OPERATING DATA REPORT DOCKETNO. 50-341 COMPLETED BY L. Burr DATE April 15.1999 TELEPHONE (734) 586-1525 l
OPERATING STATUS 1.
Unit name: Fermi 2 4
2.
Reporting period: December 1998 i
3.
Licensed thermal power (MWt): 3430 4.
Nameplate rating (Gross MWe): 1217 5.
Design elect rating (Net Mwe): 1116 (2) 6.
Max dependable cap (Gross MWe): 1123 7.
Max dependable cap (Net MWe): 1074 l
8.
If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:
MDC cross and net undated based upon analysis of data collected at 96% reactor nower operation.
I 9.
Power level to which restricted, if any (MWe Net):
(2)
- 10. Reasons for restriction,if any:
(2)
THIS MONTH YEAR TO CUMULATIVE DATE 11.
Hours in reporting period 744 8.760 95.894 12.
Hours reactor was critical 744 7.002.3 67.257.2 i
13.
Reactor reserve shutdown hours 9
9 9
14.
Hours generator on-line 744 6.870.2 63.827.9
)
15.
Unit reserve shutdown hours 9
Q Q
16.
Gross thermal energy gen (MWH) 2.449.872 21.588.432 196.407.467 17.
Gross elect energy gen (MWH) 861.510 7.468.960 63.748.067 18.
Net elect energy gen (MWH) 827.645 7.153.994 60.889.431 l
19.
Unit service factor 100.0 %
78.4 %
66.6 %
20.
Unit availability factor 100.0 %
78.4 %
66.6 %
21.
Unit cap factor (using MDC net) 103.6 %
76.0 %
61.6% (1) 22.
Unit cap factor (using DER net) 99.7 %
73.2 %
57.4% (1) 23.
Unit forced outage rate 0.0%
11.4%
21.7 %
- 24. Shutdowns scheduled over next 6 months (Type, Date, Duration of each): None
- 25. If shutdown at end of report period, estimated date of startup: NLA
- 26. Units in test status (prior to commercial operation): N/A Notes: (1) Calculated using weighted averages to reflect variations in rating (MDC and DER) from initial commercial operation.
(2) Design electrical rating reflects 96% reactor power, pending completion of Power Uprate Program Testing.