Proposed Tech Specs,Revising TS Section 2.0, Safety Limits to Incorporate Revised SLMCPRs Due to Use of GE13 Fuel Product Line & cycle-specific Analysis Performed by GE
ML20141G487
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 06/30/1997
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML19317C475 List:
References
NUDOCS 9707080349
Download: ML20141G487 (3)


Text

__.

4 I

i 4

h 4

s ATTACHMENT 2 p

PEACH BOTTOM ATOMIC POWER STATION UNIT 3 i

i Docket No. 50-278 License No. DPR-56 TECHNICAL SPECIFICATIONS CHANGES Attached Page ll0!l.3 TS Page 2.0-1 I

i i

9707000349 970630 PDR ADOCK 05000278 P

PDR,.

.. ~.

SLs 2.0 2.0 SAFETY LIMITS (SLs) 2.1 SLs 2.1.1 Reactor Core SLs f

2.1.1.1 With the reactor steam dome pressure < 785 psig or core flow < 10% rated core flow:

THERMAL POWER shall be s 25% RTP.

2.1.1.2 With the reactor steam dome pressure a: 785 psig and core flow a: 10% rated core flow:

11 be har two recirculation loop operation MCPR s or a:

for sinVre recirculation loop operation.

l.lst 2.1.1.3 Reactor vessel water level shall be greater than the top l

of active irradiated fuel.

l I

2.1.2 Reactor Coolant System Pressure SL Reactor steam done pressure shall be s 1325 psig.

l l

2.2 SL Violations With any SL violation, the following actions shall be completed:

2.2.1 Within I hour, notify the NRC Operations Center, in accordance with 10 CFR 50.72.

l 2.2.2 Within 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />s:

2.2.2.1 Restore compliance with all SLs; and l

1 l

2.2.2.2 Insert all insertable control rods.

l 2.2.3 Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, notify the Plant Manager and the Vice President--

l Peach Botton Atomic Power Station.

I (continued) l l

4 PBAPS UNIT 3 2.0-1 Amendment No. 214 l

l

i t

l l

ATTACHMENT 3 PEACH BOTTOM ATOMIC POWER STATION UNIT 3 Docket No. 50-278 License No. DPR-56 l

l LICENSE CHANGE APPLICATION ECR 96-03620 l

i Letter from R. M. Butrovich (GENE) to H. J. Diamond (PECO Energy), " Peach Bottom Unit 3 Cycle 12 Safety Limit MCPR," dated June 16,1997 6

i I

r

..m m

w

.v.