Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20249C160 | 24 June 1998 | Transmits Revised Fda for Sys 80+ Design,Per App O of 10CFR52.Duration of Fda Conforms W/Duration of Design Certification Rule for Sys 80+ Std Design | |
LD-98-009, Forwards 3 Copies of Amend X to CESSAR-Design Certification (DC) Sys 80+ Std Plant Ssar Which Is Reprint of CESSAR-DC That Incorporates Revs Made to Approved Design Matl in Dcd. All CESSAR-DC Pages Designated Except for Listed Info | 13 March 1998 | Forwards 3 Copies of Amend X to CESSAR-Design Certification (DC) Sys 80+ Std Plant Ssar Which Is Reprint of CESSAR-DC That Incorporates Revs Made to Approved Design Matl in Dcd. All CESSAR-DC Pages Designated Except for Listed Info | Probabilistic Risk Assessment |
ML20203J323 | 17 December 1997 | First Partial Response to FOIA Request for Documents.Records in App a & B Encl & Will Be Available in PDR | Fitness for Duty |
ML20149J710 | 23 July 1997 | Requests That R Simard Be Removed from Service Lists & R Bell Be Added to Svc Lists,Due to Recent NEI Reorganization | |
LD-97-020, Requests That Errata Be Corrected in Errata Amend to Sys 80+ Design Certification Rule.Memo from Egan & Assoc to C Brinkman Which Lists Errata,Basis for Correction & Suggested Corrections Encl | 13 June 1997 | Requests That Errata Be Corrected in Errata Amend to Sys 80+ Design Certification Rule.Memo from Egan & Assoc to C Brinkman Which Lists Errata,Basis for Correction & Suggested Corrections Encl | Operating Basis Earthquake |
LD-97-015, Informs That ABB-CE Has Completed Review of Effective Page Listing & Sys 80+ Design Control Document Revs Dtd Jan 1997 | 7 May 1997 | Informs That ABB-CE Has Completed Review of Effective Page Listing & Sys 80+ Design Control Document Revs Dtd Jan 1997 | |
LD-97-014, Transmits Final Version of Sys 80+ Design Control Document (DCD) | 30 April 1997 | Transmits Final Version of Sys 80+ Design Control Document (DCD) | |
ML20138E030 | 25 April 1997 | Informs That Portion of Info in Encl 1 of Vendor 960416 Submittal of Presentation Matl on ABB-C-E Licensing Plan for Full Batch Implementation of Abb Advanced Fuel for Meeting Held on 960416 W/Nrc Will Be Withheld,Per 10CFR2.790 | |
ML20147C088 | 23 January 1997 | Responds to Requesting Opportunity to Review Design Certification Rule for Abb Combustion Engineering Sys 80+ Before Sending to Office of Fr for Publication | |
ML20133A979 | 18 December 1996 | Approves Rules Certifying Asea Brown Boveri-Combustion Engineering Sys 80+ & General Electric Nuclear Energy Advanced Boiling Water Reactor | |
ML20133A981 | 18 December 1996 | Informs That NRC Has Approved Rules Certifying Two Evolutionary Reactor Designs:Asea Brown Boveri-Combustion Engineering Sys 80+ & GE Nuclear Energy ABWR | |
ML20133A987 | 18 December 1996 | Informs of NRC Approval of Rules Certifying Two Evolutionary Reactor Designs,Asea Brown Boveri-CE Sys 80+ & GE Nuclear Energy ABWR | |
ML20133A990 | 18 December 1996 | Informs That NRC Has Approved Asea Brown Boveri CE Sys 80+ & GE Nuclear Energy ABWR as Evolutionary Reactor Designs | |
ML20133B019 | 18 December 1996 | Informs of Approval of Rules Certifying Two Evolutionary Reactor Designs,Asea Brown Boveri-Combustion Engineering Sys 80+ & GE Nuclear Energys Advanced BWR | |
LD-96-062, Requests Authorization to Conduct Narrowly,Focused Review of Design Certification Rule for Sys 80+ Before Sending of Office of Fr for Publication | 18 December 1996 | Requests Authorization to Conduct Narrowly,Focused Review of Design Certification Rule for Sys 80+ Before Sending of Office of Fr for Publication | |
LD-96-060, Forwards Rev to Sys 80+ Std Plant Design Control Document | 13 December 1996 | Forwards Rev to Sys 80+ Std Plant Design Control Document | |
ML20149M309 | 10 December 1996 | Responds to Which Requested Status of CESSAR-DC Relative to Fda for Sys 80+ Design | Probabilistic Risk Assessment |
ML20129E711 | 1 October 1996 | Forward RAI Re CENPD-137,Suppl 2-P, Calculative Methods for Abb CE Small Break LOCA Evaluation Model. Submittal Being Withheld from Public Disclosure Pending Staff Final Determination,Per 960523 Request | Boric Acid Loop seal |
LD-96-042, Submits Misleading Statement by BNL on C-E Reactor Coolant Pump Seals.Statement Correction Listed | 26 September 1996 | Submits Misleading Statement by BNL on C-E Reactor Coolant Pump Seals.Statement Correction Listed | Probabilistic Risk Assessment |
ML20128P498 | 23 September 1996 | Forwards Proposed Rule Language for 3 Design Certifications Discussed at 960827 NRC Briefing | Backfit |
ML20128N600 | 16 September 1996 | Provides Addl Info in Response to Several Questions Raised by Commission During 960827 Briefing on Design Certification Rulemaking | Safe Shutdown Reactor Vessel Water Level Exemption Request Backfit |
LD-96-029, Forwards Finalized Package of Six Draft Changes to Sys 80+ Std Plant Design Control Document.Changes Will Be Formally Incorporated Into Sys 80+ Design Control Document at Conclusion of Design Certification Rulemaking | 25 July 1996 | Forwards Finalized Package of Six Draft Changes to Sys 80+ Std Plant Design Control Document.Changes Will Be Formally Incorporated Into Sys 80+ Design Control Document at Conclusion of Design Certification Rulemaking | Fuel cladding |
LD-96-028, Submits Addl Draft Changes for Staff Review & Approval. Changes Listed on Attached Table W/Details Shown on Encl Design Control Document Pages | 17 July 1996 | Submits Addl Draft Changes for Staff Review & Approval. Changes Listed on Attached Table W/Details Shown on Encl Design Control Document Pages | Fuel cladding |
LD-96-024, Transmits Finalized Package of Changes to Sys 80+ Std Plant Design Control Document | 27 June 1996 | Transmits Finalized Package of Changes to Sys 80+ Std Plant Design Control Document | Boric Acid Shutdown Margin Reactor Vessel Water Level Safe Shutdown Earthquake Hydrostatic Probabilistic Risk Assessment |
LD-96-021, Submits Changes to Sys 80+ Std Plant Design Control Document as Requested by for Staff Review & Approval | 11 June 1996 | Submits Changes to Sys 80+ Std Plant Design Control Document as Requested by for Staff Review & Approval | |
ML20107G145 | 17 April 1996 | Transmits CEOG Task 931 Survey Questionnaire-CEA Insertion Experience W/High Burnup Fuel Mgt | |
ML20101P123 | 15 March 1996 | Expresses Appreciation for Opportunity on 960308 to Brief Commission on Views on Design Certification Rules, Particularly W/Respect to Issue of Applicable Regulations | |
LD-95-026, Requests Addl Explanation of Probablistic Risk Assessment. Request for Clarification & Does Not Impact Conclusions of Evaluation Already Reported in FSER | 6 October 1995 | Requests Addl Explanation of Probablistic Risk Assessment. Request for Clarification & Does Not Impact Conclusions of Evaluation Already Reported in FSER | Probabilistic Risk Assessment |
LD-95-040, Forwards ABB-CE Proposed Statement of Considerations to Accompany ABB-CE Proposed Rule,Presented in Form of Complete Rulemaking Package | 5 September 1995 | Forwards ABB-CE Proposed Statement of Considerations to Accompany ABB-CE Proposed Rule,Presented in Form of Complete Rulemaking Package | Probabilistic Risk Assessment Operating Basis Earthquake Incorporated by reference Exemption Request Backfit |
ML20092D256 | 23 August 1995 | Forwards Correction to Comment 20 Re Proposed Design Certification Rules for Standardized Advancement Reactors. Last Line of Text May Have Been Lost Due to Word Processing Error | |
ML20092D287 | 23 August 1995 | Forwards Correction to Comment 19 Re Proposed Design Certification Rules for Standardized Advanced Reactors. Last Line on First Page May Have Been Lost Due to Word Processing Error | |
ML20085G271 | 14 June 1995 | Proposes to Respond to RAIs on GE TR NEDE-32177P, Tracg Computer Code Qualification, Dtd Jan 1993 in Three Groups as Indicated in Attachment | |
ML20082G551 | 10 April 1995 | Provides Documents & Info Requested in NRC Audit (950407- 950410) Re Rv Fabrication | |
ML20203J437 | 4 April 1995 | Forwards Fr Notice Re Proposed Amends to Commission Regulations for Commercial Npps,Adding New App a to 10CFR52 Which Will When Promulgated Certify Sys 80+ Std Design of ABWR | Safe Shutdown Anticipated operational occurrence Probabilistic Risk Assessment Operating Basis Earthquake Incorporated by reference Earthquake Offsite Circuit Backfit |
LD-95-015, Transmits Corrected Page for Incorporation Into Sys 80+ DCD Revs | 27 March 1995 | Transmits Corrected Page for Incorporation Into Sys 80+ DCD Revs | |
LD-95-013, Transmits Supplementary Revs for Incorporation Into DCD & Affidavit.Changes Resolve Inconsistencies Identified by NRC & by ABB-CE | 24 March 1995 | Transmits Supplementary Revs for Incorporation Into DCD & Affidavit.Changes Resolve Inconsistencies Identified by NRC & by ABB-CE | Ultimate heat sink Safe Shutdown Earthquake Probabilistic Risk Assessment Coatings Nondestructive Examination Earthquake Pressure Boundary Leakage |
LD-95-011, Forwards Rev Pages for Sys 80+ Design Control Document. Margin Bar Adjacent to Change & Rev Date Will Be Added to Revised DCD Page | 17 March 1995 | Forwards Rev Pages for Sys 80+ Design Control Document. Margin Bar Adjacent to Change & Rev Date Will Be Added to Revised DCD Page | Hot Short Ultimate heat sink Fire Barrier Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Coatings Fuel cladding Liquid penetrant |
LD-95-003, Provides Addl Info on Removal of Auxiliary Throttle Seal Coolers from Reactor Coolant Pumps,In Response to NRC Questions from Review of Sys 80+ Design Control Document | 3 March 1995 | Provides Addl Info on Removal of Auxiliary Throttle Seal Coolers from Reactor Coolant Pumps,In Response to NRC Questions from Review of Sys 80+ Design Control Document | |
LD-95-007, Forwards Revised Sys 80+ Design Control Document | 22 February 1995 | Forwards Revised Sys 80+ Design Control Document | |
LD-95-006, Forwards mark-up Pages Identifying Revs Incorporated Into Sys 80+ Design Control Document. Revs Provided in Response to Comments Provided by NRC & as Result of Changes Identified by ABB-CE & Discussed W/Nrc | 16 February 1995 | Forwards mark-up Pages Identifying Revs Incorporated Into Sys 80+ Design Control Document. Revs Provided in Response to Comments Provided by NRC & as Result of Changes Identified by ABB-CE & Discussed W/Nrc | |
LD-95-001, Forwards Rev 2 to Technical Support Document for Amend to 10CFR51 Considering Severe Accident Under NEPA for Plants of Sys 80+ Design | 6 January 1995 | Forwards Rev 2 to Technical Support Document for Amend to 10CFR51 Considering Severe Accident Under NEPA for Plants of Sys 80+ Design | |
NRC-94-4383, Comments on Review of Draft NUREG-1512 for Proprietary Info | 27 December 1994 | Comments on Review of Draft NUREG-1512 for Proprietary Info | |
LD-94-072, Provides Justification for Tier 2 Seismic & Valve Testing Expirations | 16 December 1994 | Provides Justification for Tier 2 Seismic & Valve Testing Expirations | Stroke time |
LD-94-073, Forwards Sys 80+ Design Control Document, Vols 1-24 | 16 December 1994 | Forwards Sys 80+ Design Control Document, Vols 1-24 | |
LD-94-071, Transmits Addl Input to System 80+ Design Control Document | 15 December 1994 | Transmits Addl Input to System 80+ Design Control Document | Safe Shutdown Boric Acid Reactor Vessel Water Level Tornado Missile Safe Shutdown Earthquake Probabilistic Risk Assessment Nondestructive Examination Incorporated by reference Tornado-Generated Missile Seismically rugged Earthquake Control of Heavy Loads Turbine Missile |
LD-94-069, Forwards marked-up CESSAR-DC Figure 5.1.2-2 Re Proposed Design Change to Remove RCP Seal Coolers | 8 December 1994 | Forwards marked-up CESSAR-DC Figure 5.1.2-2 Re Proposed Design Change to Remove RCP Seal Coolers | Boric Acid |
ML20078N896 | 1 December 1994 | Forwards Copy of Ltr NFBWR-94-033 | |
ML20149H194 | 14 November 1994 | Responds to Indicating Concern Re Application of Set of Interrelated Elements That Defines Technical & Regulatory Aspects of design-basic Accident Source Term for Licensing of Passive Plants | |
LD-94-065, Submits Proposed Language Related to Tier 2 for Sys 80+ Design Certification Rule | 28 October 1994 | Submits Proposed Language Related to Tier 2 for Sys 80+ Design Certification Rule | |
LD-94-063, Forwards Rev 1 of Technical Support Document for Amends to 10CFR51 Considering Severe Accidents Under NEPA for Plants of Sys 80+ Design | 10 October 1994 | Forwards Rev 1 of Technical Support Document for Amends to 10CFR51 Considering Severe Accidents Under NEPA for Plants of Sys 80+ Design |