|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20249C1601998-06-24024 June 1998 Transmits Revised Fda for Sys 80+ Design,Per App O of 10CFR52.Duration of Fda Conforms W/Duration of Design Certification Rule for Sys 80+ Std Design LD-98-009, Forwards 3 Copies of Amend X to CESSAR-Design Certification (DC) Sys 80+ Std Plant SSAR Which Is Reprint of CESSAR-DC That Incorporates Revs Made to Approved Design Matl in Dcd. All CESSAR-DC Pages Designated Except for Listed Info1998-03-13013 March 1998 Forwards 3 Copies of Amend X to CESSAR-Design Certification (DC) Sys 80+ Std Plant SSAR Which Is Reprint of CESSAR-DC That Incorporates Revs Made to Approved Design Matl in Dcd. All CESSAR-DC Pages Designated Except for Listed Info ML20203J3231997-12-17017 December 1997 First Partial Response to FOIA Request for Documents.Records in App a & B Encl & Will Be Available in PDR ML20149J7101997-07-23023 July 1997 Requests That R Simard Be Removed from Service Lists & R Bell Be Added to Svc Lists,Due to Recent NEI Reorganization LD-97-020, Requests That Errata Be Corrected in Errata Amend to Sys 80+ Design Certification Rule.Memo from Egan & Assoc to C Brinkman Which Lists Errata,Basis for Correction & Suggested Corrections Encl1997-06-13013 June 1997 Requests That Errata Be Corrected in Errata Amend to Sys 80+ Design Certification Rule.Memo from Egan & Assoc to C Brinkman Which Lists Errata,Basis for Correction & Suggested Corrections Encl LD-97-015, Informs That ABB-CE Has Completed Review of Effective Page Listing & Sys 80+ Design Control Document Revs Dtd Jan 19971997-05-0707 May 1997 Informs That ABB-CE Has Completed Review of Effective Page Listing & Sys 80+ Design Control Document Revs Dtd Jan 1997 LD-97-014, Transmits Final Version of Sys 80+ Design Control Document (DCD)1997-04-30030 April 1997 Transmits Final Version of Sys 80+ Design Control Document (DCD) ML20138E0301997-04-25025 April 1997 Informs That Portion of Info in Encl 1 of Vendor 960416 Submittal of Presentation Matl on ABB-C-E Licensing Plan for Full Batch Implementation of ABB Advanced Fuel for Meeting Held on 960416 W/Nrc Will Be Withheld,Per 10CFR2.790 ML20147C0881997-01-23023 January 1997 Responds to Requesting Opportunity to Review Design Certification Rule for ABB Combustion Engineering Sys 80+ Before Sending to Office of Fr for Publication LD-96-062, Requests Authorization to Conduct Narrowly,Focused Review of Design Certification Rule for Sys 80+ Before Sending of Office of Fr for Publication1996-12-18018 December 1996 Requests Authorization to Conduct Narrowly,Focused Review of Design Certification Rule for Sys 80+ Before Sending of Office of Fr for Publication ML20133A9791996-12-18018 December 1996 Approves Rules Certifying Asea Brown Boveri-Combustion Engineering Sys 80+ & General Electric Nuclear Energy Advanced Boiling Water Reactor ML20133A9811996-12-18018 December 1996 Informs That NRC Has Approved Rules Certifying Two Evolutionary Reactor Designs:Asea Brown Boveri-Combustion Engineering Sys 80+ & GE Nuclear Energy ABWR ML20133A9871996-12-18018 December 1996 Informs of NRC Approval of Rules Certifying Two Evolutionary Reactor Designs,Asea Brown Boveri-CE Sys 80+ & GE Nuclear Energy ABWR ML20133A9901996-12-18018 December 1996 Informs That NRC Has Approved Asea Brown Boveri CE Sys 80+ & GE Nuclear Energy ABWR as Evolutionary Reactor Designs ML20133B0191996-12-18018 December 1996 Informs of Approval of Rules Certifying Two Evolutionary Reactor Designs,Asea Brown Boveri-Combustion Engineering Sys 80+ & GE Nuclear Energys Advanced BWR LD-96-060, Forwards Rev to Sys 80+ Std Plant Design Control Document1996-12-13013 December 1996 Forwards Rev to Sys 80+ Std Plant Design Control Document ML20149M3091996-12-10010 December 1996 Responds to Which Requested Status of CESSAR-DC Relative to Fda for Sys 80+ Design ML20129E7111996-10-0101 October 1996 Forward RAI Re CENPD-137,Suppl 2-P, Calculative Methods for ABB CE Small Break LOCA Evaluation Model. Submittal Being Withheld from Public Disclosure Pending Staff Final Determination,Per 960523 Request LD-96-042, Submits Misleading Statement by BNL on C-E Reactor Coolant Pump Seals.Statement Correction Listed1996-09-26026 September 1996 Submits Misleading Statement by BNL on C-E Reactor Coolant Pump Seals.Statement Correction Listed ML20128P4981996-09-23023 September 1996 Forwards Proposed Rule Language for 3 Design Certifications Discussed at 960827 NRC Briefing ML20128N6001996-09-16016 September 1996 Provides Addl Info in Response to Several Questions Raised by Commission During 960827 Briefing on Design Certification Rulemaking LD-96-029, Forwards Finalized Package of Six Draft Changes to Sys 80+ Std Plant Design Control Document.Changes Will Be Formally Incorporated Into Sys 80+ Design Control Document at Conclusion of Design Certification Rulemaking1996-07-25025 July 1996 Forwards Finalized Package of Six Draft Changes to Sys 80+ Std Plant Design Control Document.Changes Will Be Formally Incorporated Into Sys 80+ Design Control Document at Conclusion of Design Certification Rulemaking LD-96-028, Submits Addl Draft Changes for Staff Review & Approval. Changes Listed on Attached Table W/Details Shown on Encl Design Control Document Pages1996-07-17017 July 1996 Submits Addl Draft Changes for Staff Review & Approval. Changes Listed on Attached Table W/Details Shown on Encl Design Control Document Pages LD-96-024, Transmits Finalized Package of Changes to Sys 80+ Std Plant Design Control Document1996-06-27027 June 1996 Transmits Finalized Package of Changes to Sys 80+ Std Plant Design Control Document LD-96-021, Submits Changes to Sys 80+ Std Plant Design Control Document as Requested by for Staff Review & Approval1996-06-11011 June 1996 Submits Changes to Sys 80+ Std Plant Design Control Document as Requested by for Staff Review & Approval ML20107G1451996-04-17017 April 1996 Transmits CEOG Task 931 Survey Questionnaire-CEA Insertion Experience W/High Burnup Fuel Mgt ML20101P1231996-03-15015 March 1996 Expresses Appreciation for Opportunity on 960308 to Brief Commission on Views on Design Certification Rules, Particularly W/Respect to Issue of Applicable Regulations LD-95-026, Requests Addl Explanation of Probablistic Risk Assessment. Request for Clarification & Does Not Impact Conclusions of Evaluation Already Reported in FSER1995-10-0606 October 1995 Requests Addl Explanation of Probablistic Risk Assessment. Request for Clarification & Does Not Impact Conclusions of Evaluation Already Reported in FSER LD-95-040, Forwards ABB-CE Proposed Statement of Considerations to Accompany ABB-CE Proposed Rule,Presented in Form of Complete Rulemaking Package1995-09-0505 September 1995 Forwards ABB-CE Proposed Statement of Considerations to Accompany ABB-CE Proposed Rule,Presented in Form of Complete Rulemaking Package ML20092D2871995-08-23023 August 1995 Forwards Correction to Comment 19 Re Proposed Design Certification Rules for Standardized Advanced Reactors. Last Line on First Page May Have Been Lost Due to Word Processing Error ML20092D2561995-08-23023 August 1995 Forwards Correction to Comment 20 Re Proposed Design Certification Rules for Standardized Advancement Reactors. Last Line of Text May Have Been Lost Due to Word Processing Error ML20085G2711995-06-14014 June 1995 Proposes to Respond to RAIs on GE TR NEDE-32177P, Tracg Computer Code Qualification, Dtd Jan 1993 in Three Groups as Indicated in Attachment ML20082G5511995-04-10010 April 1995 Provides Documents & Info Requested in NRC Audit (950407- 950410) Re Rv Fabrication ML20203J4371995-04-0404 April 1995 Forwards Fr Notice Re Proposed Amends to Commission Regulations for Commercial Npps,Adding New App a to 10CFR52 Which Will When Promulgated Certify Sys 80+ Std Design of ABWR LD-95-015, Transmits Corrected Page for Incorporation Into Sys 80+ DCD Revs1995-03-27027 March 1995 Transmits Corrected Page for Incorporation Into Sys 80+ DCD Revs LD-95-013, Transmits Supplementary Revs for Incorporation Into DCD & Affidavit.Changes Resolve Inconsistencies Identified by NRC & by ABB-CE1995-03-24024 March 1995 Transmits Supplementary Revs for Incorporation Into DCD & Affidavit.Changes Resolve Inconsistencies Identified by NRC & by ABB-CE LD-95-011, Forwards Rev Pages for Sys 80+ Design Control Document. Margin Bar Adjacent to Change & Rev Date Will Be Added to Revised DCD Page1995-03-17017 March 1995 Forwards Rev Pages for Sys 80+ Design Control Document. Margin Bar Adjacent to Change & Rev Date Will Be Added to Revised DCD Page LD-95-003, Provides Addl Info on Removal of Auxiliary Throttle Seal Coolers from Reactor Coolant Pumps,In Response to NRC Questions from Review of Sys 80+ Design Control Document1995-03-0303 March 1995 Provides Addl Info on Removal of Auxiliary Throttle Seal Coolers from Reactor Coolant Pumps,In Response to NRC Questions from Review of Sys 80+ Design Control Document LD-95-007, Forwards Revised Sys 80+ Design Control Document1995-02-22022 February 1995 Forwards Revised Sys 80+ Design Control Document LD-95-006, Forwards mark-up Pages Identifying Revs Incorporated Into Sys 80+ Design Control Document. Revs Provided in Response to Comments Provided by NRC & as Result of Changes Identified by ABB-CE & Discussed W/Nrc1995-02-16016 February 1995 Forwards mark-up Pages Identifying Revs Incorporated Into Sys 80+ Design Control Document. Revs Provided in Response to Comments Provided by NRC & as Result of Changes Identified by ABB-CE & Discussed W/Nrc LD-95-005, Forwards Proprietary Sys 80+ Parameter List for Safety Analyses. Encl Withheld1995-02-10010 February 1995 Forwards Proprietary Sys 80+ Parameter List for Safety Analyses. Encl Withheld LD-95-001, Forwards Rev 2 to Technical Support Document for Amend to 10CFR51 Considering Severe Accident Under NEPA for Plants of Sys 80+ Design1995-01-0606 January 1995 Forwards Rev 2 to Technical Support Document for Amend to 10CFR51 Considering Severe Accident Under NEPA for Plants of Sys 80+ Design NRC-94-4383, Comments on Review of Draft NUREG-1512 for Proprietary Info1994-12-27027 December 1994 Comments on Review of Draft NUREG-1512 for Proprietary Info LD-94-073, Forwards Sys 80+ Design Control Document, Vols 1-241994-12-16016 December 1994 Forwards Sys 80+ Design Control Document, Vols 1-24 LD-94-072, Provides Justification for Tier 2 Seismic & Valve Testing Expirations1994-12-16016 December 1994 Provides Justification for Tier 2 Seismic & Valve Testing Expirations LD-94-071, Transmits Addl Input to System 80+ Design Control Document1994-12-15015 December 1994 Transmits Addl Input to System 80+ Design Control Document LD-94-069, Forwards marked-up CESSAR-DC Figure 5.1.2-2 Re Proposed Design Change to Remove RCP Seal Coolers1994-12-0808 December 1994 Forwards marked-up CESSAR-DC Figure 5.1.2-2 Re Proposed Design Change to Remove RCP Seal Coolers ML20078N8961994-12-0101 December 1994 Forwards Copy of Ltr NFBWR-94-033 ML20149H1941994-11-14014 November 1994 Responds to Indicating Concern Re Application of Set of Interrelated Elements That Defines Technical & Regulatory Aspects of design-basic Accident Source Term for Licensing of Passive Plants LD-94-065, Submits Proposed Language Related to Tier 2 for Sys 80+ Design Certification Rule1994-10-28028 October 1994 Submits Proposed Language Related to Tier 2 for Sys 80+ Design Certification Rule 1998-06-24
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20249C1601998-06-24024 June 1998 Transmits Revised Fda for Sys 80+ Design,Per App O of 10CFR52.Duration of Fda Conforms W/Duration of Design Certification Rule for Sys 80+ Std Design ML20203J3231997-12-17017 December 1997 First Partial Response to FOIA Request for Documents.Records in App a & B Encl & Will Be Available in PDR ML20138E0301997-04-25025 April 1997 Informs That Portion of Info in Encl 1 of Vendor 960416 Submittal of Presentation Matl on ABB-C-E Licensing Plan for Full Batch Implementation of ABB Advanced Fuel for Meeting Held on 960416 W/Nrc Will Be Withheld,Per 10CFR2.790 ML20147C0881997-01-23023 January 1997 Responds to Requesting Opportunity to Review Design Certification Rule for ABB Combustion Engineering Sys 80+ Before Sending to Office of Fr for Publication ML20133A9871996-12-18018 December 1996 Informs of NRC Approval of Rules Certifying Two Evolutionary Reactor Designs,Asea Brown Boveri-CE Sys 80+ & GE Nuclear Energy ABWR ML20133A9811996-12-18018 December 1996 Informs That NRC Has Approved Rules Certifying Two Evolutionary Reactor Designs:Asea Brown Boveri-Combustion Engineering Sys 80+ & GE Nuclear Energy ABWR ML20133A9791996-12-18018 December 1996 Approves Rules Certifying Asea Brown Boveri-Combustion Engineering Sys 80+ & General Electric Nuclear Energy Advanced Boiling Water Reactor ML20133A9901996-12-18018 December 1996 Informs That NRC Has Approved Asea Brown Boveri CE Sys 80+ & GE Nuclear Energy ABWR as Evolutionary Reactor Designs ML20133B0191996-12-18018 December 1996 Informs of Approval of Rules Certifying Two Evolutionary Reactor Designs,Asea Brown Boveri-Combustion Engineering Sys 80+ & GE Nuclear Energys Advanced BWR ML20149M3091996-12-10010 December 1996 Responds to Which Requested Status of CESSAR-DC Relative to Fda for Sys 80+ Design ML20129E7111996-10-0101 October 1996 Forward RAI Re CENPD-137,Suppl 2-P, Calculative Methods for ABB CE Small Break LOCA Evaluation Model. Submittal Being Withheld from Public Disclosure Pending Staff Final Determination,Per 960523 Request ML20203J4371995-04-0404 April 1995 Forwards Fr Notice Re Proposed Amends to Commission Regulations for Commercial Npps,Adding New App a to 10CFR52 Which Will When Promulgated Certify Sys 80+ Std Design of ABWR ML20149H1941994-11-14014 November 1994 Responds to Indicating Concern Re Application of Set of Interrelated Elements That Defines Technical & Regulatory Aspects of design-basic Accident Source Term for Licensing of Passive Plants ML20149F4231994-08-0505 August 1994 Updates Guidance on Preparation of Design Control Document Contained in .Requests Submittal of Listed Info,In Order to Preclude Iterations & Amends to Design Control Document ML20059F4031994-01-0707 January 1994 Comments on TS Sections 4 & 5 for Sys 80+.Markup Copy of Affected TS Encl.Responses to Comments Requested No Later than 2 Wks from Receipt of Ltr ML20058L3811993-12-0707 December 1993 Forwards Staff Comments on Markup Copy of Affected TS & Requests That Responses to Comments Be Provided No Later than Two Wks from Receipt of Ltr ML20058L2651993-12-0303 December 1993 Forwards Initial Staff Comments on ABB-CE Sys 80+ Tier 1 931020 & 1112 Submittals.Submittals Adequately Reflected Agreements Reached for Tier 1 Matl During 931004-06 Meetings.Several Open Items Remain Unresolved ML20058A0931993-11-16016 November 1993 Forwards Comments on TS for Sys 80+.Requests Responses to Comments No Later than 2 Weeks from Ltr Receipt to Maintain Review Schedules ML20059J0771993-11-0404 November 1993 Provides Update on Status of Review of Nuplex 80+ Control Complex for Sys 80+ Design Certification.Review Essentially Complete & NRC Preparing SER ML20057F8641993-10-14014 October 1993 Forwards Llnl Comments on ABB-CE Sys 80+ I&C Ts. Attachments 1 & 2 to Rept Provide Sample Definitions for Channels & Functional Tests NUREG/CR-6105, Forwards Preliminary Draft Version of NUREG/CR-6105, Human Factors Engineering Guidelines for Review of Advanced Alarm Sys & Draft of NUREG/CR-5908, Advanced Human Sys Interface Design Review Guideline1993-09-28028 September 1993 Forwards Preliminary Draft Version of NUREG/CR-6105, Human Factors Engineering Guidelines for Review of Advanced Alarm Sys & Draft of NUREG/CR-5908, Advanced Human Sys Interface Design Review Guideline ML20057A9391993-09-0202 September 1993 Forwards NRC Comments on CE Sys 80+ Tier 1 Submittals Dtd 930430,0503-08,0604,0618 & 0629 ML20056H6361993-08-26026 August 1993 Responds to Informal Inquiries from Design Certification Applicants Re Form & Content of Design Control Document. Forwards Presentation of Current Staff Views Re Document ML20056F3741993-08-12012 August 1993 Requests That ABB-CE Comprehensively & Systematically Evaluate Potential Design Alternatives Proposed to Reduce Probability of SGTR Containment Bypass Accident Sequences ML20056D9431993-07-30030 July 1993 Forwards Preliminary Comments on TS Sys 80+ (Chapter 16 CESSAR-DC) Submitted in App K.Status Sheet Also Encl ML20046C6721993-07-23023 July 1993 Responds to 930624 Request for Status of NRC Review & General Assessment of Nuplex 80+ Advanced Control Complex Design for Sys 80+.Staff Continuing Integrated multi-disciplined Review of Nuplex 80+ ML20046B3331993-07-15015 July 1993 Forwards Two Technical Repts Requested by C-E Technical Staff During Recent Meetings W/Nrc Technical Staff Members ML20045D5741993-06-24024 June 1993 Responds to 930305 Request for Clarification of Statement, Re Generic Weakness Identified During Operating Exam,That Appeared in Initial Exam Rept 50-002/OL-92-03 ML20045B8101993-06-16016 June 1993 Responds to Providing Preliminary Comments on SECY-93-087, Policy,Technical & Licensing Issues Pertaining to Evolutionary & Alwr Designs ML20044E3711993-05-13013 May 1993 Provides Summary of 930406 Telcon Conducted Among Representatives of Nrc,Bnl & ABB-CE.Summary of Topics Discussed Listed ML20035H7291993-04-29029 April 1993 Responds to Licensee Commenting on Importance of Completing Reviews of Both ABWR & Sys 80+ Designs as Quickly as Possible ML20035F9151993-04-16016 April 1993 Discusses Review of Human Factors Program Plan & Operating Experience Review for Sys 80+ Design & Requests Mfg Address Unresolved Issues Identified in Plans within 60 Days.Draft TERs Encl ML20035D2251993-04-0606 April 1993 Discusses Review Status of ABB-CE Sys 80+ Design.Staff Considers Dser for Sys 80+ Equivalent to Dfser for General Electric Co ABWR Design ML17306B3221993-03-0404 March 1993 Expresses Appreciation for Opportunity to Visit Plant on 930209 & 10 to Interview Operators Re Operating Experience W/Ce Sys 80 Design That Would Be Pertinent to NRC Review of CE Sys 80+ Advanced Control Room Design ML20034F8591993-03-0101 March 1993 Forwards SECY-93-041, Advanced BWR Review Schedule ML20128G1051993-02-10010 February 1993 Discusses ITAAC Submittal for ABB-CE Sys 80+ & Provides Proposed Schedule for Review ML20035B1401993-01-29029 January 1993 Forwards Amend K to Sys 80+ Alwr CESSAR-DC.W/o Encl ML20127J2821993-01-15015 January 1993 Discusses Level of Design Detail for Sys 80+ Structures & Lists Expected Level of Completion ML20044B5951993-01-0707 January 1993 Requests Addl Info on Topical Rept CENPD-382-P, Methodology for Core Designs Containing Erbium Burnable Absorbers ML20126G5571992-12-23023 December 1992 Forwards Request for Addl Info on CESSAR-DC,system 80+ Shutdown Risk Evaluation Rept ML20126F6021992-12-22022 December 1992 Forwards Llnl 921208 Rept Entitled, Review of CE 80+ FMEA & D&Did Analysis, to Be Discussed at 930106 Public Meeting ML17306A5351992-03-0202 March 1992 Forwards Trip Rept of 911104-06 Visit to Plant to Identify Areas Where Changes Could Be Made to Reduce Radiation Exposure & to Incorporate Changes Into Design Review of Advanced CESSAR Sys 80+ Design 1998-06-24
[Table view] |
Text
_ - _ _ _ _.
'"4
[J""
'4 UNITED STATES I
j NUCLEAR REGULATORY COMMISSION
~!
WASHINGTON, D.C. 20555-0001 8
November 4, 1993
\\.w... f Docket No.52-002 Mr. C. B. Brinkman, Acting Director Nuclear Systems Licensing Combustion Engineering, Inc.
1000 Prospect Hill Road Windsor, Connecticut 06095-0500
Dear Mr. Brinkman:
SUBJECT:
UPDATE ON STATUS OF THE REVIEW 0F THE NUPLEX 80+ DESIGN By letter dated July 23, 1993, I provided you with the status of the Nuclear Regulatory Commissien (NRC) staff review and general assesment of the NUPLEX 80+ control complex for System 80+ design certificati m. ihe review is now essentially complete, and the staff is preparing its safety evaluation report.
All issues identified in the July 23, 1993, letter except plant emergency procedure guidelines that have not yet been fully reviewed and the technical specifications for digitally-based instrumentation and control systems (I&C) have been acceptably resolved. ABB-Combustion Engineering (ABB-CE) and the NRC staff have reached agreement on the basic approach for completing the technical specifications. This takes into account the advanced design features, such as continuous automatic testing and enhanced four channel designs that allow relaxation of the limiting conditions for operation (LCOs) and surveillance requirements.
Acceptability of the NUPLEX 80+ was based on the following key issues that would also be applied to any design seeking USNRC licensing approval today:
- Control room design conforming to current human factors engineering standards for a thorough well-documented design process, including verification and validation.
- Utilization of modern man-machine interface technology that improves operator awareness and coping capabilities through functionally oriented it. formation presentation, dynamic graphic displays, and alarm overload management.
Improved channel independence and main control room / remote shutdown room independence using advanced technologies such as fiber optics, to enhance fire and sabotage protection.
- Protection for common-mode software failure in digital systems, including a defense-in-depth and diversity assessment.
l l
l l
I gg %
$112ggc{os 1 D a
3[6
^
s.
Mr. C. B. Brinkman November 4, 1993 The staff continues to believe that the NUPLEX 80+ design is an improvement over the current generation of power-reactor control room.
Sincerely, Orig *nd SIMM Py*
Dennis M. Crutchfield, Associate Director for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation cc: See next page DISTRIBUTION:
' Docket File PDST R/F DCrutchfield WTravers PDR PShea MXFranovich ACRS (11)
TWambach SMagruder JMoore,15B18 TGody, Jr., 17G21 REckenrode, 10D24 DLange, 10022 JWermiel, 10D24 BBoger, 10H5 l
RArchitzel RBorchardt 0FC: LA:PDST;ADAR PM:
dB HHFB H
NAME: PShea1 v '
TWa
- tz ode DLang J rmiel l
DATE: 11/ 2. 93 11/ 2 /93 11' J 3 11/2/93 11/ 3 /93 0FC: h: CHfi SC:PDS D:P
- ADAR RR e.0 NAME: BBoger RArchitzel RB hardt icfield I
DATE: 11/}/93 11/ 3 /93 11/ /93 11/4[/93 0FFICIAL RECORD COPY: NUPLEXLT.TVW l
l l
m
i ABB-Combustion Engineering, Inc.
Docket No.52-002 cc:
Mr. C. B. Brinkman, Acting Director Nuclear Systems Licensing ABB-Combustion Engineering, Inc.
1000 Prospect Hill Road Windsor, Connecticut 06095-0500 l
Mr. C. B. Brinkman, Manager j
Washington Nuclear Operatiore ABB-Combustion Engineering, Inc.
I l
12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Stan Ritterbusch Nuclear Licensing ABB-Combustion Engineering 1000 Prospect Hill Road Post Office Bcx 500 Windsor, Connecticut 06095-0500 Mr. Sterling Franks U.S. Department of Energy NE-42 Washington, D.C.
20585 Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.
Washington, D.C.
20503 Mr. Raymond Ng 1776 Eye Street, N.W.
Suite 300 Washington, D.C.
20006 Joseph R. Egan, Esquire Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.
Washington, D.C.
20037-1128 Mr. Regis A. Matzie, Vice President Nuclear Systems Development ABB-Combustion Engineering, Inc.
1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 Mr. Victor G. Snell, Director Safety and Licensing AECL Technologies 9210 Corporate Boulevard Suite 410 Rockville, Maryland 20850
-