ML20249C160 | 24 June 1998 | Transmits Revised Fda for Sys 80+ Design,Per App O of 10CFR52.Duration of Fda Conforms W/Duration of Design Certification Rule for Sys 80+ Std Design | |
ML20203J323 | 17 December 1997 | First Partial Response to FOIA Request for Documents.Records in App a & B Encl & Will Be Available in PDR | Fitness for Duty |
ML20138E030 | 25 April 1997 | Informs That Portion of Info in Encl 1 of Vendor 960416 Submittal of Presentation Matl on ABB-C-E Licensing Plan for Full Batch Implementation of Abb Advanced Fuel for Meeting Held on 960416 W/Nrc Will Be Withheld,Per 10CFR2.790 | |
ML20147C088 | 23 January 1997 | Responds to Requesting Opportunity to Review Design Certification Rule for Abb Combustion Engineering Sys 80+ Before Sending to Office of Fr for Publication | |
ML20133A987 | 18 December 1996 | Informs of NRC Approval of Rules Certifying Two Evolutionary Reactor Designs,Asea Brown Boveri-CE Sys 80+ & GE Nuclear Energy ABWR | |
ML20133B019 | 18 December 1996 | Informs of Approval of Rules Certifying Two Evolutionary Reactor Designs,Asea Brown Boveri-Combustion Engineering Sys 80+ & GE Nuclear Energys Advanced BWR | |
ML20133A981 | 18 December 1996 | Informs That NRC Has Approved Rules Certifying Two Evolutionary Reactor Designs:Asea Brown Boveri-Combustion Engineering Sys 80+ & GE Nuclear Energy ABWR | |
ML20133A990 | 18 December 1996 | Informs That NRC Has Approved Asea Brown Boveri CE Sys 80+ & GE Nuclear Energy ABWR as Evolutionary Reactor Designs | |
ML20133A979 | 18 December 1996 | Approves Rules Certifying Asea Brown Boveri-Combustion Engineering Sys 80+ & General Electric Nuclear Energy Advanced Boiling Water Reactor | |
ML20149M309 | 10 December 1996 | Responds to Which Requested Status of CESSAR-DC Relative to Fda for Sys 80+ Design | Probabilistic Risk Assessment |
ML20129E711 | 1 October 1996 | Forward RAI Re CENPD-137,Suppl 2-P, Calculative Methods for Abb CE Small Break LOCA Evaluation Model. Submittal Being Withheld from Public Disclosure Pending Staff Final Determination,Per 960523 Request | Boric Acid Loop seal |
ML20203J437 | 4 April 1995 | Forwards Fr Notice Re Proposed Amends to Commission Regulations for Commercial Npps,Adding New App a to 10CFR52 Which Will When Promulgated Certify Sys 80+ Std Design of ABWR | Safe Shutdown Anticipated operational occurrence Probabilistic Risk Assessment Operating Basis Earthquake Incorporated by reference Earthquake Offsite Circuit Backfit |
ML20149H194 | 14 November 1994 | Responds to Indicating Concern Re Application of Set of Interrelated Elements That Defines Technical & Regulatory Aspects of design-basic Accident Source Term for Licensing of Passive Plants | |
ML20149F423 | 5 August 1994 | Updates Guidance on Preparation of Design Control Document Contained in .Requests Submittal of Listed Info,In Order to Preclude Iterations & Amends to Design Control Document | Probabilistic Risk Assessment |
ML20059F403 | 7 January 1994 | Comments on TS Sections 4 & 5 for Sys 80+.Markup Copy of Affected TS Encl.Responses to Comments Requested No Later than 2 Wks from Receipt of Ltr | Safe Shutdown Offsite Dose Calculation Manual Hydrostatic Pressure and Temperature Limits Report Annual Radiological Environmental Operating Report Process Control Program |
ML20058L381 | 7 December 1993 | Forwards Staff Comments on Markup Copy of Affected TS & Requests That Responses to Comments Be Provided No Later than Two Wks from Receipt of Ltr | |
ML20058L265 | 3 December 1993 | Forwards Initial Staff Comments on ABB-CE Sys 80+ Tier 1 931020 & 1112 Submittals.Submittals Adequately Reflected Agreements Reached for Tier 1 Matl During 931004-06 Meetings.Several Open Items Remain Unresolved | |
ML20058A093 | 16 November 1993 | Forwards Comments on TS for Sys 80+.Requests Responses to Comments No Later than 2 Weeks from Ltr Receipt to Maintain Review Schedules | |
ML20059J077 | 4 November 1993 | Provides Update on Status of Review of Nuplex 80+ Control Complex for Sys 80+ Design Certification.Review Essentially Complete & NRC Preparing SER | |
ML20057F864 | 14 October 1993 | Forwards Llnl Comments on ABB-CE Sys 80+ I&C Ts. Attachments 1 & 2 to Rept Provide Sample Definitions for Channels & Functional Tests | |
NUREG/CR-6105, Forwards Preliminary Draft Version of NUREG/CR-6105, Human Factors Engineering Guidelines for Review of Advanced Alarm Sys & Draft of NUREG/CR-5908, Advanced Human Sys Interface Design Review Guideline | 28 September 1993 | Forwards Preliminary Draft Version of NUREG/CR-6105, Human Factors Engineering Guidelines for Review of Advanced Alarm Sys & Draft of NUREG/CR-5908, Advanced Human Sys Interface Design Review Guideline | |
ML20057A939 | 2 September 1993 | Forwards NRC Comments on CE Sys 80+ Tier 1 Submittals Dtd 930430,0503-08,0604,0618 & 0629 | Safe Shutdown Boric Acid Fire Barrier Stroke time Anticipated operational occurrence Tornado Missile Hydrostatic Emergency Lighting Tornado-Generated Missile Tornado Generated Missile Design basis earthquake License Renewal Earthquake Deep Dose Equivalent Power Operated Valves Turbine Missile Flow Induced Vibration |
ML20056H636 | 26 August 1993 | Responds to Informal Inquiries from Design Certification Applicants Re Form & Content of Design Control Document. Forwards Presentation of Current Staff Views Re Document | Probabilistic Risk Assessment Incorporated by reference License Renewal |
ML20056F374 | 12 August 1993 | Requests That ABB-CE Comprehensively & Systematically Evaluate Potential Design Alternatives Proposed to Reduce Probability of SGTR Containment Bypass Accident Sequences | License Renewal |
ML20056D943 | 30 July 1993 | Forwards Preliminary Comments on TS Sys 80+ (Chapter 16 CESSAR-DC) Submitted in App K.Status Sheet Also Encl | High Radiation Area Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program License Renewal Earthquake |
ML20128G105 | 10 February 1993 | Discusses ITAAC Submittal for ABB-CE Sys 80+ & Provides Proposed Schedule for Review | |
ML20127J282 | 15 January 1993 | Discusses Level of Design Detail for Sys 80+ Structures & Lists Expected Level of Completion | |
ML20126G557 | 23 December 1992 | Forwards Request for Addl Info on CESSAR-DC,system 80+ Shutdown Risk Evaluation Rept | Boric Acid Reactor Vessel Water Level Loop seal Mission time Time to boil Probabilistic Risk Assessment Earthquake |
ML20126F602 | 22 December 1992 | Forwards Llnl 921208 Rept Entitled, Review of CE 80+ FMEA & D&Did Analysis, to Be Discussed at 930106 Public Meeting |