Interim Deficiency Rept Re Core Spray Pump Motor Damage. Initially Reported on 820401.Repaired Motor Installed.Next Rept Will Be Provided by 821223
ML20063L407
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/27/1982
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, EF2-59392, NUDOCS 8209090091
Download: ML20063L407 (3)


Text

..

Donald A. Wells u raq.s,thwy A' u.:e

/

Detroit " " ' " ' "

2 Edison =000Second Avenuet= -

August 27, 1982 EF2-59392 i

Mr. Janes G. Keppler, Regional Administrator Region III U.S. Nuclear Regulatory Ccumission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Interim Report of 10CFR50.55(e) Item on Core Spray Pump Motor Damage (#66)

Dear Mr. Keppler:

This additional interim report on the Core Spray Pump Motor damage problem has been pmpared to provide you with the current status of this problem.

This item was originally reported to Mr. J. Eccklin of NRC Region III by Project Quality Assurance's Mr. E.L. Thompson, Acting Supervisor-Construc-tion Quality Assurance, on April 1, 1982.

This item deals with a gouge discovered in the shaft of a core spray pump motor. Because of the size and depth of the gouge, Edison Engineering decided that the possibility of internal damage existed, and the notor was shipped off-site to a General Electric repair shop.

The motor was returned to the site, on May 20, 1982. It was conditionally released pending receipt of required documentation as outlined in Purchase Order 059136, and subsequently installed by Edison Maintenance. Based on investigation to date, probable cause of the gouge is assigned to handling equipnent on site (fork lift) .

Another report on this item, either interim or final, is scheduled to be

sent to you on or before December 23, 1982. If you have questions concern-

. ing this matter, please contact Mr. G.M. Trahey, Assistant Director-Project Quality Assurance.

Very truly yours, j

DAW /DF/cp sao9090091 820s27 PDR ADOCK 05000341 I $@

S PDR pf

Mr. James G. Keppler, Regional Administrator August 27, 1982 Page Two EF2-59392 cc: Mr. Richard DeYoung, Director Office of Inspection and Enforcement Division of Reactor Inspection Programs Washington, D.C. 20555 Mr. Bruce Little, Resident Inspector U.S. Nuclear Regulatory Cmmission 6450 North Dixie Highway Newport, Michigan 48166

i f

, Mr. James G. Keppler, Regional Administrator August 27, 1982 i Page Three EF2-59392 i

1 bec: T.A. Alessi J.C. Ard, Jr.

C.R. Bacon W.F. Colbert W.M. Everett W.J. Fahrner D. Ferencz E.P. Griffing C.M. Heidel l W.H. Jens l E. IAlsis

, P.A. Marquardt/ Docket File (2)

E.H. Newton S.H. Noetzel J.W. Nunley J.D. Ryan L.E. Schuerman H. Tauber G.M. Trahey

, R.A. Vance/L.E. Eix A.E. Wegele Site Document Control

! NRC Follow-Up Book /NRC File i

Chron File I

f 1

f i