. ANNUAL OPERATING REPORT JANUARY 1 - DECEMBER 31,1998 t
DETROIT EDISON COMPANY NRC DOCKET NO. 50-341 FACILITY OPERATING LICENSE NO. NPF-43 l
I i
l l
l l
9903080225 990301 PDR ADOCK 05000341 R
PDR L.
Enclosure to NRC-99-0013
' Page 2 t
Table of Contents' Page 1
1.0 Introduction 3
i
. 2.0 Summary of Operations 3-l 2.1 Summary of Operating Experience 3
2.2. Summary of Outages and Forced Reductions 4
[
Greater than 20 Percent of Full Power r
2.3 Fuel Performance 4
i 2.4 Shore Barrier Survey 5
l i
2.5 Safety Relief Valve Challenges 5
2.6 Personnel Monitoring and Exposum 5
1 2.7 Service Life of Main Steam Bypass Line 7
i 2.8 Specific Activity Analysis of the Primary Coolant 7
)
i
' 2.9 ECCS Cooling Performance Evaluation Model 7
Changes or Errors 2.10 ECCS Outages 7
l l
l l
Enclosure to --
]
NRC-99-0013 T Page 3 i
1.0_'
Intrdduction The Fermi 2 Nuclear Power Plant site is located on the western shore of Lake Erie in i
Frenchtown Township, Monroe County, Michigan. The Nuclear Steam Supply System is
)
a General Electric BWR 4 with a Mark I pressure-suppression containment. The plant is fully owned by The Detroit Edison Company.
-l
\\
2.0 -
Summary of ODerations l
i 2.1 Summary of ODeratine Experience Fermi 2 was operating at 96% reactor power at the start of 1998. Fermi 2 had generated a record amount of electricity in January 1998. The 827,891 megawatt -
hours produced was the most gene;ated for any month in the history of the plant.
On February 1,1998, a reactor scram occurred that was initiated from a Main Turbine Trip caused by relay testing on the 345 kV transmission mat. The l
shutdown was caused by a faulty relay and voltage irregularities, which caused the generator output breakers to open and initiate a turbine trip signal. Investigation into the causes and corrective actions were completed and plant restan occurred on Febmey 15,1998. As scheduled, power was reduced on April 18,1998, to perform main turbine stop, control and bypass valve surveillances, control rod scram time surveillances, and control rod pattern adjustments. Power was reduced on May 4,1998, to perform feedwater and reactor water level control i'
troubleshooting and monitoring. Power was reduced again, as scheduled, on May 29,1998, to perform control rod scram solenoid pilot valve replacement for 39 control rods. The last scheduled power reduction greater than 20% full power occurred on July 19,1998. A reactor power reduction was conunenced in preparation for making a control rod pattern adjustment. With the reactor at
..approximately 64% power, reactor power began fluctuating between 50 and 75%.
A manual scram was inserted following the onset of power fluctuations. Plant
{
restart occurred on July 24,1998 with the No. 4 High Pressure Turbine Control
{
Valve closed for the remainder of the cycle. The reactor was shutdown from
~
' September 4 through October 29,1998 for the sixth refueling outage. The plant
{
restarted on October 29,1998. Power was reduced on November 5,1998 when j
reactor recirculation 'A' pump speed decreased to minimum speed while attempting I
to remove the controller from saturation. The reactor was shutdown from November 13 through 18,1998, to repair an indicator shaft pressure seal leak on a feedwater check valve. The plant restaned on November 18,1998 and maintained power operation for the remainder of the year with no shutdowns or power reductions greater than 20% full power.
..m_
Enclosure to NRC-99-0013 4'"
' Page 4 '
l 4
2.2 Summary of Outanes and Forced Reductions Greater than 20 Percent of Full Power February 1 - 15,1998 - 342.1 Hours Shutdown i
Reactor shutdown due to 345 KV mat relay failure resultmg m a mam turbine generator trip on electrical load rejection followed by a reactor protection system initiated automatic reactor scram.
l May 4,1998 - Power Reduction.
[
Reactor power was reduced to 25% CTP to perform feedwater and reactor water level control troubleshooting / monitoring.
July 19 - 24,1998 - 114.7 Hours Shutdown i
t-
- i Reactor shutdown due to oscillations in reactor power and associated
' parameters. Cause was determined to be unstable flow through the No. 4 Turbine Control Valve. Plant restarted with the No. 4 TCV closed.
i l
September 4 - October 29,1998 - 1307.1 Hours Shutdown Reactor shutdown for sixth refueling outage.
L l
November 5,'1998 - Power Reduction Reduced reactor power to 65% CTP after recirculation pump 'A' speed l
Jecreased to minimum speed while attempting to remove the controller from saturation'.
November 13 - 18,1998 - 126.1 Hours Shutdown i
Reactor shutdown' to repair an indicator shaft pressure seal leak on a feedwater check valve.
i 6
l 2.3 Fuel Performance The reactor has operated failure free following the replacement of two leaking bundles during the cy:le six mid-cycle outage in October 1997. As of February 1999, off gas release rates are approximately 2500 Ci/sec, compared to approximately 7000 pCi/sec prior to the sixth refueling outage. While all leaking 4
bundles have been removed from the core, elevated off gas radiation levels and release rates remain due to residual plate-out of fuel inside the core. Off gas levels u
will continue to decrease as this plate-out is burned up and bundles are replaced in j
subsequent reloads.
l.
i
.~
I Enclosure to NRC-99-0013 Page 5 l
' Past irradiated fuel inspections of both failed and sound bundles have revealed the presence of small metallic debris. Three of Fermi's six fuel failures are confirmed debris induced fretting failures.. For this reason a number of debris mitigation efforts have been pursued. The cycle seven reload bundles contain a debris resistant
- lower tie plate.. A significant effort continues.to increase plant Foreign Material j
~
Exclusion (FME) awareness and reinforce exclusion practices. The plant has also j
incorporated a " soft" operating philosophy that limits the rate ofincrease in bundle t
. power and enforces a maximum nodal power level. This " soft" operation is j
believed to reduce the risk of failure for bundles that have been damaged by debris j
fretting.
l 2.4 _ Shore Barrier Survey A survey of the Fermi 2 shore barrier was completed as required by Technical I
Specification 4.7.3. The results of the survey indicated no damage, significant movement, or deterioration of the barrier. All forty-seven survey point elevations were within the tolerance specified in Technical Specification Table 3.7.3-1. Civil Engineering Drawings 6C721-44 through 49 were revised to incorporate the survey j
data. No unusualincidents occurred in 1998 that would have required additional surveillances.
j 2'5 ' Safety Relief Valve Challences There were no instances in 1998 where reactor pressure was high enough to require Safety Relief Valve (SRV) actuation. There were no instances in 1998 where an SRV actuation was demanded by an automatic logic system. SRVs were manually actuated for surveillance / post-maintenance testing as described below:
Date Affected SRV Comments 10/27/98 All SurveillanceTesting/ Post Maintenance Testing Following 1998 Refuel Outage. All SRVs lifted on demand (LERs96-017 and 98-010).
2.6 Personnel Monitorine and Exposure Table 2.6-1 provides a breakdown of radiation exposure by work and job function as required by Technical Specification 6.9.1.5.a.
i
Enclosure to NRC-99-0013.
Page 6 Table 2.6-1 Detroit Edison Fermi 2 1998 Regulatory Guide 1.16 Direct Reeding Dosimeter (DRD) Deep Dose Equivalent (DDE) Dose Report Personnel Recerving Exposure DRD DDE Manrem l
Funchon Department Station Utility Contract -
Station Utility Contract Employees Employees Workers Employees Employees Workers Plant Maintenance 139 9
136 11.860 0.065 15.992 Operations Operations 58 1
60 5.564 0.040 8.392 Health Phys 6cs 25 0
32 4.522 0.000 3.781 Supervisory 114 17 144 7.174 0.053 3.917 Engmeenng 74 4
11 1.955 0.012 0.055 Reactor Maintenance 4
1 41 0.452 0.013 4.816 Opsiabons Operations 0
0 0
0.000 0.000 0.000 ard Survesitance Health Physics 0
0 0
0.000 0.000 0.000 Supervisory 3
3 3
0.042 0.013 0.391 Engmeenna 2
0 2
0.330 0.000 0.370 i
Reactor Marntenance 1
0 196 0.155 0.000 43.942 Memtenance/ISI Opershons 1
0 0
0.211 0.000 0.000 Health Physses 1
0 2
0.137 0.000 0.246 Superwsory 8
0 32 0.320 0.000 9.218 Enameenno 0
0 12 0.000 0.000 2.538 i
Spec 6al Mamtenance 31 60 232 3.765 0.834 43.215 Mamtenance Operahons 17 0
13 1.456 0.000 4.455 t
Health Phys 6cs 8
0 12 1.284 0.000 1.681 Supervisory 30 8
63 3.394 0.105 3.546 Enoineenno 6
0 6
0.324 0.000 0.035 W aste Maintenance 0
0 3
0.000 0.000 0.007
+
[
Processing Operations 1
0 8
0.104 0.000 2.407 Health Physses 6
0 1
2.123 0.000 0.013 Supervisorv 0
0 11 0.000 0.000 E.521 Engmeenna 2
0 0
0.333 0.000 0 000 Refuehng Mamtenance 6
1 5
0.177 0.000 0.719 Operations 5
0 17 0.074 0.000 2.569 Health Physics 4
0 16 0.085 0.000 1.577 l
Supervisory 21 3
53 1.371 0.093 3.592 Engmeenna 17 1
4 0.181 0.008 0.031 Total Maintenance 181 71 613 16.409 0.912 108.891 i
Operations 82 1
98 7.409 0.040 17.823 Health Physics 44 0
63 8.151 0.000 7.298 Supervisory 176 31 306 12.301 0.264 23.185 Engineering 101 5
35
- 3.123 0.020 3.029
[
Grand Total Personnel 1,807 Manrem 208.655 NOTE: This report was produced using only secondary (DRD) extemal dosimetry - it does not include any intemal exposure.
i m
...-.~>-m
--r
.+,~n
. Enclosure to 1,
NRC-99-0013 Page 7 2.7f Service Life of Main Steam Bvoass Line In accordance with a Detroit Edison letter to the NRC dated November 7,1986
[VP-86-0154], the cumulative time the main steam bypass lines are operated with the bypass valves between 30 percent and 45 percent open will be reported annually.
A cuinulative value of 100 days is not to be exceeded without prior NRC _
notification.
Evalitations performed by Stone and Webster and by Hopper and Associates -
concluded that the bypass lines are acceptable for safe operation when operated
. within the 100 day constraint. Based on these evaluations, the new main steam i
bypass piping that was installed in 1985 has a service life which will allow it to i
function for the life of the plant under anticipated operating conditions. The mam steam bypass lines cumulative usage was 37.38 days as of December 31,1998.
j i
2.8 Specific Activity Analysis of the Primary Coolant Exceeding the Limits of Technical Specification 3.4.5 During 1998, the specific activity of the primary coolant did not exceed the limits of Technical Specification 3.4.5.
l-2.9 ' ECCS Cooline Performance Evaluation Model Changes or Errors No changes or errors which impact the Fermi 2 licensing basis Peak Cladding l.
Temperature (PCT) were identified in 1998. The licensing basis remains as -
reported to the NRC in Detroit Edison Letter NRC-96-0052, dated May 28,1996.
2.10 ECCS Outanes Pursuant to Fermi 2 Technical Specification 6.9.1.5.c, a summary of the Emergency l
i Core Cooling System (ECCS) outages which occurred between January 1,1998 and December 31,1998 is provided. The tabulation of ECCS outage hours (Table 2.10-
- 1) includes both forced and planned outages for the Low Pressure Coolant Injection
_ (LPCI), Core Spray, High Pressure Coolant Injection (HPCI), and Automatic Depressurization Systems (ADS). An outage was considered to be whenever one of the ECCS systems was out-of-service at a time it was required to be operable per i
the Technical Specifications.
M 4
i y.-,,,.
F Enclosure to NRC-99-0013 Page 8 ECCS Outanes
. Table 2.10-1 ECCS Outage Hours January 1,1998 to December 31,1998
- ECCS SYSTEM FORCED HOURS PLANNED HOURS LPCI Division I 0.0 44.94 LPCI Division II 0.0 63.8 Core Spray Division I '
O.0 90.52 Core Spray Division II 0.0 83.37 ADS Division I 0.0 0.0 ADS Division II 0.0 0.0 HPCI 10.45 134.06 DIVISION I LOW PRESSURE COOLANT INJECTION ECCS System Outage:
Division I Low Pressure Coolant Iniection Out of Service from~
224102/21/98 to 0135 02/22/98 Duration:
2.90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> Planned Outage Outane Summary: Surveillance Performance ECCS System Outage:~
Division I Low Pressure Coolant Iniection Out of Service from 0602 03/10/98 to 2009 03/10/98
. Duration:
14.12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Planned Outage Outane Summary: Performance of MOV Motor Pinion Inspection (A Train)
ECCS System Outage:
Division I Low Pressure Coolant Iniection Out of Service from 0523 04/07/98 to 1520 04/07/98 Duration:
9.95 hours0.0011 days <br />0.0264 hours <br />1.570767e-4 weeks <br />3.61475e-5 months <br /> Planned Outage
- Outane Summary: Performance of MOV Motor Pinion Inspection (C Train)
ECCS System Outage:
Division I Low Pressure Coolant Iniection Out of Service from 0914 05/12/98 to 1150 05/12/98
' Duration:
2.60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br /> Planned Outage Outane Summary: Surveillance Performance t-
Enclosure to NRC-99-0013 Page 9 ECCS System Outage:
Division I Low Pressure Coolant Iniection Out of Service from 0404 08/04/98 to 2217 08/04/98 Duration:
18.22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> Planned Outage Outage Summary: System Outage for Preventative Maintenance ECCS System Outage:
Division I Low Pressure Coolant Injection Out of Service from 0543 08/05/98 to 0628 08/05/98 Duration:
0.75 hours8.680556e-4 days <br />0.0208 hours <br />1.240079e-4 weeks <br />2.85375e-5 months <br /> Planned Outage Outage Summary: Surveillance Performance ECCS System Outage:
Division I Low Pressure Coolant Iniection Out of Service frorn 0215 09/05/98 to 0538 09/05/98 Duration:
3.38 hours4.398148e-4 days <br />0.0106 hours <br />6.283069e-5 weeks <br />1.4459e-5 months <br /> Planned Outage Outage Summary: System Warmup Prior to Placing SDC in Service ECCS System Outage:
Division I Low Pressure Coolant Iniection Out of Service from 202811/10/98 to 232611/10/98 Duration:
2.97 hour0.00112 days <br />0.0269 hours <br />1.603836e-4 weeks <br />3.69085e-5 months <br />s-Planned Outage Outage Summary: Surveillance Performance DIVISION II LOW PRESSURE COOLANT INJECTION ECCS System Outage:
Division II Low Pressure Coolant Iniection Out of Service from 2334 02/02/98 to 0150 02/03/98 Duration:
2.27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> Planneo Outage Outage Summary: System Warmup Prior to Placing SDC in Service ECCS System. Outage:
Division II Low Pressure Coolant Iniection
- Out of Service from 0450 03/17/98 to 1617 03/17/98 Duration:
11.45 hours5.208333e-4 days <br />0.0125 hours <br />7.440476e-5 weeks <br />1.71225e-5 months <br /> Planned Outage Outare Summary: Performance of MOV Motor Pinion Inspection (B Train)
ECCS System Outage:
Division II Low Pressure Coolant Iniection Out of Service from 0424 03/25/98 to 0607 03/25/98 Duration:
1.72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> P:anned Outage Outage Summary: Surveillance Performance
Enclosure to NRC-99-0013 Page 10 ECCS System Outage:
Division II Low Pressure Coolant Iniection Out of Service from 0503 06/17/98 to 1536 06/17/98 Duration:
10.55 hours6.365741e-4 days <br />0.0153 hours <br />9.093915e-5 weeks <br />2.09275e-5 months <br /> Planned Outage Outane Summary: Performance of MOV Motor Pinion Inspection (B Train)
ECCS System Outage:
Division II Low Pressure Coolant Iniection :
Out of Service from 0400 06/23/98 to 1716 M/24/98 Duration:
37.27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> Planned Outage
- Outage Summary: System Outage for Preventative Maintenance
- ECCS System Outage:
Division II Low Pressure Coolant Iniection Out of Service from 0007 06/25/98 to 0137 06/25/98 Duration:
1.50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> Planned Outage Outage Summary: Surveillance Performance ECCS System Outage:
Division II Low Pressure Coolant Iniection Out of Service from 0347 09/05/98 to 0700 09/05/98 Duration:
3.22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> Planned Outage Outane Summary: Removed From Service Due to Voiding Caused by Warmup of Division I Piping.
ECCS System Outage:
Division II Low Pressure Coolant In_iection Out of Service from 060311/13/98 to 1113 11/13/98 Duration:
5.17 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br /> Planned Outage Outage Summary: System Warmup Prior to Placing SDC in Service ECCS System Outage:
Division II Low Pressure Coolant Iniection Out of Service from 1611 12/22/98 to 1623 12/22/98 Duration:
0.20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> Planned Outage Outane Summary: Surveillance Performance (D Train)
ECCS System Outage:
Division II Low Pressnre Coolant Iniection Out of Service from 174912/22/98 to 1800 12/22/98 Duration:
0.18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> Planned Outage Outage Summary: Surveillance Performance (B Train) i i
I
Enclosure to -
1 j
L'.
' NRC-994)013 ~
i l~
. Page ll '
l-l l
ECCS System Ontage:
Division II Low Pressure Coolant Iniection Out of Service from 204412/22/98 to 214512/22/98 l
l1 Duration:
1.02 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> Plaimed Outage j
l.
l l
Outane Summary: Surveillance Performance i
I i
DIVISION I CORE SPRAY l
ECCS System Outage:
Division I Core Sorav. Pumo "A" Out of Service from 083001/02/98 to 1100 01/02/98 Duration:
' 2.50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> Planned Outage j
i Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance l
' ECCS System Outage:
Division I Core Sorav l
Out of Service from 1440 01/06/98 to 1610 01/06/98 Duration:
- 1.50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> '
Planned Outage Outane Summary: Core Spray Pump and Valve Surveillance Performance
[
i I
ECCS System Outage:
Division I Core Soray Pumo "C" Out of. Service from 0800 01/09/98 to 1017 01/09/98 Duration:
2.28 hours3.240741e-4 days <br />0.00778 hours <br />4.62963e-5 weeks <br />1.0654e-5 months <br /> Planned Outage
{
Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance l
1 ECCS System Outage:
Division I Core Sorav. Pumo "A"
- Out of Service from 1213 03/13/98 to 1400 03/13/98
{
Duration:
1.78 hours9.027778e-4 days <br />0.0217 hours <br />1.289683e-4 weeks <br />2.9679e-5 months <br /> Planned Outage l
Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance l
. ECCS System Outage:
Division I Core Sorav. Pumo "C" Out of Service from 1603 03/13/98 to 1805 03/13/98 Duration:.
2.03 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.
Planned Outage l
1 Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage:
Division I Core Sprav.
L Out of Service from 1736 04/02/98 to ' 1740 04/02/98 l
Duration:
0.07 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> Planned Outage L.
Outane Summary: Core Spray Pump and Valve Surv(illance Perfermance i~
I
Enclosure to.
i
?
t" NRC-99-0013
'l
.' ?
f Page 12 i
1 ECCS Systdm Outage:
- Division I Core Sorav. Pumo "A" Out of Service from 1230 04/09/98 to 1350 04/09/98' i
' Duration:
1.33 hours3.819444e-4 days <br />0.00917 hours <br />5.456349e-5 weeks <br />1.25565e-5 months <br /> Planned Outage i
Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage:
Division I Core Sorav. PumD"C" Out of Service from.
' 0832 04/09/98 to 1000 04/09/98 Duration:
1.47 hours5.439815e-4 days <br />0.0131 hours <br />7.771164e-5 weeks <br />1.78835e-5 months <br /> Planned Outage I
l Outane Sumnluya Electrical Bus Undervoltage Trip Surveillance Performance l
ECCS System Outage:
Division I Core Sorav. Pumo "A" l
Out of Service from
~ 0822 05/08/98 - to 1036 05/08/98 Duration:
2.23 hours2.662037e-4 days <br />0.00639 hours <br />3.80291e-5 weeks <br />8.7515e-6 months <br /> Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance I
i ECCS Srstem Outage:
Division I Core Sorav. Pumo "C" i
Out of Service from 0829 05/15/98 to 1100 05/1568 Duration:
2.52 hours6.018519e-4 days <br />0.0144 hours <br />8.597884e-5 weeks <br />1.9786e-5 months <br /> Planned Outage -
Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance
. ECCS System Outage:
Division I Core Sorav. Pumo "A" Out of Service from 0830 OM)5/98 ' to 1145 OM)5/98 l
- Duration:
3.25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br />.
Planned Outage l
l
. Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance L
L ECCS System Outage:
Division I Core Sorav l
Out of Service from 0600 06/09/98 to 1850 06/09/98 1
L Duration:
12.83 hours9.606481e-4 days <br />0.0231 hours <br />1.372354e-4 weeks <br />3.15815e-5 months <br /> -
Planned Outage
-I Outare Summarv: Room Cooler T4100B021 MCC Preventative Maintenance
. ECCS System Outage:
Division I Core Sorav. Pumo "C".
Out of Service from 0909-06/12/98 to 1042,06/12/98
_j Duration:
1.55 hours6.365741e-4 days <br />0.0153 hours <br />9.093915e-5 weeks <br />2.09275e-5 months <br /> Planned Outage.
J Outare Summary: Electrical Bus Undervoltage Trip Surveillance Performance
.7 -
Y l
- ~
Enclosure to NRC-99-0013 Page 13 ECC'S System Outage:
Division I Core Sorav. Pumo "A" j
Out of Service from 0815 07/02/98 to 1225 07/02/98 Duration:
4.17 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br />' Planned Outage 4
Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance t
- ECCS System Outage:
Division I Core Sorav Out of Service from 0040 07/07/98 to 0547 07/08/98 Duration:
25.12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Planned Outage l.;
Outane Summary: Planned Division 1 Outage l
ECCS System Outage:
- Division I Core Sorav. Pumo "C"
{
Out of Service from -
1443 07/10/98 to 1700 07/10/98-i Duration:
2.28 hours3.240741e-4 days <br />0.00778 hours <br />4.62963e-5 weeks <br />1.0654e-5 months <br /> Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance l
ECCS System Outage:
Division I Core Sorav. Pumo "A" Out of Service from 0852 08/07/98 to 1100 08/07/98 Duration:
2.13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br /> Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance j
ECCS System Outage:
Division I Core Sorav. Pumo "C'
'i Out of Service from -
0850 08/14/98 to 1300 08/14/98 l
Duration:
4.17 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br /> Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance
- ECCS System Outage:
Division I Core Sorav. Pumo "A" i
Out of Service from 0826 09/04/98 to 1000 09/04/98 Duration:
1.57 hours6.597222e-4 days <br />0.0158 hours <br />9.424603e-5 weeks <br />2.16885e-5 months <br /> Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance
{
i ECCS System Outage:
Division I Core Sorav. Pumo "C'
'i
'Out of Service from 1218 09/04/98 to 1330 09/04/98 Duration:
1.20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />
~ Planned Outage
' Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance r
. Enclosure to NRC-99-0013 Page 14
)
i
' ECCS System Outage:
Division I Core Sorav. Pumo "A"
' Out of Service from 085010/30/98 to 1355 10/306 8 Duration:
5.08 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Planned Outage
]
Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance l
I ECCS System Outage:'
Division I Core Sorav. Pumo "C" l
Out of Service from 165511/12/98 to 1820 11/12/98 Duration:
- 1.42 hours4.861111e-4 days <br />0.0117 hours <br />6.944444e-5 weeks <br />1.5981e-5 months <br /> Planned Outage Outane Sununary: Electrical Bus Undervoltage Trip Surveillance Performance l
ECCS System Outage:
Division I Core Sorav. Pumo "A" i
Out of Service from 091412/04/98 to 1233 12/046 8 l
Duration:
3.32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> Planned Outage l
Outare Summary: Electrical Bus Undervoltage Trip Surveillance Performance l
ECCS System Outage:
Division I Core Sorav.' Pumo "C" Out of Service from 0851 12/11/98 to 1045 12/118 8 l
Duration:
1.90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> Planned Outage l
~ Outare Summary: Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage:
Division I Core Sorav. Pumo "A" Out of Service from 0815'12/30/98 to 110412/30/98 Duration:
2.82 hours9.490741e-4 days <br />0.0228 hours <br />1.35582e-4 weeks <br />3.1201e-5 months <br /> Planned Outage l
l Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance l
DIVISION II CORE SPRAY
- ECCS System Outage:
Division II Core Sorav. Pumo "B"
~l Out of Service from:
0846 01/16/98 to 1053 01/16/98 Duration:
2.12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Planned Outage l
l Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage:
Division II Core Sorav
- Out of Service from:
1512 01/20/98 to 1730 01/20/98 i
Duration:
2.30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> Planned Outage
)
Outane Summary: Com Spray Pump and Valve Surveillance Performance i-4
Enclosure to '
NRC-99-0013 Page 15 l
i ECC3 System Outage:
Division II Core Sorav. Pumo "D" i
Out of Service from 1214 01/23/98 to 1410 01/23/98 i
Duration:
1.93 hours0.00108 days <br />0.0258 hours <br />1.537698e-4 weeks <br />3.53865e-5 months <br /> Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage:
Division II Core Sorav. Pumo "B" Out of Service from:
0938 02/20/98 to 1545 02/20/98 Duration:
6.12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Planned Outage l
Outage Sammary: Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage:
Division II Core Sorav. Pumo "B" Out of Service from:
1409 02/2168 to 1646 02/21/98
{
Duration:
2.62 hours7.175926e-4 days <br />0.0172 hours <br />1.025132e-4 weeks <br />2.3591e-5 months <br /> Planned Outage Outare Summary: Electrical Bus Undervoltage Trip Surveillance Performance l
ECCS System Outage:
Division II Core Sorav. Pumo "D"
- Out of Service from 0933 02/27/98 to 1053 02/27/98-Duration:
2 M hours Planned Outage l
t i
l l
Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance i
l ECCS System Outage:
Division II Core Sorav. Pumo "B"
' Out of Service from:
1228 03/20/98 to 1510 03/20/98 i
l Duration:
2.70 hours8.101852e-4 days <br />0.0194 hours <br />1.157407e-4 weeks <br />2.6635e-5 months <br /> Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage:
Division II Core Sorav. Pumo "D" i.
Out of Service from 0823 03/27B8 to 1130 03/278 8 Duration:
3.12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> Planned Outage i
1 l
Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance j
l
\\
ECCS System Outage:
Division II Core Sorav. Pumo "B"
. Out of Service from:
083104/17/98 to 1300 04/17B8 Duration:
4.48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> Planned Outage i
Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance l
1 l
_ _.. ~.. _ _ _ -...
Enclosu e to NRC-99-0013 Page 16 -
i ECCS System Outage:
Division II Core Sprav Out of Service from:
1320 04/20/98 to 1600 04/20/98 1
Duration:
2.67 hours7.75463e-4 days <br />0.0186 hours <br />1.107804e-4 weeks <br />2.54935e-5 months <br /> Planned Outage i
Outane Summary: Core Spray Pump and Valve Surveillance Performance ECCS System Outage:
Division II Core Sorav. Pumo "D" Out of Service from-0914 04/27/98 to 1100 04/27/98 Duration:
1.77 hours8.912037e-4 days <br />0.0214 hours <br />1.273148e-4 weeks <br />2.92985e-5 months <br /> Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage:
Division II Core Sorav. Pumo "B" Out of Service from:
093105/22/98 to 1130 05/22/98 Duration:
1.98 hours0.00113 days <br />0.0272 hours <br />1.62037e-4 weeks <br />3.7289e-5 months <br /> Planned Outage l
Outare Summary: Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage:
Division II Core Sorav. Pumo "D" Out of Service from 0840 05/29/48 to 10.58'05/29/98
. Duration:
2.30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
Planned Outage
)
1 Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage:
Division II Core Sorav. Pumo "B" Out of Service from:
-0817 06/19/98 to 1150 06/19/98-Duration:
2.55 hours6.365741e-4 days <br />0.0153 hours <br />9.093915e-5 weeks <br />2.09275e-5 months <br /> Planned Outage Outare Summary: Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage:
Division II Core Sprav. Pumo "D" l
Out of Service from 1018 06/26/98 to 1440 06/26/98 l
. Duration:
2.37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br /> Planned Outage L
- Outane Summarvi Electrical Bus Undervoltage Trip Surveillance Performance ECCS' System Outage:
. Division II Core Soray. Pumo "B" Out of Service from:
1626 07/18/98 to 2017 07/18/98 Duration:
3.85 hours9.837963e-4 days <br />0.0236 hours <br />1.405423e-4 weeks <br />3.23425e-5 months <br />
. Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance 4
Enclosum to -
I L NRC-99-0013 -
l
~*
Page 17 ECdS Systim Outage:
. Division II Core Sorav. Pumo "D"
. Out of Service from -
1446 07/25/98 to 1630 07/25/98' Deation:
.1.73 hours8.449074e-4 days <br />0.0203 hours <br />1.207011e-4 weeks <br />2.77765e-5 months <br /> Planned Outage i
L
'Outare Sumnav; Electrical Bus Undervoltage Trip Surveillance Performance f
ECCS System Outage:
Division II Core Sorav Out of Service frorn:
1330 07/2668 to 1500 07/26/98 Duration:
1.50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> -
Planned Outage l
i Outare Summary: Core Spray Pump and Valve Surveillance Performance j
ECCS System Outage:
Division II Core Sorav. PumD "B"
]
Out of Service from:
1635 08/17/98'to 2010 08/17/98 l
Duration:
3.58 hours6.712963e-4 days <br />0.0161 hours <br />9.589947e-5 weeks <br />2.2069e-5 months <br /> -
Planned Outage
]
Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance y
ECCS System Outage:
Division II Core Sorav -
Out of Service from:
0429 08/19/98 to 0023 08/20/98 l
. Duration:
- 19.90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> -
Planned Outage l
Outane Summary: Planned Division II Outage -
ECCS System Outage:
Division II Core Sorav. Pumo "D" Out of Service from 0909 08/28/98 to 1030 08/28/98
. Duration:
1.35 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br /> Planned Outage Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage:
Division II Core Sorav. Pumo "B" Out of Service from:
124011/19/98 to 151211/19/98 Duration:
2.53 hours6.134259e-4 days <br />0.0147 hours <br />8.763227e-5 weeks <br />2.01665e-5 months <br /> Planned Outage
- Outane Summary: Electrical Bus Undervoltage Trip Surveillance Performance i
1 ECCS System Outage:
Division II Core Sorav. Pumo "D"
.Out of Service from 085011/25/98 to 1056 I1/25/98 Duration:
2.10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> Planned Outage Outare Summary: Electrical Bus Undervoltage Trip Surveillance Performance j
l
Enclosure to
+
NRC-99-0013 Page 18 ECCS System Outage:
Division II Core Sorav. Pumo "B" Out of Service from:
083312/18/98 to 104512/18/98 Duration:
2.20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> Planned Outage Outage Summary: Electrical Bus Undervoltage Trip Surveillance Performance ECCS System Outage:
Division II Core Sorav. Pumo "D" Out of Service from 082712/23/98 to 1143 12/23/98 Duration:
3.27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> Planned Outage Outace Summary: Electrical Bus Undervoltage Trip Surveillance Performance 1
h DIVISION I & DIVISION II AUTOMrl'IC DEPRESSURIZATION SYSTEM L
The Automatic Depressurization System (ADS) accumulated zero outage hours from January 1,1998 to December 31,1998.
i i
HIGH PRESSURE COOLANTINJECTION 1
ECCS Syste n Outage:
High Pressure Coolant Iniection Out of Service from 2033 01/12/98 to 2059 01/12/98 1
Duration:
0.43 hours4.976852e-4 days <br />0.0119 hours <br />7.109788e-5 weeks <br />1.63615e-5 months <br /> Planned Outage i
Outane Summary: Steam Line Flow Functional Test ECCS System Outage:
Hich Pressum Coolant Iniection 1
Out of Service from 2100 01/12/98 to 2134 01/12/98 l
Duration:
0.57 hours6.597222e-4 days <br />0.0158 hours <br />9.424603e-5 weeks <br />2.16885e-5 months <br /> Planned Outage Outare Summary: Steam Line Flow Functional Test ECCS System Outage:
High Pressure Coolant Iniection Out of Service from 1706 03/16/98 to 0333 03/17/98 Duration:
10.45 hours5.208333e-4 days <br />0.0125 hours <br />7.440476e-5 weeks <br />1.71225e-5 months <br /> Forced Outage Outage Summary: Unplanned Outage Due to Vacuum Breaker Stroke Failure
1 Enclosure to -
NRC-99_-0013 Page 19.
- ECdS System Outage:
High Pressure Coolant Iniection i
.Out of Service from 2006 03/17/98 to 2028 03/17/98 i
Duration:
0.37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br /> Planned Outage j
'Outane Summary: Steam Line Flow Functional Test l
' ECCS System Outage:
High Pressure Coolant Iniection Out of Service from >
225103/23/98 to 2308 03/23/98 i
Duration:
0.28 houis Planned Outage Outane Summary: Steam Line Flow Functional Test
- ECCS System Outage:
High Pressure Coolant Iniection j
- Out of Service from 0300 04/21/98.to 0029 04/26/98 l
' Duration:
117.48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> Planned Outage Outane St.umary: System Outage ECCS System Outage:
High Pressure Coolant Iniection l
Out of Service from ~
1827 06/16/98 to 1838 06/16/98 Duration:
0.18 hours2.083333e-4 days <br />0.005 hours <br />2.97619e-5 weeks <br />6.849e-6 months <br /> -
Planned Outage Outare Summary: Steam Line Flow Functional Test ECCS System Outage:
High Pressure Coolant Iniection Out of Service from 1243 06/19/98 to 1613 06/19/98 l
Duration:
3.50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> Planned Outage Outane Summary: Pump Response Time and Operability Test l
l ECCS System Outage:
High Pressure Coolant Iniection i
Out of Service from 1640 06/22/98 to 1650 06/22/98 l
Duration:
0.17 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br /> Planned Outage j
Outane Summary: Steam Line Flow Functional Test l
ECCS System Outage:
High Pressure Coolant Iniection l
Out of Service from.
2242 07/14/98 to 2320 07/14/98 -
i Duration:
0.63 hours7.291667e-4 days <br />0.0175 hours <br />1.041667e-4 weeks <br />2.39715e-5 months <br />
. Planned Outage
- Outane Summary: Steam Line Flow Functional Test
p i
~ Enclosun: t3 l~;
Page 20 LECdS System Outage:
High Pressure Coolant Iniection Out of Service from
. 0944 07/25/98 to 1015 07/25/98
- Duration:
0.52 hours6.018519e-4 days <br />0.0144 hours <br />8.597884e-5 weeks <br />1.9786e-5 months <br /> Plaimed Outage l
' Outane Summary: Steam Line Flow Functional Test 1
ECCS System Outage:
Hinh Pressure Coolant Iniection l-Out of Service from.
1355 07/28/98 to 1718 07/28/98
. Duration:
3.38 hours4.398148e-4 days <br />0.0106 hours <br />6.283069e-5 weeks <br />1.4459e-5 months <br /> Planned Outage Outane Summary: Pump Response Time and Operability Test 1
ECCS System Outage:
High Pressure Coolant Iniection i
Out of Service from 2137 08/l8/98 to 2200 08/l8/98 Duration:
0.38 hours4.398148e-4 days <br />0.0106 hours <br />6.283069e-5 weeks <br />1.4459e-5 months <br /> Planned Outage Outane Summary: Steam Line Flow Functional Test
. ECCS System Outage:
High Pressure Coolant Iniection
- Out of Service from 0922 08/21/98 to 1000 08/21/98 Duration:
0.63 hours7.291667e-4 days <br />0.0175 hours <br />1.041667e-4 weeks <br />2.39715e-5 months <br /> Planned Outage Outane Summary: Steam Line Flow Functional Test
. ECCS System Outage:
Hinh Pressure Coolant Iniection
'l
' Out of Service from 165710/27/98 to 180010/27/98.
1 Duration:
1.05 hour5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />s-Planned Outage i
1
' Outane Summary: Pump Response Time and Operability Test -
l
)
.ECCS System Outage:
High Pressure Coolant Iniection Out of Service from-0631 10/28/98 to 1038.10/28/98 '
Duration:
4.17 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br /> Planned Outage
' Outare Summary: Pump Response Time and Operability Test l-
- ECCS System Outage:
Hinh Pressure Coolant Iniection.
l-Out of Service from 0957'12/15/98 to 1016 12/15/98 L
Duration:
0.32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> Planned Outage
' Outane Summary: Steam'Line Flow Functional Test 1
+,+s n