ML20073A991

From kanterella
Jump to navigation Jump to search
Responds to Requested Actions 1 & 2 of NRC GL 94-02, Long- Term Solutions & Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Boiling Water Reactors
ML20073A991
Person / Time
Site: Oyster Creek
Issue date: 09/09/1994
From: J. J. Barton
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
C321-94-2144, GL-94-02, GL-94-2, NUDOCS 9409210108
Download: ML20073A991 (4)


Text

-..

GPU Nuclear Corporation 4 Nuclear o

en:r888 Forked River, New Jersey 08731-0388 609 971-4000 Writer's Direct Dial Number:

September 9,1994 C321-94-2144 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Facility Operating License No. DPR-16 Response to Generic Letter No. 94-02 Re: Boiling Water Reactor Stability

References:

(1) Letter from J. J. Barton, GPU Nuclear, to U.S. Nuclear Regulatory Commission (NRC), " Technical Specification Change Request No.191," dated October 9,1991.

(2) Letter from L.A. England, BWR Owners' Group, to M. J.

Virgilio (NRC), "BWR Owners' Group Improved Guidelines i for Stability Interim Corrective Actions, April 4,1994.

I This letter responds to requested actions 1 and 2 of NRC Generic Letter 94-02, "Long-Term Solutions and Upgrade of Interim Operating Recommendations for Thermal-Hydraulic Instabilities in Boiling Water Reactors." The generic letter requested Boiling Water Reactor ,

licensees to review operating procedures and operator training programs and to modify them l as appropriate to strengthen administrative provisions intended to avoid power oscillations or j to detect and suppress them if they occur.

GPUN has implemented Interim Corrective Actions (ICAs) specified in NRC Bulletin 88-07, Supplement 1 at Oyster Creek. These ICAs establish procedural controls to prohibit operation in a designated region on the power / flow map known as the exclusion region. In addition, GPU Nuclear (GPUN) has actively pursued a resolution to the stability issue and has submitted to the NRC a license amendment application (Reference 1) supporting the Oyster Creek-specific long term solution. The application provides analytical results that demonstrate the effativeness of quadrant-based Average Power Range Monitor (APRM) 94O9210108 940909 PDR P.

ADDCK 05000219 PDR GPU Nuclear Corporation is a subsidiary of General Public Utihties Corporcmon xD\ .

C321-94-2144 Page 2 scram protection for both in-phase and out-of-phase oscillations. The license amendment request is under review by the NRC staff.

In response to the BWR Owners' Group effort to develop improved guidelines for ICAs to better address startup and low power maneuvering conditions (Reference 2), GPUN has recently conducted a review of Oyster Creek procedures and training programs. The review focused on areas that could be modified to strengthen the administrative provisions intended to avoid power oscillations or to detect and suppress them if they occur. Several changes have been identified, are discussed in response to requested action 1.b below and are currently scheduled to be implemented in June 1995. These changes are intended to remain in place following resolution of the long term solution.

Requested Action 1 1.a Existing procedural controls and operator training at Oyster Creek provide a high degree of assurance that reactor instability will be avoided following a trip of all five recirculation pumps. Procedural requirements exist for initiation of manual reactor scram if two or more of the five pumps trip with the reactor in the Run Mode.

1.b Plant operating procedures have been reviewed to assess improvements to further reduce the likelihood of instability. The evaluation considered procedures governing changes in reactor power, including startup and shutdown, particularly at low-flow operating conditions. During normal plant startups and shutdowns significant margin to the exclusion region is maintained. While operating in the Startup Mode (IRM Range 10) the Technical Specifications require flow to be greater than 65% of rated, well above the instability region. In the Run Mode core flow must be maintained greater than 45% flow (this value will be changed to 40% flow upon NRC approval of Reference 1). However, during normal power maneuvering recirculation flow is usually not reduced below 65% of rated providing plenty of margin to the exclusion region.

Changes to instability regions will be made in order to strengthen the procedural controls intended to avoid power oscillations. Figure 1, attached, defines the new regions to be implemented into plant procedures. The exclusion region is defined procedurally as an area on the power / flow map where intentional operation is prohibited and inadvertent entry into the region requires an immediate exit. If at any time in this region reactor instability is observed (defined as 4% power oscillations indicated by the APRMs) procedures require an immediate reactor scram. The heightened awareness (or buffer) region has no operational restrictions but will act as a buffer zone to the exclusion region providing the operator with enough margin and time to take steps to avoid entering the exclusion region. These regions will be k

e C321-94-2144 Page 3 i l

1 procedurally defined and posted on panel 3F in the control room. The Safety Parameter Display System (SPDS) reactivity / power distribution display will be modified to identify the various regions on the power operation curve. The regions will be color-coded, a message displayed and an alarm flashes informing the operator when a specific region has been entered. -

Requested Action 2 The long-term stability corrective action is Option II (quadrant based flow-biased APRM scram protection) per Reference 3 of Generic Letter 94-02. As indicated above, GPUN has previously submitted to the NRC a plant-specific evaluation of Oyster Creek's APRM scram -

protection with respect to reactor instability. The NRC staff is currently reviewing this proposed resolution. .

Sincerely, J. J. Barton Vice President and Director l Oyster Creek Sworn to and subscribed before me this day of I tm iffp U '

Notary Public Attachment ' W o m CR M Notary Public of My Commission Expires IM Tf cc: Administrator, NRC Region I NRC Senior Resident Inspector, Oyster Creek i Oyster Creek NRC Project Manager

)

, e

E NE ELIN _

N U ID _

LOD M RO R 0 A% 2 l

R8% 1 C00 S18

~~

~

~

~ -

- 0 T 0 1

- 0 N 8 S - O _

N -

I G N O E O

I R

G I _

E N G 1

R O E R

W .

E I O

R U Y S

U R

E L

F .

G T I

- L C

F F T I

F L -

X U 0 N I

6 E B E B C A R T

S -

E P

D -

E -

S I

V - /

E /

R 0 ii '

4

( ,

- 0 2

O C. C. 0 0 0 0 0 0 0 0 0 0 0 2 0 8 6 4 2 0

1 1 gm3O' H$@i e E