Interim Deficiency Rept Re Klockner-Moeller Supplied Starter/Breaker plug-in Drawers Not Seismically Qualified, Initially Reported 810227.Investigation Is Continuing.Final Rept Expected by 810601
ML19350C711
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 03/30/1981
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, AECM-81-120, NUDOCS 8104060630
Download: ML19350C711 (4)


Text

' *

, :. (

~ ~

72t ~~7 i MISSISSIPPI POWER & LIGHT COMPANY Helpsng Build Mississippi Emammammad P. O. B O X 16 40. J A C K S O N, MI S SI S SIP PI 39205 JAVES P vcGAUGMv. M "5"" " "5 " March 30, 1981 Pt aq Office of Inspection & Enforce =ent U. S. Nuclear Regulatory Co==istion s( [, f '

//

Region II / vg/'k , '

101 Marietta Street, N.W.

Q /,PTTO 31981 =]4 Suite 3100 $

Atlanta, Georgia 30303 d,i v.s. iaun no.s4 en wucu

~'

~

Attention: Mr. J. P. O'Reilly, Dire,: tor '{ .'\ x. y ,,

, j^

Dear Mr. O'Reilly:

SU3JECr: Grand Gulf Nuclear 3tation Units 1 and 2 Docket Nos. 50-416/417 File 0260/15525/15526 PRD-31/16, Interi Report, Twenty-four Inch Starter Breacer Drawers in MCC's AECM-81/120 On February 27, 1981, Mississippi Power & Light Co=pany notified Mr. P.

A. Taylor, of your office, of a Potentially Reportable Deficiency (PRD) at the Grand Gulf Nuclear Station (GGNS) construction ute. The deficiency concerns the Klockner-Moeller-supplied starter / breaker (24-inch) plug-in drawers installed in the 480-volt Motor Control Centurs (MCC's) not being seis=ically qualified.

This condition has been deter =ined to be reportable under the provisions of 10CFR50.55(e)1(ii). Investigation for reportability under 10CFR21 is continuing.

We expect to provide a final report of this deficiency on ,2r before June 1, 1981.

Yours truly, y J. P. McGaughy, Jr.

FGM:=t Attach =ent [,

cc: See page 2 S

/

ll1 3

, g g Member Middle South Utilities System

MISSISSIPPI POWER & LIGHT COMPANY r

Mr. J. P. O'Reilly AECM-81/120 NRC- Page 2 4

- cc: Mr. N. L. Stampley Mr.-R. B. McGehee Mr. T. B. Conner Mr. Victor Stello, Director Office of. Inspection & Enforcement' U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. G.'B. Taylor South Miss. Electric Power Association P. O. Box 1589 Hattiesburg, MS 39401 I

y s+

4

^ *

,m

Attachment to AECM-81/120 Page 1 of 2 INTERIM REPORT NO. 1 TO PRD-81/16 I. Description of the Deficiency On February 27, 1981, Mississippi Power & Light Company notified the Nuclear Regulatory Commission of a Potentially Reportable Deficiency (PRD) at the Grand Gulf Nuclear Station (GGNS) construction site. The deficiency concerns the Klockner-Moeller-supplied starter / breaker (24-inch) plug-in drawers not being seismically qualified.

The following MCCs in System Z77 are affected:

15B42 (F4) 15B21 (14) 16B 1 (II) 15B61 (E1) 16B61 (D1)

The loss of the MCCs listed above, with the exception of 15B42 (F4),

affects the functioning of the Class IE Switchgear and Battery Room HVAC Systems. This condition further affects all Division 1 and 2 power supplies to all Class IE plant systems.

II. Approach to Resolution of the Problem Klockner-Moeller will replace the 24-inch drawer with a seismically qualified 18-inch drawer. The new size 3, non-reversing starter breaker will be mounted on an 18-inch frame. Associated hardware will include a 6-inch filler plate and a divider partition to convert the original 24-

~

inch space to an 18-inch compartment. The installation will be performed by the constructor in compliance with Klockner-Moeller instructions. This modification will comply with seismic qualification requirements.

Corrective actions on this deficiency were originally being tracked pr QAR-F-293. "This QAR has been closed and elevated to tracking by MCAR-114. MCC 15B42 (F4) continues to be tracked per MCAR-101.

III. Status of the Proposed Resolution

' The 18-inch drawers are on site to replace the 24-inch drawers. In order to-conduct replacement of these components, de-energization of the syatem:is-required. Evaluation is being made as to the most desirable time to accomplish this.

~

IV. Reason Why A Final Report'Will Be Delayed Investigation is continuing into the reportability under 10CFR21.

a

=

f v &'

Attachment to AECI-81/120 Page 2 of 2 V. Date When Final Report Will Be Submitted We expect t.o file a final report on this deficiency on or before June 1, 1981.

9 f