I EP Ind3x
,~
kl EMERGENCY PLTd PROCEDURES INDEX PIga 1 g
Rev. 59
- j PEACH BOPIOM UtTITS 2 AND 3 06/29/86
- l Review Rev. Revision Number Title Date No.
Date i
/
v EP-101 Classificaticn of Emergencies 12/31/85 15 01/10/86
.l EP-102 Unusual Event Response 01/17/86 12 01/21/86 EP-103 Alert Response 01/17/86 12 01/21/86 EP-104 Site Emergency Response 01/17/86 13 01/21/86 EP-105 General Emergency Response 01/21/86 12 01/21/86 EP-110 Personnel Assembly and Accountability 12/20/85 2 01/06/86 EP-201 Technical Support Center (TSC)
Activaticn 12/20/85 9 01/07/86 EP-202 Operaticns Support Centers (OSC)
Activaticn 10/16/85 8 10/16/85 EP-203 Emergency Operaticns Facility (EOF) i Activaticn 12/16/85 9 01/08/86 EP-203A Alternate Emergency Operations Facility (EOF) Activaticn 10/12/84 0 10/12/84 i
EP-205 DELETED 09/12/84 EP-205A Chemistry Sampling and Analysis Team 10/16/85 6 10/16/85 EP-205A Operation of Post Accident Sampling
.1 Staticn 10/15/85 6 10/15/85 1
EP-205A Obtaining Drywell Gas Samples i
.2 from Containment Atmosphere Dilution Cabinets 10/16/85 1 10/16/85 EP-205A Retrieving and Changing Sample
.3 Filters and Cartridges from the Drywell Radiaticn M:nitor During Emergencies 10/16/85 2 10/16/85 EP-205A Obtaining Drywell Gas Samples
.4 frce the Drywell Radiation Monitor Sampling Staticn 10/15/85 1 10/15/85
~i i
EP-205A Obtaining Reactor Water Samples
.5 from Sample Sinks FollcWing Accident jQ Ccnditicns 10/16/85 1 10/16/85 h
8608510170 860715 l
PDR ADOCK 0500 7
F t
EP Index EMERGENCY PIAN PROCEDURES INDEX pig 2 2 6
Rev. 59.*
i PEACH BOI'IOM UNITS 2 AND 3 06/29/86
- Review Rev. Revision,
b Number Title Date No.
Date EP-205A Obtaining Canal Discharge Water
.i
.6 Samples Following Radioactive Liquid Releases After Accident Ccnditicns 12/30/85 3 01/07/86 EP-205A Obtaining the Iodine and Particulate
.7 Samples from the Main Stack and Roof Vents Following Accident Ccnditicns 10/16/85 3 10/16/85 EP-205A Obtaining Liquid Radwaste Samples
.8 from Radwaste Sample Sink Following Accident Conditions 10/16/85 1 10/16/85 EP-205A Obtaining Samples from Ocmdensate
.9 Sample Sink Following Accident Ocmditicns 10/15/85 1 10/15/85 EP-205A Obtaining Off-Gas Samples from
.10 the Off-Gas Hydrogen Analyzer Following Accident Ccmditicns 10/15/85 1 10/15/85 EP-205A D E L E T E D - Incorporated into
.11 EP-205A.13 12/20/85 h
I EP-205A Sample Preparaticn and Handling
.12 of Highly Radioactive Particulate Filters and Iodine Cartridges 10/15/F3 4 10/15/85 EP-205A Sample Preparaticn and Handling of
.13 Highly Radioactive Liquid and Gas Samples 10/15/85 3 10/15/85 EP-205A Off-site Analysis of High Activity
.14 Samples 10/15/85 1 10/15/85 EP-205A' Guidelines for the Order of
.15 Analysis on Post-Accident Samples 10/15/85 1 10/15/85 EP-205A Storage of Post-Accident
.16 Samples 09/12/85 0 09/12/85 EP-205A Obtaining a Gas Sample from the
.17 Main Stack Under Accident Conditions 10/15/85 0 10/15/85 EP-205B D E L E T E D - Replaced by EP 207G &
EP-210A 12/20/85 EP-205C DELETED 08/07/85 Q
EP-206 DELETED 04/27/83
EP Ind3x EMERGENCY PIAN PROCEDURES INDEX P;gn 3 Rev. 59
- PEACH BOI'IOM UNITS 2 AND 3 06/29/86
- Q Review Rev. Revision.
Ntznber Title Date No.
Date EP-206A Fire Fighting Group 12/20/85 8 01/08/86 I?-206B Damage Repair Group 12/20/85 4 01/07/86 EP-207 Personnel Safety Team Activaticn 09/12/85 7 09/12/85 EP-207A First Aid / Search and Rescue 07/31/85 4 07/31/85 EP-207B DELETED 04/27/84 EP-207C D E L E T E D - Incorporated into 207A 06/26/85 EP-207D Evacuaticn Assembly Group 09/16/85 4 09/16/85 EP-207E D E L E T E D - Incorporated into 207D 08/28/85 i
(
EP-207F D E L E T E D - Incorporated into 207D 08/28/85 EP-207G Plant Survey Groups 09/09/85 0 09/09/85 EP-207H Dosimetry, Bionssay, and Respiratory Group 09/16/85 0 09/16/85 EP-208 Security Team 12/18/85 2 01/03/86 EP-209 h lephone List For Emergency Use 05/09/86 11 12/31/85 EP-209 Imediate Notificatica Call List Appendix A 05/08/86 13 06/27/86
- EP-209 DELETED 11/04/81 Appendix B EP-209 Peach Bottom Staticn Supervisicm Appendix C 05/08/86 20 06/27/86
- EP-209 On Site Emergency Team Leaders Appendix D-1 05/08/86 16 0 6/27/86
- EP-209 Dose Assessment Team Appendix D-2 05/08/86 19 06/17/86
- EP-209 Fire and Damage ham
' Appendix D-3 05/08/86 18 06/13/86 *
,Q EP-209 Personnel Safety ham Appendix D-4 C'!08/86 22 06/17/86
- g EP Ind3x EMERGENCY PIAN PROCEDURES INDEX Paga 4 6
Rev. 59
- PEPG BOI'IOM UNITS 2 AND 3 06/29/86
- Review Rev. Revision,
V Number Title Date No.
Date EP-209 Security Team Appendix D-5 05/08/86 16 06/27/86
'Ibchnical Support Center Group Appendix D-7 05/08/86 20 06/17/86
- EP-209 Chemistry Sampling & Analysis 'Itam 05/08/86 6 06/17/86
- Appendix D-8 EP-209 Corporate Emergency 'Itam Leaders and Appendix E Support Personnel 05/08/86 17 06/17/86 *.
EP-209 U. S. Government Agencies Appendix F 05/08/86 7 03/19/86 EP-209 Emergency Management Agencies Appendix G 05/08/86 10 06/27/86
- EP-209 Conpany Ccmsultants Appendix H 05/08/86 13 06/17/86
- EP-209 Field Support Personnel Appendix I-1 05/08/86 22 06/17/86 *
/
EP-209 Chemistry & Health Physics Contractor Appendix I-2 Call List 05/08/86 20 06/13/86
- EP-209 Nearby Public and Industrial Users Appendix J Of Downstream Waters 05/08/86 9 06/17/86
- EP-209 Miscellaneous Appendix K 05/08/86 9 06/27/86
- EP-209 Iccal PECo Phcnes Appendix L 05/08/86 9 06/27/86
- EP-209 Staffing Augmentaticn - 60 Minute Appendix P Call Procedure 05/08/86 15 06/17/86
- V EP-210 Dose Assessment 'Itam 12/18/85 2, 12/31/85
EP Indax EMERGENCY PIAN PROCEDURES INDEX Pags 5 Rev. 59
- PEACH DOI'ICM UNITS 2 AND 3 06/29/86
- Q Review Rev. Revisicn,
Number Title Date No.
Date EP-210A Field Survey Groups 12/18/85 1 01/15/86 EP-211 Bnergency Radiation Exposure Guidelines and Controls 06/28/85 0 06/28/85 EP-212 Technical Support Team Activation 02/21/86 1 02/21/86 EP-301 Operating the Evacuaticn Alarm and Pond Page System 09/09/85 2 09/09/85 EP-303 Partial Plant Evacuaticn 08/30/85 3 08/30/85 EP-304 DELETED 12/04/81 EP-305 Site Evacuation 12/20/85 6 01/07/86 EP-306 D E L E T E D - No Replacement 01/17/86 4
EP-307 Recepticn and Orientation of Support Personnel 09/16/85 2 09/16/85 Y
EP-311 Ccntaminated Injury 06/28/85 4 06/28/85 EP-312 Radioactive Liquid Release (Emergency Director Functions) 12/16/85 2 09/20/84 EP-313 Ccntrol of Thyroid Blocking (KI)
Tablets 09/12/85 2 09/12/85 EP-315 Corporate Computer Dose Calculations 12/16/85 0 10/12/84 EP-316 Ctznulative Populaticn Dose Calculations for Airbourne Releases Manual Method 12/18/85 8 12/31/85 i
EP-316 Worksheets/ Meterological Calculaticns Appendix A 09/17/85 8 09/17/85 l
EP-316 Activity After Reactor Shutdown Appendix B 09/17/85 7 09/17/85 EP-316 Index of X/Q Outputs for Off-Gas Appendix C Stack Releases 09/17/85 7 09/17/85 EP-316 Relative Dispersicn Values for Emer-Appendix D gency Dose Calculation Procedure 09/17/85 7 09/17/85 V
EP-316 SGIS Efficiency vs Decentaminaticn Appendix E Factor 09/17/85 7 09/17/85 1
2 r
y-,
..-,v w, - -,
,----_,-1
-y
.-w--e-y
i EP Indax EMERGENCY PIAN PROCEDURE INDEX P.g3 6 2
Rev. 59
- PEACH BOP 10M UNITS 2 AND 3 06/29/86
- Review Rev. Revision Number Title Date No.
Date EP-316 Percent Cmpositim Of Isotopic a Appendix F Distribution 09/17/85 7 09/17/85 EP-316 Ccuposite Whole Body Dose Appendix C Conversion Factors vs Time Since Reactor Shutdown 09/17/85 7 09/17/85 EP-316 I-131/I-133 Cmposite %yroid Dose Appendix H Conversion Factors vs Time Since Reactor Shutdown 09/17/85 7 09/17/85 EP-316 Populaticn Distributicn by cwa =
Appendix I Sector-Sumer Day 09/17/85 0 09/17/85 EP-316 I/131/I-133 Percent Abundance vs
-~
Appendix J Time Since Reactor Shutdown 09/17/85 0 09/17/85 EP-316 PBAPS Iodine Source Term From Appendix K TSC Field Data 09/17/85 0 09/17/85 EP-316 Index of Plume Shine outputs Q
Appendix L for Off-Cas Stack Releases 09/17/85 0 09/17/85 Ep-316 Plume Shine Value for Emergency Appendix M Dose Calculation Procedure 09/17/85 0 09/17/85 EP-316 Refined Dose Assessment of Appendix N Unmcnitored Ground Release 09/17/85 0 09/17/85 EP-316A Reading the Rapid Dose Assess-ment I Program into the TI-59 09/24/85 2 09/24/85 EP-316B Calculating Rapid Dose Assessment on the TI-59 09/24/85 2 09/24/85 EP-316C Reading the Refine Doce Assessment I Program onto the TI-59 12/16/85 0 10/15/84 EP-317 Determination of Protective Action Recu mendations 12/20/85 4 01/06/86 EP-318 Liquid Release Dose Calculaticn Method for Intake Water at Downstream Facilities 05/27/86 3 06/27/86
- EP-319 Liquid Release Dose Calculaticn Method for Fish 05/27/86 3 06/27/86
s
~
EP Irybx
~
.i, DERGE2CY PIAN PROCEDURES INDEX Page 7 Rev. 59
- PEACH BOPIOM UNITS 2 AND 3 06/29/86
- b Review Rev. Revisicn.
Number Title Date No.
Date EP-325 Use of the Ccntainment Radiation Monitor to Estimate Release Source Term 12/18/85 1 01/10/86 EP-401 Entry for Emergency Repair and Operations 12/18/85 6 01/03/86 EP-500 Review and R3 vision of Emergency Plan (FSAR Appendix 0) 04/01/81 0 04/01/81 M*$
,J
't I
e ll l
1 I
l i
4 EP-209 k
CONTROLLED APPRO'!ED COPY-gpg,, DIX D-3 DISTRIBUTIONF23A$,
VOID FREV10ti:1 ISSU Page 1 of 3, Rev. 18
~
JJT:clg v>
/
__w.%
PHIIADELPHIA ELECTRIC COMPANY PEACH BOITOM UNITS 2 & 3 EP-209 AP2ENDIX D FIRE AND DA?GGE 'IEAM f
_~
Fire and Damage Team Leader Fire and Interim Damage Team Merbers a
q.
t t
4
EP-209 P
APPENDIX D-3 Page 2 of 3, Pav. 18 d
Maintenance Perscnnel - Damage ALmentaticn Forces 4
i o
i
\\
1 t
]
M' i
s
3 Y
s EP-209
}-
APPE2iDIX D-3 Page 3 of 3, Rev.18 r
b m
'g.-
U
C01. TROLLED APPP.G'!C CCFY-EP-209 V O I D.'..
ISSUE APPalDIX I-2 DISTRibuT10:1 PER A-2 Page 1 of 1, Rev. 20 JJT:clg
.,v
- - -.. _ ~
PHIIADELPHIA ELECTRIC CC" JUN 131986 PEACH BOI'IOM UNITS 2 & 3 EP-209 APPENDIX I CHDfISTRY AND HEALTH PHYSICS CCtTTPACIOR CALL LIST j
Chemistry (Rad Services, Inc.) x-4839 m b\\
i i\\
l i
i
\\
.I 1
i O
H[a'llh )MtsicEiNBEtietVNuclear a Ino.)
- o.,
.a.. ma.s a w; a
=
l I
,I I
(
)
I
(
41 1
r
f "%,
4 UNITED STATES p
't.,
NUCLEAR REGULATORY COMMISSION g
j WASHINGTON, D. C. 20555
/
July 28,1986 wee <*
50-277/278 Peach Bottom MEMORANDUM FOR:
Chief, Document Management Branch, TIDC FROM:
Director, Division of Rules and Records, ADM
SUBJECT:
REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION The Division of Rules and Records has reviewed the attached document and has determined that it may now be made publicly available.
/h s 7
Donnie H. Grimsley, Director Division of Rules and Records Office of Administration
Attachment:
As stated i
'l I
REGULATORY IFFORMATION DISTRIBUTTON SYSTEM (RIDS)
)
ACCESSION NBR:TSU721MMM4 DOC. DATE: 86/07/15 NOTARI ZED: NO DOCKET #
FACIL: 50-277 Peach Bottom Atomic Pouer Station, Unit 2, Philadelph 05000277 50-278 Peach Bottom Atomic Pouer Station, Unit 3, Philadelph 05000278 AUTH.NAME AUTHOR AFFILIATION DALTROFF,S.L.
Philadelphia Electric Co.
RECIP.NAME RECIPIENT AFFILIATION MURLEY,T.E.
Region 1, Office of Director SUB JECT: Forwards Central Files version of emergency plan implementing procedures, including Rev 18 to EP-209, App D-3,
" Fire & Damage Team" & Rev 20 to EP-209, App I-2,
" Chemistry
& Health Physics Contractor Call List." Withheld.
DISTRIBUTION CODE: XOO5D COPIES RECEIVED: LTR ENCL d SIZE:
TITLE: Emerg Plan (CF Avail)
NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE /NAME LTTR ENCL ID CODE /NAME LTTR ENCL BWR PD2 LA 1
0 DWR PD2 PD 1
0 CEARS,G
$y 1
1 INTERNAL:{ADM/DQ 88f 1
1 IE/DEPER/EPB (2O 2 2
2C/DCICnfIRB ff-(a 1
1 REG FILES F/
1 1
TOTAL NUMBER OF COPIES REGUIRED: LTTR 8
ENCL 6
-