Category:LICENSEE EVENT REPORT (SEE ALSO AO RO)
MONTHYEARRBG-44727, LER 98-S01-00:on 981021,identified That Contract Employee with Temporary Access Authorization Failed to Disclose Complete Criminal & Employment History.Individual Denied Access to Plants for Five Years.With1998-11-17017 November 1998 LER 98-S01-00:on 981021,identified That Contract Employee with Temporary Access Authorization Failed to Disclose Complete Criminal & Employment History.Individual Denied Access to Plants for Five Years.With RBG-44243, LER 97-S03-00:on 970911,contract Employee Was Granted Temporary Access After Failing to List Prior Employment Termination & Access Denial.Caused by Employee Failure to Provide Accurate Info.Updated Info Re Employee1997-10-13013 October 1997 LER 97-S03-00:on 970911,contract Employee Was Granted Temporary Access After Failing to List Prior Employment Termination & Access Denial.Caused by Employee Failure to Provide Accurate Info.Updated Info Re Employee RBG-44204, LER 97-S02-00:on 970717,contract Employee Failed to List Prior Employment Termination Due to Positive Drug Test & Was Granted Temporary Access.Caused by Incomplete Info Provided by Licensee.Deleted Employee'S Key Card1997-09-11011 September 1997 LER 97-S02-00:on 970717,contract Employee Failed to List Prior Employment Termination Due to Positive Drug Test & Was Granted Temporary Access.Caused by Incomplete Info Provided by Licensee.Deleted Employee'S Key Card RBG-44187, LER 97-S01-00:on 970514,contract Employee Did Not Identify Criminal Background & Was Granted Temporary Access.Caused by Inaccurate & Incomplete Info Provided by Employee.Employee'S Key Card Was Suspended1997-08-28028 August 1997 LER 97-S01-00:on 970514,contract Employee Did Not Identify Criminal Background & Was Granted Temporary Access.Caused by Inaccurate & Incomplete Info Provided by Employee.Employee'S Key Card Was Suspended 05000458/LER-1993-0161993-08-27027 August 1993 LER 93-016-00:on 930727,HPCS Sys Actuation Occurred Due to Improperly Prepared Rev to Surveillance Test Procedure. Changed Surveillance Procedure STP-051-4811.W/930827 Ltr 05000458/LER-1993-0121993-08-26026 August 1993 LER 93-012-01:on 930603,deficiency in Plant Surveillance Test Procedures Identified.Caused by Inattention to Detail During Initial Procedure.Surveillance Test Procedures revised.W/930826 Ltr 05000458/LER-1993-0151993-08-23023 August 1993 LER 93-015-00:on 930723,discovered Time Response Testing of Isolation Instrumentation for RWCU & RCIC Sys Not Performed at Intervals Required by Tss.Caused by Scheduling Error & Misinterpretation of Ts.Schedule revised.W/930824 Ltr 05000458/LER-1993-0101993-08-16016 August 1993 LER 93-010-01:on 930514,SDC Loss for Three Minutes When SDC Suction Valves Closed.Caused by Failure to Identify Need for Compensatory Measures.Revised Procedural Guidance Clarifying Valve isolation.W/930816 Ltr 05000458/LER-1990-0221990-06-18018 June 1990 LER 90-022-00:on 900518,HPCS Sys Declared Inoperable & 14-day Shutdown Limiting Condition for Operation Entered Due to Inoperative Suppression Pool Level Transmitter.Caused by Personnel Error.Reactor Operators trained.W/900618 Ltr 05000458/LER-1987-001, Corrected LER 87-001-00:on 870108,discovered That Main Plant & Fuel Bldg Exhaust Radiation Monitor Particulate & Iodine Samplers Isolated Since 870107.Caused by Operator Error. Operator Aid Issued1987-02-0909 February 1987 Corrected LER 87-001-00:on 870108,discovered That Main Plant & Fuel Bldg Exhaust Radiation Monitor Particulate & Iodine Samplers Isolated Since 870107.Caused by Operator Error. Operator Aid Issued 05000458/LER-1986-009, Corrected LER 86-009-00:on 860114,radwaste Liquid Effluent Monitor Sample Pump Not Started During Radioactive Liquid Discharge.Caused by Miscommunication & Procedure Ambiguities.Procedures Revised1986-02-13013 February 1986 Corrected LER 86-009-00:on 860114,radwaste Liquid Effluent Monitor Sample Pump Not Started During Radioactive Liquid Discharge.Caused by Miscommunication & Procedure Ambiguities.Procedures Revised 1998-11-17
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARRBG-45144, Monthly Operating Rept for Sept 1999 for River Bend Station. with1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for River Bend Station. with ML20216G1201999-09-0909 September 1999 Rev 3 to Rbs,Cycle 9 Colr RBG-45110, Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With RBG-45087, Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection1999-08-0606 August 1999 Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection ML20210K4721999-08-0303 August 1999 SER Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves RBG-45091, Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With ML20210C6391999-07-0202 July 1999 Rev 2 to River Bend Station,Cycle 9 Colr RBG-45055, Monthly Operating Rept for June 1999 for River Bend Station, Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for River Bend Station, Unit 1.With ML20196J8031999-06-24024 June 1999 Rev 1 to Rbs,Cycle 9 Colr RBG-45028, Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With1999-05-31031 May 1999 Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With RBG-45016, Monthly Operating Rept for Apr 1999 for River Bend Station, Unit 1.With1999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for River Bend Station, Unit 1.With ML20206A2111999-04-21021 April 1999 Safety Evaluation Authorizing Pump Relief Request PRR-001 & Valve Relief Request VRR-001 & Denying Valve Relief Request VRR-002 RBG-44969, Monthly Operating Rept for Mar 1999 for River Bend Station, Unit 1.With1999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for River Bend Station, Unit 1.With ML20205S0601999-03-31031 March 1999 Rept on Status of Public Petitions Under 10CFR2.206 with Status Change from Previous Update,990331 ML20205D5481999-03-26026 March 1999 SER Accepting Util Proposed Alternative to Exam Weld AA with Weld Volume Coverage of 62 Percent for First 10-year Insp Interval Pursuant to 10CFR50.55a(a)(3)(ii) & 10CFR50.55a(g)(6)(ii)(A)(5) RBG-44930, Monthly Operating Rept for Feb 1999 for River Bend Station, Unit 1.With1999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for River Bend Station, Unit 1.With RBG-44826, Monthly Operating Rept for Dec 1998 for River Bend Station Unit 1.With1998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for River Bend Station Unit 1.With ML20198K2701998-12-22022 December 1998 Rev 1 to RBS Cycle 8 Colr RBG-44773, Monthly Operating Rept for Nov 1998 for River Bend Station, Unit 1.With1998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for River Bend Station, Unit 1.With RBG-44727, LER 98-S01-00:on 981021,identified That Contract Employee with Temporary Access Authorization Failed to Disclose Complete Criminal & Employment History.Individual Denied Access to Plants for Five Years.With1998-11-17017 November 1998 LER 98-S01-00:on 981021,identified That Contract Employee with Temporary Access Authorization Failed to Disclose Complete Criminal & Employment History.Individual Denied Access to Plants for Five Years.With ML20195C4841998-11-0606 November 1998 SER Accepting QA Program Change to Consolidate Four Existing QA Programs for Arkansas Nuclear One,Grand Gulf Nuclear Station,River Bend Station & Waterford 3 Steam Electric Station Into Single QA Program ML20155H3491998-11-0303 November 1998 Safety Evaluation Granting Requests for Relief RR2-0001, RR2-0002 & RR2-0003 RBG-44719, Monthly Operating Rept for Oct 1998 for River Bend Station, Unit 1.With1998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for River Bend Station, Unit 1.With ML20155C1351998-10-26026 October 1998 Rev B to Entergy QA Program Manual RBG-44677, Monthly Operating Rept for Sept 1998 for River Bend Station, Unit 1.With1998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for River Bend Station, Unit 1.With ML20154E2171998-09-28028 September 1998 Follow-up Part 21 Rept Re Defect with 1200AC & 1200BC Recorders Built Under Westronics 10CFR50 App B Program. Westronics Has Notified Bvps,Ano & RBS & Is Currently Making Arrangements to Implement Design Mods ML20151S5421998-09-0303 September 1998 Safety Evaluation Opposing Licensee Thermal Model as Currently Implemented.Evaluation Recommended to Be Used in Any follow-up Site Insp RBG-44629, Monthly Operating Rept for Aug 1998 for River Bend Station, Unit 1.With1998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for River Bend Station, Unit 1.With ML20236X2351998-08-0505 August 1998 Part 21 Rept Re Defect Associated W/Westronics 1200AC & 1200BC Recorders Built Under Westronics 10CFR50,App B Program.Beaver Valley,Arkansas Nuclear One & River Bend Station Notified.Design Mod Is Being Developed RBG-44600, Monthly Operating Rept for July 1998 for River Bend Station1998-07-31031 July 1998 Monthly Operating Rept for July 1998 for River Bend Station RBG-44564, Monthly Operating Rept for June 1998 for River Bend Station, Unit 11998-06-30030 June 1998 Monthly Operating Rept for June 1998 for River Bend Station, Unit 1 ML20249A6431998-06-12012 June 1998 SER Accepting 980427 Request for Change to River Bend QA Manual Program Description,Per 10CFR50.54(a)(3) RBG-44539, Monthly Operating Rept for May 1998 for River Bend Station, Unit 11998-05-31031 May 1998 Monthly Operating Rept for May 1998 for River Bend Station, Unit 1 RBG-44501, Monthly Operating Rept for Apr 1998 for River Bend Station, Unit 11998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for River Bend Station, Unit 1 ML20217M8951998-04-30030 April 1998 QA Program Manual ML20217P8281998-04-0707 April 1998 Safety Evaluation Accepting Relief Authorization for Alternative to Requirements of ASME Section Xi,Subarticle IWA-5250 Bolting Exam for Plants,Per 10CFR50.55a(a)(3)(i) RBG-44458, Monthly Operating Rept for Mar 1998 for River Bend Station, Unit 11998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for River Bend Station, Unit 1 RBG-44423, Monthly Operating Rept for Feb 1998 for River Bend Station Unit 11998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for River Bend Station Unit 1 ML20203L6631998-02-11011 February 1998 Rev 0 to River Bend Station,1998 Emergency Preparedness Exercise RBG-44385, Monthly Operating Rept for Jan 1998 for River Bend Station, Unit 11998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for River Bend Station, Unit 1 RBG-44353, Monthly Operating Rept for Dec 1997 for River Bend Station, Unit 11997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for River Bend Station, Unit 1 RBG-44460, Forwards Annual Radiological Environmental Operating Rept, for Period Jan-Dec 19971997-12-31031 December 1997 Forwards Annual Radiological Environmental Operating Rept, for Period Jan-Dec 1997 ML20203H9891997-12-12012 December 1997 Part 21 Rept Re Potential Manufacturing Defect of Enterprise DSR-4 & DSRV-4 Edgs.Cooper Energy Svcs Supplied 1A-7840 Adjusting Screw to Affected Utils & Sites.River Bend Station Replaced W/Acceptable Assemblies ML20202E9941997-12-0101 December 1997 ISI Plan Second Ten-Yr Interval (Dec 1,1997-Nov 30,2007) ML20199K9741997-11-30030 November 1997 Brief Aerial Photography Analysis of RBS at St Francisville,LA:1996-1997 RBG-44337, Monthly Operating Rept for Nov 1997 for River Bend Station, Unit 11997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for River Bend Station, Unit 1 ML20202F0191997-11-28028 November 1997 Safety Evaluation Approving Transfer of License NPF-47 for River Bend Station,Unit 1 ML20199H3711997-11-19019 November 1997 SER Accepting Approving Request Relief from Requirements of Section XI, Rule for Inservice Insp of NPP Components, of ASME for Current or New 10-year Inservice Insp Interval IAW 50.55(a)(3)(i) of 10CFR50 RBG-44295, Monthly Operating Rept for Oct 1997 for River Bend Station Unit 11997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for River Bend Station Unit 1 RBG-44243, LER 97-S03-00:on 970911,contract Employee Was Granted Temporary Access After Failing to List Prior Employment Termination & Access Denial.Caused by Employee Failure to Provide Accurate Info.Updated Info Re Employee1997-10-13013 October 1997 LER 97-S03-00:on 970911,contract Employee Was Granted Temporary Access After Failing to List Prior Employment Termination & Access Denial.Caused by Employee Failure to Provide Accurate Info.Updated Info Re Employee 1999-09-09
[Table view] |
Text
__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -_ - _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ~ ~~------ - ~
Entirgy Operations. Inc. l River Bend Stahon 1
_ - 6485 U. S. Kghway 61
& ffj ;
OC St Francisville. LA 70775 Tel 504 336 0225 Fax 504 635 5008 Y
Rick J. King
)fIa5 afety S & RegJaury Afans October 13,1997 U.S. NRC Document Control Desk, OPl-17 Washington, D.C. 20555
Subject:
River Bend Station - Unit 1 Docket No. 50-458 License No. NPF-47
- Safeguards Event Report 50-458/97 S03-00 File Nos. G9.5, G9.25.1.3 RBG-44243 RBF1-97-0368 Ladies and Gentlemen
In accordance with 10CFR73.71(b)(1), enclosed is tl.e subject security event report.
Sincerely, A8 2' RJK/WJF/m p enclosure i
, )
9710210031 971013 "
PDR ADOCK 05000458 g PDR.
.Udrf -m>
l I
Safeguardi Event Report 50-458/97 S03-00
- - October 13,1997._
RBG-44243 RBF1-97-0368 ,
Page 2 of 2 cc: U. S. Nuclear Regulatory Commission Region IV -
611 Ryan Plaza Drive, Suite 400 Arlir.gton,TX 76011 NRC Sr. Resident Inspector P. O. Box 1050 '
St. Francisville, LA 70775 INPO Records Center 700 Galleria Parkway
- Atlanta, GA 30339-3064 Mr. Glenn Dishong Public Utility Commission of Texas 1701 N. Congress Ave.
Austin, TX 78711-3326 -
Louisiana Department of Environmental Quality
. Radiation Protection Division P.O. Box 82135
_ Baton Rouge, LA 70884-2135 ATTN: Administrator i
NRC FORA 366 U.S. NUCLEAR REGULATORY COMMISSION
- APPROVED BY OMB NO. 3150-0104 (445)
EXPlRES 04/30/98 wow #oM###M2"un! 4?%"M"anin8 LICENSEE EVENT REPORT (LER) 2"' vows'e"/ T#wWe"#M"R/lEMuss (See reverse for re uired number of SN8 E'" EYo"NESENYSEN
^
digits / characters or each block) O M "AGNEM N T A G O "[ C 7
,Acww.m - ,Nu.. m -m River Bend Station 05000-458 1 of 3 mte m Contract Employee Was Granted Temporary Access After Failing to List Prior Employment Termination And Access Denial EVENT DATE (5) LER NUMtstR (5) RI PORT DATE (7)
MUN m DAY RAR RAM M N T IAL HL MQF TH DAY OTHER FACILIIIE5 INVOLVED (5)
TLAR F AGILITY NAML UQGKLI NUMt;LR N/A 05000 09 11 97 97 - 503 - 00 10 13 97 F AG4H Y NAML MI NNH N/A 05000 GT 5 THIS REPORT 15 5UBMti i tu PUR DANT r0 THE REQUI (EMENT5 OF 10 GFR 9: (Check one or more) (11) 20.2201(b) 20.2203(ax2Xv) j 50.73(a)(2Xi) 50 73(ax2)(vm) 74 Qo/n 20.2203(a)(1) 20.2203(ax3)(i) 50.73(aX2)(u) 50.73(a)(2)(x) 20 2203(a)(2)(i) 20.2203(aK3Xn) 50.73 tax 2Xm) X 73.71 20.2203(aX2)(u) 20.2203(aX4) 50.73(aX2)(rv) OTHER 20.2203(aX2Xm) 50 36(cx1) 50.73(ax2Xv) gggbs glow 20.2203(aX2Xiv) 50.36(c)(2) 50.73(aX2Xvn)
NAML LIGEN5EE CONTACT FOR THIS LER (12)
Ti.LLPHONL NUMULM (inchale Area Gode; s
D. N. Lorfing, Supervisor - Licensing 504-381-4157 CAU5L bYb iLM COMPLti COMPUNLNI t ONE LINE FOR EACH MANUI A I'URLR V COMPONENT i
FAILURE DEUGRIBED IN THis REPORT (13)
L CAUbL bVblLM COMPQNLNI MANUF AGIUMLM H rvMiAB E S JPPLEMENTA L REPORT EXPliGitu (14) EXPEUlhu MONTH A( YEAR SUBMISSloN YE5 DATE (15)
X NO (if yes. complete EXPECTED SUBMISSION DATE).
AB4TRAGT (Larrut to 1400 spaces. i.e., approximately 15 singie-spaced typewntten hnes) (16)
On September 30,1997, with the plant in mode 5 (refueling) at 0% power, River Bend Station (RBS) received a telephone call from another utility regarding a contract employee. The other utility previously sent the contract employee a letter reflecting a one-year access denial due to multiple priorjob terrmnations. The individual had been granted temporary unescorted access at RBS on September 11,1997, in accordance with RBS procedures.
This discrepancy is reportable pursuant to 10CFR73.71(b)(1).
The contrrci employee was interviewed and stated that the letter received from the other utility was not recognized as a denial when responding to the RBS questionnaire. Regarding the em,ployee's failure to identify the priorjob terminations, the employee stated that the information wasjust not provided. The cause of this event was incomplete information provided by the employee. RBS programs and procedures functioned as expected in detecting and resolving this issue.
During the time in which the employee had access to the RBS Protected Area, primary job res a millwright working on the turbme. No safety related work was performed by A check the employee.ponsibility of the employee's keycard access history showed no entry to vital areas of the plant. Therefore, this condition had no safety significance.
- - _ _ _ _ _ _ _ _ A
NRC FORM 366A U.S. NUCLEAR REGULATORY COMMISSION
(%5)
- LICENSEE EVENT REPORT (LER)
TEXT CONTINUATION FACluTY NAME 0) DOCKET LER NUMBER (6) PAGE (3)
River Bend Station 05000-458 "
97 - S03 - 00 2 of 3 BACKGROUND On September 11,1997, a contract employee was granted temporary unescorted access, based upon satisfactorily completing the initial RBS access processing requirements. The RBS process for granting tempe " access includes - among other things - an employment check for the last year, a credit check, identity verif.. ation through one photo identification (e.g. driver's license), and passing a psychological evaluation.
REPORTED CONDITION On September 30,1997, with the plant at 0% power in mode 5 (refueling), RBS received a telephone call from another utility regarding the contract employee. While personnel from the other utility were reviewing the Personnel Access Database System (PADS), they noted that RBS had granted temporary access to the contract employee. The other utility previously sent tne contract employee a letter reflecting a one-year access denial due to multiple priorjob terminations. However, PADS did not contain supplemental information on the employee and the one-year access denial period at the other utility had expired. Also, the other utility was not sure that the contract employee had received the access denial letter. The contract employee's failure to disclose prior employment terminations is reportable pursuant to 10CFR73.71(b)(1).
INVESTIGATION The individual was not on-site when the phone call from the other utility was received. Upon the employee's arrival for the next scheduled work shift, the employee was brought in and interviewed. During the interview, the employee stated that the letter from the other utility was received, but the letter was not recognized as a denial when responding to the RBS questionnaire. Regarding the employee's failure to identify priorjob terminations, the employee stated that the information was just not provided. The contract employee's access to .
RBS has been deleted.
ROOT CAUSE The cause for this event was the contract employee's failure to provide accurate and complete information.
t CORRECTIVE ACTIONS TO PREVENT RECURRENCE PADS information related to the employee was updated. RBS programs and procedures functioned as expected.
No other corrective actions are necessary to prevent recurrence.
I 1
_ _ _ J
. NRC FORM 3%A U.S. NUCLEAR REGULATORY COMMISSION s.w -
LICENSEE EVENT REPORT (LER)
TEXT CONTINUATION FACILITY NAME (1) DOCKET LER NUMBER (6) PAGE (3) i River Bend Station **
05000 4 58 "#AP "J3N 97 -
S03 -
00 3 of 3 l
SAFETY ASSESSMENT- i During the time in which the employee had access to the RBS Protected Area, the employee functioned as a !
, millwright performing work on the turbine. No safety related work was performed. A check of the employee's keycard access history showed no entry to vital areas of the plant. Therefore, this condition had no safety ;
significance, i
4 4
)