ML20071L188

From kanterella
Jump to navigation Jump to search
Submits Annual Operating Rept for Jul 1981-June 1982
ML20071L188
Person / Time
Site: 05000148
Issue date: 07/23/1982
From: Mesler R
KANSAS, UNIV. OF, LAWRENCE, KS
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8208020362
Download: ML20071L188 (2)


Text

~

e THE UNIVERSITY OF KANSAS LAWRENCE, KANSAS 66044 DEPARTMENT OF CHEMICAL AND PETROLEUM ENGINEERING Chemical Engineering I!2 Nuclear Reactor Center 913-UN 4-3938 July 23, 1982 Director Division of Reactor Licensing Nuclear Regulatory Commis sion Washington, D.C. 20545 RE: Docket No. 50-148

Dear Sir:

In accordance with Facility License R-78 I submit the following annual re-port for the period July 1, 1981 to June 30, 1982.

1. Routine operation of the reactor accumulated .28 megawatt hours mostly at 250 ley.
2. Unscheduled shutdown occurred on March 31, April 7, 16 and 29, 1982.

The cause was electrical transients of unknown origin.

3. Routine maintenance has been successful in avoiding any necessity for performing special preventative and corrective maintenance having safety significance.
4. There have been no changes in the facility or in the procedures nor have any test or experiments been carried out without prior approval by the NRC pursuant to 10 CFR 50.59.
5. Gross Beta and Gamma activities released to the sanitary sewer system from the demineralizer regeneration effluent hold-up tank was less than .029 pCi and less than .61 pCi respectively.
6. Air samples taken outside of the Reactor Building were as follows for the period 7-01-81 to 6-30-82 (error given at 20 level):

Beta Activity '.ve rag e (1.2 1.8) x 10- pCi Gamma Activity Average (10.2 15.7) x 10~ pCi Q

8208020362 820723 PDR ADOCK 05000148

\

R PDR l

1 Director,' Nuclear Regulatory Commission July:23, 1982 page 2.

'7. Air samples taken inside the Reactor Building were as follows for the period 7-01-81 to 6-30-82 (error given at 20 level):

Beta Activity Average (1.1 1.6) x 10~ pCi

-2 Gamma Activity Average (6.4 I 1.5) x 10 Ci

8. No facility personnel or visitors received any significant radiation.

exposure.

9. The membership of the University's Committee on Radiation Sources remains unchanged. The Nuclear Reactor Committee remains-the same.

Very truly yours,

- gA (oII$&k~

Russell B. Mesler Professor RBM/dm cc: Nuclear Reactor. Committee I

_ _ _ _ _ _ . _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ . . . . _ _ _ _ _ . _ _ _ . _ _ _ . _ . . _ _ . _ . _ . _ _ . . _ _ _ _ _ . . . _ _ _ _ _ _ _ _ _ . _ _ _ . _ . _ _ _ _ _ _ _ _ . _ . _ . _ _ _ . . _ _ _ _ . _ _ _ . ._ _ _ _ _ _ _ _ . __