ATTACHMENT 2 PEACH BOTTOM ATOMIC POWER STATION, UNIT 1 DOCKET NO. 50-171 LICENSE NO. DPR-12 LICENSE CHANGE REQUEST ECR PB 97-03136 l
LIST OF ATTACHED PAGES PAGE 2 1
PAGE 4
]
9803120255 900302 DR ADOCK OSOC 1
)
i l
v.
Containment personnel access lock at Elevation 176'-6".
vi.
Grating over southwest stairway leading from refueling floor of Containment to Containment lower levels.
vii. Personnel door into Spent Fuel Pool Area at Elevation 116'-0".
viii. Radwaste Room personnel door at Elevation 104'-
I 0".
2.
Employees of the Peach Bottom Atomic Power Station shall report to the Peach Bottom Plant Manager or his designated representative any observed indication of change in facility status as shown by smoke, fire, tornado, flood or attempted break-in and take any j
immediate action authorized.
J 3.
Administrative procedures shall be established for the notification and reporting of the following reportable events:
1.
The entrance of an unauthorized person (s) into the facility.
11.
A significant change in the radiation or contamination levels in the facility.
I iii.
Effluent releases in excess of Specification 2.1(b)(8).
iv.
Water accumulation in the containment sump in excess of Specification 2.1(b)(9).
4.
Security of the facility shall be included as a part of the Peach Bottom Atomic Power Station security plan.
5.
In the event of a Probable Maximum Flood, the personnel access door at elevation 116'-0" shall be opened in accordance with the Peach Bottom Atomic Power Station Units 2 and 3 flood procedures.
6.
If entry and/or work in the controlled area of the containment should be necessary, ra6ation level and airborne activity surveys shall be performed prior to beginning work and all work shall be performed under controls, as appropriate, to minimize the radiation exposure of personnel and te prevent the release of radioactivity to the environment.
<sdteacHve. e-V-Vluud con +eoIs y 7.
All radiation surveys, tests, counting work nd radiation exposure control measures shall be performed in accordance with written instructions and procedures that conform with the requirements of the Peach Bottom Atomic Power Station Units 2 and 3 radiation control procedures.
Amendment No. 8 HV 8 3 SH
. Appendix A Page 4 a
s 3.
The high efficiency particulate filter on the containment breather line shall be surveyed for activity, and the filter changed at least annually.
4.
Inspect the accessiblo areas below ground level in the containment vessel for water accumulation.
Perforin a radiological analysis if there is sufficient water accumulation to obtain a sample.
eR-Ploeds8 " " #7 (slessed t"
'*8 O E 06 2.4 Reports 0"
y (a)
An annual report shall be submitted to the Nuclear Regulatory Commiss on, Washington, DC 20555, describing the results of facility radiation surveys 3 the status of the facility, and an evaluation of the performance of security and surveillance measures.
Include the results of the radiological analysis, along with an evaluation of the source of the water and corrective actions taken, for sampleable quantities of water accumulation in the containment vessel.
(b)
The NRC Regional Office shall be notified within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of discovery of a reporteble event (specification 2.1(b)(3)), and a written report pursuant to 10 CFR 50.73 shall be submitted to the Administrator of the Regional Office within 30 days.
l Amendment No. 8 f
NGY Q 3 8%
i
--