RBG-45028, Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With
ML20195E824
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/31/1999
From: King R, Williamson D
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RBF1-99-0184, RBF1-99-184, RBG-45028, NUDOCS 9906140108
Download: ML20195E824 (4)


Text

.

, EntIrgy operttions, Inc.

River Bend Station y 5485 U S Highway 61 P O. Box 220

, y St Francisville. LA 70775 Tel 225 336 6225 Fax 225 635 50G8 Rick J. King

  • . Owector Nuclear Safety & Regulatory Affairs i

June 8,1999 U. S. Nuclear Regulatory Commission i ATTN: Document Control Desk l Washington, D. C. 20555

Subject:

River Bend Station- Unit 1 Docket No. 50-458 -

Monthly Operating Report File No.: G9.5, G4.25 RBG-45028 RBF1-99-0184 Ladies and Gentlemen:

In accordance with River Bend Station Technical Specification 5.6.4, enclosed is the Monthly Operating Report for May 1999.

Sincerely, RJK/dhw I enclosure

\ .

s- /

{&h Y y' g PDR ADOCK 05000458 '

R PDR ;_

L

Monthly Operating Report June 8,1999 RBG-45028 -

RBF1-99-0184'

' Page 2 of 2 i

cc: U. S. Nuclear Regulatory Commission Region IV -

611 Ryan Plaza Drive, Suite 400 Arlington,TX 76011 NRC Senior Resident Inspector P. O. Box 1050 - l St.Francisville,LA 70775 INPO Records Center

- 700 Galleria Parkway i Atlanta, GA 30339-3064 1 Mr. Jim Calloway Public Utility Commission of Texas

1701 N. Congress Ave.

Austin, TX 78711-3326  !

Dottie Sherman  !

American NuclearInsurers 29 South Main Street.

West Hartford, CT 06107 i

l l

l r<

f i l

U DOCKET NO. 50/458 RIVER BEND STATION

. DATE June 8,1999 COMPLETED BY Danny H. Williamson TITLE Sr. Licensing Specialist TELEPHONE 225-381-4279 PAGE 1 OF 2 1

OPERATING STATUS

1. REPORTING PERIOD: May 1999
2. MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 936 3, DESIGN ELECTRICAL RATING (MWe-Net): 936 MONTH YEAR TO CUMULATIVE DATE
4. NUMBER OF HOURS REACTOR WAS CRITICAL 0 2208.0 90918.4
5. HOURS GENERATOR ON LINE O 2208.0 87578.2
6. UNIT RESERVE SHUTDOWN HOURS 0 0 0
7. NET ELECTRICAL ENERGY GENERATED (MWH) 0 1,796,099 76,519,414

, v o'

)

PAGE 2 OF 2 UNIT SHUTDOWNS {

l I

SHUTDOWN CAUSE/ l NUMBER DATE TYPE DURATION METHOD REASON CORRECTIVE ACTIONS )

99-01 Outage was S 294.5 hrs. 2 C Refueling outage no. 8 j in progress at beginning ofmonth, and ended on 5/13/99 at 0630.

99-02 Outage F 449.5 hrs. 5 H Declared end of refueling started (Unit was (Forced outage no. 8 and entered forced 5/13/99 at already shut outage outage to investigate fuel 0630,and down when entered to assembly corrosion.

still was in outage was investigate progress at entered.) fuel month's assembly end. corrosion.)

LECEND:

TYPE: F Forced SIIUTDOWN METilOD: I - Manual REASON: A - Equipment failure (explain)

S - Scheduled 2 Manualtrip/seram B Maintenance or Test 3- Automatie trip /scrain C - Refueling 4 Continuation D Regulatory restriction 5 Other(czplain) E- Operator training / License eram F Administrative ,

G Operationalerror(etplain) '

II Other(explain)

NOTES:

1. No challenges to the reactor safety-relief valves occurred in May, m th & -J -

Danny H. Williamson I