressure vessel will be shown to be acceptable per the onginal AShE Code Section III requirements in a separate certified stress report. The stabilizer stress report and the certified stress report will be reviewed and approved according to '

Paragraph 3.0. The seismic analysis will be documented in a letter repon separate from the design report. The seismic analysis results will also be reviewed and approved  !

according to Paragraph 3.0.

7.0 OTHER EVALUATIONS Evaluations will be performed to demonstrate that the repair produces no unacceptable  ;

j impact on reactor operations, or ECCS performance, and that there will not be any unacceptable impact on other reactor internals. The effect of the stabilizers on other in- i vessel servicing and inspection activities will be determined. All design required t preinstallation inspections will be performed by GE. All required post installation mspections will be identified by GE.  ;

i 8.0 DESIGN FREEZE Design freeze signifies agreement by PECO and GE on all aspects of the repair design. ,

Changes to the design, analyses, and/or fabrication which are outside GE control, are made subsequent to design freeze, and increase GE cost or extend.the mrojectachedule  ;

shall be cause for re-negoti. ~ j i

e

' GENE-771-54-0894 Rev.0.

DRF B13-01732 AUGUST 1994 9.0 DESIGN DOCUMENTATION Design documentation provided under the firm price repair contract will include the following:

Project Instmction (this document)

Design Specification (s)

Fabrication Specification Installation Specification Reactor Modification Drawing ,

Modification Drawing Parts List Shroud Repair Product Drawings Cleaning and Cleanliness Control Specification Stress Report (s)

Seismic Letter Report Safety Evaluation FDI Supporting design information (calculations, etc.) required by PECO will be identified {

during the course of the project and will be provided on a schedule subsequent to that  !

required for delivery of the hardware. This information was not specified at the start of the project, but will be provided as mutually agreed.

10.0 FABRICATION Hardware and tooling fabrication requirements will be developed during the design process and will be reviewed and approved according to Paragraph 3.0.

11.0 INSTALLATION REOUIREMENTS Installation requirements will be documented in an Installation Specification that will be developed during the design analysis process, and will be reviewed and approved according to Paragraph 3.0. Details of the installation will be provided by a modification drawing (s), with general instmetions provided by a Field Disposition Instruction (FDI).

The installation will be performed using special purpose procedures developed under plant i' specific guidelines. The applicable Peach Bottom refueling floor procedures will be adhered to during the shroud repair installation.

12.0 SAFETY ANALYSIS  ;

A 10CFR50.59 safety analysis document will be provided assessing the safety impact of the shroud repair addition. Submittals to the NRC will be provided by PECO. GE will support any required follow-up or additional meetings requested by the NRC.

6

GENE-771-54-0894 Rev.0.

DRF B13-01732 AUGUST 1994 a

13.0 ITARDWARE DELIVERABLES Conceptual hardware scope is as follows. The final scope will be determined following detailed analysis by GE.

Item Ouantity Stabilizer Assemblies, 4 to 6 consisting of top guide stabilizer core plate stabilizer tie rod upper and lower connections attachment devices 14.0 TOOLING All equired installation tooling will be designed, procured, fabricated, functionally tested, qualified for installation of the stabilizer assemblies, and shipped to the site. Testing will be performed on a full scale mock-up at the GE BWR Training Center in San Jose, Cahfornia. New tooling will be developed usirig past lessons where possible. GE is responsible for providing all equipment necessary to support the project objective of minimizing repair duration.

15.0 TRAINING A training plan will be prepared. All installation personnel will be trained on a full scale mock-up.

16.0 INSTALLATION All ,necessary , personnel to install the stabilizer assemblies per the installation requirements will be provided. The installation crew will consist of a Project Manager, Lead Field Engineers, Field Engineers, QA/QC Personnel, Tooling Specialists, EDM Engineers, FDM Operators, and all necessary Technicians. Design engineenng ,

assistance for hardware and tooling from San Jose will be provided as required.

i 17.0 OUALITY ASSURANCE t Quality Assurance for this project shall be in accordance with the Quality Assurance Section of GE Proposal No. 893 1ET2H-HEO.

7