LER 89-039-00:on 891114,discovered That Required post-maint Overall Leak Rate Test on Upper Containment Airlock Not Performed After Replacement of Inflatable Seal.Caused by Personnel Error.Maint Procedure revised.W/891214 Ltr
ML20011D137
Person / Time
Site: River Bend Entergy icon.png
Issue date: 12/14/1989
From: Booker J, England L
GULF STATES UTILITIES CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-89-039, LER-89-39, RBG-31945, NUDOCS 8912200440
Download: ML20011D137 (4)


Text

e oa ,

) '

GULF STATES UTILITIES COMPANY hivili BLND ET AitON POSTOff(10DY220 $1 fliAN0f!MLLI LOutNANA 707/b ARE A CODC fin (356'M J M66M1 k.

December 14,1989 I RBG- 3194 5 l File Nos. G9.5, G9.25.1.3 ,

1 U.S. Nuclear Regulatory Commission' Document Control Desk - "

Washington, D.C. 20555 i

Gentlemen:  ;

River Bend Station - Unit 1 Docket No. 50-458 Please find ~ enclosed Licensee Event Report No.89-039 for River Bend Station - Unit 1. This report is being submitted '

pursuant to 10CFR50.73.  :

Sincerely,

. E. Booker Manager-River Bend Oversight River Bend Nuclear Group MJ JEB/TFP RGW DEJ/ch. ,

cc: U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 NRC Resident Inspector P.O. Box 1051 '

St. Francisville, LA 70775 INPO Records Center 1100 Circle 75 Parkway Atlanta, GA 30339-3064 ,

b 8912200440 891214 [b M

{DR ADOCK 05000438 PDC f/

//

  • u m. .t .osa,0.. .O 1 Wsl
  • aev.oveo 0 e 0 eiewi. l UCENSEE EVENT REPORT (LC) " ***
  • 8 '*r*

..Clut, a E oi 00Catt v.soon ei === +

RIVER BEND STATION o 16 t o t o I o I 41518 1 lod Of 3 eiv6 . 1 Missed STP on Upper Containment Airlock due to Personnel Error I tvt=t ontI iei ua =viesa iei ne cat Oatt eri Or t aciutin i=v0Lvto esi won 1.e Day Stam vtan " N 7,% w0ht e. Dat vt ast ' aC8 4'Y. *awt B D0 Cast wvweters.

015l0l0lol l l

~ ~

1l 1 1l 4 9 9 8l 9 0l 3l 9, 0l 0 1l 2 1l 4 8l 9 0 # 5l0lo 0, I i TMs e0 '$ e itttO pmakt 70 t**t h60Usmemesure 08 is C7m I (Caer. e.i. es me.e of ra. 8 esse.= aes til.

uteWe "o** *i m en.i n oi.i es tanen i va ti.i n . W ientud es hiettil es.ttion3H.6 13.ttisi

. . inn.i . .iei., . n.i.n .

,,e, i i _ _ _ =u g,..g,,,, ,

ma, n mi.inu.i 1 m.tmion.

sein nen nai t se n. inn. se n.imn.i es t=nen nsi

$d .MieH1 H.i De ?9isIGH i 3D tkH9Hei LICttGGS COwract 8084 TMit LI A (18i Napt etLtPm0ht %vwet#

ahta COD 4 L. A. England, Director - Nuclear Licensin9 51014 318111-14111415 COes>Ltte Cast Leht 908 54CM Consposetert pasLuet Otecest:0 in TMis topont its N

Cault 8t$ttw Cour0%sht "$% AC. yoq,T,ap,6 Cault Svstiu C0we0=tht "$g(aC yp agge I l I 1 I I 1 i t i I I I I l l I l l I l l l l 1  ! I I supPtenseert&L mgpOnt tapecito nei lwo%tu pay 3 vlam tvew S8104 vil ftf res ,emedess (A*fCff0 Sveertsis04 0afts

] NO g l l 4est act ,o . .e ,= , . . . e.. , a, ,. -., . , n ei On 11/14/89 at 0800, with the unit operating at 95 percent power in Operational Condition 1, it was discovered that a required post maintenance overall leak rate test on the upper containment airlock

had not been performed after replacement of an inflatable seal was completed on 2/5/89 per Maintenance Work Order Request (MWOR) R133511. -

l This event is reportable per 10CFR50.73 (a) (2) (1) (B) as an operation prohibited by Technical Specification 3/4.6.1.3.

On reviewing the MWOR it was determined that Surveillance Test Procedure (STP)-057-3804 had been inadvertently deleted and replaced with STP-057-5203. The root cause was determined to be personnel ,

error by the maintenance personnel. The corrective maintenance  ;

procedure (CMP)-9249, " Personnel Air Locks Door Seal Requirement", was revised such that required testing is specified in the acceptance l criteria determination section of the procedure.

l L During the period 2/5/89 and 3/15/09, no event challenging containment l integrity occurred. STP-057-3704 was satisfactorily performed on 3/15/89 as a normal surveillance at the start of the second refueling

, outage. The overall leak rate would have been found satisfactory on

! 2/5/89 had the STP been performed on that date. The health and safety .

of the public was not significan*.ly affected by this event.

OE** * . -

g

ac % inns vs muc6 tan aeveson,ca . o

L **"

.~ LICENSEE EVENT REPORT (LER) TEXT CONTINUATION *movgo ome ao vio-em inreis e n e f actuf t waast m exalt wundsta s85 ten wunsota asi taot tal n aa "Mr  !

'T.T:

RIVER BEND STATION o l6 lo 10 l0 l 4l 5l 8 8l 9 --

O 13 19 0 10 Ol2 0F 013 vins,, . . == aacwamamm REPORTED CONDITION At 0800 on 11/4/89 with the unit at 95 percent power in Operational Condition 1, it was discovered that a required post-maintenance overall leak rate test had not been performed on the upper containment airlock (*AL*) after replacement of an inflatable seal was completed on 2/5/89 per Maintenance Work Order (MNO) R133511. The door was placed in service at 1718 on 2/5/89 without proving operability in accordance with the overall leak rate Surveillance Test Procedure (STP) -0 5 7-3 7 0 4 . This event is being reported as an operation prohibited by the Technical Specifications pursuant 10CFR50. 73 (a) (2) (1) (B) .

INVESTIGATION The Maintenance Work Order Request (MWOR) for installation.of the new seal was reviewed. It was determined that STP-057-3704 was originally listed on the MWOR as one of the required operability tests following replacement of the seal. This surveillance was inadvertent 1/ deleted and replaced on the MWOR by the airlock seal accumulator surveillance

- test (STF-057-5203). Maintenance personnel should not have changed the STPs. The root cause for not performing STP-057-3704 is personnel error.

CORRECTIVE ACTION The corrective maintenance procedure (CMP)-9249, " Personnel Air Locks Door Seal Replacement", was revised auch that required testing is specified in the acceptance criteria determination section for the procedure. This procedure change included reference to all three tests, " Drop Test", " Airlock Seals Accumulator Test", and " Personnel Air Locks Door Seal Replacement Test", and as such assures that all required testing will be performed in the future.

In reviewing earlier LERs involving missed STPs performed for operability purposes and that were caused by personnel error, no earlier LERs were identified which involved MWOR document changes; nor were any identified which involved airlock door seal replacement.

Corrective action taken on other missed STP LERs involving personnel error would not have prevented occurrence of this event.

SAFETY ASSESSMENT STP-057-3704 was satisfactorily performed on 3/15/89 as a normal surveillance at the start of the second refueling outage. Since no i additional maintenance was performed on the airlock between 2/5/89 and 3/15/89, the overall leak rate would have been found to be satisfactory on 2/5/89, had Lne STP been performed on that date.

E During this period, no actual event occurred which would have l challenged the system. As such, the health and safety of the public l was not significantly affected by this event.

.a c . .. m. .u s o o w oen n. de

$ 431

i wac pe J au6a - u. eveter.a tarv6ttoav conomission

,. .' UCENSEE EVENT REPORT (LER) TEXT CONTINUATION anaovao ov. =o mo-oio.

ta me. e v m pactatTV esaaet at . occast asuesten ta' 4 8 8 = Wh.De n 4.s taot tai

"*a I

" $1.10. @#.Y RIVER BEND STATION o ls lo lo lc 141518 Bl9 -

0l319 -

01 0 01 3 0F 0l3 van .. . = % an.w nn -

NOTE: Energy Industry Identification System Codes are identified in i the text as (*XX*).

l

+

n 4

L

{

i r

t

- . u . o.o . ... . .. . 3. . ..

p ,,.3

- - . . _ . - . . .- . . . - _ - _ . - . . - - . - . _ - - . - _ . .. .-