Interim Deficiency Rept 9 Re Discrepancies in Design Documentation for Power Generation Control Complex Panels & Hardware,Originally Reported on 800223.Caused by as-shipped Panels Not Matching as-shipped Drawings
ML19350C235
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 03/24/1981
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, AECM-81-118, NUDOCS 8103310663
Download: ML19350C235 (3)


Text

'

J p

C v5C. t _V.

m

/ . MISSISSIPPI POWER & LIGHT COMPANY

'i

. AVES P. McGAUGHY. JR.

^"^"**"""7 Mareh 24, 1 [ -_ -

/ [a. :.

Nq. \ [.

d '\

Grfice of Inspection & Enforcement l .w

' \

U. S. Nuclear Regulatory Cocnission ,D '*

Region II b gg[ Q, 101 Marietta Street, N.W.

ly s ,e, 2 A Qtf. j Suite 3100 g/., o.h*#j j y/

Atlanta, Georgia 3:1303 -

/

/ .4, y .- , ,.. y Attention: Mr. J. P. O'Reilly, Director 'r

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416/417 File 0260/15525/15526 PRD-79/05, Status Report #9, Improper Drawings AECM-81/118

References:

1) AECM-79/27, 3/27/79
2) AECM-79/55, 5/29/79
3) AECM-79/97, 8/31/79
4) AECM-79/134, 11/30/79 5)' AECM-80/21, 1/16/80
6) AECM-80/62, 3/31/80
7) AECM-80/218, 9/15/80
8) AECM-80/317, 12/30/80 On February 23, 1980, Missii;sippi Power & Light Con:pany notified Mr. W.

B. Kenna, of your office, of a Potentially Reportable Deficiency (PRD) at the Grand Gulf Nuclear Station (GGNS) construction site. The deficiency concerns discrepancies in the design documentation for the Power Generation Control Complex (PGCC) panels and its associated delivered hardware.

Our investigation on this matter is continuing. A status report on this matter is attached. We expect to provide you our final evaluation of this

! deficiency by May 21, 1981.

Yours truly,

/ J. P. McGaughy, Jr.

EWC:st Attachri.ent cc: See page 2 f[

3 810 3 310 66J Member Middle South Utilities System

o D

Attachment to AECM-81/118 Page 1 of 1 STATUS REPORT t'O. 9 TO PRD-79/05 I. Description of the Deficiency A deficiency was discovered in t'.e Power Generation Control Complex (PGCC) panels, in tha* the "as shipped" panels do not match the "as shipped" drawings. The PGCC ranels were supplied by the General Electric Company. Thir defic .ency applied to Unit 1 only.

II. Approach to Resolution of the Problem The delivered hardware was compared to design documentation, and discrepancies were corrected through the NSSS vendor's Field Deviation Disposition Request (FDDR) procedure. Actions to prevent recurrence were taken by the NSSS vendor to incorporate checklists in the design records file, change the drawing control procedures, and change the

' inspection instructions.

III. Status of Proposed Resolution The NSSS vendor has cocpleted their corrective actions. Our Constructor issued an audit item on the actions to prevent recurrence during an audit in 9/80. This item was not closed out until an audit in February, 1981.

IV. Reason Why A Final Report Will Be Delayed MP&L has t:ot yet determined whether we agree with GE's determination that this item is not reportable under 10CFR50.55(e). We are presently evaluating the deficiency to determine whether this deficiency, had it remained uncorrected, could have affected the safe operation of the plant.

'V. Date When A Final Report Will Be Submitted We expect to submit our final report on this matter by May 21, 1981.

.