Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-225/81-01. Extensive Review of Current Operating Procedures to Be Performed Before 811231 Per 810922 Telcon
ML20032C428
Person / Time
Site: Rensselaer Polytechnic Institute
Issue date: 11/04/1981
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lahey R
RENSSELAER POLYTECHNIC INSTITUTE, TROY, NY
Shared Package
ML20032C429 List:
References
NUDOCS 8111100395
Download: ML20032C428 (2)


See also: IR 05000225/1981001

Text

,.

_

-

O

NOV ;

igg;

(

'

f

Docket No. 50-22!,

[ * 'f

\\

'

(r K

'

5)

Rensselaer Polytechnic Institute

s

ATTN: Dr. R. T. Lahey, Chairman

"

j

Depaitment of Nuclear Engineering

-

-

and Science

( NOVO 91981> f

Department of Nuclear Engineering and Science

u.s.nnun naissa (

'"55 "

Troy, New York

12181

Q.

p

Gentlemen:

y

,

,

su

Subject:

Inspection 50-225/81-01

This refers to your letter dated August 3, 1981, in response to our letter

dated July 10, 1981.

Thank you for informing us of the corrective and preventive actions documented

in your letter. These actions will be examined during a future inspection of

your licensed program.

Regarding review of your current facility operating procedures, based on a

September 22, 1981 telephone discussion between Mr. D. R. Harris, Director RPI

Critical Facility and Mr. R. Nimitz of this office, a preliminary review of

the procedures was performed during May 1981. This preliminary review did not

identify any procedural shortcomings but did identify the need for a more

extensive review. This review is to be performed by a new Critical Facility

-

Supervisor by December 31, 1981.

If this is not your understanding, please contact this office.

Your cooperation with es is appreciated.

Sincerely,

Ortst=S1 Signe d By:

Thomas T. Martin, Acting Director

Division of Engineering and Technical

Inspection

,

f/

TIB

RI y I

RI

RI:FRPS

RI:FRP

,

l'

W

Nimitz/mjd

Knap

gv Joyner

T. Martin

g

10/20/81

10/7#81

10/M/81

g/S/81

i

accICIAL RECORD COPY

8111100395 811104

PDR ADOCK 05000225

G

PDR

h

f fS

d

r

't

o

Rensselaer Polytechnic Institute

2

NOV 4

19 1

8

cc:

Dr. D. R. Harris, Facility Director

Dr. G. Judd, Vice Provost for Plans and Resources

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information center (NSIC)

State of New York

bcc:

Region I Docket Room (with concurrences)

0FFICIAL RECORD CDPY

J