Monthly Operating Repts for Nov 1983
ML20082R903
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/30/1983
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8312130341
Download: ML20082R903 (9)


Text

_ _ _ _ . - ._

~~'

8312130341 831208 PDR ADOCK 05CX}0266

  • R PDR OPERATING DATA REPORT ,

DOCKET NO. 50-266 DATE December 5, 1983 COMPLETED BY C. W. FAY TELEPHONE 414 277 2811 OPERATIN6 STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1 . NOTES .
2. REPORTIN6 PERIOD: NOVEMBER 1983 . .
3. LICENSED THERMAL POWER-(MUT): 1518. . .
4. NAMEPLATE RATIN6 (GROSS MWE): 523.8 . .
5. DESIGN ELECTRICAL RATIN6 (NET MWE): 497. . .
6. MAXIMUM DEPENDABLE CAPACITY (6ROSS MWE): 519. . .
7. MAXIMUM DEPENDABLE CAPACITY (NET MUE): 495. ........................
8. IF CHAN6ES OCCUR IN CAPACITY RATIN6S (ITEMS NUMBER 3 THROU6H 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICABLE

, 9. POWER LEVEL T0 bHICH RESTRICTED, IF ANY (NET MWE1: NOT APPLICABLE

10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE 4
11. HOURS IN REPORTIN6 PERIOD 720 8,016 114,552
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 6,506.2 94,078.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 1.4 625.4
14. HOURS GENERATOR ON LINE 0.0 6,499.2 91,607.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 793.5
16. 6ROSS THERMAL ENER6Y 6ENERATED (MUH) 0 7,536,323 123,535,312 l 17. GROSS ELECTRICAL ENER6Y 6ENERATED (MWH) 0 2,520,190 41,395,980
18. NET ELECTRICAL ENER6Y GENERATED (MWH) 0 2,382,248 39,363,966
19. UNIT SERVICE FACTCR 0.0 81.1 80.0
20. UNIT AVAILABILITY FACTOR 0.0 81.1 80.7 t
21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 60.0 70.3
22. UNIT CAPACITY FAC10R (USIN6 DER NET) 0.0 59.8 69.1
23. UNIT FORCED OUTA6s RATE 0.0 0.1 2.6
24. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

l NONE

23. IF SHUTDOWN AT END OF PEPORT PERIOD, ESTIMATED DATE OF STARTUP: MARCH 30, 1984 i

DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-266 ,

UNIT NAME Point Beach Unit 1 REPORT MONTH November, 1983 COMPLETED B W Fay TELEPHONE 414/277-2811 m

W C  %@o o o

M au "co .'i t eae h

oe en ae No. Date g mg g pgg Licensee Event gjo g] Cause and Corrective Action e am o ya Report No. m so To Prevent Recurrence Q ~-  % omC o -

E 3 0 o

O 3 831001 S 720 C 1 N/A ZZ ZZZZZZ Continuation of 26-week refueling and replacement outage.

F: Forced Reason: 3 Method: Exhibit G-Instruc-S: Scheduled A- Equipment Failure (explain) l- Manual tions for Prepar-B- Maintenance or Test 2- Manual Scram ation of Data Entry C- Refueling 3- Automatic Scram Sheets for LER File D- Regulatory Restriction 4- Other (explain) (NUREG-0161)

E- Operator Training & License Exam F- Administrative 5 AD-28B Exhibit I- Same G- Operational Error (explain) Source (01-78) H- Other (explain)

DOCKET NO. 50-266 UNIT NAME Point Beach Unit 1 -

DATE December 5, 1983 COMPLETED BY C. W. Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER LEVEL MONTH November,'1983 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY.

POWER LEVEL POWER LEVEL POWER LEVEL-DAY MWe NET DAY MWe NET DAY MWe NET 1 -2 11 -2 21 -1 2 -2 12 -2 22 -2 3 -2 13 -2 23 -2 4 -2 14 -2 24 -2 5 -2 15 -2 25 -2 6 -2 16 -2 26 -2 7 -2 17 -2 27 -2 8 -2 _

18 -2 28 -2 9 -2 19 -2 29 -2 10 -2 2d -2 30 -2 31 AD-28A

T l

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No.- 50-266 Unit Name Point Beach Unit 1 Date. December 5, 1983 Completed By C. W. Fay Telephone 414/277-2811 Unit 1 completed its fifth through ninth weeks of the refueling and steam generator replacement outage. Major work this period in-cluded upgrading and load testing of,the containment polar crane and the removal of the old steam generators from containment into the storage facilities.

On November 1, 1983, at 1131 hours0.0131 days <br />0.314 hours <br />0.00187 weeks <br />4.303455e-4 months <br />, Unit 1 containment was evacuated because of an increase in airborne radioactive particulate.

The source of the release was unknown and containment access was restored at 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br />.

On November 3, 1983, while cutting the "B" hot leg piping, there was an increase in airborne radioactive particulate. At 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />, Unit 1 containment was evacuated because of this release. 1,382 Curies of equivalent Xe-133 were released. This constituted approximately 7% of our 15-minute Technical Specifi-

. cation limits. At 0245 hours0.00284 days <br />0.0681 hours <br />4.050926e-4 weeks <br />9.32225e-5 months <br /> on November 4, 1983, access was restored to the containment.

Safety-related maintenance performed this period included inspection and repair of "B" residual heat removal pump and oil changes for the auxiliary feed pumps.

OPERATING DATA REPORT DOCKET NO. 50-301 DATE December 5, 1983 COMPLETED BY C. U. FAY TELEPHONE 414 277 2811 OPERATIN6 STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2 . NOTES .
2. REPORTING PERIOD: NOVEMBER 1983 . .
3. LICENSED THERMAL POWER (MUT): 1518. . .
4. NAMEPLATE RATING (GROSS MWE): 523.8 . .
5. DESI6N ELECTRICAL RATIN6 (NET MUE): 497. . .
6. MAXIMUM DEPENDABLE CAPACITY (6ROSS MWE): 519. . .
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 495. ........................
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROU6H 7) SINCE LAST REPORT, 61VE REASONS:

NOT APPLICABLE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUMULATIVE
11. HOURS IN REPORTING PERIOD 720 8,016 99,337
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 5,626.1 87,684.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 1.5 198.3
14. HOURS GENERATOR ON LINE 720.0 5,503.6 86,158.8
15. UNIT RESERVE SHUTDOWN HOURS 0.0 1.5 182.7
14. GROSS THERMAL ENERGY GENERATED (MWH) 1,088,861 8,258,654 119,774,248
17. 6ROSS ELECTRICAL ENERGY GENERATED (HWH) 368,170 2,781,200 40,582,600
18. NET ELECTRICAL ENERGY GENERATED (MWH) 351,782 2,650,412 38,639,379
19. UNIT SERVICE FACTOR 100.0 68.7 86.7
20. UNIT AVAILABILITY FACTOR 100.0 68.7 86.9
21. UNIT CAPACITY FACTOR (USING MDC NET) 98.7 66.8 79.1
22. UNIT CAPACITY FACTOR (USING DER NET) 98.3 66.5 78.3
23. UNIT FORCED OUTAGE RATE 0.0 0.7 1.5
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

NONE

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

.. oO n>

HI lN Z l M Co ,O co to w

H O

in m

  • rt O

en m OO D* M (D 0

c. (D 1 c o. Type H

(D O.

Duration (Hours)

N '

= O M :o o O tn > w i 1 1 I I I I I O Reason W

OO>Oxx3Mm I rt *c c.'c (D o W ic O c D' (D 5 0 Q m H C D Method Of Z m M e M c c D e. .. .

M W D W H' o n m Shutting 3 5 H

8 ct H et W H Q 5

- H En O rt H D (D DOwn Reactor O g in OOnMODWD q- =

XDM M Q D rt e C t W W 8 54 0 g 3 e HHWM Om g O o W HW% W ya Z O H tn < H- O O H- gg a DMGDm MH og m m

-M H ft d og m O DM 8M M (D M Q H.

0 OO

=

g m

2

- @n de Z< f a (D H- (D <

X t" O X .o pa 9

  • d
  • O H- D 'O g O H O H g g W G W m H~ U H* ,n W D m D System  !

- m -

g W Code 4 e M i

1 M to O X w C W O 9 H Component s W Code # 9

~

zn AWNH3 1 1 I I (D O>337 '

ncWWO gg 7&DD4 Om QOCCa g MEWW en NHH ng O

- et mD 80 (D H ID X00 4 g, tg 3 O (D t* 'd C T M 30- MM Z H Cn W no TM HM WO3 n :n a e tc PM xM OM 8 DD to m ZOOZ

  • B 00 tu >>Z

, ce M830 M p- MMM*

mM M<

-mmMM OX c7 Z D* rt P X C (D P O D' gy A

H O

u O O t m o

MH mmODH gg A O H I O tT tu rt 3 (n tT g N E O D W OH O t.1 H ,

g, N . rt o ft i O m rt O W ommo U w *d o tc H HO MO 1 W M O 1 cn M C 1 N < S g W 'd H # m O (n w t1 r" M 3 H

  • D' W MWmm H W C B W T&

o MWM @ D

'O D M C WP' P rt i O w rt HM i O '< M

_ _-___-__x-___--

DOCKET NO. 50-301 UNIT NAME Point Beach Unit 2 -

DATE December 5, 1983 COMPLETED BY C. W. Fay TELEPHONE 414/277-2811 AVERAGE DAILY UNIT POWER-LEVEL MONTH November, 1983 AVERAGE AVERAGE , AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET' 1 491 11 484 21 490-2 491 12 488 22 490 3 490 13 475 23 490 4 490 14 486 24- 489 ,

5 490 15 489 25 488 6 489 16 489 26 487 7 489 17 489 27 485 8 490 18 489 28 489 9 489 19 490 29 489 10 493 20 491 30 488 31 AD-28A (1-77) 17

r J-NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE Docket No. 50-301 Unit Name Point Beach Unit 2 Date December 5, 1983 Completed By_ C. W. Fay Telephone 414/277-2811 Unit 2 operated at approximately 491 MWe net throughout the period with.no significant load reductions. The primary-to-secondary leakage remains at less than 10 gallons per day.

' Safety-related maintenance performed this period included oil changes for the auxiliary feed pumps, "B" residual heat removal pump spring hanger adjustments and governor replacement for the Unit 2 turbine-driven auxiliary feedwater pump.

l l

l

8 Wisconsin Electnc eowracouessy 231 W. MICHIGAN, P.O. BOX 2046, MllWAUKEE, WI 53201 December 8, 1983 S

Director of Regulatory Operations U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555 Gentlemen:

MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT l

Attached are monthly operating reports for Units 1 and 2, Point Beach Nuclear Plant, for the calendar month of November 1983.

Very truly yours, V /,

ck j ,

I l Vice President-Nuclear Power C. W. Fay Attachments l

l Copies to J. G. Keppler - NRC, Region III NRC Resident Inspector C. F. Riederer - PSCW I)I