ML20117F947

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Re CRD Charging Water Header Pressure for Shutdown Margin Test
ML20117F947
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 08/27/1996
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20117F936 List:
References
NUDOCS 9609040350
Download: ML20117F947 (3)


Text

-_

t ATTACHMENT 2 PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 Docket Nos. 50 2.'7 50-278 License Nos. DPR-44 DPR-56 LICENSE CHANGE APPUCATION ECR 96-00565 1

Ust of Attached Pages

]

.U.0lL2

.UDla i

3.10-20 3.10-20 9609040350 960827 PDR ADOCK 05000277 p

PDR

SDM Test--Refueling i

3.10.8 3.10 SPECIAL'0PERATIONS 3.10.8 SHUTDOWN MAnGIN (SDM) Test--Refueling LC0 3.10.8 The reactor mode switch position specified in Table 1.1-1 for MODE 5 may be changed to include the startup/ hot standby position,.and operation considered not to be in MODE 2, to allow SDM testing, provided the following requirements are met:

a.

LCO 3.3.1.1, " Reactor Protection System Instrumentation," MODE 2 requirements for Functions 2.a and 2.e of Table 3.3.1.1-1; b.

1.

LCO 3.3.2.1, " Control Rod Block Instrumentation,"

MODE 2 requirements for Function 2 of Table 3.3.2.1-1, with the banked position withdrawal sequence requirements of SR 3.3.2.1.8 changed to require the control rod sequence to conform to the 3

SDM test sequence, DB 4

2.

Conformance to the approved control rod sequence for the SDM test is verified by a second licensed i

operator or other qualified member of the technical

(

staff; c.

Each withdrawn control rod shall be coupled to the associated CRD; d.

All control rod withdrawals during out of sequence

{

control rod moves shall be made in notch out mode; i

]

e.

No other CORE ALT 2RATI0h5 are in progress; and I

ch(o f.

CRD charging water header pressure 2:)6( psig.

1 APP!ICABILITY:

MODE 5 with the reactor mode switch in startup/ hot-standby position.

PBAPS UNIT 2 3.10-20 Amendment No. 210

/

f SDM Test-Refueling

./

s 3.10.8

)

3.10 SPECIAL OPERATIONS 3.10.8 SHUTDOWN MARGIN (SDM) Test-Refueling f

LCO 3.10.8 The reactor mode switch position specified in Table 1.1-1 for MODE 5 may be changed to include the startup/ hot standby position, and operation considered not to be in MODE 2, to allow SDM testing, provided the following requirements are met:

LCO 3.3.1.1, " Reactor Protection System a.

Instrumentation," MODE 2 requirements for Functions 2.a and 2.e of Table 3.3.1.1-1; b.

1.

LCO 3.3.2.1, " Control Rod Block Instrumentation,"

MODE 2 requirements for Function 2 of Table 3.3.2.1-1, with the banked position withdrawal sequence requirements of SR 3.3.2.1.8 changed to require the control rod sequence to conform to the SDM test sequence, 9.E 2.

Confruance to the approved control rod sequence for the SDM test is verified by a second licensed operator or other qualified member of the technical staff; Each withdrawn control rod shall be coupled to tha c.

associated CRD; d.

All control rod withdrawals during out of sequence control rod moves shall be made in notch out mode; No other CORE ALTERATIONS are in progress; and e.

cl40 f.

CRD charging water header pressure 2: !J5 5 psig.

APPLICABILITY:

MODE 5 with the reactor mode switch in startup/ hot standby position.

PBAPS UNIT 3 3.10-20 Amendment No. 214 t