ML20004D146

From kanterella
Jump to navigation Jump to search
Final Deficiency Rept,Also Reportable Per Part 21,re Discrepancies in Design Documentation for Power Generation Control Complex Panels & Hardware,Initially Submitted 790223.GE Corrections Completed in Mar 1981
ML20004D146
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 05/29/1981
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, AECM-81-163, NUDOCS 8106080467
Download: ML20004D146 (4)


Text

,,..:.

'b ^:

MISSISSIPPI POWER & LIGHT COMPANY l A Helping Build Mississippi l

EnWhWnes P. O. B O X 16 4 0. J A C K S O N, MIS SIS SI P PI 3 9 2 0 5 l

JAMES P. McGAUcHY, JR.

.msvaar vica eans.co.r May 29, 1981

}b Office of Inspection & Enforcement Q\ l y U. u. Nuclear Regulatory Commission  ! ' Dg, Region II ,p UJ D" 101 Marietta Street, N.W. ,2 Suite 3100 S JUN 051981m vd Atlanta, Georgia 30303 h N/,"w"^!"88 j[,7 Attention: Mr. J. P. O'Reilly, Director f

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416/417 File 0260/15525/15526 ERD-79/05, 10CFR50.55(e) & Part 21 Final Report, Improper Drawings AECM-81/163

References:

1) AEdi-79/27, 3/27/79 -
2) AECM-79/55, 5/29/79 .
3) AECM-79/97, 8/31/79
4) AECM-79/134, 11/30/79 '
5) AECM-80/21, 1/16/80
6) AECM-80/62, 3/31/80
7) AECM-80/218, 9/15/80 -
8) AECM-80/317, 12/30/80
9) AECM-81/118, 3/24/81 f

On February 23, 1979, Mississippi Power & Light Company notified Mr. W.

B. Kenna, of your office, of a Potentially Reportable Deficiency (PRD) at the Grand Gulf Nuclear Station (GGNS) co.,ctruction site. The deficiency concerns discrepancies in the design documentation for the Power Generation Control Complex (PGCC) panels and its asociated delivered hardware.

Our investigation into this matter has determined that it is reportable under 10CFR50.55(e) and Part 21. Mr. Virgil Brownlee of your office was contacted May 29, 1981, and formally notified of the reportability status of this deficiency. Our final report on this matter is attached.

An extension for the submittal of this 10CFR50.55(e) report (originally scheduled for 5/21/81) was obtained from Mr. Art Johnson of your of fice until 5/29/81.

-cf/'T 6>/

b Member Middie south utilities System O '/p 8106oso$7

. Mr. J. P. O'Reilly AECM-81/163 NRC Page 2 Yours trul' ,

f -

1

g J. P. McCaughy, Jr.

Attachment l

cc: Mr. N. L. Staapley Mr. R. B. McGehee Mr. T. B. Conner-Mr. Victor Stello, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. G. B. Taylor South Miss. Electric Power Association P. O. Box 1589 Hattiesburg, MS 39401 l

E O

O I

l i

i l

l l

_ - - _ ~ , _ _ , , . . - . , . . - _ . . _ _ . ~_ - . _ _ _ . . - , _ - . _ , .. _.

F Attachment to AECM-81/163 Page 1 of 2 FINAL REPORT FOR PRD-79/05 REPORTABLE UNDER 10CFR50.55(e) and 10CFR PART 21

1. Name and addrass of the individual... informing the commission:

-T. E. Reaves, Jr.  !

Manager of Quality Assurance r P.O. Box 1640 >

Jackson, Mississippi 39205 l t

2. Identification of the f tility..

. .which. . .contains a defect:

Grand Gulf Faclear Station (CGNS) Unit 1  ;

Port Gibson, Mississippi 39150 3 Identification of the firm... supplying the basic component which...contains a defect:  !

The General Electric Company Nuclear Energy Business Group 175 Curtner Ave. I San Jose, California 95125

4. Nature of the defect...and the safety hazard which...could be created by such defect...: .

A. Description of the Deficiency A deficiency was discovered in the Power Generation Control complex  !

(PGCC) panels, in that the "as shipped" panels do not match the "as shipped" drawings. The PGCC panels were supplied by the General Electric Company. This deficiency applied to Unit 1 only.

i B. Analysis of Safety Implications Based on the generic nature of the deficiency, significant degradation of the PGCC to control plant operations could have resulted, thereby adversely affecting the safety of operations of the plar.. .

In that the NC'S vendor had to: conduct an extensive evaluation to

-determine el + ts-built condition of the panels shipped to GGNS site; establish new design document control measures; and incorporate extensive design changes, MP&L feels that this deficiency meets the reportability requirements of 10CFR50.55(e)(1)(iii) and Part 21.

It should be noted that General Electric does not agree with our ,

de te rmination.

,,.,ye, ,.. - - . . .,, -.--- n -.- - ,,,, -

n -n - -e-- ,, .,a --y-. , - , , , , - -

~

u,, -

C Attachmment to AECM 81/163 Page 2 of 2

5. The date on which the information of such defect...was obtained:

T:e deficiency was originally identified and reported to Mr. W. B. Kenna, Nuclear Regulatory Commission, as a Potentially Reportable Deficiency on February 23, 1979. Since that date, MP&L has filed nine(9) status reports to inform the Commission of the progress and status of this deficiency.

An evaluation for Part 21 has been compic.ted and the MP&L " Responsible Officer" Mr. J. P. McGaughy, Jr., will be notified when he returns to his office.

6. In the case of the basic component...the number and location of all such Components...:

Our knowledge of this deficiency is limited to GGNS Unit 1. The deficiency was identified and corrected prior to delivery of GGNS Unit 2 components.

7. The corrective action which has been taken. ...the name of the individual... responsible for the action; snd the length of time that has been....taken to complete the action.

A. Corrective Actions Taken The delivered hardware was compared to design documentation, and discrepancies were corrected through the NSSS vendor's Field Deviation Disposition Request (FDDR) procedure. Actions to prevent recurrence were taken by the NSSS vendor to incorporate checklists in the design records file, change the drawing control procedures, and change the inspection instructions. Additionally, MP&L will confirm the functional adequacy of the circuitry during pre-operational and startup testing.

B. Responsible Individual G. B. Rogers , Jr.

Site Manager Mississippi Power & Light Company C. Length of Time The problem was identified in February,1979. All corrective actions performed by General Electric were verified as being complete in-March, 1981. MP&L will continue to confirm the functional adequacy of the circuitry during pre-operational and startup testing.

8. Any advice related to the defect...that has been, is being, or will be given to purchasers or licensees:

As the deficiency did not originate with MP&L, we have no advice to of fer.