LER 93-012-00:on 930603,deficiency in Plant Surveillance Test Procedures Identified.Caused by Primary Causal Factor Inattention to Detail During Initial Procedure Development Process.Surveillance Test Procedures performed.W/930702 Ltr
ML20045G611
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/02/1993
From: Booker J, Lorfing D
GULF STATES UTILITIES CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-93-012, LER-93-12, RBG-38704, NUDOCS 9307140195
Download: ML20045G611 (6)


Text

. . ,- ,

GULF ^ STATES UTILITXES COMPANY aCJ' N!4R 6t *dD $1 ADON POST C481Cf 00K L0 51 F R ANC fbil1 L E L L JtGAh A 707 76 AHf A 00DF SO4 635 6994 346 B6bt July 2, 1993 RBG- 38704 File Nos. G9.5, G9.25.1.3 U.S. Nuclear Regulatory Commission .

Document Control Desk I Washington, D.C. 20555  ;

Gentlemen:

River Bend Station - Unit 1 +

Docket No. 50-458 Please find enclosed Licensee Event Report No.93-012 for River Bend Station - -

Unit 1. This report is submitted pursuant to 10CFR50.73.

Sincerely, j ,t.BA J. E. Booker Manager - Safety Assessment and Quality Verification River Bend Nuclear Group DNL/JPS/FRC/ )CH/MLS/kvm 130059 m

9307140195 930702 ig DR ADOCK0500g8 ,

ll

J &- <m. . J cc: U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011.

NRC Resident Inspector P.O. Box 1051 St. Francisville, LA 70775 INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-5957 Mr. C.R. Oberg Public Utility Commission of Texas 7800 Shoal Creek Blvd., Suite 400 North ,

Austin, TX 78757 Department of Environmental Quality Radiation Protection Division P.O. Box 82135 Baton Rouge, LA 70884-2135 ATrN: Administrator J

l l

l l

l l

4

._~ .- _ _ _ _ = . - . . ~ , _ . __ . _ -- - .-. .

NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO. 3150-0104

?, Pa EXPlRES 5/31/95 E ST' MATED BURDfN PE R RESPONGE TO COMPLV W4H TNG i LICENLEE EVENT REPORT (LER) $$% E n% 5T'ljn1 E d?OO,d CT2

  • AND HEGORDS MANAGEMENT BRANCH IVNB0 17 W, U S NUCtE AR MGULATORY COUVtS90N. WAnHiNGTON, CC FJ5%-0C% AND TO TsE reERwang REDuchoN PacutcT onc ona. on ct of (see reverse for requaed number et d'gtts/t.haracters for each block) MANAGEMENT AND DVDGET W AMNGTUN. DC M1 F ACIUTY NAME (1) DOCl4T NUMBlH (2)

River Bend Station 05000 458 PAGt 1 OF (3)4 ,

mo6urveillance lesfs for the High Uryweli i>ressure tsypass ififleTTUEtToif of thU Automatic Depressurization Sy_ stem Have Not Been Developed per Technical Specifications  ;

EVENT DATE (5) LER NUMBERJ t REPORT NUMDER (7) OTHER FACILITIES INVOLVED (8) l uautNTm nrvscN %un m e ma umm e,w va vrAn NuMm s NuwEn ggsy, gy yg ,g 05000 2 F AuuM MW ggcq7 ggygg 06 03 93 93 - 012 --

00 07 02 93 05000 OPERATING THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR 1: ICheck one or mo'et (11) 4 ~

MODE (9) 20 402(b) 20 405fc) 50.73taH2)Dv) 73 71(b)

POWER *** "" ' '** "## ' " '

0 LEVEL (10) 20 405taH1 Hu) 50.36tc H2) 50 73(alt 2Hvn) OTHER 20 405laH1)(ni) X 50 73{a)(2)D) 50.73(aM2)(vm)(A) r**'-@ 'n Amad be end n Tut, Nnc 20.405 f a H I)(iv) 50 73(a)(2)6i) 50.73(aH2)(vui)(B) rei- 3%A) 20 405(aH1Hv) 50 73(aH2)Cn) 50.73(aH2)(x)

LICENSEE CONTACT FOR THIS LER (12)

~

D. N. Lorfing, Supervisor-Nuclear Licensing ~ (D D" M Il W COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT (13) cAusE tyrEv cowaONENT MANJf ACTURE A CAU5E sys rE M COV m NENT M Art;r ACTunE n

~

[ SUPPLEMENTAL REPORT EXPECTED (14) EXPECTED W* D

  • ns y go SUBMISSION n m, . rpm E wccTro susM'sooN t.Atrl DATE (15)

ABSTRACT (Lim,t to 1400 spaces,i.e.. approomately 15 single-spaced typewrmen lines) (16)

On June 3,1993 with the plant in cold shutdown (Operational Condition 4), a deficiency in plant surveillance test procedures (STPs) was identified. During a logic system functional test review, it was discovered that the channel functional and channel calibration tests that verify the high drywell pressure bypass timer function of the automatic depressurization system (ADS) were not being perfonned for channels "E" and "F" as required by Technical Specification 4.3.3.1. Therefore, this report is submitted pursuant to 10CFR50.73(a)(2)(i)(b) as opemtion prohibited by the Technical Specifications.

A change analysis was perfonned which revealed the primary causal factor was inattention to detail during the initial procedure development process. Surveillance test procedures, STP-051-4297 and STP-051-4294, were created to perform the channel calibration of the ADS drywell high pressure bypass timers "E" and "F" STP-051-4297 and STP-051-4594 were created to perfonn the channel functional tests of these same timers. Suneillance test pmcedures, STP-051-4224 and STP-051-4225 perfonned testing to assure that the timers would operate every 18 months. Following this event, these timers were verified to be functioning properly and within the Technical Specification allowable setpoint limits. Therefore, GSU is confident that these timers have been operable since the initial procedure development and the pre-operational system testing.

mc roru m w

, ... . .. . .. .- _ . = . . . . -. . . - . . - . . ~ . . - , _ , . _ .

+ *

.t REQUIRED NUMBER OF DIGITS / CHARACTERS ,

FOR EACH BLOCK +  !

t BLOCK NUMBER OF

  • NUMBER TITLE DIGITS / CHARACTERS 1 UP TO 46 FACILITY NAME 8 TOTAL DOCKET NUMBER 3 IN ADDITION TO 05000 3 VARIES PAGE NUMBER  ;

4 UP TO 76 TITLE [

6 TOTAL l EVENT DATE 2 PER BLOCK 7 TOTAL 6

^" LER NUMBER 3 FOR SEQUENTML NUMBER  !

2 FOR REVISION NUMBER 6 TOTAL 7 REPORT DATE  !

2 PER BLOCK UP TO 18 - FACILITY NAME i

8 8 TOTAL- DOCKET NUMBER

^

i 3 IN ADDITION TO 05000 9 1 OPERATING MODE 10 3 POWER LEVEL II CHECK BOX THAT APPLIES OWEUENTS OF 10 UR UP TO 50 FOR NAME 12 LICENSEE CONTACT 14 FOR TELEPHONE CAUSE VARIES 2 FOR SYSTEM 13 4 FOR COMPONENT EACH COMPONENT FAILURE 4 FOR MANUFACTURER NPRDS VARIES .

SUPPLEMENTAL REPORT EXPECTED 4 CHECK BOX THAT APPLIES 6 TOTAL 15 EXPECTED SUBMISSION DATE 2 PER BLOCK

NRC FORM 366A u.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO. 3150-0104 m sg

. EXPIRES 5/31/95 EST!MA'EO BURDEN PER RESPONSE TO COMPLY WiH THrs LICENSEE EVENT REPORT (LER) 1 *MT@s

  • REG %fN2Tno"ENiEih AUO 7E' isF2%%

TEXT CONTINUATION $$v"ti@*c"o^"vis"',7yTTs?"o'%%ug,7gAn o THE PAPEFiWORK REDUCTION PROJECT (3tS0-0104h DFF:CE OF MANAGEVENT AND BJDGE'T. WASr41NGTON, DC 20503 FACILITY NAME (4 DOCp ET NUMBER (2) LER NUMBER (4) P AGE (3)

SEQvlNTaAL, RE wSON NUVBER NUMBER F

g 4 RiverrBend Station 93 -

012 - 00 TEKT ts! more space os reawea. use e03@onse copres of wtC Form 3%A) (17)

REPORTED CONDITION On June 3,1993 with the plant in cold shutdown (Opemtional Condition 4), a deficiency in plant surveillance test procedures (STPs) was identified. During a logic system functional test review, it was discovered that the channel functional and channel calibration tests that verify the high drywell 1 pressure bypass timer function of the automatic depressurization system (ADS) were not being performed for channels "E" and "F" . ,

Technical Specifications (TS) Table 4.3.3.1-1-A.2.g and 4.3.3.1-1.B.2.f requires that a channel functional test be performed every month and that a channel calibmtion test be performed every quarter. It was discovered that these tests for channels "E" and "F" were not being performed.

Therefore, this report is submitted pursuant to 10CFR50.73(a)(2)(i)(b)as operation prohibited by the ,

Technical Specifications.

INVESTIGATION A review of the STP program revealed that high drywell pressure bypass timers, IB21C-K114E and F, have not had a channel functional or channel calibmtion since the implementation of the STP program at RBS. Surveillance test procedures to perform these tem do not exist. Channels "A" and "B" of the high drywell bypass timers were properly tested as requimd by the Technical SpeciGcations. Therefore, one channel in each trip system has not been tested thmughout plant life.

This review also found that STP-051-4224 and STP-051-4225 did test to assure that the timers i would operate every 18 months, but did not include checking the calibration of the timer. The logic system functional test requirements of Technical SpeciGcation 4.3.3.2 for the ADS high drywell ,

pressure bypass timers IB21C-K114E and F have been performed as required.

The ADS system is designed to initiate on the combination of a low reactor water level I signal and a high drywell pressure signal. There are two independent trip systems (A and B). Each trip system is comprised of two independent channels. Trip system "A" contains channel "A" and channel "E",

while trip system "B" contains channels "B" and "F". Initiation of ADS requires both channels of either trip system to receive a trip signal (ie., channels "A" and "E" or channels "B" and "F").

I Within each channel (A, B, E, or F), three signals are required to provide an initiation signal. These are high dryweIl pressure, low reactor water level 1, and either a low pressure core spray (LPCS) pump mnning or a residual heat removal (RHR) pump running. If all three of these signals are present then that channel will provide an initiation signal to its respective trip system (A or B). l Channels "A" and "B" also require a confirmatory low level 3 signal. i l

l Nf40 FORM 3661 @ 921

+ .

NRC FORM 366A U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO. 3150-0104 q EXPinES 5/31/95 ESTIMATED BURDEN PER RESPONSE TO COMP L Y w7H TM's LICENSEE EVENT REPORT (LER) EIMEs"Eo'O$'E*RDEN EEoO STS '

TEXT CONTINUATION R$u"$"J5Cy"a'"y'Es"o'"'w!%a"gd y  %'AL'o,"Q'il THE PAPERWORK REDUCTION PROJECT (3150-0104), OFFICE OF M ANAGEMENT AND BJDGE"f, WASHINGTON. DC 20%3 FACIUTY N W DOCF ET NUMBLR p) LER NUMBI R tt) PAGE p) tA QulNieAi R0090% ,

NUMBEA NUMBER River Bend Station 05000458- 3 OF 4 93 - 012 00

,w w.~,.u.a ,.w.a ..m - m , ~ C w m n In the event that there is a low reactor level 1 and level 3 for a duration of 5 minutes without a high drywell pressure signal, indicating a loss of coolant outside the drywell, the drywell pressure signal will be bypassed and ADS initiated. This is the function of the high drywell pressure bypass timers.

! These timers have contacts in parallel with the high drywell pressure contacts in the actuation logic which will close (thereby bypassing the nonnal drywell pressure contacts). This function is installed '

to depressurize the reactor and enable the lower pressure emergency con: cooling systems (ECCS) to assist in making up a loss of coolant in situations where the loss of coolant will not cause a rise in drywell pn:ssure (e.g. leak outside the drywell). The 5 minute time delay is designed for automatic backup to operator action.

ROOT CAUSE A change analysis was perfonned which revealed the primary causal factor was inattention to detail ,

during the initial procedure development process. Adequate verification that the STP prognun implemented all surveillance requirements would have prevented this condition.

A review of previous LERs for similarity revealed LER 88-010,89-003, 92-014,93-002, and 93-005. Each of these LERs described conditions in which STPs failed to satisfy the surveillance requirements as identified in the Technical Specifications. The events reponed in LERs92-014 and 93-002 concemed inadequate overlap between STPs implementing LSFT requirements. Licensee event report 93-005, had a secondary causal factor that distinguishes it from LER 93-012. The  :

event reported in LER 93-005 was a failure to include a monthly channel functional test in the STP for the RCIC steam flow - high timer function. The primary causal factor for LER 93-005 was I

failure to include the monthly channel functional in the original pmcedure development. This is ,

similar to the primary causal factor for this event, LER 93-012. However, LER 93-005 includes a secondary causal factor, the failure of personnel perfonning previous procedure reviews and revisions to identify this condition. The applicable STPs stated in their purpose sections that they l satisfy the requirements for the monthly channel functional test; however, this statement was never i verified in subsequent procedure revisions. '

l i

NRC FOPM E6A (S Ph

NRC FORM 366A U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO. 3150-0104 sq .

EXPIRES 5/31/95 ESTIMATED BJRDEN PER RESPONSE TO COMPLY WTH TH:S LICENSEE EVENT REPORT (LER) d 50E5'NEa'AS$$RDE8$$$ oOMEMESE TEXT CONTINUATION QSu"5$"S*C us$"d"'w"NEo"TE*E'E$'s"$Yt$

THE PAPERWORK HEDUCT60N PROJECT Q1604104). OFFICE OF M ANr.4 MENT AND BUDGET. W ASH!NGTON. DC 20503 FACILITY NAME (1) DOCEET NUMBER p) LER NUMBEM (81 PAGE p) ygg MQUE NTA REViheON NUMBER NUMBER 05000458 4 OF 4 River Bend Station 93 012 - 00 T LxT pr more scace a rega red, use additionar copres of NFtC f orm .%'A) (17)

CORRECTIVE ACTIONS Surveillance test procedures, STP-051-4297 and STP-051-4294, were created to perform the channel calibration of the ADS drywell high pressure bypass timers "E" and "F". STP-051-4297 and STP-051-4594 were created to perfonn the channel functional tests of these same timers.

A sampling of STPs based on MIL STD 105E will be reviewed against the Technical Specincation requirements. The purpose of this review is to provide a detailed technical review and determine the extent of STP inadequacies with respect to TS requirements. The estimated completion date for this review is July 30,1993.

SAFETY ASSESSMENT The TS surveillance requirements for channel functional and channel calibration were not satisfied for ADS drywell high pressure bypass timers IB21C-Kil4E and IB21C-Kil4F. However, surveillance test procedures, STP-051-4224 and STP-051-4225 did test to assure that the timers would operate every 18 months. In addition, these timers have been verified to be functioning properly and within the Technical Specification allowable setpoint limits. Therefore, GSU is confident that these timers have been operable since the initial procedure development and the pre-operational system testing.