NRC-98-0019, Monthly Operating Rept for Jan 1998 for Fermi 2
| ML20202G400 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 01/31/1998 |
| From: | Giles H, Peterson N DETROIT EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CON-NRC-98-0019, CON-NRC-98-19 NUDOCS 9802200121 | |
| Download: ML20202G400 (4) | |
Text
<
.o Edson r=ionhDixieHwy=r""'"
h.
Reg. Guide 1.16 February 9,1998 NRC-98-0019 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washmgton, D. C. 20555
Reference:
Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43
Subject:
Monthlv Oneratina Status Renor' for January 1998 Enclosed for your information and use is the Fermi 2 Monthly Ope ~tting Status Report for January 1998. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.
If you have any questions, please contact me, at (734) 5864258.
Sincerely,
~
Norman K. Peterson Director - Nuclear Licensing Enclosures cc: A. B. Beach B. L. Burgess D. R. Hahn G. Harris 1
"'^'
A. J. Kugler l
M. V. Yudasz, Jr.
9D i1111110 tilll.lllil.liti.lll'll 9
""
- i " " '
9802200121 980131 PDR ADOCK 05000341 R
-.- - - - _ - _ ~.. -
OPERATING DATA REPORT DOCKET NO. 1Q 341 COMPLETED BY H. B. Giles DATE February 9.1998 TELEPHONE (734) 586-1522 OPERATING STATUS l.
Unit name: Fermi 2 Notes: (1) Calculated using weighted 2.-
Reporting period: January 1998 averages to reflect variations in rating 4
3.
Licensed thermal power (MWt): 3430 (MDC and DER) from initial commercial 4.
Nameplate rating (Gross MWe): 1215 (3) operation. (2) Design electricalrating 5.
Design elect rating (Net MWe): 1116 (2) reflects 96% reactor power, pending 6.
Max dependable cap (Gross MWe): 1147 completion of Power Uprate Program 7.
Max depertable cap (Net MWe): 1098 Testing. (3) General Electric Company 1
Alsthom instruction manual.
8.
If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:
N!%
9.
Power level to which restricted, if any (MWe Net):
(2)
- 10. Reasont ior restriction,if any:
(2)
THIS MONTil YEAR TO CUMULATIVE DATE 11.
Hours in reporting period 744 744 87.878 12.
liours reactor was critical 744.0-744.Q 60.998.9 13.
Reactor reserve shutdown hours Q
Q Q
14.
Hours generator on-line 744.0 744.0 57.701.7 15.
Unit reserve shutdown hours 0
0 Q
16.
Gross thermal energy gen (MWH) 2.448.576 2.448.576 177.267.611 17.
Gross elect energy gen (MWH) 860.950 860.950 57.140.057 18.
Net Elect energy gen (MWH) 827.891 827.891 54.563.328 19.
Unit sen> ice factor 100.0 100.0 65.7 20.
Unit availability factor 100.0 100.0 65.7 21.
Unit cap factor (using MDC ne.)
101.3 101.3 60.4 (1) 22.
Unit cap factor (using DER net) 97.7 97.7 56.2 (1) 23.
Unit forced outage rate 0
0 22.6
- 24.. Shutdowns scheduled over next 6 months (Type, Date, Duration of each): N/A
- 25. If shotdown at end of report period, estimated date of startup: N/A
' 26. Units in test status (prior to commercial operation): N/A
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-341 i
UNIT Fermi 2 a
^
DATE February 9.1998 COMPLETED BY H. B. Giles TELEPH WE (734) 586-1522 Month January 1998 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL I
(MWe-Net)
(MWe-Net)
I 1113 17 1118 2
1098 18 1117 3
1108 19 1117 4
i s
1114 20 1118 5
1107 21 1118 6
1107-22 1118 7
1111 23 1115 4
8 1113 24 1115 9
1114 25 1115 10 1116 26 1114 l
11 1118 27 1116 5
12 1117 28 1118 13 1116 29 1116 14 1116 30 1116 15 1119 31 1116 16 1118
.. g UNIT SilUTDOWNS AND POWER REDUCTIONS j
DOCKET NO:
50-341 COMPLETED BY:
II. B. Giles DATE-February 9.1998 TELEPilONE:
(734)586-1522 i
REPORT MONTil January 1998
'[
i No. (6)
Date TYPE Dur(firs)
Reason (2)
Method of shutting LER No.
Sys Code (4)
Comp Cause and Corrective Action to (1)'
down reactor or Code Prevent Recurrence reducing power (3)
(5)
None (1)
F: Forced (2)
REASON:
(3)
METilOD:
(4) Instructions for preparation ofdata entry sheets S: Scheduled A - Equipment Failure (Explain) 1 - Manual for Licensee Event Report (LER) file (NUREG.
3 - Maintenance or Test 2 - Manual Scram 1022)
C - Refueling 3 - Automatic Scram (5) Same Source as (4)
D - Regulatory Restriction 4 - Continued (6) R - Prefix indicates power reduction.
E - Operations Training and License 5 - Reduced Load S - Prefix indicated plant shutdown.
Examination 9 - Other (7) Duration of reductions reported as zero per i
F-Administrative Regulatory Guide 1.16, Revision 4.
G - Operational Error (Explain) 11 - Other (Explain) i t
l i
i t