Revised Monthly Operating Rept for Dec 1998 for Fermi 2
ML20205Q962
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/31/1998
From: Burr L
DETROIT EDISON CO.
To:
Shared Package
ML20205P970 List:
References
NUDOCS 9904220137
Download: ML20205Q962 (1)


Text

'

(

OPERATING DATA REPORT DOCKETNO. 50-341 COMPLETED BY L. Burr DATE April 15.1999 TELEPHONE (734) 586-1525 l

OPERATING STATUS 1.

Unit name: Fermi 2 4

2.

Reporting period: December 1998 i

3.

Licensed thermal power (MWt): 3430 4.

Nameplate rating (Gross MWe): 1217 5.

Design elect rating (Net Mwe): 1116 (2) 6.

Max dependable cap (Gross MWe): 1123 7.

Max dependable cap (Net MWe): 1074 l

8.

If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:

MDC cross and net undated based upon analysis of data collected at 96% reactor nower operation.

I 9.

Power level to which restricted, if any (MWe Net):

(2)

10. Reasons for restriction,if any:

(2)

THIS MONTH YEAR TO CUMULATIVE DATE 11.

Hours in reporting period 744 8.760 95.894 12.

Hours reactor was critical 744 7.002.3 67.257.2 i

13.

Reactor reserve shutdown hours 9

9 9

14.

Hours generator on-line 744 6.870.2 63.827.9

)

15.

Unit reserve shutdown hours 9

Q Q

16.

Gross thermal energy gen (MWH) 2.449.872 21.588.432 196.407.467 17.

Gross elect energy gen (MWH) 861.510 7.468.960 63.748.067 18.

Net elect energy gen (MWH) 827.645 7.153.994 60.889.431 l

19.

Unit service factor 100.0 %

78.4 %

66.6 %

20.

Unit availability factor 100.0 %

78.4 %

66.6 %

21.

Unit cap factor (using MDC net) 103.6 %

76.0 %

61.6% (1) 22.

Unit cap factor (using DER net) 99.7 %

73.2 %

57.4% (1) 23.

Unit forced outage rate 0.0%

11.4%

21.7 %

24. Shutdowns scheduled over next 6 months (Type, Date, Duration of each): None
25. If shutdown at end of report period, estimated date of startup: NLA
26. Units in test status (prior to commercial operation): N/A Notes: (1) Calculated using weighted averages to reflect variations in rating (MDC and DER) from initial commercial operation.

(2) Design electrical rating reflects 96% reactor power, pending completion of Power Uprate Program Testing.

9904220137 990415 PDR ADOCK o 31 R

,