Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G6971999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with ML20206R5871999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ccnpp,Units 1 & 2. with ML20205P5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20207M8321999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Calvert Cliffs Nuclear Power Plant.With ML20199E2931998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with ML20198B2631998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20195E5281998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Calvert Cliffs Nuclear Power Station,Units 1 & 2.With ML20154M5841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Calvert Cliffs Nuclear Plant,Units 1 & 2.With ML20151Y1191998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Calvert Cliffs Nuclear Power Plant Units 1 & 2.With ML20237B9371998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Calvert Cliffs Nuclear Power Plant ML20236R0881998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20249A7711998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ccnpp,Units 1 & 2 ML20247H5661998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Ccnpp ML20216G4601998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20248L3641998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20202G6611998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20198N9441997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Calvert Cliffs Nuclear Power Plant,Units 2 & 3 ML20203H3081997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Calvert Cliffs Nuclear Power Plant ML20199D0801997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20198J6631997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Calvert Cliffs Nuclear Power Plant ML20210U7031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ccnpp ML20210L0671997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Ccnpp ML20149E2301997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Calvert Cliffs Nuclear Power Plant ML20148L1761997-05-31031 May 1997 Monthly Operating Repts for May 1997 for CCNP ML20141F1401997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20137W8781997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Calvert Cliffs Nuclear Power Plant ML20136J4941997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20134M2891997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20133N1031996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20132D1141996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Calvert Cliffs Nuclear Power Plant,Unit 1 & 2 ML20134L6621996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Calvert Cliffs Nuclear Power Plant Unit 1 & 2 ML20128Q8011996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Calvert Cliffs Npp,Units 1 & 2 ML20117N2171996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20116M6701996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20115F7281996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20112J1291996-05-31031 May 1996 Monthly Operating Rept for May 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20112A2421996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20107C1831996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20101D7831996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ccnpp ML20149K8721996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ccnpp ML20096D7031995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ccnpp Units 1 & 2 ML20095H3741995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 ML20096D7171995-11-30030 November 1995 Rev to Monthly Operating Rept for Nov 1995 for Ccnpp Unit 2 ML20094M0161995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Calvert Cliffs Nuclear Plant ML20093G5881995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Calvert Cliffs Nuclear Power Plants Units 1 & 2 ML20092G3521995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Calvert Cliffs Nuclear Power Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G6971999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Calvert Cliffs Npp,Units 1 & 2.With ML20216J8731999-09-10010 September 1999 Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant ML20212A4441999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Ccnpp,Units 1 & 2. with ML17326A2011999-08-23023 August 1999 LER 99-004-00:on 990724,reactor Tripped Due to Main Transformer Bushing Flashover.Plant Was Brought to SS & Components Were Tested & Performed Satisfactorily.With 990823 Ltr ML20210S6091999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ccnpp,Units 1 & 2. with ML20210N6001999-07-27027 July 1999 ISI Summary Rept for Calvert Cliffs Unit 2. Page 2 of 3 in Encl 1 of Incoming Submittal Not Included ML20210B7941999-07-15015 July 1999 SER Denying Licensee Request for Changes to Current Ts,Re Deletion of Tendon Surveillance Requirements for Calvert Cliffs LD-99-039, Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified1999-06-30030 June 1999 Part 21 Rept Re Defect of Abb 1200A 4kV Vacuum Breakers. Initially Reported on 990625.Defect Results in Breaker Failing to Remain in Closed Position.Root Cause Evaluation & Corrective Action Plan Being Developed.Licensee Notified ML20209F1721999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Calvert Cliffs Npp.With LD-99-035, Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed1999-06-25025 June 1999 Part 21 Rept Re Abb 1200A 4KV Vacuum Breakers Performing Trip Free Operation When Close Signal Received by Breaker. Defect Results in Breaker Failing to Remain in Closed Position.Root Cause & CAP Being Developed ML20196C6981999-06-21021 June 1999 Safety Evaluation Concluding That Use of ASME Section XI Code Including Summer 1983 Addenda as Interim Code for Third 10-year Insp Interval at Calvert Cliffs Units 1 & 2 Until Review of 1998 Code Completed,Would Be Acceptable ML20195K2811999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ccnpp,Units 1 & 2. with ML20206R5871999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ccnpp,Units 1 & 2. with ML20195B3891999-04-30030 April 1999 0 to CENPD-279, Annual Rept on Abb CE ECCS Performance Evaluation Models ML20205N2951999-04-13013 April 1999 Special Rept:On 990314,fire Detection Sys Was Removed from Svc to Support Mod to Replace SRW Heat Exchangers in Unit 2 SRW Room During Unit 2 Refueling Outage.Contingency Measure 15.3.5.A.1 Will Continue Until Fire Detection Sys Restored ML20210T5211999-04-0101 April 1999 Rev 0 to Ccnpp COLR for Unit 2,Cycle 13 ML20205P5441999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20204H6471999-03-21021 March 1999 SER Re License Renewal of Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20207M8321999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Calvert Cliffs Nuclear Power Plant.With ML20203D4311999-02-0505 February 1999 Safety Evaluation Accepting Procedure Established for long-term Corrective Action Plan Related to Containment Vertical Tendons ML20199G4671999-01-20020 January 1999 SER Accepting USI A-46 Implementation for Plant ML20206Q3221999-01-11011 January 1999 Special Rept:On 981226,wide Range Noble Gas Effluent RM Was Removed from Operable Status.Caused by Failure of mid-range Checksource to Properly Reseat.Completed Maint & post-maint Testing & RM Was Returned to Operable Status on 990104 ML20207L0451999-01-0808 January 1999 Cost-Benefit Risk Analyses:Radwaste Sys for Light Water Reactors ML20199F4781999-01-0808 January 1999 Safety Evaluation Concluding That Bg&E Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves Susceptible to Pressure Locking.Concludes GL 95-07 Actions Were Addressed ML20198S7591999-01-0707 January 1999 SER Accepting Quality Assurance Program Description Change for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20207M2281998-12-31031 December 1998 1998 Annual Rept for Bg&E. with ML20199E2931998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Calvert Cliffs Npp. with ML20206R9911998-12-0808 December 1998 Rept of Changes,Tests & Experiments (10CFR50.59(b)(2)). with ML20198B2631998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2.With ML20195H1001998-11-16016 November 1998 Safety Evaluation of First Containment Insp Interval Iwe/Iwl Program Alternative ML20196E2211998-10-31031 October 1998 Non-proprietary Rev 03-NP to CEN-633-NP, SG Tube Repair for Combustion Engineering Designed Plant with 3/4 - .048 Wall Inconel 600 Tubes Using Leak Limiting Alloy 800 Sleeves ML20195E5281998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Calvert Cliffs Nuclear Power Station,Units 1 & 2.With ML20154Q7191998-10-21021 October 1998 Special Rept:On 980923,unit 1 Wrngm Was Removed from Operable Status.Caused by Failure of Process Flow Transducer.Completed Maint to Remove Process Flow Transducer Input to Wrngm Microprocessor & Completed Formal Evaluation ML20154G3931998-10-0505 October 1998 Safety Evaluation Concluding That Flaw Tolerance Evaluation for Assumed Flaw in Inboard Instrument Weld of Pressurizer Meets Rules of ASME Code ML20154M5841998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Calvert Cliffs Nuclear Plant,Units 1 & 2.With ML20153C2571998-09-18018 September 1998 Special Rept:On 980830,wide Range Noble Gas Monitor (Wrngm) Channel Was Removed from Operable Status.Caused by Need to Support Performance of Required 18-month Channel Calibr.Will Return Wrngm to Operable Status by 980925 ML20153C1091998-09-18018 September 1998 Part 21 Rept Re Defective Capacity Control Valves.Trentec Personnel Have Been in Contact with Bg&E Personnel Re Condition & Have Requested Potentially Defective Valves ML20151U5441998-09-0404 September 1998 Bg&E ISI Summary Rept for Calvert Cliffs ML20151T5281998-09-0101 September 1998 Special Rept:On 980819,declared Rv Water Level Monitor Channel a Inoperable.Caused by Failure of Three Heated Junction Thermocouples (Sensors) in Lower Five Sensors. Channel a & B Rv Water Level Probes Will Be Replaced ML20151Y1191998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Calvert Cliffs Nuclear Power Plant Units 1 & 2.With ML20237D4981998-08-19019 August 1998 Safety Evaluation Accepting Licensee Request for Extension of Second ten-year Inservice Insp Interval ML18066A2771998-08-13013 August 1998 Part 21 Rept Re Deficiency in CE Current Screening Methodology for Determining Limiting Fuel Assembly for Detailed PWR thermal-hydraulic Sa.Evaluations Were Performed for Affected Plants to Determine Effect of Deficiency ML20237B9371998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Calvert Cliffs Nuclear Power Plant ML20237D5941998-07-22022 July 1998 Rev 2 to Ccnpp COLR for Unit 2,Cycle 12 ML20236L7521998-07-0606 July 1998 Safety Evaluation Granting Bg&E 980527 Request for Relief from Requirement of Section IWA-5250 of ASME Code for Calvert Cliffs Unit 2.Alternatives Provide Reasonable Assurance of Operational Readiness ML20236F7791998-06-30030 June 1998 Safety Evaluation Authorizing Request for Temporary Relief from Requirement of Subsection IWA-5250 of ASME Code,Section XI for Plant,Unit 1 ML20236R0881998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Calvert Cliffs Nuclear Power Plant,Units 1 & 2 ML20236X3101998-06-19019 June 1998 Rev 1 to Calvert Cliffs Nuclear Power Plant COLR for Unit 2,Cycle 12 ML20249A9571998-06-15015 June 1998 Special Rept:On 980430,fire Detection Sys Was Removed from Svc to Support Mod to Purge Air Sys 27-foot Elevation & 5-foot Elevation East Piping Penetration Rooms.Installed Temporary Alteration & Returned Fire Detection Sys to Svc ML20249A7711998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ccnpp,Units 1 & 2 1999-09-30
[Table view] |
Text
'
[
co**************************************************************************
UNIT 1 OPERATING DATA REPORT oc**************************************************************************
Docket No. 50-317 June 15, 1994 Prepared by Frank Piazza Telephone:(410)260-3821 OPERATING STATUS
- 1. UNIT NAME Calvert Cliffs Unit 1
- 2. REPORTING PERIOD MAY 1994
- 3. LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 918
- 5. DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 830
- 8. CHANGE IN CAPACITY RATINGS NONE
- 9. POWER LEVEL TO WHICH RESTRICTED N/A
- 10. REASONS FOR RESTRICTIONS N/A Cumulative This month Year-to-Date to Date
- 11. HOURS IN REPORTING PERIOD 744 3,623 167,124
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 376.5 1,111.1 118,080.1
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
- 14. HOURS GENERATOR ON LINE 173.5 894.2 115,472.6
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 245,853 2,149,584 292,464,403
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 77,584 715,077 97,188,623
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 71,120 681,585 92,485,867
- 19. UNIT SERVICE FACTOR 23.3 24.7 69.1
- 20. UNIT AVAILABILITY FACTOR 23.3 24.7 69.1
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 11.5 22.7 67.1
- 22. UNIT CAPACITY FACTOR (USING DER NET) 11.3 22.3 65.5
- 23. UNIT FORCED OUTAGE RATE 41.9 27.7 8.9
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
N/A
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
June 5, 1994 9406210007 940613 PDR i
ADOCK 05000317 PDR i 1
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKT_:T NO. 50-317 UNIT NAhiE Calvert Cliffs-U1 DATE June 15. IMt CONtPLETED BY Frank Piana TELEPHONE (410)260-3821 REPORT 310NTil Stav 1994 j htEDIOD OF SIIUTriNG LICENSEE CAUSE & CORRECTIVE DURADON DOWN EVENT SYSTEh! CONtPONENT ACHON TO -
NO. DATE TYPEI (IIOURS) REASON 2 REACTOR 3 REPORT # CODE-8 CODES PREVENT RECURRENCE
( 94-02 940209 S 430.3 C 4 N/A N/A N/A Unit shutdown for planned Refueling Outage.
I
! 94 03 940520 S 15.1 B 9 N/A JJ 12 Unit removed from grid for hiain Turbine over-l speed trip test. During an attempt to paral!el to the grid a ground was detected. The ground was due to electrical short on a bus. The problem was correct-l ed and the unit was paralleied at 1700 on 5/2094.
j 94-(M 940526 F 16.5 B 5 N/A TA TRB Power was reduced on 5/26,94 at 1615 to correct high dbrations in the #8 hiain Turbine Bearing.
Installation of a balance shot was completed at approximately 1057 on hiay 27,1994.
94 05 940527 F 108.6 A 1 N/A TA TRB During power escalation after balancing the #8 bearing, excessive temperature indications from the
- 7 hiain Turbine Bearing was noted due to a bad bearing. The unit was manually shut down and remained off the grid to repair the #7 bearing.
There was a loss of oil pressure from the bearing lift pump due to a missing oil plug in the oil manifold which caused the bearing to fail. The bearing was repaired and returned to service.
I F: Forced 2 Reason: 3 h1ethod: 4 IEEE Standard 805-1984 S: Scheduled A - Equipment Failure 1 - h1anual B - h1aintenance or Test 2 - h1anual Scram. e 5
C - Refueling 3 - Automatic Scram. IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Reduced Load F- Administrative 9 - Other G - Operational Error H - Other
AVERAGE DAILY UNIT POWER LEVEL co**********************************************************************
Docket No. 50-317 Calvert Cliffs Unit No. 1 June 15, 1994 Prepared by Frank Piazza Telephone: (410) 260-3821 MAY 1994 Average Daily Power Level Average Daily Power Level Day (MWe-Net) Day (MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 136 4 0 20 66 5 0 21 352 6 0 22 475 7 0 23 522 8 0 24 518 9 0 25 519 10 0 26 376 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0
i I
DOCKET NO. 50-317 i CAINEllT CLIFFS UNIT I June 15,1934 SUMMAllY OF OPEllATING EXPEltlENCE May 1994 i
The unit began the month shutdown because of the continued refueling outage. The refueling i outage ended May 18, IV>4 when the unit was paralleled to the grid at 2215. The unit was removed !
from the grid on May 20, IV)4 at 0150 for Main Turbine testing. After completion of the Main Turbine testing and during paralleling to the grid procedure, there was an electrical ground detected. l The ground was corrected at 1600 on May 20, IV>4. The unit was again paralleled to the grid on May ;
20,1994 at 1700. !
i At 1856 on May 26, IV14 the unit was again removed from the grid to allow for installation of a halance shot in Main Bearing #8. During start.up procedures, Main Turhine llearing #7 experienced high ternperature and the unit was shutdown to repair the bearing.
The unit ended the month in a shut-down condition in mode 5.
I i
June 6,1994 NFM 94-163 Page 2 of 3 f1EFUELING INFORMATION RE_ QUEST
- 1. Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No.1.
- 2. Scheduled date for next refueling shutdown: March,1996*.
- 3. Scheduled date for restart following refueling: May,1996.*
- 4. Will refueling or resumption of operation thereafter require a Technical Specification I change or other license amendment?
l None identified at this time.*
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information. ;
1 Unknown.
- 6. Important licensing considerations associated with the refueling.
None identified at this time.
- 7. Tho number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 1514 (Note 2) l Spent fuel pools are common to Units 1 and 2. l
- 8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
(a) 4710 (Note 1) (b) 0
- 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load. i l
March 2014 l
NOTE 1: 4710 total licensed site storage capacity.
(1830 pool + 2880 ISFSI)
NOTE 2: 72 Spent Fuel Assemblies in the ISFSI.
Entry has changed since last reported.
co**************************************************************************
UNIT 2 OPERATING DATA REPORT l
- o************************************************************************** l Docket No. 50-318 June 15, 1994 Prepared by Frank Piazza Telephone:(410)260-3821 OPERATING STATUS
- 1. UNIT NAME Calvert Cliffs Unit 2
- 2. REPORTING PERIOD MAY 1994
- 3. LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 911
- 5. DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 830
- 8. CHANGE IN CAPACITY RATINGS NONE
- 9. POWER LEVEL TO WHICH RESTRICTED N/A
- 10. REASONS FOR RESTRICTIONS N/A Cumulative This month Year-to-Date to Date
- 11. HOURS IN REPORTING PERIOD 744 3,623 150,479
- 12. NUMBER OF llOURS REACTOR WAS CRITICAL 596.9 3,303.1 109,339.9
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
- 14. HOURS GENERATOR ON LINE 595.2 3,298.2 107,821.8
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,495,495 8,724,505 275,590,048
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 502,324 2,936,689 91,092,558
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 481,309 2,820,636 87,063,770
- 19. UNIT SERVICE FACTOR 80.0 91.0 71.7
- 20. UNIT AVAILABILITY FACTOR 80.0 91.0 71.7
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 77.9 93.8 70.1
- 22. UNIT CAPACITY FACTOR (USING DER NET) 76.6 92.1 68.5
- 23. UNIT FORCED OUTAGE RATE 0.0 5.1 5.7
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
N/A ,
- 25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
N/A t
l
UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-318 .
UNITNAME Calvert Cliffs-U2 DATE June 15.1994 COMPLETED BY Frank Piana TELEPHONE (410) 260-3821 REPORTMONTil Ma51994 MErilOD OF SIIUTIING LICENSEE CAUSE & CORRECTIVE ,
DURATION DOWN EVENT SYSTEM COMPONENT ACTION TO NO. DATE T(PEI (IIOURS) REASON 2 REACf0R3 REPORT # CODE 4 CODES PREVENT RECURRENCE 94-03 940515 S 148.8 B 1 N/A N/A N/A Unit shutdown for planned outage to complete Surveillance tests. The unit was returned to power on May 22 at 2217.
944M 940523 F 0 B 5 N/A SJ P Unit power was reduced for maintenance on 21 Steam Generator Feed Pump. The Steam Generator Feed Pump was experiencing speed oscillations caused by contaminated actuation / lube oit The problem was corrected by disassembling and cleaning the actuator. A portable lube oil purifier was placed in the lube oil system to further clean the oil f
l 1 F: Forced 2 Reason: 3 Method: 4 IEEE Standard 805-1984 S: Scheduled A- Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram.
C - Refueling 3 - Automatic Scram. 5 IEEE Standard 803A-1983 D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Reduced Imad F- Administrative 9 - Other G - Operational Error H - Other
AVERAGE DAILY UNIT POWER LEVEL co**********************************************************************
Docket No. 50-318 Calvert Cliffs Unit No. 2 June 15, 1994 Prepared by Frank Piazza Telephone: (410) 260-3821 MAY 1994 Average Daily Power Level Average Daily Power Level Day (MWe-Net) Day (MWe-Net) 1 866 17 0 2 864 18 0 3 865 19 0 4 867 20 0 5 868 21 0 6 865 22 0 7 864 23 689 8 866 24 539 9 871 25 785 10 868 26 857 11 850 27 859 12 850 28 860 13 871 29 862 14 867 30 863 15 775 31 862 16 0 1
. __ . . _ _ - ._ _ _ _ ~ _ _ . . _ _ _ _ _ _ . _ _ _ _ _ _ __
4 DOCKET NO. 50-318 CAINERT CLIFFS - UNIT 2 June 15,1994
SUMMARY
OF OPERATING EXPERIENCE May 1994 The unit began the month at 100% Reactor power (850 MWe).
On May 15,1994 commenced reducing Reactor power for a planned outage to complete Surveillance Test Procedures. The unit was removed from the grid on May 15,1994 at 2130. After completion of the Surveillance Tests, the unit was started and paralleled to the grid on May 22,1994 at 2217.
On May 23,1994 reduced Reactor power to 65% to perform maintenance on 21 Steam Generator Feed pump. Following completion of the Steam Generator Feed Pump maintenance Reactor power was increased, reaching 100% power at 1340 on May 25,1994.
The unit continued to operate the remainder of the month at 100% Reactor power.
i
\
l
June 6,1994 NFM 94163 Page 3 of 3 B_EFUELING INFORM ATION REQUEST
- 1. Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2
- 2. Scheduled date for next refueling shutdown: February 18,1995,
- 3. Scheduled date for restart following refueling: May 3,1995.
- 4. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Unknown.
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
Unknown.
- 6. Important licensing considerations associated with the refueling.
None identified at this time.
- 7. The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 1514 (Note 2) ,
Spent fuel pools are common to Units 1 and 2.
- 8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
(a) 4710 (Note 1) (b) 0
- 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off-load.
March 2016.
NOTE 1: 4710 total licensed site storage capacity.
(1830 pool + 2880 ISFSI)
NOTE 2: 72 Spent Fuel Assemblies in the ISFSI.