,E:..wsure NRC-98-0021 Page1 i

FERMI 2 j ANNUAL OPERATING REPORT l

JANUARY I - DECEMBER 31,1997 j DETROIT EDISON COMPANY NRC DOCKET NO. 50-341 FACILITY OPERATING LICENSE NO. NPF-43 1

9803090005 900227 PDR ADOCK 05000341 R PDR ,_

{

l

. Enclosure NRC-98-0021 Page 2 Table of Contents- Page 10 Introduction- -3 2.0 Summary of Operations . 3 2.1 Summary of Operating Experience 3 2.2 Summary of Outages and Forced Reductions 3 Greater than 20 Percent of Full Power -

2.3 Fuel Performance 5 2.4 Sho.e Barrier Survey 6 2.5 Safety Relief Valve Challenges 6 2.6 Personnel Monitoring and Exposure 6-2.7 Service Life of Main Steam Bypass Line 8 2.8 Specific Activity Analysis of the Primary Coolant 8 2.9 ECCS Cooling Performance Evaluation Model 8 Changes or Errors 2.10 ECCS Outages 8 1

1 l

i

, Enclosure NRC-98-0021 Page 3 1.0 Introduction -

l 1

The Fermi 2 Nuclear Power Plant site is located on the western shore of Lake Erie in Frenchtown Township, Monroe County, Michigan. The Nuclear Steam Supply System is a General Electric BWR 4 with a Mark I pressure-suppression containment. The plant is fully owned by The Detroit Edison Company.

)

2.0 _S_gm_ mary of Ooerations 2.1 Summary of Ooeratine Experience Fermi 2 was shutdown at the start of 1997 due to a forced outage that occurred at -

. the end of 1996. A subsequent forced shutdown occurred on January 17,1997, due

~

to failure of the main generator output breaker while attempting to synchronize to the grid during startup from the forced outage that began on January 10,1997.

Plant restart occurred on May 2,1997. Power was reduced on May 12,199' to permit flux suppression testing for determining the exact location of the fuel leak detected in~ the reactor. Power was reduced again on September 24,1097 to permit i power suppression testing to help determine the locat n of a second leaking fuel l rod. The reactor was shutdown from October 3 througn "ober 19,1997 for a planned mid-cycle outage to replace two leaking fuel bundles and a Reactor )

Recirculation pump seal. After the mid-cycle outage, the reactor maintained power j operation with three power reductions to set Reactor Recirculation Motor Generator 1 (MG) Set limiters and stops,345 kV switchyard corrective maintenance, and main turbine stop, control, and bypass valve surveillances, control rod scram time testing, - :

control rod pattern adjustments, and reactor water level control system repair. Core  ;

Thermal Power (CTP) is administratively limited to 96 percent due to the high , j pressure turbine flow passing limitations.

l i

2.2 Summary of Outanes and Forced Reductions Greater than 20 Percent of Full Power January 6,1997- Power Reduction Unit load reduced and main turbine generator tripped to add balance weights l to the main turbine.

January 10 - 16,1997 - 157.6 Hours Shutdown

- Reactor shutdown to repair high water level in 20 inch offgas manifold. Main Turbine remained shutdown from January 6,1997.

1

. Enclosure NRC-98-0021 Page 4 i

1 January 17 - 31,1997 - 357.5 Hours Shutdown Main generator output breaker failed while attempting to synchronize to the 3 grid. Reactor was shutdown to inspect the Main Generator.- )

February 1 - 28,1997 - 672 Hours Shutdown Reactor shutdown from January 17,1997 forced outage to inspect the Main Generator.

March 1- 31,1997 - 744 Hours Shutdown Reactor shutdown from January 17,1997 forced outage to inspect the Main Generator.

April 1 - 30,1997 - 719 Hours Shutdown Reactor shutdown from January 17,1997 forced outage to inspect the Main Generator.

May 1 - 5,1997 - 132.9 Hours Shutdown l 1

Reactor shutdown from January 17,1997 forced outage to inspect the Main Generator.

May 12,1997 - Power Reduction Reactor power was reduced to 65% CTP to conduct power suppression testing associated with a leaking fuel rod.

June 26,1997 - Power Reduction Reactor power was reduced to 35% CTP for single loop operation to repair Reactor Recirculation system motor-generator set tachometer-generator.

September 5,1997 - Power Reduction Reactor power was reduced to 76% CTP to repair Main Generator 'CM' breaker 'Z' connection hot spot.

September 24,1997 - Power Reduction Reactor power was reduced to 55% CTP to perform power suppression testing for leaking fuel rod.

1

J Enclosure NRC-98-0021 Page 5 October 3 - 19,1997 - 368.7 Hour Shutdown Reactor shutdown to replace 2 leaking fuel bundles and replace a Reactor Recirculation pump seal.

October 29,1997 - Power Reduction Reduced reactor power to 60% CTP to set Reactor Recirculation MG Set limiters and stops, and also to perform corrective maintenance on 345 KV Brownstown line breaker hot spots.

December 13,1997 - Power Reduction Reduced reactor power to 65% CTP to perform main turbine stop, control and .

bypass valve surveillances, control rod scram time testing and control rod pattern adjustments.

December 29,1997 - Power Reduction Reduced reactor power to 25% CTP to repair reactor water level control system.

2.3 Fuel Performance The reactor was shutdown at the start of 1997, but produced 206 effective full  ;

power days during the year. Except for a brief period during November when core thermal power was raised to 98.6 percent for power uprate testing, power was administratively limited to 96 percent due to high pressure turbine flow passing l limitations.  !

l l

During the cycle's first approach to near rated power, which occurred during May, l off-gas activity spiked at 1,300 pCi/sec. Subsequently, power suppression testing i was performed and confirmed the presence of a leaking fuel rod. Three control rods I were inserted to reduce power in the fuel bundle and off-gas activity dropped to 400 Ci/sec. Activity levels continued to rise slowly during the next few months reaching a level of about 3,000 pCi/sec by mid-September. At that time, off-gas l activity spiked at just over 4,000 Ci/sec indicating a second leaking fuel rod. The  ;

second leaking fuel rod was confirmed by power suppression testing, and a single  !

control rod was iuserted to suppress the power in this fuel bundle.

Early in October the plant was shutdown to replace the leaking fuel. During this  ;

outage, General Electric performed both in-core sipping and vacuum sipping to confirm the number and location of the leaking fuel assemblies. The first leaking bundle was YJ7119. This bundle was in its second cycle of duty. The second leaking bundle was YJ2802 which was in its third cycle of duty.

,' Enclo'sure NRC-98-0021 Page 6 t

Since the off-gas activity had been slowly rising despite power suppression for the first leaking rod, the degree of degradation was expected to be greater than a pin hole leak. This was confirmed in November during inspection of the bundle. The

, cause of the leak could not be determined. The cause of the second leak, which was

- a pm hole, was determined to be debris.

l The plant operated fuel failure free during the remainder of the year.

2.4 Shore Barrier Survey A survey of the Fermi 2 shore barrier was completed as required by Technical Specification 4.7.3. The results of the survey indicated no damage, significant movement, or deterioration of the barrier. All forty-seven survey point elevations were within the tolerance specified in Technical Specification Table 3.7.3-1. Civil Engineering Drawings 6C721-44 through 49 were revised to incorporate the survey data. No unusual incidents occurred in 1997 that would have required additional surveillances.

2.5 Safety Relief Valve Challenges There were no instances in 1997 where reactor pressure was high enough to require Safety Relief Valve (SRV) actuation. There were no instances in 1997 where an SRV actuation was demanded by an automatic logic system. SRVs were manually actuated for surveillance / post-maintenance testing as described below:

Date Affected SRV Comments 10/18/97 All Surveillance Testing / Post Maintenance Testing Following Pilot Valve Replacement during 1997 Mid-Cycle Outage. All SRVs lifted on demand (LER 96-017, Revision 3).

2.6 Personnel Monitorine and Exoosure Table 2.6-1 provides a breakdown of radiation exposure by work and job function as required by Technical Specification 6.9.1.5.a.

L l

l l

l

t 7 3 3 7 0 6 0 0 2 0 0 0 0 0 0 5 0 5 7 9 0 5 0 r 0 0 0 5 0 3 0 8 3 8 9 9 0

o p drs 1 1 4 1 4 4 1 3 0 0

0 0

0 0 1 0 0 0 0 0

0 0

0 0

0 0

0 0

0 4 0 3 8 0 0 5

9 0

2 0

0 9

2 0

0 0

0 0

0 0

0 4 0 3 0 0 8 0

0 6 5 7 1 2 7 1 1 0

2 ee tr k 1 3 0 2 0 0 0 0 0 0 0 0 0 0 0 5 0 0 2 0 0 0 0 e nr 0 0 0 0 0 1 0 7 3 0 7 0 R oo 9 e e CW s m o

2 7

6 4 c r

u s -

D e p

r x n e

) a 0 0 0 E M ;  ;

1 0 0 0 6 2 4 0 0

0 0 0

0 0

0 0

0 0

0 0

0 0 0 0 0 0 0 2 0 0 5 0 0 0 3 0

0 0

0 0

0 0 0 0 0 0 0 0

0 0

0 0

0 0

0 0

0 3 0 0 1 0 0 0 8 2

0 la D Ey ;j 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 m e

D

(

Dh t 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 t n

Dt a s i U y n D t u n -

R a l

e D E e .

a d u

i v  ; lc u

q  ; 3 8 2 5 3 n ; 69 55 95 34 20 5

0 0 0 0 5 0 0 5 0 0

0 0

0 3

7 0

0 0

0 2 5 3 6 6 8 0 4 4 5 0 0 0 0 0 0 0 0 0 0 1 9 0 0 8 8 6 1 0 5 1

1 2 8 9 5 4 0 5 1

i t

n o y 1 0 0 0 0 0 0 2 0 0 3 2 1 4 1 0 0 0 0 0 2 0 0 0 0 7 8 0 8 4 o E it c 7 2 4 6 1 1 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 5 6 m n e ai t p 1

1 1 e r s -

s Sn r n e o

o E a d D M it p - .

y e 2 4 1 4 2 2 0 0 5 0 0 0 0 0 0 9 1 2 7 5 0 1 0 0 0 J' 2 1 1 0 3 8 4 7 7 r e tcr ae s 4 2 1 2

0 1 3 5 2 6 t

e .

2D rk 1 1 1 3 m .

et nr is i

) r o o mD r sCuoW 4

8 d eR o p

1, la 1 FD( E x 1 m -

6 n t e

g x 2or e iny; 2 0 0 6 5 0 0 0 0 0 0 0 0 0 0 3 1 0 6 0 0 0 0 0 0 0 0 0 0 0 5 1 0 2 5 e eist vit i i ;

l 2 1 4 )

D l

b de et y aEm Tt s i

R cU e

G-R D

(

i oo le E n y r

a trD n n d eg o n Dn i s

r e ;

o c

e d P  ; 4 2 7 6 2 6 0 0 0 0 0 0 0 o 4 2 6 0 0 0 0 0 2 4 3 0 2 s a n o i c 3 7 3 5 8 1 1 1 2 t 2 1 2 1 1 4 3 6 8 4 8 0 l

e ly e it a

1 1 1 1 1 n n n -

R o S- G o t

t n s g c E r n e e is r , P u i

d D e c

6 u .

1 s s s s s s s d _

c c e c c c c o _

1 e e e e e e s y g r s s s

i s

i s s s i

is i s c p y r g y g y g a y r g y g t

c c c y c c s y y g y r n _

e n e n s n h o n n n s y r n n s h o n n s y r n n n y r n n n ns y r n n n h o s a n h o n n h o n h o o n a i n

P s n d a P s a a o a o n a o o P s re a i m n o n e n te P s* e n e e n P s e n it P s e n t P s e n i v w u

i i a h r e i i h rv e e i

h rv e h rv e i

it e a h rv i

e e e e e a h v e n e a n te t t t t r a h e n a a r t e n e n lt e n lt e n r lt e n r t -

G a t r t t n re t t n r t n r t n re lt e t

n r m e e ig n e a p ig e o l i l a p g p ig i i p i ra p g i e a p g i a p ig a p p a a a i i a p e u n a e u n p a p ia p y e p e u n p e u n e u n a p e u n e u n e r D M O H S E M O H S E M O H S E M O H S E M O H S E M O H S E M O H S E r t

o s i

a h l e i T

u c S  :

n t E

g fa

/

e e l T

e s s ed c c g a n n n t

o O 1

R n n

o r n v o r r n a a n is g

n T N 7 o t i

o ta u i

o e la te e s i

tO 02 9 t i

a t c r S t

c tn i

e le d 9

c n

t n re a e a a c n e

t s c u l

a n la p e p dn e i

p a r

a o f t a e0 -

r 1

F u

P O R O a R M S M W P r

R e

T o

G r

u8 s9 o -7 l

Ce g cRa n

ENP

Enclosure to

. NRC-98-0021 Page 8 , ,

2.7 ' Service Life of Main Steam Bvoass Line -

In accordance_with a Detroit Edison letter to the NRC dated November 7,1986  !

[VP-86-0154], the cumulative time the main steam bypass lines are operated with the bypass valves between 30 percent and 45 percent open will be reported annually. A cumulative value of 100 days is not to be exceeded without prior NRC notification.

l Evaluations performed by Stone and Webster and by Hopper and Associates concluded that the bypass lines are acceptable for safe operation when operated within the 100 day constraint. Based on these evaluations, the new main steam bypass piping that was installed in 1985 has a service life which will allow it to function for the life of the plant under anticipated operating conditions. The main steam bypass lines cumulative usage was 36.70 days as of December 31,1997.

' 2.8 Specific Activity Analysis of the Primary Coolant Exceeding the Limits of Technical Soecification 3.4.5 During 1997, the specific activity of the primary coolant did not exceed the limits of j Technical Specification 3.4.5.

2.9 ECCS Cooline Performance Evaluation Model Channes or Errors  !

l No changes or errors which impact the Fermi 2 licensing basis Peak Cladding _

Temperature (PCT) were identified .in 1997. The licensing basis remains as  !

reported to the NRC in Detroit Edison Letter NRC-96-0052 dated May 28,1996.

]

l 2.10 ECCS Outanes Pursuant to Fermi 2 Technical Specification 6.9.1.5.c, a summary of the Emergency i Core Cooling System (ECCS) outages which occurred between January 1,1997 and December 31,1997 is provided. The tabulation of ECCS outage hours (Table 2.10-

1) includes both forced and planned outages for the Low Pressure Coolant Injection  !

(LPCI), Core Spray, High Pressure Coolant injection (HPCI), and Automatic Depressurization Systems (ADS). An outage was considered to be whenever one of  ;

the ECCS systems was out-of-service at a time it was required to be operable per  !

the Technical Specifications. l l

Enclosure to

. NRC-98-0021 Page 9 , ,

i ECCS Outanes Table 2.10-1 ECCS Outage Hours January 1,1997 to December 31,1997 ECCS SYSTEM FORCED HOURS PLANNED HOURS LPCI Division I 0.0 46.83 {

LPCI DivisionII 2.83 31.94 Core Spray Division 1 0.0 99.13 Core Spray Division Il 2.08 103.32 ADS Division I 0.0 0.0 ADS Division 11 0.0 0.0 HPCI 31.14 61.00 DIVISION I LOW PRESSURE COOLANT INJECTION  !

l ECCS System Outage: Division I Low Pressure Coolant Iniection l Out of Service from 1545 01/19/97 to 1645 01/19/97  !

Duration: 1.00 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Planned Outage Outa2e Summary: System Warmup Prior to Placing SDC in Service  !

1 ECCS System Outage: Division I Low Pressure Coolant Iniection Out of Service from 1900 02/15/97 to 213102/15/97 ,

Duration: 2.52 hours6.018519e-4 days <br />0.0144 hours <br />8.597884e-5 weeks <br />1.9786e-5 months <br /> Planned Outage l l

Outane Summary: Surveillance Performance  !

ECCS System Outage: Division I Low Pressure Coolant Iniection Out of Service from 2115 04/14/97 to 1400 04/15/97 Duration: 16.75 hours8.680556e-4 days <br />0.0208 hours <br />1.240079e-4 weeks <br />2.85375e-5 months <br /> Planned Outage l Outace Summary: Preventative Maintenance - MCC Inspection ECCS System Outage: Division I Low Pressure Coolant Iniection Out of Service from 0405 08/12/97 to 0358 08/13/97 Duration: 23.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br /> Planned Outage Outace Summary: System Outage for Preventative Maintenance

4: ,

Enclosure to -

. NRC-98-0021 Page 10, ,

ECCS System Outage: Division I Low Pressure Coolant Iniection Out of Service from 104811/12/97 to 1329 11/12/97 Duration: 2.68 hours7.87037e-4 days <br />0.0189 hours <br />1.124339e-4 weeks <br />2.5874e-5 months <br /> Planned Outage

- Outane Summary: Surveillance Performance DIVISION 11 LOW PRESSURE COOLANT INJECTION I

ECCS System Outage: Division II Low Pressure Coolant Iniection  !

Out of Service from 1812 03/29/97 to 1950 03/29/97 Duration: 1.63 hours7.291667e-4 days <br />0.0175 hours <br />1.041667e-4 weeks <br />2.39715e-5 months <br /> Planned Outage Outane Summary: Surveillance Performance ECCS System Outage: Division II Low Pressure Coolant Iniection Out of Service from 0505 06/24/97 to 1830 06/24/97 I Duration: 13.42 hours4.861111e-4 days <br />0.0117 hours <br />6.944444e-5 weeks <br />1.5981e-5 months <br /> Planned Outage I Qutane Summary: System Outage for Preventative Maintenance ECCS Systen Outage: Division II Low Pressure Coolant Iniection Out of Service from 0240 06/25/97 to 0647 06/25/97 Duration: 4.12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Planned Outage Outane Summary: Surveillance Performance ECCS System Outage: Division 11 Low Pressure Coolant Iniection Out of Service from 1055 07/04/97 to 1345 07/04/97 Duration: 2.83 hours9.606481e-4 days <br />0.0231 hours <br />1.372354e-4 weeks <br />3.15815e-5 months <br /> Unplanned Outage j i

Outane Summary: RHR Room Cooler Removed from Service to Tighten Belt ECCS System Outage: Division II Low Pressure Coolant Iniection Out of Service from 235010/03/97 to 040510/04/97 -I Duration: 4.25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br /> Planned Outage l i

Outane Summary: Warming Lines Prior to Placing Shutdown Cooling (SDC) in Service l

' ECCS System Outage: Division 11 Low Pressure Coolant Iniection Out of Service from 1845.10/13/97 to 2051 10/13/97 Duration: 2.10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> Planned Outage Outane Summary: Surveillance Performance i

1 Enclosure to

. NRC-98-0021 Page11, ,

i ECCS System Outage: Division II Low Pressure Coolant Iniection Out of Service from 063912/17/97 to 1110 12/17/97 l Duration: 4.52 hours6.018519e-4 days <br />0.0144 hours <br />8.597884e-5 weeks <br />1.9786e-5 months <br /> Planned Outage 1 Outane Summary: Change Oil in RHR Pump B Lower Motor Bearing i

ECCS System Outage: Division II Low Pressure Coolant Iniection Out of Service from 015212/18/97 to 034612/18/97 l Duration: 1.90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> Planned Outage '

Outage Summary: Surveillance Performance i

DIVISION I CORE SPRAY I ECCS System Outage: Division I Core Snrav. Pumn "A" Out of Service from 0800 01/03/97 to 1430 01/03/97 Duration: 6.50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage: Division I Core Sorav Out of Service from 0135 01/07/97 to 1405 01/07/97 Duration: 12.50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> Planned Outage l

Outane Summary: Core Spray Pump and Valve Surveillance Performance ECCS System Outage: Division I Core Spray. Pumo "C" Out of Service from 2040 01/09/97 to 2210 01/09/97 i Duration: 1.50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> Planned Outage Outace Summary: Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage: Division I Core Snrav. Pumo "A" Out of Service from 0915 05/07/97 to 1620 05/07/97 Duration: 7.08 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Planned Outage Outace Summary: Electrical Bus Undervoltage Trip Surveillance Performance

Enclosure to

. NRC-98-0021 Page 12, ,

ECCS System Outage:- Division I Core Sorav. Pumo "C" Out of Service from 1345 05/16/97 to 1609 05/16/97 Duration: 2.40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance

- ECCS System Outage: Division I Core Sorav. Pumo "A" Out of Service from 0842 06/%/97 to 1325 06/06/97 Duration: 4.72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage: Division I Core Sorav. Pumo "C" Out of Service from' 0839 06/13/97 to' 101106/13/97

- Duration: 1.53 hours6.134259e-4 days <br />0.0147 hours <br />8.763227e-5 weeks <br />2.01665e-5 months <br /> Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage: Division I Core Sorav. Pumo "A" Out of Service from 1655 07/02/97 to 1904 07/02/97 Duration: 2.15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance 1

ECCS System Outage: Division I Core Sorav .

Out of Service from 0423 07/08/97 to 1945 07/08/97 l T Duration: 15.36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Planned Outage Outane Summary: Planned Division 1 Outage .

ECCS System Outage: Division I Core Sorav. Pumo "C" Out of Service from 0834 07/11/97 to 1400 07/11/97 Duration:- 5.43 hours4.976852e-4 days <br />0.0119 hours <br />7.109788e-5 weeks <br />1.63615e-5 months <br /> Planned Outage Outane Summary:- Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage: Division I Core Sorav. Pumo "A" Out of Service from .0823 08/07/97 to 1235 08/07/97 )

Duration: 4.20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> Planned Outage j i

Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance  ;

I 1

~

Enclosure to .

. NRC-98-0021 Page 13, ,

.t ECCS System Outage: Division I Core Sorav. Pumo "C"

- Out'of Service from 1700 08/15/97 to 1943 08/15/97

. Duration: 2.72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance

. ECCS System Outage: Division i Core Sorav. Pumo "A" Out of Service from 0555 09/05/97 to 1750 09/05/97 Duration: 11.91 hours0.00105 days <br />0.0253 hours <br />1.50463e-4 weeks <br />3.46255e-5 months <br /> Planned Outage-

Outane Sununary Electrical Bus Undervoltage Trip Surveillance Performance

- ECCS System Outage: Division I Core Sorav. Pumo "C" Out of Service from %04 09/12/97 to '1440 09/12/97 Duration: 8.60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br /> Planned Outage 1

Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance l ECCS System Outage: Division I Core Sorav Out of Service from 2257 09/30/97 to 2359 09/30/97 l Duration: 1.C3 hours Planned Outage l Outane Summary: Core Spray Pump and Valve Surveillance Performance ECCS System Outage: pivision I Core Sorav. Pumo "A" Out of Service from 145010/02/97 to 165010/02/97 Duration: - 2.00 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />

- Planned Outage  ;

putane Summary: Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage: Division I Core Sorav. Pumo "A" Out of Service from 105211/07/97 to 1200 11/07/97 Duration: 1.13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br /> Planned Outage Outane S3mmary: Electrical Bus Undervoltage Trip Surveillance Performance  !

ECCS System Outage: Division I Core Sorav. Pumo "C" Out of Service from 082811/14/97 to 111311/14/97 Duration: 2.75 hours8.680556e-4 days <br />0.0208 hours <br />1.240079e-4 weeks <br />2.85375e-5 months <br /> Planned Outage j V . . . ,

t Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance

l Enclosure to ,

. NRC-98-0021 -

' Page 14. . .

J ECCS System Outage: Division I Core Sorav. Pumo "A" Out of Service from 084512/05/97 to 1100 12/05/97 Duration: 2.25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br /> Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage:' Division I Core Sorav. Pumo "C" Out of Service from 091012/12/97 to 1232 12/12/97 Duration: - 3.37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br /> Planned Outage-Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance DIVISION 11 CORE SPRAY ECCS System' Outage: Division II Core Soray. Pumo "B" l

Out of Service from: 0836 01/17/97 to 1325 01/17/97 Duration: 4.82 hours9.490741e-4 days <br />0.0228 hours <br />1.35582e-4 weeks <br />3.1201e-5 months <br /> Planned Outage Outane Summary: Electr i cal Bus Undervoltage Trip Surveillance Performance I

ECCS System Outage: Division II Core Sorav. Pumo "D" Out of Service from 0845 01/24/97 to 1410 01/24/97 Duration: 5.12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance '

I

- ECCS System Outage: Division 11 Core Soray. Pumo "B"  !

Out of Service from: 0843 05/23/97 to 1425 05/23/97 l Duration: 5.70 hours8.101852e-4 days <br />0.0194 hours <br />1.157407e-4 weeks <br />2.6635e-5 months <br /> Planned Outage i

Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage: Division Il Core Soray. Pumo "D" Out of Service from 0830 05/30/97 to 1255 05/30/97 Duration: 4.42 hours4.861111e-4 days <br />0.0117 hours <br />6.944444e-5 weeks <br />1.5981e-5 months <br /> Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance , l ECCS System Outage: Division II Core Soray. Pumo "B" Out of Service from: 1645 06/20/97 to 2112 06/20/97 Duration: 4.45 hours5.208333e-4 days <br />0.0125 hours <br />7.440476e-5 weeks <br />1.71225e-5 months <br /> Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance

. Enclosure to

. NRC-98-0021 Page 15

- ECCS System Outage: Division II Core Sorav. Pumo "D" l Out of Service from' 1240 06/27/97. to 1400 06/27/97 Duration: 1.33 hours3.819444e-4 days <br />0.00917 hours <br />5.456349e-5 weeks <br />1.25565e-5 months <br />' Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance

- ECCS System Outage: Division II Core Sorav. Pumo "B"

. Out of Service from: 1224 07/18/97 to 1510 07/18/97 Duration: 2.77 hours8.912037e-4 days <br />0.0214 hours <br />1.273148e-4 weeks <br />2.92985e-5 months <br /> Planned Outage .

Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance i

ECCS System Outage: Division II Co e Sorav 'I Out of Service from: 1646 07/22/97 to 1920 07/22/97 Duration: 2.57 hours6.597222e-4 days <br />0.0158 hours <br />9.424603e-5 weeks <br />2.16885e-5 months <br /> - Planned Outage Outane Summary: Core Spray Pump and Valve Surveillance Performance ECCS System Outage: Division II Core Soray. Pumo "D" Out of Service from 0840 07/25/97 to 1254 07/25/97  ;

Duration: 4.23 hours2.662037e-4 days <br />0.00639 hours <br />3.80291e-5 weeks <br />8.7515e-6 months <br /> Planned Outage  !

Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage: Division II Core Sorav. Pumo "B" I Out of Service from: 0957 08/22/97 to 1144 08/22/97 Duration: 1.78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance

- ECCS System Outage: Division II Core Sorav. Pumo "D" Out of Service from 0508 08/29/97 to 1930 08/29/97 '

Duration: 14.37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br /> Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage: Division II Core Sorav. Pumo "B" Out of Service from: 0535 09/19/97 to 1230 09/19/97 Duration: 6.92 hours0.00106 days <br />0.0256 hours <br />1.521164e-4 weeks <br />3.5006e-5 months <br /> Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance

Enclosure to

. NRC-98-0021 Page 16 , ,

ECCS System Outage: Division 11 Core Soray Out of Service from: 0400 09/23/97 to 0335 09/24/97 Duration: 23.58 hours6.712963e-4 days <br />0.0161 hours <br />9.589947e-5 weeks <br />2.2069e-5 months <br /> Planned Outage Outane Summary: Planned Division II Outage ECCS System Outage: Divi, ion 11 Core Sorav. Pumn "D" Out of Service from 143010/03/97 to 1552 10/03/97 Duration: 1.36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage: Division II Core Sorav. Pump "B" Out of Service from: 164010/20/97 to 190010/20/97 Duration: 1.33 hours3.819444e-4 days <br />0.00917 hours <br />5.456349e-5 weeks <br />1.25565e-5 months <br /> Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage: Division 11 Core Sorav. Pumn "D" Out of Service from 090510/24/97 to 1112 10/24/97 Duration: 2.12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage: Division 11 Core Sorav. Pumn "B" Out of Service from: 174311/17/97 to 203611/17/97 Duration: 2.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br /> Planned Outage Outane Summary: Core Spray Pump and Valve Surveillance Performance ECCS System Outage: Division il Core Sorav. Pumn "B" Out of Service from: 092311/21/97 to 123511/21/97 Duration: 3.20 bours Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage: Division 11 Core Sorav. Pumn "D" Out of Service from 101511/26/97 to 1336 11/26/97 Duration: 3.35 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br /> Planned Outage Dutane Summary: Electrical Bus Undervoltage Trip Surveillance Performance 1

l

. Enclosure to NRC-98-0021 Page 17 ECCS System Outage: Division 11 Core Soray Out of Service from: 120712/04/97 to 141212/04/97 Duration: 2.08 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Unplanned Outage Outace Summary: Unplanned Outage to Repair Valve F036B ECCS System Outage: Division 11 Core Soray. Pumo "B" Out of Service from: 080012/19/97 to 111512/19/97 Duratisn: 3.25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br /> Planned Outage Outace Summary: Electrical Bus Undervoltage Trip Surveillance Perfcrmance ECCS System Outage: Division 11 Core Sorav. Pumo "D" Out of Service from 1434 '12/26/97 to 1820 12/26/97 Duration: 3.77 hours8.912037e-4 days <br />0.0214 hours <br />1.273148e-4 weeks <br />2.92985e-5 months <br /> Planned Outage Outace Summan: Electrical Bus Undervoltage Trip Surveillance Performance DIVISION I & DIVISION II AUTOMATIC DEPRESSURIZATION SYSTEM The Automatic Depressurization System (ADS) accumulated zero outage hours from January 1,1997 to December 31,1997.

HIGH PRESSURE CORE INJECTION ECCS System Outage: HPCI Out of Service from 1714 01/17/97 to 1730 01/17/97 Duration: 0.27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> Planned Outage Outace Summary: Steam Line Flow Functional Test '

ECCS System Outage: 11PCI Out of Service from 1750 01/17.'97 to 1820 01/17/97 Duratior . 0.50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> Planned Outage Outace Summary: Steam Line Flow Functional Test

,. ;:. Enclosurtto

-n NRC-98-0021 -

Pcge 18 ECCS System Outage: liPCI

- Out of Service f;om 0253 05/05/97 to 0707 05/05/97 Duration: 4.23 hours2.662037e-4 days <br />0.00639 hours <br />3.80291e-5 weeks <br />8.7515e-6 months <br /> Forced Outage Outane Summaryl Unplanned Outage due to Auxiliary Contact Failure ECCS System Outage: HPCI Out of Service from 1502 05/05/97 to 2035 05/05/97 Duration: 5.55 hours6.365741e-4 days <br />0.0153 hours <br />9.093915e-5 weeks <br />2.09275e-5 months <br /> Forced Outwe Outane Summary: Unplanned Outage to Replace Contactor for Start Circuit to the Auxiliary Oil Pump ECCS System Outage: J1PCI Out of Service from 1653 06/19/97 to 1043 06/20/97 Duration: 17.83 hours9.606481e-4 days <br />0.0231 hours <br />1.372354e-4 weeks <br />3.15815e-5 months <br /> Forced Outage Outane Summarv: Isolation of HPCI during Function Test of Division I Steam Line Pressure ECCS System Outage: HPCI Out of Service from 0227 07/15/97 to 0306 07/15/97 Duration: 0.65 hours7.523148e-4 days <br />0.0181 hours <br />1.074735e-4 weeks <br />2.47325e-5 months <br /> Planned Outage Outane Summary: Steam Line Flow Functional Test ECCS System Outage: IIPCI l Out of Service from 0315 07/15/97 to 0329 07/15/97 Duration: 0.23 hours2.662037e-4 days <br />0.00639 hours <br />3.80291e-5 weeks <br />8.7515e-6 months <br /> Planned Outage Outane Summary: Steam Line Flow Functional Test ECCS System Outage: HPCI Out of Service from 0400 07/15/97 to 1453 07/17/97 Duration: 58.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br /> Planned Outage Outane Summary: System Outage for Preventative Maintenance and Corrective Maintenance work

' ECCS System Outage: HPCI Out of Service from 0844 09/28/97 to 0912 09/28/97 Duration: 0.47 hours5.439815e-4 days <br />0.0131 hours <br />7.771164e-5 weeks <br />1.78835e-5 months <br /> Planned Outage Outane Summa:v: Steam Line Flow Functional Test )

l I

. . ; .' Enclosure to 4

NRC-98-0021 P:ge 19 _

ECCS System Outage: HPCI .

Out of Service from ' 2305 09/29/97 to 0237 09/30/97 Duration: 3.53 hours6.134259e-4 days <br />0.0147 hours <br />8.763227e-5 weeks <br />2.01665e-5 months <br />  : Forced Outage

- Outane Summary: System Outage to Repair HPCI Barometric Condenser Condensate Pump Discharge Check Valve 1

,