Confirms 820910 Meeting Results Re Seismic Analysis for Steam Relief Valve Line 124,main Steam Line Inside Drywell & Main Steam & Feedwater Lines Outside Drywell
ML20065B913
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 09/20/1982
From: Zimmerman S
CAROLINA POWER & LIGHT CO.
To: Van Vliet J
Office of Nuclear Reactor Regulation
References
NUDOCS 8209230095
Download: ML20065B913 (2)


Text

__

e

@&L Carolina Power & Light Company

.h September 20, 1982 Mr. Jim Van Vliet l Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission .

Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 SEISMIC ANALYSIS

Dear Mr. Van Vliet:

This confirms the results of our meeting of September 10, 1982 as follows:

1. Steam Relief Valve Line No. 124 Carolina Power & Light Company (CP&L) presented a seismic analysis of this line, which demonstrated that three snubbers could be considered long term fixes. Based on the analysis presented at the meeting, which will be documented in a written report, NRC-NRR agreed that these three snubbers can be considered as long term fixes, and will not require repair prior to startup.

2.

Main Steam Line Inside Drywell Carolina Power & Light Company analysis of this line concluded that it was reasonable to assign long term fix-category to one snubber on this line. However, in that there appeared to be sufficient time for modification of this snubber prior to startup, CP&L committed to complete appropriate modifications prior to startup.

3. Main Steam and Feedwater Lines Outside Drywell Carolina Power & Light Company analysis of these lines con-cluded it was reasonable to assign long term fix category, however, in that it appeared that modifications could be completed (subject to confirmation that materials were availabic) CP&L committed to complete these modifications prior to startup.

Should the status change during modification of items 2 and 3 O above, CP&L would need to present further engineering justification for NRC-NRR concurrence, before these items could be reconsidered as long term fixes.

8209230095 820920 PDR ADOCK 05000324 P PDR 411 Fayetteville Street

  • P O. Box 1551
  • Haleigti, N. C. 27602

,., s Mr. Van Vliet September 20, 1982 A follow-up letter which documents our presentation on Steam Relief Valve Line 124 will be forwarded to you shortly.

Yours very truly, fS.

' J!!me-

. Zimmerman Manager Licensing & Permits SRZ/1r (5274) cc: Mr. D. O. Myers (NRC-BSEP)

Mr. J. P. O'Reilly (NRC-RII)

Mr. J. A. Van Vliet (NRC) k