Monthly Operating Repts for Point Beach Nuclear Plant Units 1 & 2 for Nov 1990
ML20065R090
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/30/1990
From: Fay C, Nickels K
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-90-121 VPNPD-90-486, NUDOCS 9012180193
Download: ML20065R090 (9)


Text

. _ . . _ . . _ -__ . . - _ - - - _ . _ - . . . . - _- - - .-- - -

i Wisconsin Electnc PONER COMPANY 231 w u.cnor+. Po b> 2'A$ Mwait+ M '.3201 (4* 'i, <21 2345 VPNPD-90-486 NRC-90-121 December 10, 1990 U. S. NUCLEAR REGULATORY COMMISSION Document Control Desk Mail Station P1-137 Washington, D. C. 20555 Gentlement D.QCEETS 50-266 AND 50-301 MONTilLY OPERATING REPORTH POINT BEACH NUCLEAR PLANT. UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2, Point Dench Nuclear Plant, for the calendar month of November 1990.

Vezy truly yours

% %wa J'

\

C . 'W . Fay Vice President Nuclear Power Attachments Copics to R. S. Cullen, PSCW NRC Rogional Administrator, Region III NRC Resident Inspector I I i

9012180193 901130 /

i PDR (\ DOCK 05000266 ( 'g T i R FDR l

.4 suhsfun af Hivtnun hem (lepratwn

~

.~ .I 1 ,

OPERATING DATA REPORT -

l

_ t 1 DOCKET NO. 50-266 .

. i 1

  • l DATE_ December 7, 1990 l COMPI.ETED BY K. H. Nickels  !

! l l TELEPHONE 414 755 2321  !

l OPERATING STATUS i jt . UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 1 . NOTES .

[

j 2. REPORTING PERIOD: NOVEMBER 1990 . . t 4 '

i i 3. LICENSED THERMAL POWER-(MWT): 1518.5 . . L 4 NAMEPLATE RATING iGROSS MWE): 523.8 . . f

5. DESIGN ELECTRICAL RATING (NET MWE): 497. . .
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509. . .
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485. . . . . . . . . . . . . . . . . . . . . .. . .

j 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICABLE [

j 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NOT APPLICABLE  ;

10. REASONS FOR RESTRICTIONS, (IF AN!): NOT APPLICABLE I i

i- THIS MONTH TR TO DATE CUMULATIVE  !

11. HOURS IN T*IPORTING PERIOD 720 8,016 175,920 l 12. NUMBER OV FOURS REACTOR WAS CRITICAL 720.0 6,679.8 145,023.5

~

13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 652.7  !

j- 14. HOURS GENERATOR ON LINE 720.0 6,620.3 142,159.5

15. UNIT RESERVE SHUTDOWN HOURS '

O.O 0.0 837.9

16. GROSS-THERMAL ENERGY GENERATED (MWH) 1,090,639 9,810,390 198,278,782
17. GROSS ELECTRICAL ENERG1 GENERATED (MWH) 370,250 3,314,780 66,919,470
18. NET ELECTRICAL ENERGY GENERATED (MWM) 354,009 3,163,948 63,754,639

. 19. UNIT SERVICE FACTOR 100.0 82.6 80.8 i 3 20. UNIT AVAILABILITY FACIUR 100.0 82.6 81.3 f

21. UNIT CAPACITY FACTOR (USING MDC NET) 101.4 81.4 74.3 i
22. UNIT CAPACITY FACTOR (USING DER NET) 98.9 79.4 72.9
23. UNIT FORCED OUTAGE RATE 0.0 . 0.0 1.7 i
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

I 43-day refueling and maintenance outage scheduled to begin on April 5,1990.

f

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN ,

i DATA REPORTED AND FACTORS CALCULATED ELS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977 ,

?

f

POINT BEACH NUCLEAR PLANT DOCKLT NO. 50-2M .

~

AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Peint Ucach. Unh I MONT11 NOVEMBER DATE December 7.1990 COMPLLTED BY K. IL NickcIs TELEPHONE 414T755-2321 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL rO%ER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 493 11 402 21 493 2 494 12 492 22 494 3 494 13 492 23 #6 4 493 14 194 24 492 5 492 15 493 25 488 6 493 16 495 26 492 7 492 17 493 27 493 8 472 18 493 28 493 9 497 19 493 29 493 0 490 20 494 30 494 PDF4WY2%

(03-79)

i-  :

, POTNT BEACTI NUCLEAR P1 ANT Docket No. _50-266 -

Unit Name Po'mt Beach. Unit 1 ,

UNIT SHUTDOWNS AND POWER REDUCTIONS Date Ducmbci 7. lirM '

! Completed By K. II. Nick31s

' REPORT MONrig NOVEMBER _

Telephone No. 414/ 5 5-2321 .

r

Mettwvi d i Shutting No. Dave Type' Derstina Reswm 2 gy , g,,,,, pg,, 5,,,, gn ,pn,,,, c, ,,, c,,,,4 A,,;g, filowrs) Red Rewrt No. Code' Cx*' To Prevent Reevmme I r

I I

i f

i i

L i

I i

i I

r t

i

~

i i l

1 ,

'F: Forced ' Reason- ' Method-

  • Exhibit G - instructions I S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of  !

j B - Maintenance or Testing 2 - Manual .ccram data entrv sheets ,

C - Refueling 3 - Automwic Scrant LER file (NUREG-0161)  !

D - Regulatory Restriction 4 - Continuation of l E - Operator Training & Previous Shutdown 13 censing Exans 5 - Reduced I;wl I F- Administrative 6 - Other (explain) ' Exhibit I- Same Source  ;

I G - Operational Error (explain) [

II- Other (explain)  ;

PRFm

  • j (O W )

I

- ~. _ . _ . - . _ _ _ . . = . _ . - _ _ _ . - _ . - . - __. _ - . - _ . - . . _ . _ . . _ _

DOCKET NO. 50 266 UNIT NAME Point Beach Unit i 1 DATE December 7,1990 j COMPLETED BY K. II. Nickels i I

TELEPilONE 414/755 2321 J

Unit 1 operated at approximately 493 MWe net throughout this report period with no significant load reductions.

Safety related maintenance includes balancing the 'B' and 'C' tervice water pump.

OPERATING DATA REPORT ,

DOCKET NO. 50-301 .

DATE December 7, 1990 -

COMPLETED 3Y K. H. Nickels t

TELEPHONE 414 755 2321 OPERATING STATUS

1. UNIT NAME: POINT BEACH NUCLEAR PLANT UNIT 2 . NOTES .
2. REPORTING PERIOD: NOVEMBER 1990 . .
3. LICENSED THERMAL POWER (MWT): 1518.5 . .
4. NAMEPLATL RATING (GROSS MWE): 523.8 . .
5. DESIGN ELECTRICAL RATING (NET MWE): 497. . .
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509. . .
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485. . . . . . . . . . . . . . . . . . . . . . . . .
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS ', UMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

NOT APPLICADLE

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY ( b e, a n T,) . NOT APPLICABLE
10. REASONS FOR RESTRICTIONS, (IF ANY): NOT APPLICABLE THIS MONTH YR TO DATE CUM'ULATIVE
11. HOURS IN REPORTING PERIOD 720 8,016 160,705
12. NUMBER OF HOURS REACTOR WAS CRITICAL 320.0 6,994.8 140,340.5-
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 216.7
14. HOURS GENERATOR ON LINE 297.5 6,970.1 138,175.4
15. UNIT RESERVE SHUTDOWN HOURS 0. f' O.O 302.2
16. GROSS THERMAL ENERGY GENERATED (MWH) 400,728 10,460,372 197,043,908
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 139.910 3,585,150 66,910,370
18. NET ELECTRICAL ENERGY GENERATED (MWH) 130,309 3,423,385 63,761,995
19. UNIT SERVICE FACTOR 41.3 87.0 86.0
20. UNIT AVAILABILITY FACTOR 41.3 87.0 86.2
21. UNIT CAPACITY FACTOR (USING MDC NET) 37.5 88.1 81.1
22. UNIT CAPACITY FACTOR (USING DER NET) 36.6 85.9 79.8
23. UNIT FORCED OUTAGE RATE O.0 0.0 1.1
20. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, Anti uG ATION OF EACH):

NONE

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NOT SHUTDOWN DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN HRC LETTER DATED SEPTEMBER 22, 1977

- - - _ _ - _ _ _ _ - _ _ _ _ _ _ _ - _ -}

I POthT BEttCil NUCLEAR FIANT DOCKET NO. _50-301

~

AVERAGE DAILY UNIT PO%TR LEVEL UNTT NAME Peint Beach. Unit 2 l

MONTli NOVEMBER DATE December 7. I?M

! COMPLETED BY K. II. Nickels TELErilONE 414/755-2321 AVERAGE AVERAGE AVERAGE DAILY Daft.Y DAILY POWER LEVEL POWER LEVEL POWER LEVEL DA' . MWe NET DAY MWe NET DAY MWe NE_T 1 -2 11 -5 21 471 2 -2 12 -6 22 504 3 -1 13 -13 23 M3 4 -2 14 -12 24 504 5 -2 15 -7 25 M3 6 -2 16 -14 26 M3 7 _.,

-2 17 -13 27 503 8 _ _-2 18 24 28 M2 9 -2 19 141 29 504 10 -6 20 380 30 503 PI1F 032Ra (0pr;)

w POINT BEACli NUCLEAR PIANT Docket No. 50-M1 -

Unit Name Point Beach Unit 2

  • UNITSHUTDOWNS AND POWER REDUCTIONS Date December 7 I'M ~

Completed By K. II. Nickets _

REPORT MONTII NOVEMBER Te 8ephone No. 414/755- 3 21 ,

Methext c( ,

Sheting 2

Na Date Type' Derstion Remem Down IAemee IW S* stem Cem pnaent Cause end Correctne Actum >

filoursi Peac d Re e No. Code' Code' To Pmt t Reenmn m 2 l 9014M S 422.5 C 1 N/A ZZ I2.///2 Cootmsstum c4 ennust ref=ein.g and c. .s.uc mi(q r

i 2

t

' I i

l 2

'F: Forced ILasete 'Metid ' Exhibit G -Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of i B - Maintenance or Testing 2 - Manual Scram data entry sheets l

C - Refueling 3 - Automatic Scram LER file (NUREG-0161) i I

D - Regulatory Restriction 4 - Continuation of E - Operator Training & Previous Shutdown Licensing Exam 5 - Reduced lead F- Administrative 6 - Other (explain) ' Exhibit I - Same Source G - Operational Errw (explain)

II - Other (explain) i PDF-on28b t (OM3)

I

( ,*'.'

DOCKET NO. 50 301 UNIT N AME Point Beach Unit ?

DATE Dxember "i.1990 COMPLETED BY K. ll. Nickels TELEP} LONE 414/755 232a -

Unit 2 began this report pericd in refueling shutdown. Refueling activities included repairing a canopy seal leak on a (ontrol r(d drive mxhanism, performing the loss of AC 6afeguards system actuation test and crevice flushing of the steam generators.

Cold rod drops were completed and a satisfactory leak test of the primary system was performed. The unit was taken entical on November 17 und the generator was phased to the line on November 18, thus ending the outage.