Final Deficiency Rept Re Expansion Anchors for Conduit Hangers,Instrument Process Tubing & Air Supply Supports, Initially Reported on 800804.Constructor Work Plan Procedure Revised to Require Certification of Installers
ML20010G605
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 09/03/1981
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, AECM-81-217, NUDOCS 8109220298
Download: ML20010G605 (4)


Text

. -.

O MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi hilbibblidd5 P. O. B O X 164 0. J AC K S O N, MIS SIS SIP PI 3 9 2 05 YssrYNsE*,/r* September 3,1981 Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N.W.

Suite 3100 Atlanta, Caorgia 30303 Attentiva: Mr. J. P. O'Reilly, Director

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Statio 4,g M n- ,

l'aits 1 and 2 N- .g Docket Nos. 50-416/41 O c -

File 0260/15525/1552 N [f[ f b//,^ '7 PRD-80/46, Final Re Expansion Anchors t, SEP2 2 I AECM-81/217 -

u, s, s. OO I m-

,s- co%3 uj %,

References:

1) AECM-80/205, 9/3/80 \ ,
  1. ,f
2) AECM-80/282, 11/11/80 g/ <= i g Q,k
3) AECM-81/99, 3/10/81 On August 4,1980, Mississippi Potter & Light Company notified Mr. C. R.

McFarland, of your office, of a Potentially Reportable Deficiency (PRD) at the Grand Gulf Nuclear Station (GGNS) construction site. The deficiency concerns installation of expansion anchors for conduit hangers, instrument process tubing, and air supply supports without proper approvel.

We have determined that this deficiency is not reportable under 10CFR50.55(e). Our final report is attached.

Yo9rs truly,

//

EWC:dr I O ATTACHMENT cc: See page 2  !

8109220298 810903 PDR ADOCh 05000416 PDR S

Member Middle South Utilities System

Attcchment to AECM-81/217 Pag 2 1 of 1 FINAL REPORT TO PRD-80/46 1- I. Description of Deficiency Expansion anchors for conduit hangers, instrument process tubing, and air supply supports have been installed without prior engineering approval, as required by the specification. The scope of the deficiency has been expanded to include instrumentation, pipe hangers, electrical, electrical hangers, and General Mechanical' Corporation, a subcontractor for HVAC ductwork.

11, Analysis of Safety Implientions 1

Our Architect / Engineer performed calculatious to determine the adequacy of the structural integrity of the columns and of the local ef fects to the attachments. The evaluation resulted in the conclusion that, had the conditions remained uncorrected, they would not have af fected the safe operation of the nuclear plant.

III. Corrective Actions-Taken An investigation to determine the location of all concrete expansion anchors which have been installed in restricted areas has been completed, the nonconformances documented and engineering disposition _ obtained.

The Constructor's Work Plan Procedure, " Installation, Inspection, and Documentation for Concrete Expansion Anchors", has-been revised to require certification of all installers of expansion anchors. This certification signifies the installers have completed training and testing on installation of expansion anchors.

Retraining has been conducted for all craf tsmen, non-manual personnel, and field engineers involved with the installation of expansion j anchore. The retraining program includes the requirements of the Work

[ Plan Procedure and the restricted areas defined by the Specification.

Corrective actions are tracked by our Constructor's Management Corrective

! Action Request (MCAR)-94.

I l'

l e

I I

l I

l Mr. J. P. O'Reilly AECM-81/217 NRC- Page 2 cc: Mr. N. L. Stampley Mr. R. B. McGehee l Mr. T. B. Conner Mr. Victor Stello, Director Of fice of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. G. B. Taylor South Miss. Electric Power Association P. O. Box 1589 Hattiesburg, MS 39401 L

t h

l l

r t

5 s

L 9

i

(

I-l w ~-

wy-^wy . * "-Q K4 9- g-- 9+--1e-p ey g- --- g W ge 9 y eyp,ywg,--r*%gy y vg qmyy-yyq y w gp--- w-q w - 99e-g pi-y q g-9 w M -qyyy-py e p v y vyWww- a v y-w,-oe--yq<+-m-ygt -j y , 79-

. . , i

. . y bbc: Mr. D. C. Lutken Mr. J. Leatherman Dr. D. C. Gibbs Manager of BWR-6 Licensing  ;

Mr. J. N. Ward General Electric Company

  • Mr. J. P. McGaughy, Jr. 175 Curtner Avenue Mr. J. D. Heaton San Jose, CA. 95125. .,

Mr. R. Trickovic. j Mr. J. W. Yelverton Mr. L. F. Dale Mr. D. M. Houston Mr. C. K. McCoy U. S. Nuclear Regulatory Commission Mr. T. H. Cloninger Division of Licensing Mr.-R. A. Ambrosino Washington, D. C. 20555 Mr. A. J. Iosue Mr. G. B. Rogers Mr. S. H. Hobbs Mr. J.- Matore .

Mr. L. E. Ruhland U. S. Nuclear Regulatory Commission Mr. D. L. Hunt Division of Licensing Mr. A. G. Wagner Washington, D. C. 20555 Mr. P. A. Taylor PRD File File ,

i I

\

t i, .

i i

k t

.e *