RBG-45091, Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With
ML20210U456
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/31/1999
From: King R, Williamson D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RBF1-99-0240, RBG-45091, NUDOCS 9908200114
Download: ML20210U456 (4)


Text

  1. '

Entirgy oper;tions, Inc.

f ,\}

/ River Bend Station

( 5485 U.S Highway 61 P. O. Box 220 y St. Francisville. LA 70775 Tel 225 336 6225 Fax 225 635 5068 Rick J. King Director Nuclear Safety Assurance August 16,1999 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555

Subject:

River Bend Station- Unit 1 Docket No. 50-458 Monthly Operating Report File No.: G9.5, G4.25 RBG 45091 PJdF1-99-0240 Ladies and Gentlemen:

In accordance with River Bend Station Technical Specification 5.6.4, enclosed is the Monthly Operating Repoit for July 1999.

Sincerely, M

RJK/dhw enclosure y 3,1 T:'d <34  !

9908200114 990731

~

l l

PDR ADOCK 05000458f i R PDR .

i

Monthly Operating Report August 16,1999 RBG-45091

. RBF1-99-0240.

Page 2 of 2 cc: U. S. Nuclear Regulatory Commission Region IV.

611 Ryan Plaza Drive, Suite 400 Arlington,TX 76011 NRC Senior Resident inspector

~ P. O. Box 1050 St. Francisville, LA 70775 INPO Records Center l 700 Galleria Parkway l Atlanta, GA' 30339-3064 l Mr. Jim Calloway

. Public Utility Commission of Texas

)

._ j 1701 N. Congress Ave.

Austin, TX 78711-3326 Dottie Sheiman American Nuclear Insurers 29 South Main Street  :

West Hartford, CT 06107

'I l

I

I" ,

DOCKET NO. 50/458 RIVER BEND STATION DATE August 16,1999 COMPLETED BY Danny H. Williamson TITLE Sr. Licensing Specialist TELEPHONE 225-381-4279 PAGE I OF 2 OPERATING STATUS

1. REPORTING PERIOD: July 1999
2. MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 936
3. DESIGN ELECTRICAL RATING (MWe-Net): 936 MONTH YEAR TO CUMULATIVE DATE
4. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2979.4 91689.8
5. HOURS GENERATOR ON LINE 693.3 2901.3 88271.5
6. UNIT RESERVE SIIUTDOWN HOURS 0 0 0
7. NET ELECTRICAL ENERGY GENERATED (MWH) 573,677 2,369,776 77,093,091 l

l l

1 i

F,,.

i i

l PAGE 2 OF 2 i UNIT SHUTDOWNS SHUTDOWN CAUSE/ I NUMBER DATE TYPE DURATION METHOD REASON CORRECTIVE ACTIONS 99-02 990513 F 50.7 hr. 5 H Replaced fuel assemblies.

(Unit was (Accelerated Root cause found to be already shut corrosion of thermally-induced accelerated down when fuel corrosion.

outage was cladding) entered)

LEGEND:

TYPE: F- Forced SillTDOWN METHOD: I Manual REASON: A Equipment failure (enplain)

S - Scheduled 2 - Manual trip / scram B Maintenance or Test 3- Automatic trip /seram C - Refueling 4 - Continuation D - Regulatory restriction 5 - Other (emplain) E - Operator training / Liecuse exam F- Administrathe i

l G Operationalerror(enplain) 11 - Other (etplain) l NOTES:

1. No challenges to the reactor safety-relief valves occurred in July.

m// '

Danny H. Williamson I

l f

I 4