ML20209D986

From kanterella
Jump to navigation Jump to search
Proposed Final Tech Spec Pages Correcting Minor Administrative Errors in Figure Showing Site & Exclusion Boundaries & Two SRs
ML20209D986
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 07/08/1999
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20209D982 List:
References
NUDOCS 9907140101
Download: ML20209D986 (5)


Text

I

,j$.

e.).',

ATTACHMENT 2 PEACH 30TTOM ATOMIC POWER STATION UNITS 2 AND 3 i

Docket Nos. 50-277

)

50-278 j

License Nos. DPR-44 j

DPR-56 i

LICENSE CHANGE APPLICATION ECR 98-01675 i

l Final Technical Specification Pages List of Attached Pages i

.ynit2 Unit 3 l

4.0.3 4.0.3

[

3.3.13 3.8.30 l

9907140101 990700 PDR ADOCK 05000277 P

PDR;

/

Design Features 4.0

., t' B\\g

\\,Y'\\'Q Q

g'\\

4

\\

9

+9 0

PEACE BOTTOM 4

ATOMIC POWER STATION k

9

's UN:: 3 N

(

4 mm:,/g,4-s 's

= > =r:

\\ 2>oor; W-7-s a \\ w.

,y i

' ~,

i i

I'n

" >l i

/

/

l l STACK r

(~

l s

\\

/

UN 7 1/ TRAINING

\\

\\J CENTTR j

~

N, EXCLUSION AREA BOUNDARY f

9

\\

l s

p+

.c y

SITE BOUNDARY s

/

\\

/

s

' Figure 4.1-1 (page 1 of 1)

Site and Exclusion Area Boundaries l

l l

PBAPS UNIT 2 4.0-3 Amendment No.

I L

l

Design Features 4.0

\\.

' Ta 6,\\ t.,

\\ h, \\ *c

^Q

,o

\\

l' f

PEACH BOTTOM 4g 4

AToKIC POWER STATION 7

g g

4

's h

w:: 3 N

s

's

\\

2700TT

,.g Ts W-

\\ 27oorr

, #,e+

i l

')

~((

\\ \\

m.

l;n 4--ol -

r I

l373cx

/

l'

(

f s

\\

/

WIT 2/rarzuzac g

%)

crx ra s

g/

\\,

N l

/

EXCLUSION AREA BOUNDARY

/

4

\\

\\

4 p

~

+

I-

[

SITE sousoAny 3

\\

[

!/

1 Figure 4.1-1 (page 1 of 1)

{

Site and Exclusion Area Boundaries i

PBAPS UNIT 3 4.0-3 Amendment No.

)

F WRNM Instrumentation 3.3.1.2 SURVEILLANCE REQUIREMENTS (continued) 1 SURVEILLANCE FREQUENCY l

SR 3.3.1.2.4


NOTES------------------

1.

Not required to be met with less than or equal to four fuel assemblies adjacent to the WRNM and no other fuel assemblies in the associated core quadrant.

2.

Not required to be met during spiral unloeding.

Verify count rate is:

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during CORE a.

2 3.0 cps; or ALTERATIONS b.

Within the limits of 6NQ Figure 3.3.1.2-1.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> SR 3.3.1.2.5


NOTE-------------------

Not required to be performed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after WRNMs indicate 125E-5 %

l power or below.

1 Perform CHANNEL FUNCTIONAL TEST and 31 days I

determination of signal to noise ratio.

SR 3.3.1.2.6


NOTES------------------

1.

Neutron detectors are excluded.

]

I 2.

Not required to be perforraed until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after WRNMs indicate 125E-5 %

power or below.

Perform CHANNEL CALIBRATION.

24 months PBAPS UNIT-3 3.3-13 Amendment No.

j

DC Sources-0perating i

3.8.4 SURVEILLANCE REOUIREMENTS

_______.___________________-----------NOTE-------------------------------------

SR 3.8.4.1 through SR 3.8.4.8 are applicable only to the Unit 3 DC electrical 4

l power subsystems.

SR 3.8.4.9 is applicable only to the Unit 2 DC electrical power subsystems.

j SURVEILLANCE FREQUENCY SR 3.8.4.1 Verify battery terminal voltage is


NOTE-----

2 123.5 V on float charge.

The 7 day Frequency is not applicable if the battery is on equalize charge or has been on equalize charge at any time i

during the

__$_ SI_ _ _b 7 days 6N.D 14 days SR 3.8.4.2 Verify no visible corrosion at battery 92 days terminals and connectors.

98 Verify battery connection resistance is s 40 E-6 ohms.

SR 3.8.4.3 Verify battery cells, cell plates, and 12 months racks show no visual indication of physical damage or abnormal deterioration that could potentially degrade battery performance.

(continued)

PBAPS UNIT 3 3.8-30 Amendment No.