4 o' 1

. Wisconsin  ;

' Electnc POWER COMPANY l I

l Poirit Beoch Nuclear Plant 4 6610 Nuclear Rd.Two Run.WI 54241 (414) 755-2321 PBL 95-0042 February 7, 1995 Document Control Desk U. S. NUCLEAR REGULATORY COMMISSION Mail Station Pl-137 Washington, DC 20555 Gentlemen:

POCKETS 50-266 AND 50-301 MONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of January, 1995.

Sincerely,

'/

G. J. xfield PBNP Manager yce Attachments cc: L. L. Smith, PSCW NRC Regional Administrator, Region III NRC Resident Inspector A *'4 , . a b1 - 6. l .L 9502150371 950131 PDR ADOCK 05000266 h R PM \

_ . - _ ~ ~ _

OPERATING DATA REPORT DOCKET NO. 50-266 4

DATE: 02/07/95 COMPLETED BY: M. B. Koudelka TELEPHONE: 414 755-6840 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1 . NOTES .
2. REPORTING PERIOD: January - 199S . .
3. LICENSED THERMAL POWER (MWT) : 1518.5 . .
4. NAMEPLATE RATING (GROSS MWE): 523.0 . .
5. DESIGN ELECTRICAL RATING (NET MWE): 497.0 . .

G. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE) : Sv9.0 . .

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 . . . . . . . . . . . . . . . . . .
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: l NA
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
10. REASONS l'9R RESTRICTIONS, (IF ANY) :

NA THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744.0 744.0 212,472.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 177,583.6
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
14. HOURS GENERATOR ON LINE 744.0 744.0 174,456.4
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,124,328 1,124,328 246,669,325
17. GROSS ELECTRICAL ENERGY GENERATED 382,470 382,470 83,321,120 4 18. NET ELECTRICAL ENERGY GENERATED (MWH) 366,676 366,676 79,427,327
19. UNIT SERVICE FACTOR 100.0% 100.0% 82.1%
20. UNIT AVAILABILITY FACTOR 100.0% 100.0% 84.5%
21. UNIT CAPACITY FACTOR (USING MDC NET) 101.6% 101.6% 76.7%
22. UNIT CAPACITY FACTOR (USING DER NET) 99.2% 99.2% 75.2%
23. UNIT FORCED OUTAGE RATE O.0% 0.0% 1.5%
24. SHTJrDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling, 03/11/95, 36 days

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

HA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LErrER DATED SEPTEMBER 22, 1977

POINT BEACH NUCLEAR PLANT DOCKET NO. 50-266 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 1 MONTH JANUARY- 1995 PATE February 7,1995 COMPLETED BY M. B. Koudelka TELEPHONE (414)755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 419 11 494 21 496 2 495 12 495 22 496 3 495 13 493 23 496 4 495 14 495 24 495 5 496 15 497 25 496 6 495 16 495 26 495 7 496 17 496 27 494 8 495 18 494 28 496 9 495 19 496 29 496 10 495 20 495 30 496 31 495

1 POINT BEACH NUCLEAR PLANT Docket No. 50-266 ' '.-

i Unit Name _ Point Beach. Unit 1 USTT SHUTDOWNS AND POWER REDUCTIONS Date February 7.1995 Completed By M. B. Koudelka .

REPORT MONTil JANUARY - 1995 Telephone No. 414U55-6480

Method of S'auttmg Mo. Date Type' Duration Reaso: ' Down Licensee Event System Component . Cause and Conecove Action NA NA NA NA NA NA NA NA NA NA 4

)

t a

}

a I

4 i

i

'F: Forced 2 Reason: ' Method:

  • Exhibit G - Instructions '

S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of i B - Maintenance or Testing 2 - Manual Scram data entry sheets '

, C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Imad F - Administrative 6 - Other (explain) ' Exhibit I - Same Source G - Operational Error (explain)

H - Other (explain)

PBF@28b (03 90)

--_ . . _ . . _ . - - - _ . - . . - - . _ . . - - _ _ _ . . _ . _ _ . _ . . - . . . . __ - . - - . . . _ _ _ .. . ~ . . . - - - . . --, .. ~._. _.- _. _ _ _. _ - - _ _ _ _ _ _ _ _ _ _ _ . . - - - _ - -

DOCKET NO. 50-266 UNIT NAME' Point Beach Unit 1 DATE February 7, 1995 COMPLETED BY M. B. Koudelka TELEPHONE 414/755-6480 Unit 1 operated at an average of 493 MWe net for the report period.

Safety-related maintenance included:

1. 1B52-12B power to PP-14 pressurizer backup heater C group power panel amptector setpoints adjusted and tested.
2. D08 D06 de station battery charger relay rewired.
3. LT-4038/PT-2844 condensate storage tank level and service water north header pressure transmitter calibrations.
4. 1N42/1N46 nuclear instrumentation power range comparator channel calibrations and adj1stments.
5. . P10 residual heat removal pump rotating assembly rebuilt.
6. P32F service water pump repacked.
6. 1S-6050A-C turbine overspeed protection channels A-C calibrations and adjustments.
7. SW-2912-OS south service water header Zurn strainer piston oeals  ;

and bearingt. replaced.

t

OPERATING DATA REPORT '

DOCKET NO. 50-301 DATE: 02/07/95 COMPLhitu BY: M. B. Koudelka TELEPHO?E: 414 755-6480 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 . NOTES .
2. REPORTING PERIOD: January - 1995 . .
3. LICENSED THERMAL POWER (fGT) : 1518.5 . .
4. NAMEPLATE RATING (GROSS MWE) : 523.8 . .
5. DESIGN ELECTRICAL RATING (NET MWE): 497.0 . .
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE). 509.0 . .
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 . . . . . . . . . . . . . . . . .
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NA

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
10. REASONS FOR RESTRICTIONS, (IF ANY) :

NA THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744.0 744.0 197,257.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 172 '95.6
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 233.9
14. HOURS GENERATOR ON LINE 744.0 744.0 170,438.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,116,815 1,116,815 245,098,740
17. GROSS ELECTRICAL ENERGY GENERATED 377,140 377,140 83,328,250
18. NET ELECTRICAL ENERGY GENERATED (MWH) 360,956 360,956 79,441,471 '
19. UNIT SERVICE FACTOR 100.0% 100.0% 86.4%
20. UNIT AVAILABILITY FACTOR 100.0% 100.0% 86.6%
21. UNIT CAPACITY FACTOR (USING MDC NET) 100.0% 100.0% 82.5% -
22. UNIT CAPACITY FACTOR (USING DER NET) 97.6% 97.6% 81.0%
23. UNIT FORCED OUTAGE RATE 0.0% 0.0% 1.0%
24. SHUTDOWNS SCHEDULED rNER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :

NONE

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

NA DATA REPORTED AND FACTORS Of C'JLATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977

~.

4 POINT BEACH NUCLEAR PLANT DOCKET NO. 50-301 -

AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Point Beach, Unit 2 i

MONTH JANUARY- 1995 DATE February 7,1995 COMPLETED BY M. B. Koudelka TELEPHONE (414)755-6480 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 485 11 486 21 487 2 484 12 486 22 487 3 485 13 473 23 484 4 486 14 498 24 487 5 486 15 466 25 485 6 486 16 486 26 486 7 485 17 491 27 485 8 486 18 482 28 487 9 485 19 487 29 486 10 486 20 485 30 486 31 486

POINT BEACil NUCLEAR PLANT Dcrket No. 50-301 -

Unit Name Point Beach. Unit 2 -

USTT SIIUTDOWNS AND POWER REDUCTIONS Date February 7.1995 Completed By M. B. Koudelka '

REPORT MONTH JANUARY - 1995 Telephone No. 414 055-6480 Method of Shumng Duranon bn Licensee Event System Component Cause and Correcove Action W. Date Type Glours) Reason' pe,cep Report No. Code' Code' To Prevent Recurrence NA NA NA NA NA NA NA NA NA NA I

'F: Forced 2 Reason: ' Method:

  • Exhibit G - Instructions S: SchMuled A - Equipment Failure (explain) 1 - Manual for preparation of B - Maintenance or Testing 2 - Manual Scram data entry sheets C - Refueling 3 - Automatic Scram LER file (NUREG-0161)

D - Regulatory Restricticn 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced Load F - Administrative 6 - Other (explain) 5 Exhibit 1 - Same Source G - Operational Error (explain)

II - Other (explain)

PBF@28b (03-5D)

9 4

DOCKET NO'. 50-301 UNIT NAME Point Beach Unit 2 DATE December 6, 1994 COMPLETED BY M. B. Koudelka TELEPHONE 414/755-6480 l

Unit 2 operated at an average of 485 MWe net for the report period.

Safety-related maintenance included:

1. 2B52-30C power to PP-17 pressurizer control heater E group power panel retrofit installation.
2. 2FI-115 P1A reactor coolant pump seal water injection flow indicator retubed.
3. 2P2B charging pump varidrive controller adjustment.
4. 2P/P-626 HX-11A&B residual heat removal heat exchanger bypass flow control positioner steam and sleeve replacements.
5. 2WG-1786 T16 reactor coolant drain tank vent valve operator stem guide plate attached.

O f