Updated Final Deficiency Rept Re Bracket Welds for Main Steam & Recirculation Sys Pipe Whip Restraints.Review of Installation Documentation Will Not Be Complete Until 840316
ML20080A969
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 01/30/1984
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
RDC-64(83), NUDOCS 8402060411
Download: ML20080A969 (1)


Text

r- q 6 i hh

  • 1

?

e

  • ' c.

r ,,' .>Y , :s,.. ; ,, *

,.4 4 .3 - , . .( a. ._ c .

P O. Box 5000 - CLEVELAND. OHIO 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLDG. - 55 PUBLICSQUARE

'

  • Serwng The Best Location in the Nation MURRAY R. E.DELMAh January 30, 1984 VICE PRESIDENh NUCLEAR 6

Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regula tory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE: Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Pipe Whlp Restraint Bracket Welds for B21/B33 Systems

[RDC 64(83)]

Dear Mr. Keppler:

Our final report dated December 15, 1983, concerning the bracket welds for the Main Steam and Recirculation System Pipe Whip Restraints stated that the review of the installation documentation would be completed by February 1, 1984. As document package completion has been delayed, it is now anticipated that the document review will be completed by March 16, 1984.

Please call if there are any additional questions.

Sincerely, pk Murray R. Edelman Vice President Nuclear Group MRE:pab cc: Mr. M. L. Gildner NRC Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatcry Commission Washington, D.C. 20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C. 20555 Records Center, SEE-IN Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 l p 8402060411 840130 PDR ADOCK 05000440 hg2)