ML20141A054

From kanterella
Jump to navigation Jump to search
Advises That TC Elsasser Will Replace EC Mccabe as Section Chief for Facility,Effective on 860331,based as Realignment of Projects within Region I Ofc
ML20141A054
Person / Time
Site: Rensselaer Polytechnic Institute
Issue date: 03/27/1986
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lahey R
RENSSELAER POLYTECHNIC INSTITUTE, TROY, NY
References
NUDOCS 8604040376
Download: ML20141A054 (2)


Text

_

n 4

Docket No:

50-225 MAR 2 71996 Rensselaer Polytechnic Institute ATTN:

Dr. R. T. Lahey, Chairman Department of Nuclear Engineering and Science Department of Nuclear Engineering and Science Troy, New York 12181 Gentlemen:

Subject:

Projects Realignment in Region I The purpose of this letter is to inform you that due to a realignment of projects within the Region I office, Mr. Thomas C. Elsasser will replace Mr. Ebe C. McCabe as the cognizant Section Chief for your facility.

Mr. Elsasser can be reached on 215-337-5378.

I will retain responsieility as the cognizant Branch Chief.

This realignment will become effective on March 31, 1986.

Sincerely, prh sisned nya -

Edward C. Wenzinger, Chief Projects Branch No. 3 Division of Reactor Projects cc:

-Dr. D. R. Harris, Facility Director

~

Mr. F. E. Wicxs, Supervisor Dr. G. Judd, Vice Provost for Plans and Resources Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of New York 8604040376 864X327 PDR ADOCK 05000225 P

PM g

g o/

  • ~l.

I Rensselaer Polytechnic Institute-2 m27M bec:

Region I Docket Room (with concurrences)

Management Assistant, DRMA-(w/o encl)

J. Grant H. Berkow, NRR i

RI:DRP RI P

- RI DRP k

G ant /meo Els sser zinger tarostecki 3 21/86' g

@ 7/V h

0FFICIAL RECORD COPY

.s