LER 93-011-00:on 930521,determined That Mode Switch Placed in Refuel Position During Testing of Switch Interlock Functions.Caused by Conflicting Info in Surveillance Procedures.Operating Procedure revised.W/930621 Ltr
ML20045D699
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/21/1993
From: Booker J, Lorfing D
GULF STATES UTILITIES CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-93-011, LER-93-11, RBG-38654, NUDOCS 9306290317
Download: ML20045D699 (5)


Text

m - - - . . ,

9 GULF - STATES. UTILITIES COMPANY fHvtR BEtsp $7 ATiON ' Post OFFICE BCA 22G 67 Ht Anct5VtLLE. LOUF$tANA 70775 arf A CDOE b04 035 6094 346 6651 June 21, 1993 '

RBG- 38654 File Nos. G9.5, G9.25.1.3 U.S. Nuclear Regulatory Commission  ;

Document Control Desk Washington, D.C. 20555

  • Gentlemen:  !

River Bend Station - Unit -1 ,

Docket No. 50-458 Please find enclosed Licensee Event Report No.93-011 for River Bend Station -

Unit 1. This report is submitted pursuant to_10CFR50.73.

Sincerely,

, b bM '

J. E. Booker Manager - Safety Assessment and Quality Verification River Bend Nuclear Group  :

h 3 9,'* f ,' '&

DNL/JPS/FRC C I/KdH/kym .,

.u 800'h

/ ll S P3 H 050hg "" h

cc': U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington,.TX 76011 NRC Resident Inspector P.O. Box 1051 St. Fmncisville, LA 70775 INPO Records Center 700 Galleria Parkway Atlanta, GA 30339-5957 Mr. C.R. Oberg Public Utility Commission c Texas 7800 Shoal Creek Blvd., Suite 400 Nonh ,

Austin, TX 78757 Department of Environmental Quality Radiation Protection Division P.O. Box 82135 Baton Rouge, LA 70884-2135 ATTN: Administator I

i l

WC FORb66 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO. 3150-0104 64 EXPIRES 5/31/95 ESTIMATED BURDEN PER FtESPONSE TO COMPLY WITH THIS INFORMATON COLLECTION REQUEST: 50.0 HRS FORWARD LICESEQs 's v Uv B1k etTaeU M DT. (t.

a vru g I

D)

i COMMENTS GEGARDfNG BURDEN ESTIMA11E TO THE INrORMAllON AND RECORDS MANAGEMENT E#1ANCH (MNBa 7714). O S. NUCLEAR REGULATORY COMM4SION, WASH.NGTON. CC 20M5 0001, AND TO THE PAPERWORK REDUCTION PROJECT (3150 0104L OFFICE OF (See reverse for required number of digits / characters for each block) MANAGEMENT AND BUDGET, WASHING 70N, DC 20503.

~f ACILITY NAME p) DOCKET NUMBE R (2) PAGE (3)

IIIVER BEND STATION 05000 4 5 8 1 OF 3 Y" 4*) PAST PLACEMENT OF TIIE MODE S.11TCll IN TIIE REFUEL POSITION DURING TESTING OF SWITCH INTERLOCK FUNCI.lONS EVENT DATE (5) LER NUMBER (6i REPORT NUMBER (7) .

OTHER F ACILITIES INVOLVED (8)

SE QUENDAL REWSON * *UU" N# d NUMdtN MONTH CAY YEAR YEAR N" ^

NUV9ER NUY9ER 05000 F ACIUI'Y NAME DOCKET NUMBER

~ ~

05 31 93 93 011 00 05000 OPERATING THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR 6: (Check one or rnore) (11) ,

MODE (9) 4 20 402(b) 20.405(c) 50.73(a)(2)(iv) 73.71(b) l POWER 20 405 a)(1Hi) 50.36(c)(1) 50.73(a)(2)(v) 73 71(c)

LEVEL (10) 0 20 403;,)(i;<,i) 50.36(c)(2) 50.73(a)(2)(vis) OTHER 20.405(a)(1)(m) x 50 73(a)(2)(1) 50.73(a)(2)(viii)(A) W+/ m Abskact 3$. , l 20.405(a)(1)(iv) 50 73(a)(2)(ii) 50.73(a)(2)(viii)(B) g) 20 405(a)(1)(v) 50.73(a)(2)(m) 50.73(a)(2)(x)

LICENSEE CONTACT FOR THIS LER (12)

NAME TE_LEPHONE NuvdLR (mctode A<ca Cour)

David Lorfing - Supervisor, Nuclear Licensing (504) 381-4157 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT (13)

REPORTABLE CAVSE. SYSTEU COMPONENT MANUFALTURER CAUSE SYSTEM COMPONENT MANUFACTURER TO NPRDS PRD SUPPLEMENTAL REPORT EXPECTED (14) EXPECTED MONTH DAY YEAR vts SUBMISSION X NO m y... mepw. ExrecTEo suwssioN cATE, DATE (15)

ABSTRACT (Lirnit to 1400 spaces, i e , approximately 15 single-spaced typewntien lines) (16)

On May 21,1993 at approximately 1050, during testing of mode switch interlock functions, a question was raised regarding the mode switch position during this evolution. It was later detennined that in the past, the mode switch had been placed in the " Refuel" position during testing of switch interlock functions. Technical Specification Table 1.2 does not pennit this; therefore, this report is submitted pursuant to 10CFR50.73(a)(2)(i)(b) as a condition prohibited by the Technical Specifications.

The root cause for this event consisted of the initial interpretation of the Technical Specifications and the presence of conflicting information in stuveillance test procedures.

Corrective actions included revision of General Operating Procedure (GOP)-002 ' Plant Shutdown" to emphasize specific guidance concerning mode switch requirements, revision of other procedures to be consistent with the TS requirements, and tmining.

IVtC FORM ass ($ G4

. . . . . - .. . - . - . = . -. - -- - .- ,

l

. i REQUIRED NUMBER OF DIGITS / CHARACTERS '

FOR EACH BLOCK '

BLOCK NUMBER OF NUMBER DIGITS / CHARACTERS 1 UP TO 46 FACILITY NAME .

2 DOC E M BER~

3 IN ADDril 4 TO O5000 3 VARIES PAGE NUMBER 4 UP TO 76 TITLE E

5 EVENT DATE -

2 PER BLOCK 7 TOTAL 6

OR M LER NUMBER 3 FOR SEQUENTIAL NUMBER 2 FOR REVISION NUMBER 6

7 OM D,UE

, pER BLOCK UP TO 18 - FACILITY NAME A OWED B TOTAL - DOCKET NUMBER 3 IN ADDITION TO 05000 g

9 1 OPERATING MODE l l

10 3 POVER LEVEL

'i CHECK BOX THAT APPLIES OUHEMEMS OF 10 CFR 12 W TO 50 FOR NAME LICENSEE CONTACT 14 FOR TELEPHONE  !

CAUSE VARIES 2 FOR SYSTEM 13 4 FOR COMPONENT EACH COMPONENT FAILURE 4 FOR MANUFACTURER NPRDS VARIES I

CHECK BOX THAT APPUES A ORT ENED

'o 15 , y,n l^jcx EXPECTED SUBMISSION DATE i l

I

)

j

a REQUIRED NUMBER OF DIGITS / CHARACTERS FOR EACH BLOCK 1

I DLOCK NUMBER OF NUMBER DIGITS / CHARACTERS 1 UP TO 46 FACILITY NAME 2 DOCKET NUMBER 3 IN ADDITION TO 05000 3 VARIES PAGE NUMBER 4 UP TO 76 TRLE 5 ENT DATE 2 PER BLOCK 7 TOTAL

^

6 LER NUMBER 3 FOR SEQUENTIAL NUMBER 2 FOR REVISION NUMBER 7 ^

2 PER BL CK ,

UP TO 18 - FACILITY NAME 8 OTHER FACOTIES INNED 8 TOTAL- DOCKET NUMBER 3 IN ADDITION TO 05000 9 1 OPERATING MODE 10 3 POWER LEVEL Il REQUIREMENTS OF 10 CFR CHECK BOX THAT APPLIES O W FOR NAME 12 LICENSEE CONTACT 14 FOR TELEPHONE CAUSE VARIES 2 FOR SYSTEM 13 4 FOR COMPONENT EACH COMPONENT FAILURE 4 FOR MANUFACTURER NPRDS VARIES

" CHECK BOX THAT APPLIES S EMENTAL REPORT EWECTED 6

15 g pER BL CK EXPECTED SUBMISSION DATE s

i I

l I

.L

NRC FORM 366A U.S. NUCLEAR REGULATORY CoMMISSloN APPROVED BY OMB NO. 3150-0104 ss e2; EXPIRES 5/31/95 ESTIVATED BURDEN PER RESPONSE ' TO COMPLY WITH THtS LICENSEE EVENT REPORT (LER) C$u"uMS"EENSOi!!$1LEoEudRTTs E

' E^"

TEXT CONTINUATlON Ev"M*c"a^Us'$"'w'Z"ff77[""

y  %'3A$"f3 o THE PAPERWORK REDUCTON PRCUECT (31604104). OFFICE OF MANAGEMENT AND BUDGET, WASHINGTON. DC 20$03.

F ACILITV NAME (t) DOCetET NUMBER (2) LER NUMBER (4) PAGE (3) bL JbNhA' F Y'I'ON YEAR NUMBER NUMBER HIVER BEND STATION 05000 458

93. - 011. -

00 2 3

,En m ,o.c.,,,.n.a....m - coe.1wc1.c.,um on REPORTED CONDITION On May 21,.1993 at approximately 1050, during testing of mode switch interlock functions, a question was raised regarding the mode switch position during this evolution. It was later detennined that in the past, the mode switch had been placed in the " Refuel" position during testing l of switch interlock functions. Technical Specincation Table 1.2 does not permit this; therefore, this report is submitted pursuant to 10CFR50.73(a)(2)(i)(b) as a condition prohibited by the Technical Specincations.

INVESTIGATION The investigation revealed that the practice of placing the mode switch in " Refuel" during Operational Condition 4 (Cold Shutdown) to perform nuclear instrumentation surveillances has been in place since initial plant startup. Interviews revealed that surveillance test procedures STPs provided that option. i During the performance of STP-503-4505 (SRM "C" weekly) on 5/21/93, Technical Specification Table 1.2 was reviewed and the mode switch was placed in the "Startup/ Hot Standby" position.

Strict compliance with the Technical Specifications was maintained. A preliminary review of past practice indicated that on March 11,1992 at 2156 the mode switch was taken to " Refuel" from the

" Shutdown" position to support SRM testing.

Interviews revealed that the option of placing the mode switch in " Refuel" existed in some of the instrumentation and control (I&C) STPs for nuclear instrumentation (STP-504-4501 to 4504).

ROOT CAUSE ,

I The root cause of this event consisted of the initial interpretation of the Technical Specifications and I the presence of conflicting information in surveillance test procedures. I i

1 A review of previous LERs revealed none similar. l I

I NRCrony assA(5.s2,

L NRC FORM 366A U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB No. 3150-0104 ts er, EXPlRES 5/31/95 ESTIVATED BURDEN PER RESPONSE TO COVPLY W:?H TH's LICENSEE EVENT REPORT (LER) $$ U E U EGT E E ERo"f $ $ E o O u 5 0 5 TEXT CONTINUATION ^$v"fr$8"85$"Z"d*8N e

$"JES,%$

THE PAPERWORK REDUCTION PROJECT (31540104, OFFICE OF M ANAGEMENT AND BJCGET. WASHINGTON, DC 20$03.

7 ACIUTV NAME 0) DOCp(T NUMBER (2) LER NUMBER 45) PAGE (3)

YE.AR NUMBER NUMBER OF RIVER BEND STATION 05000 458 ~

93 - 011 00 3 3 im e -..,.c...,. ,* .. ~ uor,,...,oc - on CORRECTIVE ACTION Corrective actions consist of the following:

(1) Revise General Operating Procedure (GOP)-002 " Plant Shutdown" to emphasize specific guidance from TS Table 1,2 concerning mode switch requirements during nuclear instmmentation testing. ,

(2) Brief all Senior Reactor Opemtors (SROs) and Reactor Operators (ROs) on the event and corrective actions, and emphasize that in the event of conflicting infonnation Technical Specifications shall always govern.

(3) Include this event in the next available training module for all SROs and ROs, with an estimated completion date of October 2,1993.

(4) Review all of the I&C nuclear instrumentation STPs and delete inappropriate refemnces to placing the mode switch in " Refuel" by November 1,1993.

SAFETY ASSESSMENT Placing the mode switch in " Refuel" during NI testing is a more conservative action than the Technical Specification allows, from a design standpoint. This is due to the fact that the design allows only one control rod to be withdmwn with the mode switch in " Refuel." Note that in "Stanup," the design permits more than one control rod to be withdmwn; however, two operators are used to verify rod position. Both methods are conservative; however, placing the mode switch in "Stanup/ Hot Standby" strictly complies with the Technical Specifications.

NRC FORM 366A !S 971