ML20054K849

From kanterella
Jump to navigation Jump to search

Proposed Tech Spec Changes Re Periodic Testing of Auxiliary Feedwater Sys Automatic Actuation Logic
ML20054K849
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/30/1982
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20054K848 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.E.1.1, TASK-2.E.1.2, TASK-TM TAC-53271, TAC-53272, NUDOCS 8207060215
Download: ML20054K849 (1)


Text

.....

e TABLE 15.4.1-1 (CONTINUED)

)

e, Channel Description Check Calibrate Test Remarks 10.

Rod Position Bank Counters S (1) *

  • N.A.

N.A.

1) With analog rod position 11.

Steam Generator Level S **

R M (1) *

  • 1)

Includes test of logic for reactor trip on low-low level and automatic actuation logic i

for auxiliary feedwater pumps i

12.

Steam Generator Flow Mismatch S **

R M**

13.

Charging Flow N.A.

R N.A.

14.

Residual Heat Removal Pump Flow N.A.

R N.A.

15.

Boric Acid Tank Level D

R N.A.

I 16.

Refueling Water Storage Tank Level N.A.

R N.A.

17.

Volume Control Tank Level N.A.

R N.A.

18.

Reactor Containment Pressure D

R B/W (1) **

1)

Isolation valve signal 15/21 19.

Radiation Monitoring System D

R M

20.

Boric Acid Control N.A.

R N.A.

l21.

Containment Sump Level N.A.

R N.A.

l22. Turbine Overspeed Trip

  • N.A.

R M (1) *

  • 1)

Block trip 15/21

'23.

Accumulator Level and Pressure S

R N.A.

I

  • Overspeed Trip Mechanism, and Independent Turbine Speed Detection and Valve Trip System.

)* Not required during periods of refueling shutdown, but must be performed prior to starting up if it has not been performed during the previous surveillance period.

8207060215 820630 PDR ADOCK 05000266 P

PDR

__